Salesforce Template for Twin Eagle Solutions

Telecommunications and wireless infrastructure providers manage complex sales cycles across structured cabling, Distributed Antenna Systems (DAS), fiber optic networks, and commercial Audio Visual (AV) installations. Sales teams track proposal due dates, assign estimator engineers, link change orders to base contracts, and coordinate site surveys alongside FieldPoint dispatch and SharePoint project folders. This interactive Salesforce Sales Cloud template organizes commercial bids, site surveys, project deployments, and equipment BOMs in a single workspace.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Campaigns List
C
Campaign

2026 Colorado GC Low-Voltage Bid Desk

Details
Campaign Members
Notes
Files

Campaign Overview & Industry Targeting

Campaign Name 2026 Colorado GC Low-Voltage Bid Desk ✎
Campaign Type GC Pre-Construction Bid List Outreach ✎
Target Vertical Commercial Construction & GC ✎
Promoted Solution Line Division 27 Cabling & Division 28 ERRCS ✎
Campaign Owner Brett Holloway ✎
Campaign Status In Progress - Active Q4 Bidding ✎
Start Date 09/01/2026 ✎
End Date 12/31/2026 ✎

Co-Marketing Partners & Pipeline Attribution

OEM / Distributor Co-Sponsor CommScope & Graybar MDF Co-Op ✎
Target Geographic Territory Colorado Front Range & I-25 Corridor ✎
Primary Call-to-Action Complimentary RCDD Plan Review & RF Prelim ✎
Campaign Budgeted Cost $14,500.00 ✎
Total Bid Pipeline Influenced $1,420,000.00 ✎
Featured Opportunity Won Apex Tower West - Public Safety DAS & Cat6A ✎
Procore & BuildingConnected Pre-Qualification Updated
Updated Twin Eagle Solutions EMR safety rating, bonding capacity, and RCDD / iBwave certifications across 18 Colorado general contractor bid portals as part of this Q3/Q4 outreach initiative.
Created by Megan Lindqvist • September 08, 2026
CommScope Co-Op Marketing Funds Approved
Graybar and CommScope approved $7,500 in co-op reimbursement for the GC Estimator breakfast series highlighting Systimax Cat6A and NFPA 1225 pathway survivability requirements.
Created by Brett Holloway • September 22, 2026
High Conversion on Combined Div 27 + Div 28 Bundles
General contractors strongly prefer awarding structured cabling and public safety ERRCS DAS to a single subcontractor to eliminate ceiling pathway conflicts.
Created by Sarah Jenkins • October 19, 2026
◄ Back to Leads List
L
Lead

Marcus Vance - Vance Commercial Builders

New Inquiry
Contacted
Site Walk Scheduled
Engineering Review
Converted to Bid
Details
Notes
Files

Primary Lead & Contact Information

Full Name Marcus Vance ✎
Company Vance Commercial Builders ✎
Job Title Senior Estimator ✎
Lead Source General Contractor Bid Invite ✎
Vertical Commercial Construction & GC ✎
Primary Solution Interest Public Safety DAS / ERRCS ✎
Lead Owner Brett Holloway ✎
Lead Status Site Walk Scheduled ✎
Phone (303) 555-0142 ✎
Email [email protected] ✎
Inside Rep Assigned Megan Lindqvist ✎
New Business Dev Mgr Brett Holloway ✎

Facility & Technical Qualification Details

Facility Square Footage 150,000 - 300,000 Sq Ft ✎
Construction Phase New Ground-Up Shell ✎
Estimated Drop / Node Count 250 - 500 Drops / Antennas ✎
Plenum Rating Requirement CMP Plenum Air Return Required ✎
Blueprint / CAD Availability Revit & T-Series Floorplans Uploaded ✎
Estimated Bid Budget $150,000 - $300,000 ✎
Target Proposal Due Date 11/12/2026 ✎
AHJ / Fire Marshal Jurisdiction Denver Fire Dept - 800MHz ERRCS ✎
Site Location Region Denver Metro & Tech Center ✎
Division 27 & 28 Spec Review with Marcus
Reviewed the Division 27 structured cabling and ERRCS public safety radio specifications for the Gateway Medical Plaza shell. Building has Low-E glass which is blocking macro 800MHz donor signals. Needs a rooftop Yagi donor antenna and 2-hour fire-rated pathway to the main BDA headend room.
Created by Brett Holloway • October 18, 2026
Benchmark RF Grid Test Scheduled
Assigned RCDD engineer Kevin Vance to walk the site next Tuesday to perform initial DAQ (Delivered Audio Quality) and RSSI donor signal measurements on the roof before finalizing the iBwave design proposal.
Created by Megan Lindqvist • October 21, 2026
Addendum 1 Conduit Clarification
Electrical contractor is providing 1-inch EMT conduit stubs above hard-lid ceilings, while Twin Eagle will provide J-hooks and plenum rated coax/fiber runs throughout the open return plenums on floors 2 through 5.
Created by Brett Holloway • October 24, 2026
◄ Back to Accounts List
Account

