Residential solar companies need tight coordination between field crews, local inspectors, and support staff. This Service Cloud template centralizes system specs, permit tracking, and customer inquiries, enabling support teams to resolve issues faster. Experience reduced scheduling delays, accurate hardware tracking, and improved post-installation support.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
☀️ Service Console
Centralized dashboard for issue triage.A Accounts
Manage households and solar owners.C Contacts
Track customers and primary contacts.C Cases
Log hardware faults and inquiries.I Installations
Track roof and ground mount progress.S Systems
Monitor inverter and panel details.P Permits
Track local municipality approvals.INTERACTIVE TEMPLATE BELOW
C Case Details
Case Number
Subject
Inverter Disconnected from Wi-Fi
Status
In Progress
Priority
High
Category
Connectivity
C Contact Details
Feed
PostEmailLog a CallChange Status
Case Updates ▼
TS
Tech Support changed status • 5m ago
Changed Status from New to In Progress.
TS
Tech Support logged a call • 12m ago
Spoke with Michael. Walked him through restarting the inverter box. Lights are blinking green but still no data in the app.
MC
Michael Chang (Email) • 1h ago
Hi, my solar app has not shown any production data since yesterday evening. I reset my home router but it didn't fix it.
SYS
System Alerts created a note • 12h ago
Automated Alert: Inverter INV-9902 stopped reporting telemetry. Ping attempts failed.
DR
Dispatch Routing updated Case • 1d ago
System assigned to Tier 1 Connectivity Queue.
A
Accounts
| Household Name | Dwelling Type | Primary Contact | Phone | Status |
|---|---|---|---|---|
| Chang Residence | Single Family | Michael Chang | (555) 349-8821 | Active |
| Rodriguez Home | Townhouse | Maria Rodriguez | (555) 441-2093 | Active |
| Peterson Estate | Single Family | John Peterson | (555) 882-9912 | Pending Install |
| Greenway Offices | Commercial | Sarah Jenkins | (555) 201-9988 | Active |
| O'Connor Residence | Single Family | Liam O'Connor | (555) 773-4411 | Active |
| Valley Farms | Agricultural | Danielle Smith | (555) 662-8819 | Active |
A
Account
Chang Residence
Details
Contacts
Cases
Installations
Systems
Permits
Notes
Files
Primary Details
Account NameChang Residence✎
OwnerSales Team✎
Created DateMar 12, 2024✎
Created BySystem✎
Last Mod DateSep 02, 2025✎
Last Mod ByTech Support✎
DescriptionStandard 8.5kW roof array with battery.✎
Primary Phone(555) 349-8821✎
Alt Phone(555) 201-4433✎
StatusActive✎
Dwelling TypeSingle Family✎
Roof TypeComposite Shingle✎
Utility ProviderPacific Gas & Electric✎
Payment MethodACH Direct✎
LanguageEnglish✎
Customer TierStandard✎
Address & Operations Info
Record TypeResidential Solar✎
Last ActivitySep 02, 2025✎
Sys ModstampSep 02, 2025✎
Billing Street405 Sunbeam Way✎
Billing CitySan Jose✎
Zip Code95123✎
Financing PartnerSunRun Finance✎
Internet StatusWi-Fi Connected✎
HOA StatusApproved✎
Contacts (6)
| Name | Role | Phone | Status | |
|---|---|---|---|---|
| Michael Chang | Homeowner | (555) 349-8821 | [email protected] | Active |
| Lisa Chang | Co-Owner | (555) 349-8822 | [email protected] | Active |
| Bob Jenkins | HOA President | (555) 111-2222 | [email protected] | Active |
| City Inspector | Inspector | (555) 999-0000 | [email protected] | Active |
| David Ross | Crew Lead | (555) 444-5555 | [email protected] | Active |
| Sam Smith | Sales Rep | (555) 777-8888 | [email protected] | Active |
