Geothermal energy production requires precise coordination between plant operators, reservoir engineers, and maintenance crews. This Service Cloud template centralizes well telemetry, steam turbine performance, and maintenance scheduling, enabling your team to maximize baseload generation and ensure continuous operational efficiency.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
🩺 Service Console
Centralized dashboard for plant alerts.A Accounts
Manage utility and grid partners.C Contacts
Track plant managers and operators.C Cases
Log outages and equipment faults.P Plants
Manage geothermal facility locations.W Wells
Track injection and production wells.T Turbines
Monitor steam turbine specs.INTERACTIVE TEMPLATE BELOW
C Case Details
Case Number
Subject
Wellhead Pressure Drop
Status
Investigating
Priority
Critical
Case Owner
Control Room
C Contact Details
Name
Account
Role
Plant Manager
Phone
(555) 456-7890
Email
Feed
PostEmailLog a CallChange Status
Case Updates ▼
SYS
System Auto-Alert changed status • 2m ago
Changed Status from New to Investigating.
CR
Control Room logged an update • 5m ago
Pressure drop detected in production well 4. Telemetry confirms flow rate reduction of 15%.
SYS
System Auto-Alert logged an update • 10m ago
Warning: Steam purity threshold exceeded on sensor ST-102 inlet.
MT
Maintenance Team added a note • 25m ago
Dispatched crew to inspect wellhead valves for potential scaling or blockages.
LP
Laura Palmer (Portal Msg) • 35m ago
Requesting historical pressure logs for the last 30 days on PW-04 before we initiate chemical cleaning.
P Plant Record
Plant Name
Resource Field
Klamath Basin
Plant Type
Flash Steam
Capacity MW
120 MW
Status
Active
W Well Record
A
Accounts
| Account Name | Account Type | Primary Contact | Phone | Status |
|---|---|---|---|---|
| Pacific Volcanic Energy | Utility Partner | Laura Palmer | (555) 456-7890 | Active |
| Nevada Geothermal Grid | Grid Operator | John Smith | (555) 234-5678 | Active |
| Cascadia Power Co. | Utility Partner | Sarah Miller | (555) 345-6789 | Active |
| Desert Steam Industrial | Industrial Consumer | Mike Johnson | (555) 567-8901 | Active |
| Imperial Valley Municipal | Municipal Utility | Emily Davis | (555) 678-9012 | Active |
| Salton Sea Wholesale | Wholesale Buyer | Robert Williams | (555) 789-0123 | Active |
A
Account
Pacific Volcanic Energy
Details
Contacts
Cases
Plants
Wells
Turbines
Notes
Files
Primary Details
Account NamePacific Volcanic Energy✎
OwnerSystem Admin✎
Created DateFeb 15, 2025✎
Created BySystem✎
Last Mod DateAug 01, 2026✎
Last Mod ByLaura Palmer✎
DescriptionRegional geothermal provider.✎
StatusActive✎
Account TypeUtility Partner✎
Payment TermsNet 30✎
Pref CommSecure Portal✎
Operating RegionNorthwest✎
Contract TypeLong-Term PPA✎
Grid TierTier 1✎
Additional Information
Record TypeUtility Partner✎
Last ActivityAug 01, 2026✎
Sys ModstampAug 01, 2026✎
Primary Phone(555) 456-7890✎
Emergency ContactDispatch Desk✎
Compliance LevelNERC CIP✎
SLA LevelPlatinum✎
Primary LangEnglish✎
Billing Street400 Caldera Way✎
Billing CityPortland✎
Zip Code97204✎
Contacts (6)
| Name | Role | Phone | Status | |
|---|---|---|---|---|
| Laura Palmer | Plant Manager | (555) 456-7890 | [email protected] | Active |
| Dale Cooper | Lead Engineer | (555) 456-7891 | [email protected] | Active |
| Harry Truman | Field Technician | (555) 456-7892 | [email protected] | Active |
