Telecommunications and wireless infrastructure providers manage complex sales cycles across structured cabling, Distributed Antenna Systems (DAS), fiber optic networks, and commercial Audio Visual (AV) installations. Sales teams track proposal due dates, assign estimator engineers, link change orders to base contracts, and coordinate site surveys alongside FieldPoint dispatch and SharePoint project folders. This interactive Salesforce Sales Cloud template organizes commercial bids, site surveys, project deployments, and equipment BOMs in a single workspace.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Campaigns
Measure ROI on BICSI trade shows, ERRCS code compliance seminars, and general contractor bid list outreach. Leads
Capture incoming RFPs, general contractor invites, and facility upgrade inquiries for cabling and wireless builds. Accounts
Track commercial enterprise clients, general contractors, property managers, and account tiers across multi-site portfolios. Contacts
Maintain relationships with IT directors, facility managers, construction estimators, and Low Voltage project leads. Opportunities
Manage structured cabling, DAS, and AV bids with assigned engineers, SharePoint project triggers, and change order links. Site Surveys
Coordinate walk-throughs, RF heatmapping, pathway inspections, and MDF/IDF room assessments prior to final bidding. FieldPoint Projects
Track post-sale installation phases, rough-in cabling, fiber splicing, Fluke certification, and FieldPoint work order sync. Equipment BOMs
Manage material lists, plenum cable spools, fiber enclosures, Bi-Directional Amplifiers, and distributor procurement status.Campaign
2026 Colorado GC Low-Voltage Bid Desk
Details
Campaign Members
Notes
Files
Campaign Overview & Industry Targeting
Campaign Name
2026 Colorado GC Low-Voltage Bid Desk
✎
Campaign Type
GC Pre-Construction Bid List Outreach
✎
Target Vertical
Commercial Construction & GC
✎
Promoted Solution Line
Division 27 Cabling & Division 28 ERRCS
✎
Campaign Owner
Brett Holloway
✎
Campaign Status
In Progress - Active Q4 Bidding
✎
Start Date
09/01/2026
✎
End Date
12/31/2026
✎
Co-Marketing Partners & Pipeline Attribution
OEM / Distributor Co-Sponsor
CommScope & Graybar MDF Co-Op
✎
Target Geographic Territory
Colorado Front Range & I-25 Corridor
✎
Primary Call-to-Action
Complimentary RCDD Plan Review & RF Prelim
✎
Campaign Budgeted Cost
$14,500.00
✎
Total Bid Pipeline Influenced
$1,420,000.00
✎
Procore & BuildingConnected Pre-Qualification Updated
Updated Twin Eagle Solutions EMR safety rating, bonding capacity, and RCDD / iBwave certifications across 18 Colorado general contractor bid portals as part of this Q3/Q4 outreach initiative.
CommScope Co-Op Marketing Funds Approved
Graybar and CommScope approved $7,500 in co-op reimbursement for the GC Estimator breakfast series highlighting Systimax Cat6A and NFPA 1225 pathway survivability requirements.
High Conversion on Combined Div 27 + Div 28 Bundles
General contractors strongly prefer awarding structured cabling and public safety ERRCS DAS to a single subcontractor to eliminate ceiling pathway conflicts.
Lead
Marcus Vance - Vance Commercial Builders
New Inquiry
Contacted
Site Walk Scheduled
Engineering Review
Converted to Bid
Details
Notes
Files
Primary Lead & Contact Information
Full Name
Marcus Vance
✎
Company
Vance Commercial Builders
✎
Job Title
Senior Estimator
✎
Lead Source
General Contractor Bid Invite
✎
Vertical
Commercial Construction & GC
✎
Primary Solution Interest
Public Safety DAS / ERRCS
✎
Lead Owner
Brett Holloway
✎
Lead Status
Site Walk Scheduled
✎
Phone
(303) 555-0142
✎
Inside Rep Assigned
Megan Lindqvist
✎
New Business Dev Mgr
Brett Holloway
✎
Facility & Technical Qualification Details
Facility Square Footage
150,000 - 300,000 Sq Ft
✎
Construction Phase
New Ground-Up Shell
✎
Estimated Drop / Node Count
250 - 500 Drops / Antennas
✎
Plenum Rating Requirement
CMP Plenum Air Return Required
✎
Blueprint / CAD Availability
Revit & T-Series Floorplans Uploaded
✎
Estimated Bid Budget
$150,000 - $300,000
✎
Target Proposal Due Date
11/12/2026
✎
AHJ / Fire Marshal Jurisdiction
Denver Fire Dept - 800MHz ERRCS
✎
Site Location Region
Denver Metro & Tech Center
✎
Division 27 & 28 Spec Review with Marcus
Reviewed the Division 27 structured cabling and ERRCS public safety radio specifications for the Gateway Medical Plaza shell. Building has Low-E glass which is blocking macro 800MHz donor signals. Needs a rooftop Yagi donor antenna and 2-hour fire-rated pathway to the main BDA headend room.