Cases (6)
| Case Number | Subject | Category | Status | Priority |
|---|---|---|---|---|
| CAS-8092 | Inverter Disconnected | Connectivity | In Progress | High |
| CAS-8011 | Broken Roof Tile | Damage Claim | Closed | Medium |
| CAS-7734 | App Login Issue | Software | Closed | Low |
| CAS-7621 | PTO Delay Query | Permitting | Closed | Medium |
| CAS-7500 | Battery Setup Request | Inquiry | Closed | Low |
| CAS-7201 | Sales Consultation | Sales | Closed | Low |
Installations (6)
| Installation ID | Type | Array Size | Crew Lead | Status |
|---|---|---|---|---|
| INST-2041 | Roof Mount | 8.5 kW | David Ross | Completed |
| INST-2101 | Battery Add-on | 13.5 kWh | Sarah Crew | Completed |
| INST-2250 | EV Charger | Level 2 | Mike Install | Scheduled |
| INST-1800 | Main Panel Upgrade | 200A | Electric Team | Completed |
| INST-1750 | Site Survey | N/A | Survey Team | Completed |
| INST-1700 | Roof Assessment | N/A | Roofing Team | Completed |
Solar Systems (6)
Permits (6)
| Permit Number | Municipality | Status | Submission Date | Approval Date |
|---|---|---|---|---|
| PRM-5501 | San Jose | Approved | Apr 02, 2024 | May 10, 2024 |
| PRM-5502 | San Jose | Approved | Apr 05, 2024 | May 15, 2024 |
| PRM-5503 | Santa Clara | Pending | Aug 01, 2025 | N/A |
| PRM-5504 | Sunnyvale | Approved | Feb 12, 2024 | Mar 01, 2024 |
| PRM-5505 | Cupertino | Rejected | Jan 10, 2024 | N/A |
| PRM-5506 | Milpitas | Approved | Nov 05, 2023 | Dec 10, 2023 |
Gate Code
Gate code is 4321. Beware of friendly golden retriever in back yard.
Site Survey • Feb 10
HOA Guidelines
HOA mandates panels cannot be visible from the street if possible. Array placed on south/west planes only.
Design Team • Mar 01
Financing Approved
SunRun approved 15-year PPA contract. Docs signed.
Sales • Mar 15
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Final_Design_CAD.pdf | 4.1 MB | |
| Interconnection_Agreement.pdf | 1.5 MB | |
| HOA_Approval_Letter.pdf | 0.6 MB |
C
Contacts
| Name | Account Name | Role | Phone | Status |
|---|---|---|---|---|
| Michael Chang | Chang Residence | Homeowner | (555) 349-8821 | Active |
| Maria Rodriguez | Rodriguez Home | Homeowner | (555) 441-2093 | Active |
| David Ross | SolarCorp Installers | Crew Lead | (555) 444-5555 | Active |
| City Inspector | San Jose Govt | Inspector | (555) 999-0000 | Active |
| Sarah Jenkins | Greenway Offices | Property Manager | (555) 201-9988 | Active |
| Bob Jenkins | Sunnyvale HOA | HOA President | (555) 111-2222 | Active |
C
Contact
Michael Chang
Details
Notes
Files
Primary Details
Contact NameMichael Chang✎
OwnerSales Team✎
Created DateMar 12, 2024✎
Created BySystem✎
Last Mod DateSep 02, 2025✎
Last Mod ByTech Support✎
DescriptionPrimary signer for PPA.✎
Mobile Phone(555) 349-8821✎
RoleHomeowner✎
StatusActive✎
Preferred CommEmail✎
LanguageEnglish✎
Portal AccessActive✎
Credit Score TierExcellent (750+)✎
Customer Rating5 Stars✎
Additional Information
Record TypeCustomer✎
Last ActivitySep 02, 2025✎
Sys ModstampSep 02, 2025✎
Home Phone(555) 201-4433✎
EmployerTech Systems Inc✎
Pref Contact NameMike✎
Gate Code4321✎
ID VerifiedYes✎
Mobile CarrierAT&T✎
Consent StatusFull Opt-In✎
Prefers Texting
Michael prefers text message updates for arrival times instead of phone calls.
Install Team • May 10
Credit Approval
Tier 1 credit approved instantly for PPA.
Sales • Mar 15
App Training
Walked through the solar monitoring app. Showed how to track daily kilowatt production.