| Audrey Horne | Safety Inspector | (555) 456-7893 | [email protected] | Active |
| Bobby Briggs | Grid Dispatcher | (555) 456-7894 | [email protected] | Active |
| Shelly Johnson | Compliance Officer | (555) 456-7895 | [email protected] | Active |
Cases (6)
| Case Number | Subject | Plant Reference | Status | Priority |
|---|---|---|---|---|
| CAS-8801 | Wellhead Pressure Drop | Obsidian Ridge Plant | Investigating | Critical |
| CAS-8802 | Injection Well Scaling | Crater Lake Facility | In Repair | High |
| CAS-8803 | Cooling Tower Fan Fault | Obsidian Ridge Plant | Referred | Medium |
| CAS-8804 | Brine Pump Seal Leak | Lassen Geothermal | Closed | Low |
| CAS-8805 | Turbine Vibration Alert | Mammoth Lakes Plant | New | Medium |
| CAS-8806 | H2S Abatement Sys Alert | Obsidian Ridge Plant | Monitoring | Low |
Plants (6)
| Plant Name | Resource Field | Plant Type | Capacity MW | Status |
|---|---|---|---|---|
| Obsidian Ridge Plant | Klamath Basin | Flash Steam | 120 MW | Active |
| Crater Lake Facility | Cascades Volcanic | Binary Cycle | 85 MW | Active |
| Lassen Geothermal | Lassen Volcanic | Flash Steam | 150 MW | Maintenance |
| Mammoth Lakes Plant | Long Valley | Binary Cycle | 90 MW | Active |
| Salton Sea Geo 1 | Salton Trough | Flash Steam | 185 MW | Active |
| Puna Geothermal | East Rift Zone | Binary Cycle | 38 MW | Offline |
PPA Negotiation
Negotiating terms for expanded baseload capacity from the Salton Sea field.
Sales Team • Jan 14
Drilling Permits
BLM approved two new exploratory wells in the Klamath Basin.
Compliance • Mar 02
Grid Interconnect
Completed ISO grid interconnection testing for ST-103.
Engineering • Jul 01
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| LongTerm_PPA_Contract.pdf | 2.1 MB | |
| BLM_Permit_Approvals.pdf | 4.5 MB | |
| Grid_Interconnect_Cert.pdf | 1.2 MB |
C
Contacts
| Name | Account Name | Role | Phone | Status |
|---|---|---|---|---|
| Laura Palmer | Pacific Volcanic Energy | Plant Manager | (555) 456-7890 | Active |
| Dale Cooper | Pacific Volcanic Energy | Lead Engineer | (555) 456-7891 | Active |
| Harry Truman | Nevada Geothermal Grid | Field Technician | (555) 456-7892 | Active |
| Audrey Horne | Cascadia Power Co. | Safety Inspector | (555) 456-7893 | Active |
| Bobby Briggs | Desert Steam Industrial | Grid Dispatcher | (555) 456-7894 | Active |
| Shelly Johnson | Imperial Valley Municipal | Compliance Officer | (555) 456-7895 | Active |
C
Contact
Laura Palmer
Details
Notes
Files
Primary Details
Contact NameLaura Palmer✎
OwnerSystem Admin✎
Created DateJan 10, 2026✎
Created BySystem✎
Last Mod DateAug 01, 2026✎
Last Mod ByLaura Palmer✎
DescriptionPlant Manager for Obsidian Ridge.✎
RolePlant Manager✎
StatusActive✎
Pref CommMobile Phone✎
LanguageEnglish✎
Security ClearanceLevel 3✎
Cert LevelMaster✎
Shift PrefDay Shift✎
Additional Information
Record TypePlant Operations✎
Last ActivityAug 01, 2026✎
Sys ModstampAug 01, 2026✎
Primary Phone(555) 456-7890✎
Mobile Phone(555) 123-4567✎
RegionNorthwest✎
Safety TrainingUp to Date✎
Portal AccessActive✎
Job TitlePlant Manager✎
Certification IDCM-8854✎
Primary Contact for Obsidian
Directs all operations and maintenance scheduling for the Obsidian Ridge Plant.
Dispatch • Jan 10
Safety Recertification
Passed H2S gas safety recertification.
HR • Feb 15
Portal Setup
Configured advanced SCADA telemetry access on mobile app.
