Water Management Districts balance public water supply, protect natural ecosystems, and mitigate flood risks. This interactive template demonstrates how regional water districts leverage a unified platform to track environmental resource permits, monitor water quality samples, manage critical infrastructure assets, and coordinate conservation initiatives across multiple basins.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Citizen Inquiries
Track public reports of flooding or environmental concerns. Managed Entities
Manage agricultural farms, municipalities, and HOAs. Stakeholders
Engage city engineers, environmental analysts, and residents. Water Projects
Oversee infrastructure upgrades and ecological restorations. Conservation Initiatives
Run public awareness and water restriction campaigns. Water Use Permits
Track consumptive use and environmental resource permits. Quality Samples
Monitor laboratory results for surface and groundwater. Infrastructure Assets
Maintain pump stations, spillways, levees, and wells.Citizen Inquiry
Algae Bloom in St. Johns
New Submission
Initial Review
Field Assessment
Closed Resolved
Details
Notes
Files
Primary Information
Inquiry Name
Algae Bloom in St. Johns
✎
Phone
(555) 123-4567
✎
Basin Region
Lower St. Johns
✎
Concern Category
Algae Bloom
✎
Inquiry Owner
Sarah Planner
✎
Inquiry Status
Initial Review
✎
Urgency Level
High Priority
✎
Water Body Prox.
Adjacent to River
✎
Preferred Contact
Email Preference
✎
Intake Method
Web Portal Form
✎
Field Operations Details
Latitude/Longitude
30.1245, -81.6543
✎
Initial Assessment
Visible Discoloration
✎
Inspector Assigned
Pending Assignment
✎
Dispatch Required
Yes - Sample Collection
✎
Resolution Status
Action Plan Drafted
✎
Violation Suspected
No Violation Suspected
✎
Incident Date
Aug 10, 2026
✎
Local Municipality
City of Jacksonville
✎
Permit Linked
None Associated
✎
Closure Code
N/A - Open
✎
Citizen Submission Narrative
Citizen noted a thick, bright green film forming near the community dock over the past 48 hours. Distinct smell reported.
Initial Triage Complete
Reviewed the attached photos. Matches the profile for Cyanobacteria. Escalating to field ops for immediate water quality sampling.
Dispatch Coordination
Contacted Unit B Tech. They are scheduling a boat run for tomorrow morning to extract surface and depth samples.
Managed Entity
Evergreen Citrus Farms
Details
Contacts
Water Projects
Permits
Samples
Assets
Notes
Files
Entity Profile
Entity Name
Evergreen Citrus Farms
✎
Entity Type
Agricultural Farm
✎
Parent Organization
Florida Ag Holdings LLC
✎
Tax ID
82-1234567
✎
Account Owner
Director Chen
✎
Basin Region
Southern Everglades
✎
Risk Classification
Low Risk
✎
Operating Status
Active Operation
✎
Compliance & Agreements
Primary Use Type
Crop Irrigation
✎
Compliance Rating
Compliant
✎
Inspection Cycle
Bi-Annual
✎
Contract Agreement
Standard Ag Use
✎
Renewal Month
November
✎
Field Office
South Regional HQ
✎
Site Inspection Complete
Conducted the bi-annual site inspection. Farm manager Robert Vance accompanied. Flow meters are correctly calibrated and seals are intact.
Modification Request Call
Spoke with compliance officer Kelly Barnes regarding their request to increase daily allocation by 0.5 MGD. Instructed them to submit the hydrologic modeling via portal.
Pump Station Maintenance Notice
Notified the farm that Pump Station West 2 requires bearing replacement within 60 days to remain compliant with ERP standards.
Stakeholder
Robert Vance
Details
Notes
Files
Primary Information
Stakeholder Owner
Director Chen
✎
Stakeholder Role
Farm Manager
✎
Primary Language
English
✎
Notification Pref
Email & Portal
✎
Demographics & Engagement
Mailing Region
Southern Basin Area
✎
Certification Type
Ag BMP Certified
✎
Engagement Level
Frequent Contact
✎
Committee Member
Ag Advisory Board
✎
Survey Response
Completed 2026
✎
Active Status
Current Role
✎
Portal Account Provisioned
Assisted Robert in setting up the entity's e-Permitting portal account. Walked through the meter upload process.
