Operating a wind farm requires careful tracking of assets across vast geographic areas. From managing land leases to dispatching maintenance teams for gearbox repairs, this environment helps operators keep turbines spinning and power purchase agreements fulfilled.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Qualify new development sites and repowering leads. Accounts
Manage OEMs, landowners, and utility partners. Contacts
Organize site engineers, technicians, and local officials. Opportunities
Track PPA negotiations and major component upgrades. Campaigns
Coordinate community outreach and regulatory events. Wind Farms
Manage site-level data, capacity, and substations. Turbines
Track individual turbine specs, status, and warranties. Work Orders
Dispatch blade repairs and scheduled maintenance.Lead
Robert Vance
New
Contacted
Site Assessment
Qualified
Converted
Details
Notes
Files
Primary Information
Lead NameRobert Vance✎
TitleProject Director✎
Company NameValley Wind Partners✎
Phone(555) 123-4567✎
Project Type
Greenfield Development
✎
Lead OwnerDev Team✎
Status
Site Assessment
✎
Rating
Warm
✎
Lead Source
Web Inquiry
✎
Estimated Timeline
12-24 Months
✎
Target Capacity (MW)
50-100 MW
✎
Site & Technical Details
Wind Resource Class
Class III (Medium)
✎
Turbine Preference
Vestas
✎
Land Ownership Status
Leases Under Negotiation
✎
Permitting Phase
Initial Scoping
✎
Environmental Constraints
Avian/Bat Migration Corridor
✎
Grid Interconnection Status
Queue Position Secured
✎
PPA Target Offtaker
Corporate (vPPA)
✎
Funding Source
Private Equity Backed
✎
Distance to Transmission
5-10 Miles
✎
Primary Pain Point
Supply Chain / Lead Times
✎
Initial Scoping Call
Robert indicated they have secured ~60% of the land leases needed for a 75 MW layout. They are evaluating 3MW+ platform turbines to minimize footprint.
Interconnection Update
They hold a favorable queue position, but the ISO requires a System Impact Study to finalize the substation upgrade costs. We should wait for that report before proposing final turbine models.
Avian Study Progress
The Phase 1 avian study flagged potential bat migration paths. They may need to implement curtailment algorithms during specific fall months.
Account
Great Plains Renewables
Details
Contacts
Opportunities
Wind Farms
Turbines
Work Orders
Notes
Files
Company Profile
Account NameGreat Plains Renewables✎
Phone(555) 456-7890✎
Billing CityDes Moines, IA✎
Account Type
Independent Power Producer
✎
Account OwnerKey Accounts✎
Status
Active Client
✎
Preferred O&M Partner
Self-Performing
✎
Industry Sector
Renewable Energy
✎
Operational & Market Scope
Operating Region
Midwest (MISO)
✎
Total Portfolio Capacity
1-5 GW
✎
Primary Regulator
FERC / NERC
✎
Procurement Cycle
Annual Planning (Q3)
✎
Market Focus
Onshore Wind Development
✎
Service Agreement Level
Comprehensive Master Agreement
✎
Quarterly Business Review
Met with Elaine and Thomas. They are very focused on reducing crane mobilization costs next year. Proposed bundling the gearbox exchanges into a single 4-week campaign across two adjacent sites to share the heavy lift crane. They liked the idea.
SCADA Upgrade Discussion
Alicia noted that Prairie Gust is struggling with data drops on the legacy fiber loop. We are quoting a wireless mesh overlay to run in parallel.
Master Agreement Renewal
Signed the 3-year MSA renewal. Rates locked in with a 2% annual escalator. Included new SLA penalties if availability drops below 97% on our covered assets.
Contact
Elaine Brooks
Details
Notes
Files
Contact Information
Contact NameElaine Brooks✎
TitleVP of Operations✎
GWO Certification Level
Basic Safety Training (BST)
✎
Contact OwnerKey Accounts✎
Department
Operations & Maintenance
✎
Role in Buying Center
Executive Sponsor
✎
Influence Level
High
✎
Engagement & Preferences
Phone(555) 456-7891✎
Technical Expertise
High (Mechanical/Structural)
✎
Primary Language
English
✎
Union Affiliation
Non-Union (Management)
✎
Preferred Contact Method
Email (Send pre-reads)
✎
Site Access Clearance
All Sites (Unescorted)
✎
Training Status
LOTO Authorized
✎
Event Attendance
CLEANPOWER Conference
✎
Focus on Crane Optimization
Elaine made it clear that her biggest budget overrun last year was crane mobilization for unscheduled major component exchanges. Any proposal we make moving forward must address minimizing crane calls.
