Coordinate concrete pours, masonry repairs, and hardscaping from site prep to final curing. This Service Cloud template centralizes material estimates, crew dispatching, and equipment tracking. Ensure precise concrete yardage, prevent scheduling delays, and handle foundation issues seamlessly for your clients.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
CS Service Console
Centralized dashboard for dispatch.A Accounts
Manage builders and property owners.C Contacts
Track site supers and clients.C Cases
Log warranty claims and cracks.P Projects
Manage active pours and brickwork.E Estimates
Calculate yardage and block counts.E Equipment
Track mixers and scaffolding.INTERACTIVE TEMPLATE BELOW
C Case Details
Case Number
Subject
Foundation Crack Repair
Status
Dispatched
Priority
High
Case Owner
Dispatch Team
C Contact Details
Name
Account
Role
General Contractor
Phone
(555) 123-4567
Email
Feed
PostEmailLog a CallChange Status
Case Updates ▼
DT
Dispatch Team changed status • 10m ago
Changed Status from New to Dispatched.
DT
Dispatch Team assigned technician • 15m ago
Assigned Masonry Tech Dave. ETA is 2 hours. He has the epoxy injection kit loaded.
MS
Mark Stone logged a call • 2h ago
Noticed a hairline structural crack appearing near the north footing on PRJ-801. Need an inspector out here fast before we backfill.
FM
Foreman Mike updated Case • 1d ago
Project PRJ-801 forms were stripped yesterday. Concrete cured well.
SYS
System generated record • 2h ago
Warranty case created. Linked to active Project PRJ-801.
A
Accounts
| Account Name | Client Type | Primary Contact | Phone | Status |
|---|---|---|---|---|
| Stone Construction | Commercial | Mark Stone | (555) 123-4567 | Active |
| Valley Homes | Residential Builder | Laura Valley | (555) 234-5678 | Active |
| City Works Dept | Municipal | Jim Official | (555) 345-6789 | Active |
| Apex Property Mgmt | Property Management | Sarah Jenkins | (555) 456-7890 | Active |
| Johnson Residence | Residential | Mike Johnson | (555) 567-8901 | Active |
| Pioneer Developers | Commercial | Richard Helm | (555) 678-9012 | Active |
A
Account
Stone Construction
Details
Contacts
Cases
Projects
Estimates
Equipment
Notes
Files
Primary Details
Account NameStone Construction✎
OwnerSales Team✎
Created DateJan 10, 2026✎
Created BySystem✎
Last Mod DateAug 06, 2026✎
Last Mod ByAdmin✎
DescriptionTop tier general contractor.✎
StatusActive✎
Client TypeCommercial✎
Payment TermsNet 30✎
Pref CommEmail✎
LanguageEnglish✎
Lead SourceReferral✎
Default Mix4000 PSI✎
Location & Details
Record TypeCommercial Client✎
Last ActivityAug 06, 2026✎
Sys ModstampAug 06, 2026✎
Billing Street123 Stone Blvd✎
CityAustin✎
Zip Code78701✎
Site AccessOpen Access✎
Warranty Tier1-Year Standard✎
Rating5 Stars✎
Primary Phone(555) 123-4567✎
Alt Phone(555) 987-6543✎
Contacts (6)
| Name | Role | Phone | Status | |
|---|---|---|---|---|
| Mark Stone | General Contractor | (555) 123-4567 | [email protected] | Active |
| Bill Foreman | Site Supervisor | (555) 123-4568 | [email protected] | Active |
| Sue Finance | Billing | (555) 123-4569 | [email protected] | Active |
| Tom Inspector | Inspector | (555) 123-4570 | [email protected] | Active |
| Rick Mason | Subcontractor | (555) 123-4571 | [email protected] | Active |
| Jenny Logs | Logistics | (555) 123-4572 | [email protected] | Active |
Cases (6)
| Case Number | Subject | Project Ref | Status | Priority |
|---|---|---|---|---|
| CAS-7001 | Foundation Crack Repair | PRJ-801 | Dispatched | High |
| CAS-7002 | Spalling on Driveway | PRJ-802 | New | Medium |
| CAS-7003 | Mortar Discoloration | PRJ-803 | Closed | Low |
| CAS-7004 | Block Wall Settlement | PRJ-804 | In Progress | High |
