Managing specifications, material procurement, and tight tolerances requires a specialized setup. Tool and die manufacturers often face communication gaps between engineering and the shop floor. This setup consolidates blueprints, steel grades, production runs, and dimensional audits into a single system, streamlining workflows from initial RFQ to final run-off.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
L Leads
Track incoming RFQs and prototype inquiries.A Accounts
Manage OEMs, Tier 1 suppliers, and vendors.C Contacts
Organize purchasing agents and lead engineers.O Opportunities
Forecast quotes, tool design, and production runs.C Campaigns
Drive trade shows and machining capabilities outreach.T Tooling Projects
Manage die design, build phases, and sampling.M Machine Assets
Track CNCs, presses, EDMs, and maintenance schedules.Q Quality Inspections
Log CMM reports, tolerance checks, and compliance.Interactive Template Below
L
Leads
| Name | Company | Part Family | Status | Target Tolerance | Owner |
|---|---|---|---|---|---|
| Marcus Wellby | Apex Motors | Engine Mounts | Engineering Review | +/- 0.005 in | Sarah Jenkins |
| Linda Vargas | Crestline Stamping | Bracket Assemblies | New RFQ | +/- 0.002 in | David Chen |
| Thomas Reed | Precision Aero | Turbine Casings | Quote in Progress | +/- 0.001 in | Sarah Jenkins |
| Priya Patel | TechForm Plastics | Injection Molds | Awaiting Sample | Standard | Mike Torres |
| James O'Connor | heavyDuty Trucking | Chassis Supports | Finalizing Specs | +/- 0.010 in | David Chen |
L
Lead
Marcus Wellby
New RFQ
Engineering Review
Quote in Progress
Awaiting Sample
Converted
Details
Notes
Files
Primary RFQ Information
First NameMarcus✎
Last NameWellby✎
CompanyApex Motors✎
TitleLead Tooling Engineer✎
Phone(313) 555-9802✎
Lead OwnerSarah Jenkins✎
Lead SourceTrade Show✎
Lead StatusEngineering Review✎
Part FamilyEngine Mounts✎
Expected Volume50,000 / year✎
RFQ Received DateAug 1, 2026✎
Technical Specifications
Target Tolerance+/- 0.005 in✎
Preferred MaterialA2 Tool Steel✎
Die Type RequestedProgressive Die✎
Required Press Tonnage500T✎
Coating RequirementTiN (Titanium Nitride)✎
CAD File FormatSTEP✎
Heat Treat Required?Yes✎
ISO StandardISO 9001:2015✎
PPAP LevelLevel 3✎
Target Build Time8-10 Weeks✎
Initial RFQ Review
Customer needs a progressive die for the new engine mount series. Critical tolerance on the mounting holes is +/- 0.005. They provided STEP files. Need engineering to review the draw stations.
Created by Sarah Jenkins • Aug 1, 2026
Material Cost Alert
A2 Tool Steel pricing has gone up this quarter. We should quote an alternative option with D2 to show potential cost savings without losing tool life.
Created by Purchasing • Aug 2, 2026
Press Fit Question
Called Marcus to clarify press tonnage limits at their facility. They can handle up to 800T, so our 500T design is well within their capacity.
