Traffic engineering consulting requires precise data management and streamlined workflows. This template aligns project phases, from initial Traffic Impact Analysis (TIA) requests to final municipal permit approvals. Manage counts, Level of Service (LOS) calculations, and client communications in one centralized system. Decrease administrative overhead and focus on delivering accurate, compliant roadway solutions.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track incoming municipal and private developer requests. Accounts
Manage relationships with agencies and contracting firms. Contacts
Store planners, civil engineers, and state reviewers. Opportunities
Forecast proposals for TIA and intersection studies. Campaigns
Organize bids, outreach, and local DOT initiatives. Traffic Studies
Execute VISSIM, trip generation, and capacity analyses. Intersections
Log signal warrants, geometry, and phasing details. Permits
Track MOT plans, TCP approvals, and agency reviews.Lead
Marcus Wright
New
Contacted
Qualified
Converted
Details
Notes
Files
Primary Lead Information
First NameMarcus✎
Last NameWright✎
TitleSenior Planner✎
CompanyApex Developers✎
Phone(555) 123-4567✎
Lead OwnerSarah Jenkins✎
StatusNew✎
RatingHot✎
Development TypeCommercial✎
Zoning CodeC-2✎
PriorityHigh✎
Project Requirements
Project ScopeTIA & Mitigation✎
Estimated AADT15,000✎
JurisdictionCity DOT✎
Funding TypePrivate✎
Lead SourceWebsite RFP✎
Intersection Count4✎
Site Plan StatusDrafted✎
Traffic PatternCommuter Heavy✎
TimelineQ3 Start✎
Proposed UseRetail Plaza✎
Initial Scope Call
Client is requesting a full TIA for a proposed 50k sq ft retail plaza. Needs AM/PM peak counts.
Jurisdiction Confirmation
Confirmed with City DOT that a signal warrant analysis will be required for the main entrance.
Site Plan Review
Preliminary site plan looks tight on turning radii for delivery trucks. We need to run AutoTURN simulations.
Account
Apex Developers
Details
Contacts
Opportunities
Traffic Studies
Intersections
Permits
Notes
Files
Account Information
Account NameApex Developers✎
Phone(555) 111-2222✎
Websitewww.apex.example.com✎
Billing CityChicago✎
Account OwnerSarah Jenkins✎
IndustryReal Estate Development✎
Annual Revenue$45,000,000✎
Client Classification
Account TypeCustomer - Direct✎
Client CategoryPrivate Sector✎
MSA RegionMidwest✎
Municipality StatusN/A✎
Contract TypeProject-Based✎
Review BoardPlanning Commission✎
Preferred EngineerDavid Chen✎
Master Service Agreement Renewed
Apex renewed their MSA for another 24 months. Standard hourly rates apply across all civil projects.
New Contact: Janet Lewis
Janet has taken over as Director of Development. Ensure she is CCed on all preliminary study drafts.
Billing Preference Change
Client requests all invoices be split by phase (Data Collection vs Analysis) going forward.
Contact
Marcus Wright
Details
Notes
Files
Contact Information
Contact OwnerSarah Jenkins✎
DepartmentPlanning & Zoning✎
Certification LevelAICP✎
Communication Details
Communication PreferenceEmail✎
Project InvolvementHigh✎
Mailing CityChicago✎
Lead SourceWebsite RFP✎
Prefers AM Meetings
Marcus prefers review calls before 10 AM CST. Do not schedule Friday afternoons.
Site Plan Feedback
He noted the city will be strict on pedestrian access for the new plaza. Emphasize crosswalks in the TIA.
VISSIM Requirement
Marcus specifically asked if our firm handles VISSIM modeling in-house. Confirmed we do.
Opportunity
Apex Retail Plaza TIA
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NameApex Retail Plaza TIA✎
Amount$25,000.00✎
Close Date8/15/2026✎
StageProposal✎
Probability60%✎
Opportunity OwnerSarah Jenkins✎
TypeNew Business✎
Lead SourceWebsite RFP✎
Primary CompetitorKimley-Horn✎
Proposal StatusDelivered✎
Approval ProbabilityLikely✎
Traffic Engineering Requirements
TIA RequiredYes✎
HCM MethodologyHCM 6th Edition✎
Proposed PhasingSingle Phase✎
VISSIM ModelingRequired✎
Site Area5 Acres✎
Next StepFollow up call✎
Data Collection ProviderQuality Counts✎
Capacity AnalysisIncluded✎
Mitigation RequiredLikely✎
Signal Warrant NeededYes✎
Local DOT DistrictDistrict 4✎
Revision Count1✎
Proposal Pricing Strategy
Broke out VISSIM modeling as a separate line item since the city might waive it depending on the initial trip generation results.
Competitor Intel
Client mentioned Kimley-Horn is also bidding. We need to emphasize our rapid turnaround time for data collection.