IT Team • Apr 05
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Manager_Cert_Copy.jpg | Image | 2.1 MB |
| H2S_Safety_Waiver.pdf | 0.5 MB | |
| Emergency_Protocol_Signoff.pdf | 1.2 MB |
C
Cases
| Case Number | Subject | Plant Reference | Status | Priority |
|---|---|---|---|---|
| CAS-8801 | Wellhead Pressure Drop | Obsidian Ridge Plant | Investigating | Critical |
| CAS-8802 | Injection Well Scaling | Crater Lake Facility | In Repair | High |
| CAS-8803 | Cooling Tower Fan Fault | Obsidian Ridge Plant | Referred | Medium |
| CAS-8804 | Brine Pump Seal Leak | Lassen Geothermal | Closed | Low |
| CAS-8805 | Turbine Vibration Alert | Mammoth Lakes Plant | New | Medium |
| CAS-8806 | H2S Abatement Sys Alert | Obsidian Ridge Plant | Monitoring | Low |
C
Case
CAS-8801: Wellhead Pressure Drop
New
Investigating
In Repair
Resolved
Details
Notes
Files
Primary Details
Case NumberCAS-8801✎
OwnerControl Room✎
Created DateAug 01, 2026✎
Created BySystem Auto-Alert✎
Last Mod DateAug 01, 2026✎
Last Mod ByLaura Palmer✎
DescriptionPressure drop in PW-04.✎
StatusInvestigating✎
PriorityCritical✎
CategoryFlow Obstruction✎
Severity LevelLevel 2✎
ResolutionPending✎
Assigned DeptReservoir Eng✎
Impact AreaGeneration Capacity✎
Additional Information
Record TypeEquipment Alert✎
Last ActivityAug 01, 2026✎
Sys ModstampAug 01, 2026✎
SubjectWellhead Pressure Drop✎
Enviro RiskMedium✎
Response TierTier 1✎
Weather CondClear✎
Reporter NameSCADA Auto-Alert✎
Contact PhoneN/A✎
External RefALRT-9945✎
Telemetry Log
Pressure dropped by 15% at 12:45 PM. Flow rate adjusting.
Control Room • Aug 01
Steam Purity
Silica levels rising slightly, suggesting potential scaling at the wellbore.
Reservoir Eng • Aug 01
Safety Protocol
Valves locked and tagged while crew visually inspects the wellhead.
Safety Inspector • Aug 01
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Pressure_Log_Export.csv | CSV | 1.2 MB |
| Thermal_Camera_Wellhead.jpg | Image | 3.4 MB |
| Scaling_Analysis_Report.pdf | 0.4 MB |
P
Plants
| Plant Name | Resource Field | Plant Type | Capacity MW | Status |
|---|---|---|---|---|
| Obsidian Ridge Plant | Klamath Basin | Flash Steam | 120 MW | Active |
| Crater Lake Facility | Cascades Volcanic | Binary Cycle | 85 MW | Active |
| Lassen Geothermal | Lassen Volcanic | Flash Steam | 150 MW | Maintenance |
| Mammoth Lakes Plant | Long Valley | Binary Cycle | 90 MW | Active |
| Salton Sea Geo 1 | Salton Trough | Flash Steam | 185 MW | Active |
| Puna Geothermal | East Rift Zone | Binary Cycle | 38 MW | Offline |
P
Plant
Obsidian Ridge Plant
Details
Notes
Files
Primary Details
Plant NameObsidian Ridge Plant✎
OwnerFacility Admin✎
Created DateJan 10, 2026✎
Created BySystem✎
Last Mod DateAug 01, 2026✎
Last Mod ByLaura Palmer✎
DescriptionPrimary Klamath site.✎
StatusActive✎
Plant TypeFlash Steam✎
Cooling TypeWater-Cooled✎
Grid Interconnect115 kV AC✎
Operational ModeBaseload✎
Primary PurposePower Generation✎
Seismic RiskMedium✎
Additional Information
Record TypeGeothermal Facility✎
Last ActivityAug 01, 2026✎
Sys ModstampAug 01, 2026✎
Resource FieldKlamath Basin✎
Commission Year2012✎
Capacity MW120 MW✎
Maintenance TierTier 1✎
Backup PowerDiesel Gen✎
ConnectivityFiber✎
Coordinates42.221, -121.781✎
Total Wells14✎
Permit IDPER-OR-0992✎
Security Upgrade
Installed new perimeter fencing and cameras at North Gate.