Apex Mountain Healthcare System

Details
Contacts
Opportunities
Site Surveys
FieldPoint Projects
Equipment BOMs
Notes
Files

Account Classification & Ownership

Account Name Apex Mountain Healthcare System ✎
Account Tier Tier 1 - Strategic Enterprise ✎
Vertical Healthcare & Medical Campuses ✎
Phone (303) 555-0200 ✎
Account Owner Brett Holloway ✎
Inside Rep Megan Lindqvist ✎
New Business Dev Mgr Brett Holloway ✎
Headquarters Location 14200 E Alameda Pkwy, Aurora, CO ✎

Technical Standards & FieldPoint Integration

Preferred Cabling Standard CommScope Systimax Cat6A / OS2 ✎
Master Service Agreement MSA Active - Fixed Labor Rate Card ✎
Credit & Billing Terms Net 30 - Progress Billing AIA G702 ✎
Active Facility Sites 6 - 15 Regional Facilities ✎
FieldPoint Customer Code FP-CUST-88410 (Synced) ✎
SharePoint Client Root SP://TwinEagle/Clients/ApexMountainHealth ✎
Infection Control & ICRA Containment Protocol
All technicians working above ceiling tiles in active clinical wings at Apex Mountain Healthcare must utilize HEPA negative air containment carts and wear facility-issued badges. Note synced to FieldPoint dispatch rules.
Created by Brett Holloway • September 12, 2026
CommScope 25-Year Extended Warranty Registration
Apex requires official CommScope Systimax link certification test results exported directly from Fluke LinkWare Live into their SharePoint closeout binder before releasing final 5% retainage.
Created by Carlos Mendez • October 02, 2026
Historical Dynamics 365 Account Migration Verified
Migrated 14 historical opportunities and linked active SharePoint document libraries. All open change orders are properly parented to base hospital tower contracts.
Created by Megan Lindqvist • October 22, 2026
◄ Back to Contacts List
C
Contact

Rachel Sterling

Details
Notes
Files

Contact Profile & Account Alignment

Contact Name Rachel Sterling ✎
Job Title VP of Network & Clinical IT ✎
Department Enterprise Infrastructure & Telecom ✎
Contact Owner Brett Holloway ✎
Direct Phone (303) 555-0211 ✎
Email [email protected] ✎
Stakeholder Role Executive Sponsor & Final Signer ✎

Bidding & Project Communication Preferences

Technical Focus Area Full Stack Low Voltage (Cabling/DAS/AV) ✎
Change Order Approval Limit Up to $100,000 Direct Sign-Off ✎
Primary Bid Portal Direct Email & SharePoint Portal ✎
Site Access Clearance Vendormate Tier 3 Clinical Cleared ✎
FieldPoint Work Order Signer Authorized for Mobile App Signature ✎
Primary Active Project Apex Tower West - Public Safety DAS & Cat6A ✎
Preference for Consolidated As-Built Drawings
Rachel requires every completed project or change order to include updated redline CAD floorplans showing exact jack IDs, MDF patch panel ports, and BDA donor antenna azimuths inside the shared SharePoint folder.
Created by Brett Holloway • September 28, 2026
Change Order Routing Process
When submitting Change Orders tied to a base hospital project, copy both Rachel Sterling and Facility PM David Lindstrom so IT budget and ceiling closure schedules stay aligned.
Created by Megan Lindqvist • October 10, 2026
BICSI Fall Conference Follow-Up
Met with Rachel at the Colorado healthcare facilities roundtable. Discussed upcoming Wi-Fi 7 high-density AP cabling upgrades across 4 regional urgent care centers in Q1 2027.
Created by Brett Holloway • October 21, 2026
◄ Back to Opportunities List
O
Opportunity