| CAS-7005 | Missing Expansion Joint | PRJ-805 | Resolved | Medium |
| CAS-7006 | Late Mix Truck Complaint | PRJ-806 | Closed | Low |
Projects (6)
| Project ID | Project Name | Stage | Primary Material | Foreman |
|---|---|---|---|---|
| PRJ-801 | Riverside Drive Paving | Curing/Waiting | 4000 PSI Concrete | Foreman Mike |
| PRJ-802 | Oak St Foundation | Formwork | 3000 PSI Concrete | Steve Drill |
| PRJ-803 | Main Library Brick Veneer | Finishing | Red Brick | Mark Mason |
| PRJ-804 | Hillside Retaining Wall | Prep Work | CMU Block | Foreman Mike |
| PRJ-805 | Downtown Stamped Patio | Pouring | Stamped/Dyed | Steve Drill |
| PRJ-806 | Plaza Sidewalk Repair | Completed | 4000 PSI Concrete | Mark Mason |
Estimates (6)
| Estimate ID | Estimate Type | Status | Dimensions/Volume | Estimator |
|---|---|---|---|---|
| EST-901 | Concrete Yardage | Approved for Pour | 45 Yards | John Specs |
| EST-902 | Brick Count | Pending Review | 12,000 Bricks | John Specs |
| EST-903 | Rebar Requirements | Approved for Pour | 500 Lft #4 Rebar | Sarah Plans |
| EST-904 | Concrete Yardage | Needs Review | 120 Yards | Mike Tech |
| EST-905 | Block Count | Rejected | 4,500 Blocks | John Specs |
| EST-906 | Finish Prep | Approved for Pour | 2000 SqFt | Sarah Plans |
Equipment (6)
| Equipment ID | Category | Brand/Make | Status | Location |
|---|---|---|---|---|
| EQP-501 | Mixers & Pumps | Putzmeister Boom | Available Inventory | Main Yard |
| EQP-502 | Heavy Machinery | Bobcat Skid Steer | Deployed | Job PRJ-801 |
| EQP-503 | Hand Tools | Marshalltown Trowel | Available Inventory | Tool Crib A |
| EQP-504 | Mixers & Pumps | Multiquip Line Pump | Out for Repair | Shop |
| EQP-505 | Scaffolding | Safway Frame | Deployed | Job PRJ-803 |
| EQP-506 | Heavy Machinery | Cat Excavator | Available Inventory | Main Yard |
Site Access Warning
Heavy trucks must enter through the South Gate. Do not block resident parking.
Dispatch • Feb 14
Billing Note
Client requires lien waivers before releasing retainage.
Billing • Mar 02
Mix Preference
Always wants fiberglass mesh added to flatwork mixes.
Estimating • Jun 15
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Master_Subcontract_Agreement.pdf | 3.1 MB | |
| W9_Form_2026.pdf | 0.5 MB | |
| Certificate_of_Insurance.pdf | 1.2 MB |
C
Contacts
| Name | Account Name | Role | Phone | Status |
|---|---|---|---|---|
| Mark Stone | Stone Construction | General Contractor | (555) 123-4567 | Active |
| Bill Foreman | Stone Construction | Site Supervisor | (555) 123-4568 | Active |
| Sue Finance | Stone Construction | Billing Contact | (555) 123-4569 | Active |
| Tom Inspector | City Works Dept | Inspector | (555) 123-4570 | Active |
| Rick Mason | Stone Construction | Subcontractor | (555) 123-4571 | Active |
| Jenny Logs | Stone Construction | Logistics | (555) 123-4572 | Active |
C
Contact
Mark Stone
Details
Notes
Files
Primary Details
Contact NameMark Stone✎
OwnerSales Team✎
Created DateJan 10, 2026✎
Created BySystem✎
Last Mod DateAug 06, 2026✎
Last Mod BySupport Desk✎
DescriptionOwner of Stone Construction.✎
RoleGeneral Contractor✎
StatusActive✎
Comm PrefMobile Phone✎
LanguageEnglish✎
TimezoneCST✎
Portal AccessActive✎
NewsletterSubscribed✎
Additional Information
Record TypeClient Contact✎
Last ActivityAug 06, 2026✎
Sys ModstampAug 06, 2026✎
Mobile Phone(555) 123-4567✎
Desk PhoneN/A✎
Client Rating5 Stars✎
ID VerifiedYes✎
Consent StatusFull✎
Job Site AddressMultiple✎
Gate CodeN/A✎
Wants Daily Updates
Mark is highly involved and wants a text summary every afternoon during pours.
Foreman Mike • Apr 10
Vacation Notice
Out of town July 1-10. Coordinate with Bill Foreman.
Sales • Jun 25
Mix Consult
Finalized high early strength mix for the upcoming plaza job.