Facilities • Jul 30
H2S Monitoring
Abatement system serviced. All sensors reading normal.
Environment • Jan 15
Grid Expansion
Substation upgraded to handle additional 20 MW load.
Operations • Jan 15
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Gathering_System_Blueprint.pdf | 14.4 MB | |
| Emergency_Action_Plan.pdf | 5.5 MB | |
| Plant_Overview_Drone.jpg | Image | 8.8 MB |
W
Wells
W
Well
PW-04
Details
Notes
Files
Primary Details
Well IDPW-04✎
OwnerReservoir Eng✎
Created DateAug 01, 2026✎
Created BySystem✎
Last Mod DateAug 01, 2026✎
Last Mod BySystem✎
DescriptionMain production well 4✎
StatusActive✎
Well TypeProduction✎
Flow RateMedium✎
Formation TypeFractured Volcanic✎
Valve StatusThrottled✎
Scale InhibitorContinuous Injection✎
Pump TypeArtesian✎
Additional Information
Record TypeProduction Well✎
Last ActivityAug 01, 2026✎
Sys ModstampAug 01, 2026✎
Wellhead NameNorth-Pad A✎
Drill Date2010✎
Depth Meters2400 m✎
Casing MaterialCarbon Steel✎
Maintenance SchedQ4 2026✎
Condition RateFair✎
Casing Diameter13.375 in✎
Max Temp C285 C✎
Pressure (Bar)35 Bar✎
Pressure Drop
Operating at reduced flow due to sudden pressure drop.
Control Room • Aug 01
Scaling Suspected
Silica scaling suspected near the flash horizon.
Reservoir Eng • Jan 10
Inhibitor Adjusted
Increased scale inhibitor injection rate by 5%.
Engineering • Mar 15
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Well_Log_PW04.pdf | 25.2 MB | |
| Flow_Test_Results.pdf | 4.1 MB | |
| Wellhead_Diagram.dwg | CAD | 12.5 MB |
T
Turbines
T
Turbine
ST-102
Details
Notes
Files
Primary Details
Turbine IDST-102✎
OwnerPlant Manager✎
Created DateAug 01, 2026✎
Created BySystem✎
Last Mod DateAug 01, 2026✎
Last Mod ByLaura Palmer✎
DescriptionMain single flash unit✎
StatusOnline✎
Turbine ModelSingle Flash✎
Cooling SystemWater-Cooled✎
Phase3-Phase✎
Governor TypeDigital Electro✎
LubricationForced Oil✎
Winding TypeStator Bar✎
Additional Information
Record TypeSteam Turbine✎
Last ActivityAug 01, 2026✎
Sys ModstampAug 01, 2026✎
Serial NumberMHI-4400-A✎
ManufacturerMitsubishi Heavy Ind.✎
Install Date2012✎
Excitation SysStatic✎
Maintenance SchedQ1 2027✎
Condition RateGood✎
Capacity (MW)60 MW✎
RPM3600 RPM✎
Voltage (kV)13.8 kV✎
Inlet Pressure
Operating perfectly, though inlet pressure is slightly down due to PW-04 issue.
Control Room • Aug 01
Blade Inspection
Borescope inspection of last stage blades shows minimal pitting.
Maintenance • Jan 10
Governor Calibration
Digital governor recalibrated to optimize flow matching.
Engineering • Mar 15
📄 Files (3)
| File Name | Type | Size |
|---|---|---|
| Turbine_Manual_MHI.pdf | 25.2 MB | |
| Borescope_Report.pdf | 4.1 MB | |
| Steam_Path_Diagram.dwg | CAD | 12.5 MB |
🕒 History
📝 Notes
⚙️ Macros
🟢 Omni-Channel (Online)


