Template Hub Template Hub

Sales Cloud Template for Tool and Die Manufacturing

Managing specifications, material procurement, and tight tolerances requires a specialized setup. Tool and die manufacturers often face communication gaps between engineering and the shop floor. This setup consolidates blueprints, steel grades, production runs, and dimensional audits into a single system, streamlining workflows from initial RFQ to final run-off.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Marcus Wellby

New RFQ
Engineering Review
Quote in Progress
Awaiting Sample
Converted
Details
Notes
Files

Primary RFQ Information

First NameMarcus✎
Last NameWellby✎
CompanyApex Motors✎
TitleLead Tooling Engineer✎
Phone(313) 555-9802✎
Lead OwnerSarah Jenkins✎
Lead SourceTrade Show✎
Lead StatusEngineering Review✎
Part FamilyEngine Mounts✎
Expected Volume50,000 / year✎
RFQ Received DateAug 1, 2026✎

Technical Specifications

Target Tolerance+/- 0.005 in✎
Preferred MaterialA2 Tool Steel✎
Die Type RequestedProgressive Die✎
Required Press Tonnage500T✎
Coating RequirementTiN (Titanium Nitride)✎
CAD File FormatSTEP✎
Heat Treat Required?Yes✎
ISO StandardISO 9001:2015✎
PPAP LevelLevel 3✎
Target Build Time8-10 Weeks✎
Initial RFQ Review
Customer needs a progressive die for the new engine mount series. Critical tolerance on the mounting holes is +/- 0.005. They provided STEP files. Need engineering to review the draw stations.
Created by Sarah Jenkins • Aug 1, 2026
Material Cost Alert
A2 Tool Steel pricing has gone up this quarter. We should quote an alternative option with D2 to show potential cost savings without losing tool life.
Created by Purchasing • Aug 2, 2026
Press Fit Question
Called Marcus to clarify press tonnage limits at their facility. They can handle up to 800T, so our 500T design is well within their capacity.
Created by Sarah Jenkins • Aug 3, 2026