Created by Sarah Jenkins • Aug 3, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Apex_Mount_Assembly_v2.step | STEP | 14.2 MB | Aug 1, 2026 |
| RFQ_Requirements_Doc.pdf | 1.1 MB | Aug 1, 2026 | |
| Material_Spec_Sheet_A2.pdf | 0.8 MB | Aug 2, 2026 |
A
Accounts
| Account Name | Account Type | Industry | Annual Volume | Phone | Owner |
|---|---|---|---|---|---|
| Apex Motors | OEM | Automotive | 100,000+ | (313) 555-0000 | Sarah Jenkins |
| Precision Aero | Tier 1 Supplier | Aerospace | 5,000 - 10,000 | (206) 555-1234 | David Chen |
| TechForm Plastics | Molding Partner | Consumer Goods | 25,000 - 50,000 | (408) 555-9876 | Mike Torres |
| National Steel Supply | Material Vendor | Raw Materials | N/A | (800) 555-4321 | Sarah Jenkins |
| heavyDuty Trucking | OEM | Heavy Machinery | 50,000 - 100,000 | (415) 555-6789 | David Chen |
A
Account
Apex Motors
Details
Contacts
Opportunities
Tooling Projects
Machine Assets
Quality Inspections
Notes
Files
Account Information
Account NameApex Motors✎
Account TypeOEM✎
Industry FocusAutomotive✎
Phone(313) 555-0000✎
Account OwnerSarah Jenkins✎
Active Tooling MSAYes✎
Preferred CAD FormatSTEP✎
Quality & Financials
Required ISO StandardIATF 16949✎
Standard PPAP LevelLevel 3✎
Annual Volume100,000+✎
Payment TermsNet 45✎
Max Machine Tonnage800T✎
Die Maintenance MSAIncluded✎
Vendor CodeAPX-9981✎
Contacts
| Name | Title | Phone | |
|---|---|---|---|
| Marcus Wellby | Lead Tooling Engineer | [email protected] | (313) 555-9802 |
| Sarah Kline | VP Procurement | [email protected] | (313) 555-9811 |
| Robert Vance | Quality Assurance Mgr | [email protected] | (313) 555-9822 |
| Emily Chen | Stamping Plant Mgr | [email protected] | (313) 555-9833 |
| John Davis | Supplier Quality Eng | [email protected] | (313) 555-9844 |
Opportunities
| Name | Stage | Amount | Close Date |
|---|---|---|---|
| Engine Mount Progressive Die | Prototyping/Sampling | $145,000 | Oct 15, 2026 |
| Bracket Assembly Tooling | Closed Won | $85,000 | Jan 12, 2026 |
| Heat Shield Stamping Die | Estimation | $110,000 | Dec 01, 2026 |
| Chassis Clip Transfer Die | Proposal Delivered | $220,000 | Nov 20, 2026 |
| Control Arm Prototype Run | Closed Won | $35,000 | Mar 05, 2026 |
Tooling Projects
| Project Name | Status | Die Type | Target Date |
|---|---|---|---|
| PRJ-881: Engine Mount Die | In Build | Progressive Die | Nov 1, 2026 |
| PRJ-722: Bracket Assembly | Completed | Progressive Die | Feb 20, 2026 |
| PRJ-611: Control Arm Proto | Completed | Blanking Die | Apr 10, 2026 |
| PRJ-904: Heat Shield T-Die | Design Review | Transfer Die | Jan 15, 2027 |
| PRJ-505: Door Latch Coining | Tryout Phase | Coining Die | Sep 30, 2026 |
Machine Assets (Customer Located)
| Asset Name | Asset Type | Tonnage/Capacity | Status |
|---|---|---|---|
| Apex Press Line 1 | Stamping Press | 800T | Active |
| Apex Press Line 2 | Stamping Press | 500T | Active |
| Apex Tryout Press | Tryout Press | 250T | Maintenance Due |
| Apex CMM Unit A | CMM Machine | Standard | Active |
| Apex Coil Feeder System | Coil Feeder | N/A | Active |
Quality Inspections
| Inspection ID | Project | Result | Inspector |
|---|---|---|---|
| QA-2026-081 | PRJ-881: Engine Mount | Passed | R. Vance |
| QA-2026-042 | PRJ-722: Bracket Assembly | Passed | R. Vance |
| QA-2026-099 | PRJ-505: Door Latch | Failed - Out of Tolerance | J. Davis |
| QA-2026-105 | PRJ-505: Door Latch Rework | Passed | R. Vance |
| QA-2026-011 | PRJ-611: Control Arm | Passed | J. Davis |
Annual Vendor Review Notes
Apex scored us at 98.5% on-time delivery for Q2 tooling adjustments. They want us to quote on the upcoming EV platform chassis clips.
Created by Sarah Jenkins • Jul 10, 2026
IATF Audit Notice
Apex will be conducting an IATF 16949 supplier audit next month. Ensure all PPAP documentation for PRJ-722 is fully uploaded and accessible.
Created by QA Dept • Aug 1, 2026
Press Upgrade
Apex upgraded Press Line 1 to 800T capacity. We can now design larger progressive dies for them without outsourcing the tryout phase.