Discovery Call Notes
Main concern is the Level of Service at the adjacent Hwy 50 intersection. If it drops below LOS D, they face massive mitigation costs.
Campaign
ITE Annual Conference 2026
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameITE Annual Conference 2026✎
TypeTrade Show✎
StatusIn Progress✎
Start Date8/10/2026✎
End Date8/13/2026✎
Budgeted Cost$15,000.00✎
Target AudienceTraffic Engineers✎
Campaign OwnerMarketing Team✎
Expected Revenue$150,000.00✎
Actual Cost$14,200.00✎
Responses45✎
Delivery MethodIn-Person Booth✎
RegionNational✎
Primary FocusLead Generation✎
Booth Shipping Details
Booth materials shipped via FedEx Freight. Tracking #88492001. Deliverable directly to the convention floor.
Speaker Slot Confirmed
David Chen is confirmed for the 2:00 PM Thursday slot to present on "VISSIM Applications in Roundabout Design".
Lead Scanning App Setup
Ensure all attendees download the ITE Lead Scanner app on their iPads and sync credentials before arrival.
Traffic Study
Apex Retail Full TIA
Scoping
Data Collection
Analysis
Drafting
Approved
Details
Notes
Files
Study Overview
Study NameApex Retail Full TIA✎
Study TypeTIA✎
StatusData Collection✎
Start Date8/01/2026✎
Study OwnerDavid Chen✎
RegionMidwest✎
AM Peak VolumePending✎
PM Peak VolumePending✎
Base LOSC✎
Build LOSD✎
Technical Metrics
Due Date9/01/2026✎
Data Collection MethodVideo Analytics✎
Turning Movement CountsScheduled✎
Speed Limit45 mph✎
Analysis SoftwareSynchro 11✎
Trip Generation RateITE 11th Ed✎
Mitigation CostTBD✎
Peer ReviewerCity of Portland DOT✎
Draft SubmissionPending✎
Final Approval Date--✎
TMC Scheduling
TMCs are scheduled for Tuesday next week to avoid the Monday/Friday variations. Cameras will be set up Monday night.
Trip Generation Pass
Ran the ITE 11th Ed numbers for Land Use Code 820. We are looking at ~250 PM peak hour trips.
Scoping Document Signed
City DOT approved the scoping document. We are clear to proceed with data collection.
Intersection
Hwy 50 & Retail Ent.
Details
Notes
Files
Location Details
Intersection NameHwy 50 & Retail Ent.✎
Major StreetHwy 50✎
Minor StreetRetail Entrance✎
Control TypeUnsignalized✎
Existing PhasingNone✎
Intersection OwnerSarah Jenkins✎
Crash HistoryModerate✎
Right-of-Way LimitsConstrained✎
TerrainLevel✎
Signal Warrant StatusPending Study✎
Roundabout FeasibilityLow✎
Performance & Geometry
Proposed Phasing8-Phase✎
Pedestrian InfrastructureNone✎
Bicycle FacilitiesShared Lane✎
Transit Stop PresentNo✎
Geometry TypeT-Intersection✎
Level of Service (Current)F✎
Level of Service (Future)D✎
V/C Ratio1.15✎
Delay (Seconds)85.4✎
JurisdictionState DOT✎
Warrant 3 Criteria
Peak hour volume looks like it will meet MUTCD Warrant 3 based on initial counts. Will confirm once final data is in.
ROW Constraints
The northeast quadrant has a utility pole that would be very expensive to move if we need a dedicated right-turn lane.
Crash Data Requested
Requested the last 3 years of crash data from State DOT. They estimate a 2-week turnaround.
Permit
Apex MOT Temp Lane
Drafting
Submitted
Under Review
Approved
Details
Notes
Files
Permit Details
Permit NameApex MOT Temp Lane✎
Permit TypeMOT/TCP✎
StatusSubmitted✎
Submission Date8/02/2026✎
Permit OwnerDavid Chen✎
Reviewer NameElena Rostova✎
MOT RequiredYes✎
TCP StatusDrafted✎
Lane Closure AllowedOff-Peak Only✎
Agency & Compliance
Review CycleCycle 1✎
AgencyCity DOT✎
Fee Amount$450.00✎
Payment StatusPaid✎
ExpeditedNo✎
Night Work AllowedYes✎
Approved Date--✎
Expiration Date--✎
Renewal NeededNo✎
Bond RequiredYes✎
Bond Amount$10,000.00✎
Portal Submission Successful
Uploaded the TCP and paid the $450 fee via the City DOT portal. Status is showing as received.
Night Work Approved
City confirmed that night work is allowed given the commercial zoning, but we must stay within the 70dB noise limit.
Bond Documentation
Sent the surety bond requirement to Apex so they can secure the $10k bond before approval.