Safety Record
She is incredibly strict on LOTO protocols. Sent our field ops safety manual for her review prior to the Whispering Pines repowering. She approved our procedures without redlines.
New Hire Announcement
Elaine just hired a new regional manager (Chloe Diaz) to oversee the Eagle Ridge site. Requested we run an onboarding session with Chloe for the SCADA dashboard.
Opportunity
Gearbox Exchange Campaign 2027
Discovery
Feasibility Study
Proposal
Negotiation
Closed Won
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NameGearbox Exchange Campaign 2027✎
Amount$3,200,000✎
Close DateOct 30, 2026✎
Stage
Proposal
✎
Opportunity Type
Gearbox Replacement
✎
Opportunity OwnerKey Accounts✎
Probability60%✎
Forecast Category
Best Case
✎
Target Wind Farm
Prairie Gust
✎
Primary Competitor
Winergy
✎
Lead Source
Internal Expansion (QBR)
✎
Technical Scope & Execution
Total Turbines Included
12 Turbines
✎
Rated Capacity (MW)
30 MW Affected
✎
Estimated Annual AEP
+4% Uplift Expected
✎
Warranty Period
5-Year Extended
✎
Outage Alignment
Low-Wind Season (Summer)
✎
Environmental Review
Exempt (Maintenance)
✎
Financing Vehicle
O&M Operating Budget
✎
Contract Term Length
Project-Based (Fixed)
✎
Regulatory Approval Status
Not Required
✎
Delivery Point
On-Site Laydown Yard
✎
Availability Guarantee
97% Post-Install Guarantee
✎
Next Step Phase
Awaiting Budget Committee
✎
Crane Optimization Strategy
Bundled the 12 gearbox replacements to utilize a single 600-ton crawler crane mobilization. This knocked $200k off the bid compared to Winergy's piecemeal approach. Elaine is reviewing the financials.
Core Exchange Program
Confirmed with supply chain that we can accept all 12 damaged cores for rebuild credit. Factored a $15k per unit core credit into the final proposal price.
Weather Risk Clause
Added a standby rate clause for the crane in the event of wind speeds exceeding 10 m/s during the heavy lift window. Thomas Vance approved the language.
Campaign
CLEANPOWER 2026 Conference
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameCLEANPOWER 2026 Conference✎
Start DateMay 15, 2026✎
End DateMay 18, 2026✎
Type
Trade Show
✎
Campaign OwnerMarketing Team✎
Status
Completed
✎
Budgeted Cost
$85,000 (Booth & Travel)
✎
Expected Pipeline$4,500,000✎
Targeting & Strategy
Target Audience
Asset Managers & IPPs
✎
Theme/Topic Focus
Repowering & Lifecycle Mgmt
✎
Expected Response
High Volume (500+ Scans)
✎
Geographic Target
National (US)
✎
Call to Action
Visit Booth / Scan Badge
✎
Lead Routing
Round Robin (By Territory)
✎
Post-Show Debrief
Excellent turnout. The VR headset demo showing the inside of the nacelle was a huge draw. We collected 612 badge scans, with 45 flagged as hot leads for repowering projects.
VIP Dinner Notes
Hosted 15 IPP executives. The conversation heavily focused on supply chain constraints for main bearings. We assured them our inventory is staged in the US. Great ROI on the dinner.
List Upload Status
All badge scans parsed and uploaded. Assigned territories to the sales reps. The remaining 400 'cold' scans are entering the general Q3 nurture drip.
Wind Farm / Site
Prairie Gust
Development
Construction
Commissioning
Active Operations
Decommissioned/Repowered
Details
Notes
Files
Site Overview
Farm NamePrairie Gust✎
Location (City/State)Dodge City, Kansas✎
Commissioning Year2016✎
Farm Status
Active Operations
✎
Topology/Terrain
Flat Plains / Agriculture
✎
Farm OwnerKey Accounts✎
Grid Operator / ISO
SPP (Southwest Power Pool)
✎
Interconnection Voltage
345 kV
✎
Primary PPA Offtaker
Corporate vPPA (Tech)
✎
SCADA System Vendor
OEM Proprietary (GE)
✎
O&M Provider
Self-Performed (Owner)
✎
Performance & Capacity Metrics
Total Nameplate Capacity
180 MW
✎
Number of Turbines
85
✎
Wind Resource Class
Class I (High Wind)
✎
Average Wind Speed
8.5 m/s
✎
Environmental Clearance
Cleared (No Restrictions)
✎
Substation Capacity
250 MVA (Headroom Avail)
✎
Gross Capacity Factor
48%
✎
Net Capacity Factor
42% (Post-Losses)
✎
Wildlife Mitigation Plan
Active - Camera Monitoring
✎
Wake Effect Loss Est.