Estimating • May 10
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| ID_Verification.pdf | 1.2 MB | |
| Business_Card.jpg | Image | 0.3 MB |
| Account_Signoff.pdf | 2.0 MB |
C
Cases
| Case Number | Subject | Project Ref | Status | Priority |
|---|---|---|---|---|
| CAS-7001 | Foundation Crack Repair | PRJ-801 | Dispatched | High |
| CAS-7002 | Spalling on Driveway | PRJ-802 | New | Medium |
| CAS-7003 | Mortar Discoloration | PRJ-803 | Closed | Low |
| CAS-7004 | Block Wall Settlement | PRJ-804 | In Progress | High |
| CAS-7005 | Missing Expansion Joint | PRJ-805 | Resolved | Medium |
| CAS-7006 | Late Mix Truck Complaint | PRJ-806 | Closed | Low |
C
Case
CAS-7001: Foundation Crack Repair
New
Triage
Dispatched
Resolved
Details
Notes
Files
Primary Details
Case NumberCAS-7001✎
OwnerDispatch Team✎
Created DateAug 06, 2026✎
Created BySystem✎
Last Mod DateAug 06, 2026✎
Last Mod ByDispatch Team✎
DescriptionFoundation crack observed.✎
StatusDispatched✎
PriorityHigh✎
Issue CategoryWarranty Claim✎
Escalation LevelNone✎
ResolutionPending Response✎
Warranty StatusActive Coverage✎
Defect TypeCracking✎
Incident Specifics
Record TypeService Request✎
Last ActivityAug 06, 2026✎
Sys ModstampAug 06, 2026✎
Caller NameMark Stone✎
Incident DateAug 06, 2026✎
Affected ZoneNorth Footing✎
Site ReadinessReady for Access✎
OriginPhone✎
Triage LevelInspection Needed✎
External RefN/A✎
Technician AssignedMasonry Tech Dave✎
Dispatch Alert
Tech Dave routed. He has the epoxy injection kit loaded. ETA 2 hours.
Dispatch • Aug 06
Client Communication
Told Mark we are sending someone right away to assess before backfill.
Dispatch • Aug 06
Installation Notes
Original pour was during high heat. Possible shrinkage crack. Will verify onsite.
Foreman Mike • Aug 06
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Crack_Photo.jpg | Image | 2.1 MB |
| Original_Pour_Ticket.pdf | 1.5 MB | |
| Warranty_Agreement.pdf | 0.4 MB |
P
Projects
| Project ID | Stage | Project Type | Primary Material | Foreman |
|---|---|---|---|---|
| PRJ-801 | Curing/Waiting | Foundation | 4000 PSI Concrete | Foreman Mike |
| PRJ-802 | Formwork | Flatwork/Driveway | 3000 PSI Concrete | Steve Drill |
| PRJ-803 | Finishing | Brick Veneer | Red Brick | Mark Mason |
| PRJ-804 | Prep Work | Retaining Wall | CMU Block | Foreman Mike |
| PRJ-805 | Pouring | Stamped Concrete | Stamped/Dyed | Steve Drill |
| PRJ-806 | Completed | Repair/Patch | 4000 PSI Concrete | Mark Mason |
P
Project
PRJ-801: Riverside Drive Paving
Design
Prep Work
Formwork
Pouring
Curing/Waiting
Finishing
Details
Notes
Files
Project Overview
Project IDPRJ-801✎
OwnerProduction Dept✎
Created DateJun 01, 2026✎
Created BySales✎
Last Mod DateAug 06, 2026✎
Last Mod ByForeman Mike✎
DescriptionFoundation pour.✎
StageCuring/Waiting✎
Project TypeFoundation✎
Install MethodBoom Pump✎
Primary Material4000 PSI Concrete✎
Finish TypeSmooth Trowel✎
Weather RiskHigh Heat✎
Project StatusOn Schedule✎
Specifications & Assignments
Record TypeInstallation Job✎
Last ActivityAug 06, 2026✎
Sys ModstampAug 06, 2026✎
Site Address123 Stone Blvd✎
Total Square Ft1200 sq ft✎
Budget$15,500✎
Site AccessOpen Access✎
Equipment ReqBoom Pump✎
Payment StatusProgress Payment 1✎
Estimated Days5 Days✎
ForemanForeman Mike✎
Start DateAug 01, 2026✎
Pump Truck Coordination
Make sure boom pump arrives 30 mins before the first ready-mix truck.
Foreman Mike • Jul 15
Curing Alert
High heat warning for pour day. Need curing compound ready immediately after finishing.
Crew Lead • Aug 01
Inspection Signoff
Forms and rebar passed city inspection. Cleared to pour.
