Managing complex telecommunications engineering projects requires tight coordination between site acquisition, RF design, and construction teams. This template organizes macro tower upgrades, small cell deployments, and OSP fiber buildouts. Track right-of-way permitting, colocation statuses, and infrastructure specifications in one place to streamline your engineering workflows.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track RFPs for fiber routes and macro site modifications. Accounts
Manage relationships with carriers and tower owners. Contacts
Keep track of OSP managers and RF engineering leads. Opportunities
Pipeline for 5G upgrades and dark fiber deployments. Campaigns
Organize trade show outreach and carrier meetings. Telecom Sites
Log towers, poles, equipment specs, and backhaul. Permits
Monitor zoning, right-of-way, and environmental approvals. Network Projects
Oversee active network builds from NTP to closeout.Lead
Robert Vance - Zayo Group
New
Contacted
Qualified
Converted
Details
Notes
Files
Primary Lead Information
Lead OwnerDavid Chen✎
Lead StatusNew✎
RatingHot✎
Lead SourceWebsite RFP✎
RegionMidwest✎
Phone(555) 123-4567✎
Telecom Requirements
Interest AreaOSP Fiber✎
Project ScopeTurnkey Build✎
TimelineQ3 Start✎
Tech RequirementDark Fiber✎
Budget Estimate$450,000✎
Infrastructure StatusGreenfield (New Build)✎
Carrier TierTier 1 Carrier✎
Vendor PreferenceCiena✎
TopographyUrban Dense✎
Fiber Mileage15 Miles✎
Node Count8✎
Priority LevelHigh - Contract Driven✎
Initial Scope Assessment
Zayo is looking to build out a 15-mile dark fiber ring in downtown Chicago. They need turnkey engineering including right-of-way permitting.
Make-Ready Concerns
Robert mentioned there might be significant make-ready issues on the utility poles along the northern route. We need to factor a field audit into the proposal.
Permitting Dependencies
City of Chicago DOT is running 60 days behind on excavation permits. Highlight this schedule risk early.
Account
Crown Castle
Details
Contacts
Opportunities
Telecom Sites
Permits
Network Projects
Notes
Files
Account Information
Account NameCrown Castle✎
Phone(555) 333-4444✎
Websitewww.crowncastle.com✎
Billing CityHouston✎
Account OwnerDavid Chen✎
Industry Sub-SectorTower Owner/Operator✎
Account TierStrategic Account✎
SLA LevelGold (24hr Response)✎
Network Infrastructure
Fiber FootprintNational Backbone✎
Master AgreementActive MSA✎
Preferred EquipmentEricsson/Nokia Mixed✎
Tower Portfolio Size40,000+ Sites✎
Vendor StatusApproved A&E Vendor✎
Region FocusNorth America✎
MSA Rate Update
Negotiated a 5% rate increase across all A&E services for the 2026-2028 MSA cycle. Specifically covers structural analysis and zoning drawings.
Colocation Push
Crown is heavily incentivizing their carrier clients to colocate on existing monopoles rather than build new. Focus our pitches on rapid mount design turnaround.
Billing Portal Change
They are moving from Ariba to Coupa for vendor billing starting in Q3. Ensure finance is registered.
Contact
Marcus Wright
Details
Notes
Files
Contact Information
Contact OwnerDavid Chen✎
DepartmentReal Estate & Zoning✎
RoleProject Coordinator✎
CertificationNot Applicable✎
Engagement Details
Comm PreferenceMobile / Text✎
Decision AuthoritySite Level Approvals✎
Technical FocusSite Permitting (Zoning/ROW)✎
Permitting Expediter
Marcus handles all the local zoning boards for the Northeast region. He prefers texts for quick updates on permit statuses rather than long emails.
Focus on Colocation
He mentioned his KPIs this quarter are tied to getting AT&T colocated on existing monopoles. Pitch our rapid structural analysis turnaround times.
Site Walk Protocol
Always coordinate with Marcus before sending field crews to Crown sites. He needs 48 hours notice to unlock compound gates.
Opportunity
AT&T Colocation Structurals (Batch of 50)
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NameAT&T Colocation Structurals (Batch of 50)✎
Amount$125,000.00✎
Close Date8/15/2026✎
StageProposal✎
Probability60%✎
Opportunity OwnerDavid Chen✎
TypeExisting Client Expansion✎
Lead SourceReferral✎
CompetitorBlack & Veatch✎
Primary CarrierAT&T✎
Contract VehicleMaster Service Agreement✎
Project Scope & Engineering
Tech Standard5G / C-Band Add✎
Equipment VendorEricsson✎
Backhaul TypeDark Fiber✎
Submittal PhaseA&E Drawings (CDs)✎
Site Count50✎
Route Miles0 (Macro Site Work)✎
Environment TypeExisting Macro Towers✎
Permitting ComplexityLow - Building Permit Only✎
Structural Analysis ReqPassing SA Required✎
RF Design ReqClient Provided Plumbing✎
Build MethodEngineering Only✎
NTP StatusPending PO✎
Batch Discount Applied
Applied a 10% batch discount to the SA and CD line items since they are providing all 50 site surveys (SSVs) upfront.
Mod Design Excluded
Note that if any structural analysis fails, the Modification Design (Mod) is NOT included in this $125k base. We will issue change orders at $2.5k per mod.
Ericsson Antenna Specs
Ensure the drafting team uses the latest Ericsson AIR 6449 specs for wind load calculations on these C-Band adds.