Advisory Board Nomination
Robert accepted the nomination to serve on the Agricultural Advisory Board for the 2026-2028 term.
Ag BMP Certification Verified
Received proof of completion for the state's Agricultural Best Management Practices (BMP) training.
Water Project
Drip Irrigation Retrofit Phase 1
Planning
Feasibility
Permitting
Construction
Details
Hardware & Labor
Notes
Files
Project Overview
Project Name
Drip Irrigation Retrofit Phase 1
✎
Close Date
Oct 15, 2026
✎
Stage
Construction
✎
Project Category
Ag Efficiency
✎
Funding Type
Cost-Share Grant
✎
Project Owner
Director Chen
✎
Total Budget
$450,000
✎
Priority Level
Medium
✎
Env Impact
Positive Conservation
✎
Permitting Req
ERP Modification
✎
Basin Location
Southern Everglades
✎
Execution & Compliance
Contractor Assgn
Ag-Tech Solutions Inc.
✎
Ecological Benefit
1.2 MGD Saved
✎
Federal Matching
USDA NRCS
✎
Public Comment Status
Not Required
✎
RFP Phase
Awarded
✎
Risk Assessment
Cleared - Low
✎
Hydro Model Run
MODFLOW Validated
✎
Compliance Status
In Tolerance
✎
Review Outcome
Board Approved
✎
Disbursement Phase
50% Drawdown
✎
Inspection Mandate
Quarterly Milestone
✎
Project Status
On Schedule
✎
Site Prep Started
Contractor has broken ground on trenches for the new micro-irrigation lines. Weather is holding up.
50% Drawdown Approved
Reviewed the initial hardware invoices. Approved the 50% cost-share disbursement to the farm's account.
Permit Modification Granted
Regulatory department officially modified CUP-8841 to reflect the anticipated 1.2 MGD savings from this project.
Conservation Initiative
Phase II Water Shortage Alert
Details
Target List
Notes
Files
Initiative Overview
Initiative Name
Phase II Water Shortage Alert
✎
Outreach Type
Restriction Notice
✎
Status
In Progress
✎
Start Date
Jul 01, 2026
✎
Campaign Owner
Director Chen
✎
Target Audience
All Basins
✎
Outreach Channel
Multi-Channel Broadcast
✎
Funding Source
Emergency Public Comm
✎
Metrics & Follow-up
Expected Impact
15% Demand Reduction
✎
Budget Allocation
$125,000
✎
Partner Agency
Local Municipal Water Depts
✎
Media Coverage
Statewide News Active
✎
Feedback Score
N/A (Mandate)
✎
Post-Init Action
Enforcement Sweeps
✎
Media Briefing Concluded
Director Chen held a press conference declaring the Phase II shortage. Major local channels picked it up for the evening news block.
Utility Coordination
Met with major municipal utility directors. They are loading the "1 day a week" watering schedule graphics onto citizen utility bills for next month.
Enforcement Sweep Planned
Field ops will begin randomly patrolling high-use neighborhoods on non-watering days starting next Monday. Warnings first, then citations.
Water Use Permit
CUP-8841-A (Evergreen Citrus)
Application
Under Review
Active / Issued
Expired / Closed
Details
Notes
Files
Permit Core Information
Permit Number
CUP-8841-A
✎
Issue Date
Nov 15, 2021
✎
Permit Type
Consumptive Use Permit
✎
Water Source
Groundwater
✎
Basin Location
Southern Everglades
✎
Permit Owner
Director Chen
✎
Status
Active
✎
Expiration Date
Nov 15, 2031
✎
Daily Allocation
2.50
✎
Allocation Unit
MGD (Million Gal/Day)
✎
Use Category
Agriculture Irrigation
✎
Compliance & Specifications
Pump Capacity
2000 GPM Limit
✎
Metering Req
Continuous Telemetry
✎
Drought Restr.