Created by Engineering • Jun 15, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Apex_Vendor_MSA_2026.pdf | 2.4 MB | Jan 05, 2026 | |
| IATF_Audit_Checklist.pdf | 1.1 MB | Aug 01, 2026 | |
| EV_Platform_Routing_Specs.xlsx | XLSX | 4.8 MB | Jul 10, 2026 |
C
Contacts
| Name | Account | Title | Phone | Owner | |
|---|---|---|---|---|---|
| Marcus Wellby | Apex Motors | Lead Tooling Engineer | mwellby@apex... | (313) 555-9802 | Sarah Jenkins |
| Sarah Kline | Apex Motors | VP Procurement | skline@apex... | (313) 555-9811 | Sarah Jenkins |
| Greg Halpert | Precision Aero | Senior Machinist | ghalpert@pre... | (206) 555-1212 | David Chen |
| Nina Patel | TechForm Plastics | Quality Director | npatel@techf... | (408) 555-3321 | Mike Torres |
| Luis Gomez | heavyDuty Trucking | Supply Chain Mgr | lgomez@heavy... | (415) 555-8899 | David Chen |
C
Contact
Marcus Wellby
Details
Notes
Files
Contact Information
Technical Preferences
Preferred CAD FormatSTEP✎
Design Authority?Yes✎
Approval LevelEngineering Sign-off✎
Preferred Contact MethodEmail✎
Primary Tooling FocusProgressive Dies✎
Receives Status ReportsWeekly✎
Engineering Standards
Marcus prefers all pilot holes in the progressive dies to have a minimum clearance of 0.0015". Ensure design team is aware before the next design review.
Created by Eng Dept • Aug 2, 2026
Vacation Alert
Marcus is out of the office the last week of August. Route all technical approvals to Sarah Kline during that time.
Created by Sarah Jenkins • Jul 15, 2026
Trade Show Meeting
Met Marcus at the Fabtech expo. He was impressed by our new 5-axis CNC capabilities for complex forming stations.
Created by Sarah Jenkins • May 10, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Marcus_Business_Card.jpg | JPG | 0.5 MB | May 12, 2026 |
| Apex_Engineering_Standards_v4.pdf | 3.2 MB | Jun 01, 2026 | |
| Design_Approval_Signature_MW.pdf | 0.3 MB | Jul 20, 2026 |
O
Opportunities
| Opportunity Name | Account Name | Amount | Stage | Target Tolerance | Owner |
|---|---|---|---|---|---|
| Engine Mount Progressive Die | Apex Motors | $145,000 | Prototyping/Sampling | +/- 0.005 in | Sarah Jenkins |
| Turbine Casing Fixture | Precision Aero | $82,500 | Spec Review | +/- 0.001 in | David Chen |
| Consumer Shell Mold | TechForm Plastics | $95,000 | Proposal Delivered | Standard | Mike Torres |
| Chassis Support Transfer Die | heavyDuty Trucking | $210,000 | Estimation | +/- 0.010 in | David Chen |
| Gear Blanking Die Replacement | Apex Motors | $45,000 | Negotiation | +/- 0.002 in | Sarah Jenkins |
O
Opportunity
Engine Mount Progressive Die
RFQ Received
Spec Review
Estimation
Proposal Delivered
Prototyping/Sampling
Negotiation
Closed
Details
Line Items
Notes
Files
Quote & Build Information
Opportunity NameEngine Mount Progressive Die✎
Amount$145,000.00✎
Close DateOct 15, 2026✎
StagePrototyping/Sampling✎
Probability75%✎
Opportunity OwnerSarah Jenkins✎
Tooling TypeProgressive Die✎
Die Size (L x W)48" x 24"✎
Number of Stations8✎
Estimated Build Weeks12 Weeks✎
Lead EngineerMark Peterson✎
Material & Tolerance Specs
Die Steel GradeA2 Tool Steel✎
Stock Material1018 Cold Rolled Steel✎
Stock Thickness0.125 in (11 ga)✎
Stock Width6.50 in✎
Progression/Pitch4.00 in✎
Scrap Rate Target< 15%✎
Target Tolerance+/- 0.005 in✎
Heat Treat Hardness58-60 HRC✎
Punch CoatingTiN (Titanium Nitride)✎
Target Strokes/Min60 SPM✎
Sensor IntegrationPart Out & Misfeed✎
Tryout LocationIn-House✎
P Quoted Line Items
| Line Item Name | Product Code | Quantity | Unit Price | Total Price | Tolerance Tier |
|---|---|---|---|---|---|
| Progressive Die - 8 Station (A2) | DIE-PROG-08 | 1.00 | $125,000.00 | $125,000.00 | +/- 0.005 in |
| Prototype Strip Run (500 pcs) | SRV-PROTO-500 | 1.00 | $8,500.00 | $8,500.00 | Standard |
| Spare Punch & Die Set (TiN Coated) | SPR-PUNCH-SET | 1.00 | $6,500.00 | $6,500.00 | +/- 0.002 in |
| In-Die Sensor Package | SNS-PKG-01 | 1.00 | $5,000.00 | $5,000.00 | N/A |
Prototype Sampling Adjustments
During the prototype run, we noticed some springback on station 4 (the 90-degree form). Engineering is adding an over-bend factor to the final tool design to compensate.