Apex Tower West - Public Safety DAS & Cat6A

Discovery - 20%
Site Survey & RF Design
Engineering & Takeoff
Proposal / Bid Submitted
Negotiation & GC Leveling
Closed Won
Details
Line Items
Site Surveys
Notes
Files

Opportunity & Bid Core Information

Opportunity Name Apex Tower West - Public Safety DAS & Cat6A ✎
Vertical Healthcare & Medical Campuses ✎
Opportunity Type New System Installation (Base Bid) ✎
Lead Source New Business Existing Customer ✎
Primary System Scope Hybrid Cat6A Cabling + 800MHz ERRCS DAS ✎
Opportunity Owner Brett Holloway ✎
Stage Proposal / Bid Submitted - 60% ✎
Status Reason In Progress - GC Scope Leveling ✎
Inside Rep Megan Lindqvist ✎
New Business Dev Mgr Brett Holloway ✎
Engineer Assigned Kevin Vance, RCDD / iBwave Level 3 ✎

Project Automation, SharePoint & Financial Details

Create Project (SharePoint) Yes - Provision SharePoint Folder Structure ✎
Project (Parent Deal Lookup) Master Project (Parent to CO #1 Cardiology) ✎
FieldPoint Sync Status Synced to FieldPoint Sandbox / Prod Ready ✎
Related Site Survey SRV-2026-0412 (iBwave & Pathway Walk) ✎
Related Equipment BOM BOM-2026-771 (Graybar & CommScope) ✎
Total Contract Amount $284,500.00 ✎
Proposal Due Date 11/05/2026 ✎
Expected Close Date 11/18/2026 ✎
Estimated Install Labor Hrs 750 - 1,200 Tech Hours ✎
Testing & Certification Spec Fluke DSX-8000 Cat6A + DAQ 3.4 Grid Test ✎
Manufacturer Warranty Tier CommScope 25-Year Systimax Assurance ✎
SharePoint Folder Automatically Provisioned
Setting "Create Project" to "Yes" triggered the automated SharePoint flow. Folder structure created with subfolders: 01_RFP_Specs, 02_Estimator_Takeoffs, 03_iBwave_CAD, 04_Submittals, 05_FieldPoint_AsBuilts, and 06_Fluke_Test_Results.
Created by System Automation • October 15, 2026
Child Change Order Linked via Project Lookup
Opportunity "Apex Tower West - CO #1 Cardiology Wing Drops" ($38,200) is linked to this base opportunity via the Project lookup field so engineering hours and material deliveries roll up cleanly.
Created by Brett Holloway • October 24, 2026
Engineer Kevin Vance Takeoff Sign-Off
Verified ½-inch plenum corrugated coax attenuation losses across 6 floors. Added one fiber-fed remote BDA unit in the North IDF to maintain +18dBm downlink signal strength in the basement stairwells.
Created by Kevin Vance • October 26, 2026
◄ Back to Site Surveys List
S
Site Survey

SRV-2026-0412 - Apex Tower West RF & Cabling

Scheduled
On-Site Walk & RF Test
iBwave / CAD Modeling
Takeoff Ready
Synced to SharePoint
Details
Notes
Files

Survey Assignment & Facility Environment

Survey Number SRV-2026-0412 - Apex Tower West RF & Cabling ✎
Related Account Apex Mountain Healthcare System ✎
Survey Discipline Combined Cabling Pathway + 800MHz ERRCS Benchmark ✎
Ceiling & Pathway Structure Acoustic Drop Tile + Hard-Lid Gypsum Corridors ✎
Core Drilling & Firestopping 4-Inch Sleeve Cores x 5 Floors + STI EZ-Path ✎
Survey Owner / Engineer Kevin Vance (RCDD) ✎
Survey Status Takeoff Ready - Uploaded to SharePoint ✎
Survey Date 10/14/2026 ✎
On-Site Escort Contact David Lindstrom ✎
MDF / IDF Closet Count 1 Main MDF + 6 Stacked IDFs ✎
Lift & PPE Requirements ICRA HEPA Containment Cart + 8ft Fiberglass Ladder ✎