Phase II - 15% Cut
✎
Modification Status
Approved 2026 Reduction
✎
Compliance Grade
Excellent (No Vio)
✎
Last Inspection Date
Aug 05, 2026
✎
Hydro-Geo Zone
Floridan Aquifer Upper
✎
Salinity Threat
Monitored - Safe
✎
Review Committee
South Basin Board
✎
Final Ruling
Granted with Cond.
✎
Modification Processed
Processed the modification to lower the daily allocation to 2.5 MGD as part of the new micro-irrigation project savings.
Telemetry Calibration Certs
Farm submitted the annual calibration certificates for the SCADA meters. Everything within 2% accuracy tolerance.
Drought Alert Notice
System automatically tagged permit with Phase II restrictions. Sent notification to farm manager regarding the 15% reduction mandate.
Quality Sample
SMP-2608-01 (Groundwater)
Collected
Lab Received
Testing Active
Results Cleared
Details
Notes
Files
Collection Metadata
Sample ID
SMP-2608-01
✎
Collection Date
Aug 01, 2026
✎
Water Source
Ag Observation Well
✎
Sample Type
Groundwater
✎
Collection Method
Peristaltic Pump
✎
Lab Destination
State Central Lab
✎
Sample Owner
John FieldOps
✎
Lab Status
Cleared
✎
Sample Depth
45.0 ft
✎
Weather Conditions
Clear/Sunny
✎
Chain of Custody
Digitally Verified
✎
Basin Region
Southern Everglades
✎
Lab Parameters & Results
pH Level
7.4 (Normal)
✎
Turbidity (NTU)
1.2 (Clear)
✎
Dissolved Oxygen
6.5 mg/L
✎
Phosphorus
0.03 mg/L
✎
Nitrogen Level
0.8 mg/L
✎
Chlorophyll Status
Undetected
✎
Bacterial Count
Safe Limits
✎
Violation Flag
Clear
✎
Secondary Review
Passed QA/QC
✎
Remediation Trigger
None Required
✎
Results Finalized
Lab uploaded the final PDF report. All parameters are well within the safe operational limits for agricultural use. No signs of saltwater intrusion.
Lab Intake Confirmed
Coolers arrived at the State Central Lab at 4:30 PM. Temperature holding at 4 degrees C. Chain of custody signed.
Field Collection Notes
Purged well for 15 minutes before drawing sample. Water ran clear. No odor. Standard routine draw.
Infrastructure Asset
Pump Station West 2
Planning/Install
Active/Operational
Maintenance Mode
Decommissioned
Details
Notes
Files
Asset Registry Info
Asset Tag
PMP-W2-004
✎
Asset Name
Pump Station West 2
✎
Basin Region
Southern Everglades
✎
Asset Category
Pump Station
✎
Install Date
May 12, 2012
✎
Manufacturer
FlowTech Industrial
✎
Asset Owner
John FieldOps
✎
Operational Status
Maintenance Required
✎
Condition Rating
Poor
✎
Criticality
High
✎
Maintenance Cycle
Quarterly
✎
Power Source
Diesel Generator
✎
Technical Specifications
Pumping Capacity
5,000 GPM
✎
Spillway Type
N/A
✎
SCADA Integrated
Yes - Two-way
✎
Telemetry Status
Transmitting (Cellular)
✎
Flood Mitig Value
Primary Drain Route
✎
Last Service Date
Jul 10, 2026
✎
Next Service Date
Oct 10, 2026
✎
Replacement Phase
End of Lifecycle (0-2 Yrs)
✎
Safety Inspection
Failed - Bearing Issue
✎
FEMA Certified
Yes
✎
Urgent Repair Flagged
During the July 10th routine check, noticed excessive vibration and noise from the main drive shaft. Rated condition as Poor. Replacement bearing ordered.
Maintenance Notice Sent to Farm
Automated notice dispatched to Evergreen Citrus Farms advising them that West 2 will have intermittent downtime until repairs are finalized in September.
Annual SCADA Update
Flashed the telemetry unit with the latest firmware. Cellular signal strength is excellent at -65 dBm.