Created by Mark Peterson • Aug 3, 2026
Cost Breakdown Discussion
Marcus asked for a breakout on the sensor package. Explained that the $5k includes both part-out and misfeed sensors wired to a standard junction box. He approved.
Created by Sarah Jenkins • Jul 28, 2026
Material Lead Time
A2 steel blocks for the die shoes have a 3-week lead time right now. We need a PO by next week to hit the 12-week build schedule.
Created by Purchasing • Jul 20, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Engine_Mount_Quote_v2.pdf | 1.2 MB | Jul 25, 2026 | |
| Die_Strip_Layout_Draft.pdf | 3.5 MB | Jul 20, 2026 | |
| Forming_Simulation_Report.mp4 | MP4 | 18.4 MB | Jul 18, 2026 |
C
Campaigns
| Campaign Name | Type | Status | Start Date | Expected Revenue | Owner |
|---|---|---|---|---|---|
| Fabtech Expo 2026 | Trade Show | In Progress | May 10, 2026 | $500,000 | Marketing Dept |
| Q3 Machining Capabilities Email | Planned | Sep 01, 2026 | $150,000 | Marketing Dept | |
| Automotive OEM Outreach | Direct Mail | In Progress | Jul 01, 2026 | $250,000 | Sarah Jenkins |
| Tooling Maintenance Webinar | Webinar | Completed | Jun 15, 2026 | $80,000 | Marketing Dept |
| Medical Device Spec Flyer | Planned | Oct 01, 2026 | $100,000 | David Chen |
C
Campaign
Fabtech Expo 2026
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameFabtech Expo 2026✎
TypeTrade Show✎
StatusIn Progress✎
Start DateMay 10, 2026✎
Campaign OwnerMarketing Dept✎
ActiveYes✎
Target IndustryManufacturing✎
End DateMay 14, 2026✎
Planning & Metrics
Booth Number4055✎
Promoted Capability5-Axis CNC & Progressive Dies✎
Leads in Campaign142✎
Budgeted Cost$25,000✎
Expected Revenue$500,000✎
Converted Leads18✎
Campaign Members
| Name | Title | Company | Status |
|---|---|---|---|
| Marcus Wellby | Lead Tooling Engineer | Apex Motors | Attended |
| Linda Vargas | VP Engineering | Crestline Stamping | Attended |
| Greg Halpert | Senior Machinist | Precision Aero | Responded |
| Priya Patel | Tooling Buyer | TechForm Plastics | Attended |
| Luis Gomez | Supply Chain Mgr | heavyDuty Trucking | Sent |
Booth Traffic Report
Traffic was heavy on day 2. The 5-axis CNC video loop drew a lot of attention from Tier 1 suppliers looking to reshore their complex tooling needs.
Created by Marketing Dept • May 12, 2026
Lead Qualification
Sales team needs to prioritize the 18 leads who explicitly asked for quotes on progressive dies. Ensure follow-up emails go out by Friday.
Created by Sarah Jenkins • May 15, 2026
Swag Inventory
We ran out of the precision calipers we were giving away as swag. Next year we need to order 500 instead of 250.