8% Loss
✎
Site Condition Update
Met with Chloe Diaz (Site Manager). The gravel access roads on the east string (Turbines 60-85) washed out significantly during last week's storms. We may need to grade them before bringing in heavy cranes for the gearbox campaign.
SCADA Integration Need
The legacy GE proprietary SCADA system is dropping packets. This is causing issues with the ISO dispatch signals. We are proposing a modern Ignition overlay to bypass the legacy system.
Production Milestone
Prairie Gust hit its highest ever monthly production in April due to sustained high winds. Net capacity factor hit 55% for the month.
Wind Turbine Generator
PG-T15
Details
Notes
Files
Hardware Identification
Turbine IDPG-T15✎
Manufacturer
GE Vernova
✎
Turbine Model
GE 2.5-116
✎
Serial NumberGE-PG-0015✎
Nameplate Capacity (MW)
2.5 MW
✎
Asset OwnerO&M Support✎
Operational Status
Fault - Stopped
✎
Current Fault Code
YAW_DRIVE_FAIL_02
✎
Condition Monitoring System
Active (Vibration Alert)
✎
Warranty Expiration
Expired
✎
Service Priority
High (Offline)
✎
Technical Specifications
Rotor Diameter (m)
116m
✎
Hub Height (m)
80m
✎
Cut-in Wind Speed
3.0 m/s
✎
Cut-out Wind Speed
25.0 m/s
✎
Rated Wind Speed
12.0 m/s
✎
Pitch System Type
Electric (Battery Backup)
✎
Yaw System Type
Active Electric Motors (4)
✎
Generator Type
Doubly Fed Induction (DFIG)
✎
Gearbox Type
3-Stage (Planetary/Helical)
✎
Foundation Type
Spread Footing (Gravity)
✎
Yaw Fault Logged
Turbine PG-T15 stopped due to a yaw motor overcurrent fault (YAW_DRIVE_FAIL_02). The CMS data shows increased vibration on motor 3 prior to the trip. Attempted remote reset but it failed. Requires uptower climb.
Work Order Dispatched
Created WO-99042. Dispatching two technicians to swap the yaw motor and inspect the pucks. Weather looks clear for tomorrow.
Annual PM Completed
Completed the 500-hour grease cycle and tightened the blade root bolts. No leaks observed on the pitch hydraulics.
Maintenance Work Order
WO-99042
New Alert
Remote Triage
Dispatched
In Progress On-Site
Resolved / Closed
Details
Notes
Files
Ticket Details
Work Order NumberWO-99042✎
Reported IssueYaw Motor Overcurrent Trip✎
Issue Category
Yaw System Fault
✎
Scheduled Start DateAug 04, 2026✎
Dispatch Team OwnerDispatch Team✎
Status
Dispatched
✎
Priority Level
High (Turbine Offline)
✎
SLA Commitment
48-Hour Response
✎
Field Tech Assigned
Mike Rivera & Team
✎
Resolution Type
Pending
✎
Execution & Safety Logistics
Requestor
Automated CMS Alert
✎
Estimated Duration
4 Hours (Uptower)
✎
Required Parts
GE Yaw Motor Assy (YM-220)
✎
Safety/LOTO Status
Pending LOTO Tag
✎
Crane Required
Internal Hoist Only
✎
Weather Delay Risk
Low (Clear Forecast)
✎
Root Cause Analysis
Pending Inspection
✎
Customer Approval Status
Pre-Approved (Under Contract)
✎
Estimated Repair Cost
$0 (Covered by MSA)
✎
Post-Repair Verification
Pending Final Test
✎
Initial CMS Alert
The Condition Monitoring System flagged high vibration on Yaw Motor 3 about two hours before the overcurrent trip occurred. Looks like a mechanical binding issue in the drive.
Remote Triage
Attempted a remote yaw un-twist. The system commanded the yaw motors, but motor 3 immediately spiked current and tripped the breaker. Confirmed hard fault. Dispatched tech.
Dispatch Logistics
Assigned Mike Rivera. He has checked out the replacement GE Yaw Motor assembly from the regional warehouse. He will use the nacelle's internal crane to hoist it up tomorrow morning.