Campaign
WIA Connect(X) 2026
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameWIA Connect(X) 2026✎
TypeTrade Show✎
StatusIn Progress✎
Start Date8/10/2026✎
Campaign OwnerMarketing Team✎
Target AudienceTower Owners / Carriers✎
Delivery MethodIn-Person Booth✎
End Date8/13/2026✎
Target Metrics
Service FocusA&E Design Services✎
Budgeted Cost$15,000.00✎
Actual Cost$14,200.00✎
Region FocusNational✎
Expected Revenue$150,000.00✎
Responses45✎
Booth Shipping Details
Booth materials shipped via FedEx Freight. Tracking #88492001. Deliverable directly to the convention floor at the Georgia World Congress Center.
Speaker Slot Confirmed
David Chen is confirmed for the 2:00 PM Thursday panel to present on "Overcoming Small Cell Permitting Hurdles in Dense Urban Markets".
Lead Scanning App Setup
Ensure all attendees download the Connect(X) Lead Scanner app on their iPads and sync credentials before arrival.
Telecom Site
Crown_NYC_Macro_045
Candidate Search
Leasing & Zoning
Construction
Active On-Air
Details
Notes
Files
Site Information
Site NameCrown_NYC_Macro_045✎
Site IDNY-9982-A✎
Latitude40.7128✎
Longitude-74.0060✎
Site OwnerDavid Chen✎
Asset TypeMacro Tower✎
Structure TypeSelf-Support Lattice✎
StatusActive✎
Ground Elevation15 ft AMSL✎
Engineering & Zoning
Tower Height120 ft✎
Rad Center110 ft✎
Equipment LoadHeavy (80% Capacity)✎
Power AvailabilityCommercial AC Available✎
Generator PresentYes - Shared✎
Fiber BackhaulLit Fiber Active✎
Zoning JurisdictionNYC Dept of Buildings✎
Colocation Status3 Tenants Active✎
Compound SpaceLimited (10x10 open)✎
Access Type24/7 Keypad Access✎
Lease StatusActive (> 5 Years Left)✎
Environmental RiskNEPA Cleared✎
Compound Space Limitation
Site walk confirmed there is only a 10x10 footprint left for ground equipment. AT&T will need to stack their baseband units vertically for the upcoming colocation.
Passing Structural Analysis
The recent SA run by the engineering team shows the tower is at 82% capacity, which is passing, but means any future additions after AT&T will likely require tower modifications.
Access Code Change
Crown Castle updated the main gate Knox box code. New code is 4492. Inform any field crews heading there this week.
Permit
NYC Zoning Mod - Antennas
Drafting App
Submitted
AHJ Review
Approved
Details
Notes
Files
Permit Details
Permit NameNYC Zoning Mod - Antennas✎
Application NumberAPP-NY-10294✎
Submission Date6/15/2026✎
Expiration Date6/15/2027✎
Permit OwnerDavid Chen✎
StatusApproved✎
Permit CategoryZoning Approval✎
AHJ Type✎
Approval Probability100%✎
Agency & Compliance
Jurisdiction NameNYC Buildings Dept✎
Fee Amount$1,250.00✎
Review CycleCycle 2✎
Traffic Control ReqNo (Tower Site)✎
PE Seal ReqYes - Stamped CDs provided✎
Environmental StudyExempt (Existing Structure)✎
Hearing RequiredNo (Admin Approval)✎
Expedite StatusStandard Processing✎
Historic DistrictNo✎
Neighborhood PushbackNone✎
Assigned ReviewerJim Henderson✎
Decision StatusPermit Issued✎
Cycle 1 Comments Addressed
The city asked for updated wind loading calculations showing the new C-Band antennas. We provided the revised stamped drawings on 7/10. Approved thereafter.
Permit Pick Up
Hard copy of the permit placard needs to be picked up from the DOB office. I will send a courier on Monday.
Post-Installation Inspection
Make sure the GC is aware that the city requires a post-installation structural inspection before they will close out the permit.
Network Project
Crown 5G Carrier Mods Q3
Planning
Engineering & Permitting
Construction
Integration & Test
Closeout
Details
Notes
Files
Project Information
Project NameCrown 5G Carrier Mods Q3✎
Start Date6/01/2026✎
Target Completion9/30/2026✎
Overall Progress50% Complete✎
Project OwnerSarah Jenkins✎
StatusIn Progress✎
Project TypeEquipment Upgrade✎
Deployment RegionNortheast✎
Funding SourceCarrier CapEx✎
Execution Details
NTP Date5/28/2026✎
Total Sites50✎
Fiber Route Miles0 (Site Work)✎
Trenching MethodNot Applicable✎
Splicing ReqNone✎
Material StatusFully Delivered to Warehouse✎
Turnkey StatusEngineering Only (A&E)✎
Primary SubcontractorNone (In-House A&E)✎
QA/QC StandardCarrier Specific (AT&T)✎
Closeout PackageIn Progress✎
Weather ImpactNo Delays✎
Risk LevelLow✎
A&E Deliverables Pacing
We are delivering construction drawings (CDs) in batches of 10. The first 25 sites are fully approved by the client and moved into the construction phase by their general contractor.
Material Lead Time Resolved
The delay on the Ericsson AIR radios has been resolved. The carrier's warehouse received the full shipment for the remaining 25 sites.
Closeout Review Pushed
AT&T has updated their closeout matrix. Make sure the drafting team uses the V3 checklist for all As-Built drawing submittals.