Created by Marketing Dept • May 16, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Fabtech_Badge_Scans.csv | CSV | 0.1 MB | May 15, 2026 |
| Booth_Backdrop_Design.pdf | 5.6 MB | Apr 01, 2026 | |
| CNC_Capability_Brochure.pdf | 2.2 MB | Apr 15, 2026 |
T
Tooling Projects
| Project Name | Account | Status | Die Type | Target Date | Lead Engineer |
|---|---|---|---|---|---|
| PRJ-881: Engine Mount Die | Apex Motors | In Build | Progressive Die | Nov 1, 2026 | Mark Peterson |
| PRJ-904: Heat Shield T-Die | Apex Motors | Design Review | Transfer Die | Jan 15, 2027 | Alan Wright |
| PRJ-505: Door Latch Coining | Apex Motors | Tryout Phase | Coining Die | Sep 30, 2026 | Mark Peterson |
| PRJ-992: Aerospace Bracket | Precision Aero | Material Ordered | Blanking Die | Dec 10, 2026 | Susan Lee |
| PRJ-401: Chassis Clip Proto | heavyDuty Trucking | Machining Components | Line Die | Oct 20, 2026 | Alan Wright |
T
Tooling Project
PRJ-881: Engine Mount Die
Design Review
Material Ordered
Machining Components
In Build (Assembly)
Tryout Phase
CMM Inspection
Completed
Details
Notes
Files
Project Overview
Project NamePRJ-881: Engine Mount Die✎
StatusIn Build (Assembly)✎
Die TypeProgressive Die✎
Target Completion DateNov 1, 2026✎
Lead EngineerMark Peterson✎
Shop Floor ManagerJim Halstead✎
Percent Complete65%✎
Budget StatusOn Budget✎
Actual Cost to Date$68,400✎
Manufacturing & Engineering Details
Die Size48" x 24"✎
Number of Stations8✎
CNC Machining Hours120 hrs (Est)✎
EDM Wire Hours45 hrs (Est)✎
Assembly Hours80 hrs (Est)✎
Die Steel GradeA2 Tool Steel✎
Heat Treat StatusCompleted (58 HRC)✎
Coating StatusPending✎
Tryout Press Required500T Minimum✎
First Article (PPAP)Level 3✎
Assembly Delay
The punch holders for stations 3 and 4 arrived from heat treat slightly warped. We had to surface grind them down an extra 0.002", which cost us a day in assembly. We are still on track for the Nov 1 target.
Created by Jim Halstead • Aug 1, 2026
Sensor Package Wiring
Confirmed with Marcus that the misfeed sensor will use a standard 4-pin M12 connector to interface with their press control panel. Noted in the assembly drawings.
Created by Mark Peterson • Jul 20, 2026
Design Approval Sign-off
Apex Engineering officially signed off on the strip layout and 3D solid model. We are clear to order the main A2 blocks and standard components (springs, pins).
Created by Mark Peterson • Jun 10, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| PRJ881_Assembly_Drawing.pdf | 4.5 MB | Jul 01, 2026 | |
| BOM_List_PRJ881.xlsx | XLSX | 0.4 MB | Jun 15, 2026 |
| Customer_Approval_Signed.pdf | 1.1 MB | Jun 10, 2026 |
M
Machine Assets
| Asset Name | Asset Type | Manufacturer | Location | Status | Owner |
|---|---|---|---|---|---|
| Haas 5-Axis Mill #3 | CNC Mill | Haas Automation | In-House: Bay 2 | Active | Shop Floor Mgr |
| Makino Wire EDM #1 | Wire EDM | Makino | In-House: EDM Room | Active | Shop Floor Mgr |
| Minster 500T Tryout Press | Tryout Press | Minster | In-House: Press Bay | Maintenance Due | Shop Floor Mgr |
| Apex Press Line 1 | Stamping Press | Komatsu | Customer Site | Active | Sarah Jenkins |
| Zeiss CMM Unit B | CMM Machine | Zeiss | In-House: QA Lab | Active | QA Dept |
M
Machine Asset
Minster 500T Tryout Press
Details
Notes
Files
Asset Information
Asset NameMinster 500T Tryout Press✎
Asset TypeTryout Press✎
ManufacturerMinster✎
Model NumberE2-500✎
Serial NumberMN-88421✎
Year Built2015✎
Asset OwnerShop Floor Mgr✎
LocationIn-House: Press Bay✎
StatusMaintenance Due✎
Related AccountInternal Asset✎
Tonnage/Capacity500T✎
Bed Size (L x W)120" x 60"✎
Maintenance & Capabilities
Last MaintenanceFeb 15, 2026✎
Next PM DueAug 15, 2026✎
Total Stroke Count1,450,200✎
Feeder SystemServo Roll Feeder✎
Controller TypeWintriss SmartPAC 2✎
Max Shut Height36.0 in✎
Stroke Length12.0 in✎
Variable Speed30-60 SPM✎
Cushion Capacity50T Pneumatic✎
Hourly Rate (Burdened)$185.00/hr✎
Upcoming Preventative Maintenance
The 6-month PM is due on Aug 15. We need to check the clutch/brake clearance and grease the main pitman bearings. Schedule this around the tryout for PRJ-881.