Tech Support • Jun 16
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Utility_Bill_Copy.pdf | 1.1 MB | |
| Driver_License_Copy.jpg | Image | 2.0 MB |
| Credit_Auth_Form.pdf | 0.5 MB |
C
Cases
| Case Number | Subject | Category | Status | Priority |
|---|---|---|---|---|
| CAS-8092 | Inverter Disconnected | Connectivity | In Progress | High |
| CAS-8011 | Broken Roof Tile | Damage Claim | Closed | Medium |
| CAS-7734 | App Login Issue | Software | Closed | Low |
| CAS-7621 | PTO Delay Query | Permitting | Closed | Medium |
| CAS-7500 | Battery Setup Request | Inquiry | Closed | Low |
| CAS-7201 | Sales Consultation | Sales | Closed | Low |
C
Case
CAS-8092: Inverter Disconnected from Wi-Fi
New
In Progress
Dispatch
Resolved
Details
Notes
Files
Primary Details
Case NumberCAS-8092✎
OwnerTech Support✎
Created DateSep 01, 2025✎
Created BySystem Alerts✎
Last Mod DateSep 02, 2025✎
Last Mod ByTech Support✎
DescriptionInverter went offline from monitoring portal.✎
SubjectInverter Disconnected from Wi-Fi✎
StatusIn Progress✎
PriorityHigh✎
CategoryConnectivity✎
Warranty StatusUnder Warranty✎
Remote DiagnosticFailed✎
Dispatch RequiredTBD✎
Escalation TierTier 1✎
Technical Details
Record TypeTechnical Support✎
Last ActivitySep 02, 2025✎
Sys ModstampSep 02, 2025✎
External RefSolarEdge Portal✎
Error CodeCOMM_ERR_30✎
Incident DateSep 01, 2025✎
Incident Time18:45✎
Weather ConditionClear✎
Resolution StageTroubleshooting✎
Root CausePending✎
Automated Telemetry Alert
Inverter ceased communication. Last ping was at 18:45 yesterday. Production data missing.
System Alerts • Sep 01
Customer Troubleshooting
Customer states he changed his home Wi-Fi password yesterday morning. Walked through pairing process but the inverter LCD screen is unreadable.
Tech Support • Sep 02
Dispatch Requested
Since the LCD screen on the SE7600H is blank, we may need a field tech to hardwire or replace the comms board.
Tech Support • Sep 02
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Error_Log_Extract.csv | CSV | 0.1 MB |
| Inverter_Photo_Customer.jpg | Image | 1.4 MB |
| SolarEdge_Reset_Guide.pdf | 0.6 MB |
I
Installations
| Installation ID | Type | Array Size | Crew Lead | Status |
|---|---|---|---|---|
| INST-2041 | Roof Mount | 8.5 kW | David Ross | Completed |
| INST-2101 | Battery Add-on | 13.5 kWh | Sarah Crew | Completed |
| INST-2250 | EV Charger | Level 2 | Mike Install | Scheduled |
| INST-1800 | Main Panel Upgrade | 200A | Electric Team | Completed |
| INST-1750 | Site Survey | N/A | Survey Team | Completed |
| INST-1700 | Roof Assessment | N/A | Roofing Team | Completed |
I
Installation
INST-2041
Details
Notes
Files
Primary Details
Installation IDINST-2041✎
OwnerOperations Desk✎
Created DateMay 10, 2024✎
Created BySystem✎
Last Mod DateJun 16, 2024✎
Last Mod ByDavid Ross✎
DescriptionStandard 25 panel roof array.✎
Array Size (kW)8.5 kW✎
StatusCompleted✎
Installation TypeRoof Mount✎
Roof PitchStandard (4:12-7:12)✎
Mounting HardwareIronRidge✎
Weather DelayNone✎
Safety InspectionPassed✎
Grid Tie StatusLive (PTO Granted)✎
Scheduling & Metrics
Record TypeSolar Install✎
Last ActivityJun 16, 2024✎
Sys ModstampJun 16, 2024✎
Expected Yield12,500 kWh/yr✎
Install Address405 Sunbeam Way, San Jose✎
Interconnection DateJun 15, 2024✎
Crew Lead NameDavid Ross✎
Target DateMay 20, 2024✎
Completion PhaseCommissioned✎
Equipment StagingDelivered✎
Inspector StatusSigned Off✎
Installation Complete
All panels mounted and wired. System powered on for test, voltages nominal. Left off pending PTO.