Benchmark RF Grid Test Scheduled
Assigned RCDD engineer Kevin Vance to walk the site next Tuesday to perform initial DAQ (Delivered Audio Quality) and RSSI donor signal measurements on the roof before finalizing the iBwave design proposal.
Addendum 1 Conduit Clarification
Electrical contractor is providing 1-inch EMT conduit stubs above hard-lid ceilings, while Twin Eagle will provide J-hooks and plenum rated coax/fiber runs throughout the open return plenums on floors 2 through 5.
Account
Apex Mountain Healthcare System
Details
Contacts
Opportunities
Site Surveys
FieldPoint Projects
Equipment BOMs
Notes
Files
Account Classification & Ownership
Account Name
Apex Mountain Healthcare System
✎
Account Tier
Tier 1 - Strategic Enterprise
✎
Vertical
Healthcare & Medical Campuses
✎
Phone
(303) 555-0200
✎
Account Owner
Brett Holloway
✎
Inside Rep
Megan Lindqvist
✎
New Business Dev Mgr
Brett Holloway
✎
Headquarters Location
14200 E Alameda Pkwy, Aurora, CO
✎
Technical Standards & FieldPoint Integration
Preferred Cabling Standard
CommScope Systimax Cat6A / OS2
✎
Master Service Agreement
MSA Active - Fixed Labor Rate Card
✎
Credit & Billing Terms
Net 30 - Progress Billing AIA G702
✎
Active Facility Sites
6 - 15 Regional Facilities
✎
FieldPoint Customer Code
FP-CUST-88410 (Synced)
✎
Infection Control & ICRA Containment Protocol
All technicians working above ceiling tiles in active clinical wings at Apex Mountain Healthcare must utilize HEPA negative air containment carts and wear facility-issued badges. Note synced to FieldPoint dispatch rules.
CommScope 25-Year Extended Warranty Registration
Apex requires official CommScope Systimax link certification test results exported directly from Fluke LinkWare Live into their SharePoint closeout binder before releasing final 5% retainage.
Historical Dynamics 365 Account Migration Verified
Migrated 14 historical opportunities and linked active SharePoint document libraries. All open change orders are properly parented to base hospital tower contracts.
Contact
Rachel Sterling
Details
Notes
Files
Contact Profile & Account Alignment
Contact Name
Rachel Sterling
✎
Job Title
VP of Network & Clinical IT
✎
Department
Enterprise Infrastructure & Telecom
✎
Contact Owner
Brett Holloway
✎
Direct Phone
(303) 555-0211
✎
Stakeholder Role
Executive Sponsor & Final Signer
✎
Bidding & Project Communication Preferences
Technical Focus Area
Full Stack Low Voltage (Cabling/DAS/AV)
✎
Change Order Approval Limit
Up to $100,000 Direct Sign-Off
✎
Primary Bid Portal
Direct Email & SharePoint Portal
✎
Site Access Clearance
Vendormate Tier 3 Clinical Cleared
✎
FieldPoint Work Order Signer
Authorized for Mobile App Signature
✎
Preference for Consolidated As-Built Drawings
Rachel requires every completed project or change order to include updated redline CAD floorplans showing exact jack IDs, MDF patch panel ports, and BDA donor antenna azimuths inside the shared SharePoint folder.
Change Order Routing Process
When submitting Change Orders tied to a base hospital project, copy both Rachel Sterling and Facility PM David Lindstrom so IT budget and ceiling closure schedules stay aligned.
BICSI Fall Conference Follow-Up
Met with Rachel at the Colorado healthcare facilities roundtable. Discussed upcoming Wi-Fi 7 high-density AP cabling upgrades across 4 regional urgent care centers in Q1 2027.