RF Propagation, Fiber Distance & Power Findings

Rooftop Donor Signal (RSSI) -72 dBm @ 854MHz (Strong Line-of-Sight) ✎
Baseline Interior DAQ Score Fails in Basement, Stairwells & Elevators (DAQ 1.8) ✎
Max Copper Horizontal Run 268 Feet (Within 295ft / 90m TIA-568 Limit) ✎
Backbone Fiber Footage 1,450 Feet (Armored OS2 Riser + Innerduct) ✎
Grounding & TMGB Status TIA-607 Compliant Busbar Present in MDF ✎
Dedicated AC Power & Backup Dedicated 120V 20A Hardwired + 24Hr BDA Battery ✎
Fire Alarm Panel Tie-In 6 Dry-Contact Supervisory Relays to FACP ✎
Design Software Output iBwave Public Safety + Bluebeam Revu Takeoff ✎
SharePoint Survey Subfolder SP://Apex_Tower_West/03_iBwave_CAD ✎
Resulting Equipment BOM BOM-2026-771 (420 Cat6A + 34 DAS Antennas) ✎
Rooftop Donor Azimuth & Slew Verification
Measured -72 dBm RSRP and 19 dB SINR pointing at 214 degrees True North toward the Aurora Public Safety 800MHz simulcast tower (3.1 miles away). Penthouse parapet wall provides ideal mounting structure for non-penetrating ballast sled.
Created by Kevin Vance (RCDD) • October 14, 2026
3rd Floor MRI Suite RF Shielding Note
The copper-lined MRI diagnostic suite on Level 3 has -118 dBm isolation. Placed two directional wall-mount panel antennas immediately outside the RF doors and coordinated non-ferrous pathway routing with David Lindstrom.
Created by Kevin Vance (RCDD) • October 15, 2026
IDF-4 Rack Space Constraint Resolved
Existing 2-post relay rack in 4th floor IDF has only 3 RU open. Added a Chatsworth wall-mount swing rack to the BOM to house the 48-port angled Cat6A patch panels and Corning fiber housing.
Created by Marcus Sterling • October 16, 2026
◄ Back to FieldPoint Projects List
P
FieldPoint Project

FP-PRJ-9021 - Apex Tower West DAS & Cat6A

Submittals & SharePoint Setup
Rough-In & Pathway
MDF/IDF Trim & Splicing
Fluke & AHJ Commissioning
As-Built Closeout
Details
Notes
Files

FieldPoint Dispatch & Project Execution

FieldPoint Job ID FP-PRJ-9021 - Apex Tower West DAS & Cat6A ✎
Deployment Phase Rough-In & J-Hook Pathway Installation ✎
Field Crew Assignment Crew Alpha (4 Low-Voltage Techs + 1 DAS Specialist) ✎
Rough-In Completion Status Levels 1-4 Complete / Levels 5-6 In Progress ✎
Project Owner / PM Lucas Graham (Senior PM) ✎
FieldPoint API Integration Bi-Directional Sync Active (Integration User) ✎
SharePoint Project Library SP://Projects/2026/Apex_Tower_West_DAS_Cabling ✎
Linked Change Order Job FP-PRJ-9055 (CO #1 Cardiology Wing Drops) ✎
Mobilization Start Date 10/05/2026 ✎
Target Substantial Completion 12/18/2026 ✎