David Ross • May 20
Conduit Routing
Customer requested painted conduit to match house exterior. Applied stucco-matching paint.
Electric Team • May 20
PTO Granted
Utility company issued Permission to Operate. System turned on.
Admin • Jun 15
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Roof_Photos_Pre.jpg | Image | 4.1 MB |
| Installation_Signoff.pdf | 0.5 MB | |
| Final_Array_Drone.jpg | Image | 6.2 MB |
S
Solar Systems
S
Solar System
SYS-8821
Details
Notes
Files
Primary Details
System IDSYS-8821✎
OwnerSupport Team✎
Created DateJun 15, 2024✎
Created BySystem✎
Last Mod DateSep 01, 2025✎
Last Mod BySystem Alerts✎
DescriptionSunPower 8.5kW + SolarEdge Inverter.✎
Panel BrandSunPower✎
Operating StatusWarning✎
Phase TypeSingle Phase✎
Connection TypeString Inverter✎
Battery BackupYes✎
Panel Warranty25 Year✎
Inverter Warranty12 Year✎
Performance Guarantee90% Year 25✎
Hardware Details
Record TypeHardware Asset✎
Last ActivitySep 01, 2025✎
Sys ModstampSep 01, 2025✎
Inverter ModelSolarEdge SE7600H✎
Battery Capacity13.5 kWh✎
Serial NumberSN-SE99332211✎
MAC Address00:1A:2B:3C:4D:5E✎
Optimizer Count25✎
Telemetry StatusDisconnected✎
Grid ConnectionNet Metering✎
Monitoring PortalSolarEdge✎
Connection Loss
Inverter lost connection to the portal on Sep 1 at 18:45. Flagged as Warning.
System Alerts • Sep 01
Battery Profile
Battery set to Time of Use (TOU) backup mode. Discharges primarily between 4PM-9PM.
Tech Support • Jun 16
System Mapping
Physical layout mapped in SolarEdge portal. 2 strings of 12 and 13.
Commissioning • Jun 15
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| String_Map_Layout.pdf | 1.2 MB | |
| Inverter_Serial_Pic.jpg | Image | 3.1 MB |
| Battery_Config.txt | Text | 0.1 MB |
P
Permits
P
Permit
PRM-5501
Details
Notes
Files
Primary Details
Permit NumberPRM-5501✎
OwnerPermit Dept✎
Created DateMar 18, 2024✎
Created BySystem✎
Last Mod DateMay 10, 2024✎
Last Mod ByAdmin✎
DescriptionCity solar building permit.✎
MunicipalitySan Jose✎
StatusApproved✎
Permit TypeBuilding/Electrical✎
Jurisdiction LevelCity✎
HOA ApprovalRequired✎
Engineering StampIncluded✎
Environmental ReviewN/A✎
Fee Payment StatusPaid✎
Timeline & Details
Record TypeLocal Govt Permit✎
Last ActivityMay 10, 2024✎
Sys ModstampMay 10, 2024✎
Reviewer NameJim Bureau✎
Submission DateApr 02, 2024✎
Approval DateMay 10, 2024✎
Expiration DateNov 10, 2024✎
Permit Cost$450.00✎
Expedited ProcessingNo✎
Inspection RequiredRough & Final✎
Revision StatusNone✎
Approved
City of San Jose approved the electrical and structural plans. Standard 6 month expiration.
Permit Dept • May 10
Clarification Requested
City requested clarification on rafter spacing. Provided updated engineering letter.
Permit Dept • Apr 20
Submitted
Package submitted via the online portal. Paid $450 fee via corporate card.
Permit Dept • Apr 02
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Stamped_Plans_V1.pdf | 8.5 MB | |
| City_Approval_Stamp.pdf | 1.2 MB | |
| Fee_Receipt.pdf | 0.1 MB |
🕒 History
📝 Notes
⚙️ Macros
🟢 Omni-Channel (Online)