Created by Maintenance Dept • Aug 1, 2026
Sensor Fault
The Wintriss controller threw a fault on input #4 (cam switch). Replaced the proximity sensor, system is running normally now.
Created by Maintenance Dept • May 20, 2026
Hydraulic Overload Upgrade
We upgraded the hydraulic overload protection (HOLP) system to a fast-response valve. This should prevent tonnage spikes during heavy coining tryouts.
Created by Engineering • Jan 10, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Minster_E2_Manual.pdf | 15.2 MB | Jan 05, 2020 | |
| PM_Checklist_Completed_Feb26.pdf | 0.8 MB | Feb 15, 2026 | |
| HOLP_Upgrade_Schematic.pdf | 2.1 MB | Jan 10, 2026 |
Q
Quality Inspections
| Inspection ID | Project / Tool | Type | Result | Date | Inspector |
|---|---|---|---|---|---|
| QA-2026-105 | PRJ-505: Door Latch Rework | CMM Audit | Passed | Aug 02, 2026 | Robert Vance |
| QA-2026-099 | PRJ-505: Door Latch | First Article | Failed | Jul 28, 2026 | John Davis |
| QA-2026-081 | PRJ-881: Engine Mount Component | In-Process Check | Passed | Jul 25, 2026 | Robert Vance |
| QA-2026-042 | PRJ-722: Bracket Assembly | Final PPAP | Passed | Feb 25, 2026 | Nina Patel |
| QA-2026-011 | PRJ-611: Control Arm | Tryout Run-off | Passed | Jan 15, 2026 | John Davis |
Q
Quality Inspection
QA-2026-099
Sample Submitted
CMM Programmed
Inspection in Progress
Data Review
Sign-off (Pass/Fail)
Details
Notes
Files
Inspection Report Header
Inspection IDQA-2026-099✎
Inspection TypeFirst Article (PPAP)✎
Inspection DateJul 28, 2026✎
Sample Quantity Checked30 pcs✎
Lead InspectorJohn Davis✎
Overall ResultFailed - Out of Tolerance✎
Defect CategoryDimensional Variance✎
Target StandardIATF 16949✎
Corrective Action Required?Yes✎
Measurement Data
Critical Dimension 1Hole Diameter A✎
Spec Target 10.250" +/- 0.002"✎
Actual Meas 1 (Avg)0.253" (FAIL)✎
Critical Dimension 2Bend Angle B✎
Spec Target 290.0 deg +/- 0.5 deg✎
Actual Meas 2 (Avg)90.8 deg (FAIL)✎
CPK Score (Capability)0.82 (Target > 1.33)✎
Gage R&R %8.5% (Pass)✎
Visual Finish CheckPass (No Burrs)✎
Approval SignatureJD✎
Root Cause Analysis (Dimensional)
The hole diameter is oversized due to punch wear on station 5. The bend angle is failing due to excessive springback in the HSLA steel batch. We need to add an over-bend cam to station 7.
Created by John Davis • Jul 28, 2026
Corrective Action Initiated
Engineering has ordered a TiN-coated punch to solve the wear issue, and is modifying the die shoe for the over-bend cam. Next tryout scheduled for Aug 2.
Created by Robert Vance • Jul 29, 2026
Follow Up on Aug 2
The rework fixed the issues. See QA-2026-105 for the passing CMM report. We achieved a CPK of 1.45 on the bend angle.
Created by John Davis • Aug 2, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| QA99_Zeiss_CMM_Report.pdf | 2.5 MB | Jul 28, 2026 | |
| CPK_Data_Export_PRJ505.xlsx | XLSX | 1.2 MB | Jul 28, 2026 |
| Corrective_Action_Plan_Signoff.pdf | 0.6 MB | Jul 29, 2026 |