Opportunity
Apex Tower West - Public Safety DAS & Cat6A
Discovery - 20%
Site Survey & RF Design
Engineering & Takeoff
Proposal / Bid Submitted
Negotiation & GC Leveling
Closed Won
Details
Line Items
Site Surveys
Notes
Files
Opportunity & Bid Core Information
Opportunity Name
Apex Tower West - Public Safety DAS & Cat6A
✎
Vertical
Healthcare & Medical Campuses
✎
Opportunity Type
New System Installation (Base Bid)
✎
Lead Source
New Business Existing Customer
✎
Primary System Scope
Hybrid Cat6A Cabling + 800MHz ERRCS DAS
✎
Opportunity Owner
Brett Holloway
✎
Stage
Proposal / Bid Submitted - 60%
✎
Status Reason
In Progress - GC Scope Leveling
✎
Inside Rep
Megan Lindqvist
✎
New Business Dev Mgr
Brett Holloway
✎
Engineer Assigned
Kevin Vance, RCDD / iBwave Level 3
✎
Project Automation, SharePoint & Financial Details
Create Project (SharePoint)
Yes - Provision SharePoint Folder Structure
✎
FieldPoint Sync Status
Synced to FieldPoint Sandbox / Prod Ready
✎
Total Contract Amount
$284,500.00
✎
Proposal Due Date
11/05/2026
✎
Expected Close Date
11/18/2026
✎
Estimated Install Labor Hrs
750 - 1,200 Tech Hours
✎
Testing & Certification Spec
Fluke DSX-8000 Cat6A + DAQ 3.4 Grid Test
✎
Manufacturer Warranty Tier
CommScope 25-Year Systimax Assurance
✎
SharePoint Folder Automatically Provisioned
Setting "Create Project" to "Yes" triggered the automated SharePoint flow. Folder structure created with subfolders: 01_RFP_Specs, 02_Estimator_Takeoffs, 03_iBwave_CAD, 04_Submittals, 05_FieldPoint_AsBuilts, and 06_Fluke_Test_Results.
Child Change Order Linked via Project Lookup
Opportunity "Apex Tower West - CO #1 Cardiology Wing Drops" ($38,200) is linked to this base opportunity via the Project lookup field so engineering hours and material deliveries roll up cleanly.
Engineer Kevin Vance Takeoff Sign-Off
Verified ½-inch plenum corrugated coax attenuation losses across 6 floors. Added one fiber-fed remote BDA unit in the North IDF to maintain +18dBm downlink signal strength in the basement stairwells.
Site Survey
SRV-2026-0412 - Apex Tower West RF & Cabling
Scheduled
On-Site Walk & RF Test
iBwave / CAD Modeling
Takeoff Ready
Synced to SharePoint
Details
Notes
Files
Survey Assignment & Facility Environment
Survey Number
SRV-2026-0412 - Apex Tower West RF & Cabling
✎
Survey Discipline
Combined Cabling Pathway + 800MHz ERRCS Benchmark
✎
Ceiling & Pathway Structure
Acoustic Drop Tile + Hard-Lid Gypsum Corridors
✎
Core Drilling & Firestopping
4-Inch Sleeve Cores x 5 Floors + STI EZ-Path
✎
Survey Owner / Engineer
Kevin Vance (RCDD)
✎
Survey Status
Takeoff Ready - Uploaded to SharePoint
✎
Survey Date
10/14/2026
✎
MDF / IDF Closet Count
1 Main MDF + 6 Stacked IDFs
✎
Lift & PPE Requirements
ICRA HEPA Containment Cart + 8ft Fiberglass Ladder
✎
RF Propagation, Fiber Distance & Power Findings
Rooftop Donor Signal (RSSI)
-72 dBm @ 854MHz (Strong Line-of-Sight)
✎
Baseline Interior DAQ Score
Fails in Basement, Stairwells & Elevators (DAQ 1.8)
✎
Max Copper Horizontal Run
268 Feet (Within 295ft / 90m TIA-568 Limit)
✎
Backbone Fiber Footage
1,450 Feet (Armored OS2 Riser + Innerduct)
✎
Grounding & TMGB Status
TIA-607 Compliant Busbar Present in MDF
✎
Dedicated AC Power & Backup
Dedicated 120V 20A Hardwired + 24Hr BDA Battery
✎
Fire Alarm Panel Tie-In
6 Dry-Contact Supervisory Relays to FACP
✎
Design Software Output
iBwave Public Safety + Bluebeam Revu Takeoff
✎
Rooftop Donor Azimuth & Slew Verification
Measured -72 dBm RSRP and 19 dB SINR pointing at 214 degrees True North toward the Aurora Public Safety 800MHz simulcast tower (3.1 miles away). Penthouse parapet wall provides ideal mounting structure for non-penetrating ballast sled.
3rd Floor MRI Suite RF Shielding Note
The copper-lined MRI diagnostic suite on Level 3 has -118 dBm isolation. Placed two directional wall-mount panel antennas immediately outside the RF doors and coordinated non-ferrous pathway routing with David Lindstrom.
IDF-4 Rack Space Constraint Resolved
Existing 2-post relay rack in 4th floor IDF has only 3 RU open. Added a Chatsworth wall-mount swing rack to the BOM to house the 48-port angled Cat6A patch panels and Corning fiber housing.