Sales • Aug 02
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Rebar_Inspection.pdf | 0.4 MB | |
| Foundation_Plans.pdf | 1.2 MB | |
| Pour_Tickets.zip | Archive | 5.0 MB |
E
Estimates
| Estimate ID | Estimate Type | Status | Dimensions/Volume | Estimator |
|---|---|---|---|---|
| EST-901 | Concrete Yardage | Approved for Pour | 45 Yards | John Specs |
| EST-902 | Brick Count | Pending Review | 12,000 Bricks | John Specs |
| EST-903 | Rebar Requirements | Approved for Pour | 500 Lft #4 Rebar | Sarah Plans |
| EST-904 | Concrete Yardage | Needs Review | 120 Yards | Mike Tech |
| EST-905 | Block Count | Rejected | 4,500 Blocks | John Specs |
| EST-906 | Finish Prep | Approved for Pour | 2000 SqFt | Sarah Plans |
E
Estimate
EST-901
Details
Notes
Files
Estimate Details
Estimate IDEST-901✎
OwnerJohn Specs✎
Created DateJul 12, 2026✎
Created ByJohn Specs✎
Last Mod DateJul 14, 2026✎
Last Mod ByEstimating Manager✎
DescriptionFoundation pour volume.✎
Estimate TypeConcrete Yardage✎
StatusApproved for Pour✎
Accuracy LevelExact (+/- 5%)✎
Rebar Requirements#4 Rebar Grid✎
Concrete Mix4000 PSI✎
Finish PrepSmooth Trowel✎
Site AccessBoom Pump Req✎
Dimensions & Logistics
Record TypeMaterial Takeoff✎
Last ActivityJul 14, 2026✎
Sys ModstampJul 14, 2026✎
Total Yardage45 Yards✎
Brick CountN/A✎
Depth/Thickness6 Inches✎
Weather AdditivesRetarder (Hot Day)✎
Site ReadinessForms Built✎
Re-Measure ReqNo✎
Estimator NameJohn Specs✎
Date TakenJul 12, 2026✎
Floor/ZoneNorth Foundation✎
Overage Allowed
Ordered 45 yards total. Calculated volume is 42.5 yards. +5% overage added for pump waste.
John Specs • Jul 12
Pump Sizing
Street is tight, need a 32-meter boom pump minimum to reach the back corner.
John Specs • Jul 12
Review complete
Yardage confirmed. Rebar grid matches plans. Approved for order.
Estimating Manager • Jul 14
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Foundation_Plan.pdf | 2.5 MB | |
| Takeoff_Spreadsheet.xlsx | Excel | 0.5 MB |
| Pump_Access_Diagram.pdf | 0.8 MB |
E
Equipment
| Equipment ID | Category | Brand/Make | Status | Location |
|---|---|---|---|---|
| EQP-501 | Mixers & Pumps | Putzmeister Boom | Available Inventory | Main Yard |
| EQP-502 | Heavy Machinery | Bobcat Skid Steer | Deployed | Job PRJ-801 |
| EQP-503 | Hand Tools | Marshalltown Trowel | Available Inventory | Tool Crib A |
| EQP-504 | Mixers & Pumps | Multiquip Line Pump | Out for Repair | Shop |
| EQP-505 | Scaffolding | Safway Frame | Deployed | Job PRJ-803 |
| EQP-506 | Heavy Machinery | Cat Excavator | Available Inventory | Main Yard |
E
Equipment
EQP-502
Details
Notes
Files
Equipment Specs
Equipment IDEQP-502✎
OwnerFleet Manager✎
Created DateJan 05, 2026✎
Created BySystem✎
Last Mod DateAug 01, 2026✎
Last Mod ByFleet Manager✎
DescriptionSkid steer for site prep.✎
CategoryHeavy Machinery✎
Brand/MakeBobcat Skid Steer✎
StatusDeployed✎
Storage LocationJob PRJ-801✎
Maintenance Freq250 Hours✎
Power TypeDiesel✎
QA StatusPassed Inspection✎
Inventory & Usage Details
Record TypeAsset Item✎
Last ActivityAug 01, 2026✎
Sys ModstampAug 01, 2026✎
Serial NumberBC-9941-XYZ✎
Current Hours/Miles1450 Hours✎
Daily Rate$250 / Day✎
ConditionGood (Normal Wear)✎
Transportation ReqFlatbed Trailer✎
Attachment TypeSmooth Bucket✎
Next Service DateSep 15, 2026✎
Assigned ToForeman Mike✎
Last InspectedJul 12, 2026✎
Hydraulic Fluid Low
Topped off hydraulic fluid before deploying to Riverside Drive project.
Shop Mechanic • Aug 01
Tire Wear
Front left tire showing significant wear. Order replacement for next service interval.
Fleet Manager • Jul 15
Attachment Swap
Swapped forks for smooth bucket for grading prep.
Foreman Mike • Aug 01
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Bobcat_Service_Manual.pdf | 14.4 MB | |
| Inspection_Report_Jul.pdf | 0.2 MB | |
| Asset_Photo_Front.jpg | Image | 1.1 MB |
🕒 History
📝 Notes
⚙️ Macros
🟢 Omni-Channel (Online)