Quality Assurance, Certification & AHJ Sign-Off

MDF / IDF Closet Buildout LAD Ladder Rack, 2-Post Racks & TMGB Bonded ✎
Fluke LinkWare Test Status 280 of 420 Cat6A Links Passed DSX-8000 ✎
ERRCS / AHJ Permit & Testing Permit Issued - 20-Grid Pre-Test Scheduled Nov 30 ✎
As-Built Redline Drawings In Progress - Bluebeam Field Updates Synced ✎
Labor Hours Consumed 412 of 920 Budgeted Hrs (45% - On Track) ✎
AIA Progress Billing Status 50% Material + Rough-In Billed (AIA G702 #3) ✎
Safety & ICRA Compliance Daily JHA Logged in FieldPoint / Zero Incidents ✎
Client On-Site Signer David Lindstrom (Facilities PM) ✎
Associated Equipment BOM BOM-2026-771 (Graybar & CommScope) ✎
FieldPoint Sandbox & Production Sync Verified
Work order timesheets, technician dispatch schedules, and material pick tickets from BOM-2026-771 sync directly via the dedicated FieldPoint integration user without consuming a full sales seat.
Created by Lucas Graham • October 18, 2026
2-Hour Fire Rated Pathway Inspection Passed
Aurora Building Inspector signed off on the 2-inch red EMT riser conduit and STI EZ-Path firestop devices between the roof donor antenna and the Level B1 BDA headend room.
Created by Lucas Graham • October 22, 2026
Corning OS2 Fusion Splicing Scheduled for Next Week
Fiber tech Mateo Silva will bring the Sumitomo ribbon/core alignment fusion splicer on Monday to terminate all 6 stacked IDF closets and run bi-directional OTDR traces.
Created by Mateo Silva • October 25, 2026
◄ Back to Equipment BOMs List
E
Equipment BOM

BOM-2026-771 - Apex Tower West DAS & Cat6A

Engineering Takeoff
Distributor SPA Quote
PO Issued via FieldPoint
Staged at Warehouse
Delivered & Installed
Details
Notes
Files

Bill of Materials & Distributor Sourcing

BOM Reference ID BOM-2026-771 - Apex Tower West DAS & Cat6A ✎
Related Account Apex Mountain Healthcare System ✎
Primary Supply Distributor Graybar Electric (Denver Hub) ✎
Cabling & Fiber OEM Spec CommScope Systimax 2091B Cat6A + TeraSPEED OS2 ✎
DAS / Active RF Hardware Comba RX78V2 Class B 800MHz BDA + 24Hr BBU ✎
BOM Owner / Estimator Kevin Vance (RCDD) ✎
Procurement & Staging Status Staged at Twin Eagle Warehouse (Palletized) ✎
Distributor SPA Quote # GB-SPA-994120-CO (Valid 90 Days) ✎
Total Material Cost $142,800.00 ✎
Material Gross Margin Tier 32% Blended Margin (SPA Protected) ✎
Related FieldPoint Project FP-PRJ-9021 - Apex Tower West DAS & Cat6A ✎

Pathway Hardware, Passive RF & Logistics

Plenum Coax & Passive RF RFS ½" Air-Dielectric Plenum Red Coax + PIM Splitters ✎
Racks, Cabinets & Enclosures 6x CPI 2-Post Racks + 2x NEMA 4X Red BDA Cabinets ✎
Pathway & Firestop Hardware Caddy Cat HP J-Hooks (2" & 4") + STI EZ-Path Sleeves ✎
Commercial AV / Security Gear None on Base BOM (Tracked on Boardroom Opp) ✎
Equipment Lead Time Status 100% In Stock - Zero Backorders ✎
Job Site Delivery Method Phased Delivery via Twin Eagle Box Truck (Liftgate) ✎
Submittal Cut Sheet Status Approved by MEP Engineer & Aurora Fire Marshal ✎
Pre-Configuration Lab Status BDA Bench-Tested & IP Addressed in Twin Eagle Lab ✎
SharePoint Submittal Link SP://Apex_Tower_West/04_Submittals ✎
CommScope Special Pricing Authorization (SPA) Applied
Registered the 420-drop Apex Tower West project with CommScope and Graybar under healthcare tier pricing. Saved 14% on 2091B Cat6A plenum reels and MGS600 information outlets.
Created by Megan Lindqvist • October 19, 2026
UL 2524 2nd Edition BDA Compliance Verified
Confirmed the Comba RX78V2 800MHz Class B BDA and 24-hour battery enclosure carry full UL 2524 listing required by the Aurora Fire Marshal prior to releasing the equipment PO in FieldPoint.
Created by Kevin Vance (RCDD) • October 20, 2026
Phased Warehouse Staging by Hospital Floor
Because hospital job site storage is tight, Graybar delivered all 185,000 feet of Cat6A and coax to the Twin Eagle warehouse. Warehouse team shrink-wrapped pallets by floor (IDF-1 through IDF-6) for just-in-time delivery.
Created by Lucas Graham • October 23, 2026