FieldPoint Project
FP-PRJ-9021 - Apex Tower West DAS & Cat6A
Submittals & SharePoint Setup
Rough-In & Pathway
MDF/IDF Trim & Splicing
Fluke & AHJ Commissioning
As-Built Closeout
Details
Notes
Files
FieldPoint Dispatch & Project Execution
FieldPoint Job ID
FP-PRJ-9021 - Apex Tower West DAS & Cat6A
✎
Deployment Phase
Rough-In & J-Hook Pathway Installation
✎
Field Crew Assignment
Crew Alpha (4 Low-Voltage Techs + 1 DAS Specialist)
✎
Rough-In Completion Status
Levels 1-4 Complete / Levels 5-6 In Progress
✎
Project Owner / PM
Lucas Graham (Senior PM)
✎
FieldPoint API Integration
Bi-Directional Sync Active (Integration User)
✎
Mobilization Start Date
10/05/2026
✎
Target Substantial Completion
12/18/2026
✎
Quality Assurance, Certification & AHJ Sign-Off
MDF / IDF Closet Buildout
LAD Ladder Rack, 2-Post Racks & TMGB Bonded
✎
Fluke LinkWare Test Status
280 of 420 Cat6A Links Passed DSX-8000
✎
ERRCS / AHJ Permit & Testing
Permit Issued - 20-Grid Pre-Test Scheduled Nov 30
✎
As-Built Redline Drawings
In Progress - Bluebeam Field Updates Synced
✎
Labor Hours Consumed
412 of 920 Budgeted Hrs (45% - On Track)
✎
AIA Progress Billing Status
50% Material + Rough-In Billed (AIA G702 #3)
✎
Safety & ICRA Compliance
Daily JHA Logged in FieldPoint / Zero Incidents
✎
FieldPoint Sandbox & Production Sync Verified
Work order timesheets, technician dispatch schedules, and material pick tickets from BOM-2026-771 sync directly via the dedicated FieldPoint integration user without consuming a full sales seat.
2-Hour Fire Rated Pathway Inspection Passed
Aurora Building Inspector signed off on the 2-inch red EMT riser conduit and STI EZ-Path firestop devices between the roof donor antenna and the Level B1 BDA headend room.
Corning OS2 Fusion Splicing Scheduled for Next Week
Fiber tech Mateo Silva will bring the Sumitomo ribbon/core alignment fusion splicer on Monday to terminate all 6 stacked IDF closets and run bi-directional OTDR traces.
Equipment BOM
BOM-2026-771 - Apex Tower West DAS & Cat6A
Engineering Takeoff
Distributor SPA Quote
PO Issued via FieldPoint
Staged at Warehouse
Delivered & Installed
Details
Notes
Files
Bill of Materials & Distributor Sourcing
BOM Reference ID
BOM-2026-771 - Apex Tower West DAS & Cat6A
✎
Primary Supply Distributor
Graybar Electric (Denver Hub)
✎
Cabling & Fiber OEM Spec
CommScope Systimax 2091B Cat6A + TeraSPEED OS2
✎
DAS / Active RF Hardware
Comba RX78V2 Class B 800MHz BDA + 24Hr BBU
✎
BOM Owner / Estimator
Kevin Vance (RCDD)
✎
Procurement & Staging Status
Staged at Twin Eagle Warehouse (Palletized)
✎
Distributor SPA Quote #
GB-SPA-994120-CO (Valid 90 Days)
✎
Total Material Cost
$142,800.00
✎
Material Gross Margin Tier
32% Blended Margin (SPA Protected)
✎
Pathway Hardware, Passive RF & Logistics
Plenum Coax & Passive RF
RFS ½" Air-Dielectric Plenum Red Coax + PIM Splitters
✎
Racks, Cabinets & Enclosures
6x CPI 2-Post Racks + 2x NEMA 4X Red BDA Cabinets
✎
Pathway & Firestop Hardware
Caddy Cat HP J-Hooks (2" & 4") + STI EZ-Path Sleeves
✎
Commercial AV / Security Gear
None on Base BOM (Tracked on Boardroom Opp)
✎
Equipment Lead Time Status
100% In Stock - Zero Backorders
✎
Job Site Delivery Method
Phased Delivery via Twin Eagle Box Truck (Liftgate)
✎
Submittal Cut Sheet Status
Approved by MEP Engineer & Aurora Fire Marshal
✎
Pre-Configuration Lab Status
BDA Bench-Tested & IP Addressed in Twin Eagle Lab
✎
CommScope Special Pricing Authorization (SPA) Applied
Registered the 420-drop Apex Tower West project with CommScope and Graybar under healthcare tier pricing. Saved 14% on 2091B Cat6A plenum reels and MGS600 information outlets.
UL 2524 2nd Edition BDA Compliance Verified
Confirmed the Comba RX78V2 800MHz Class B BDA and 24-hour battery enclosure carry full UL 2524 listing required by the Aurora Fire Marshal prior to releasing the equipment PO in FieldPoint.
Phased Warehouse Staging by Hospital Floor
Because hospital job site storage is tight, Graybar delivered all 185,000 feet of Cat6A and coax to the Twin Eagle warehouse. Warehouse team shrink-wrapped pallets by floor (IDF-1 through IDF-6) for just-in-time delivery.


