Structural engineering firms require precise tracking for complex project lifecycles. This CRM template is built specifically for structural design, forensic engineering, and inspection services. Track project phases, site inspections, and RFIs seamlessly. Streamline your firm operations and maintain rigorous project oversight.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track incoming design bids and project inquiries. Accounts
Manage developers, contractors, and public agencies. Contacts
Organize key project stakeholders and designers. Opportunities
Monitor design contracts and service proposals. Campaigns
Coordinate technical seminars and industry events. Projects
Oversee active structural design engagements. Site Inspections
Log field reports, rebar checks, and weld quality. RFIs
Manage field questions and drawing clarifications.Lead
Marcus Wright - Summit Construction
New
Contacted
Qualified
Pending RFP
Converted
Details
Notes
Files
Primary Contact Information
First NameMarcus✎
Last NameWright✎
TitlePreconstruction Manager✎
Lead Status
Contacted
✎
Project Type
Commercial High-Rise
✎
Lead OwnerSarah Jenkins✎
Phone555-102-3948✎
Sector
Private Developer
✎
Lead Source
Referral
✎
Primary Discipline
Structural Engineering
✎
Technical Project Parameters
Foundation Type Req
Deep Pile Foundation
✎
Expected Tonnage
1000-5000 Tons
✎
Building Material Focus
Structural Steel
✎
Construction Method
Design-Build
✎
Seismic Zone
Zone 3
✎
Wind Load Category
Category III
✎
Soil Condition
Site Class D (Stiff Soil)
✎
Procurement Method
Negotiated Contract
✎
Budget Status
Fully Funded
✎
Rating
Hot
✎
Initial Meeting - Geotechnical Concerns
Met with Marcus regarding the upcoming high-rise project. They are concerned about the soil classification (Site Class D) and want our input on deep pile foundations vs mat raft.
Budget Clarification
Confirmed the project is fully funded. They are looking to issue the RFP for the structural engineering package by the end of the month.
Design-Build Strategy
Client is opting for a Design-Build delivery method. We will need to partner with a local contractor if we proceed.
Account
Apex General Contractors
Details
Contacts
Opportunities
Projects
Inspections
RFIs
Notes
Files
Primary Information
Account NameApex General Contractors✎
Account Type
Contractor
✎
Industry Sector
Private Developer
✎
Billing CityChicago✎
Account OwnerMichael Torres✎
Phone555-882-9911✎
Websitewww.apex-gc-builds.com✎
Engineering Business Details
Client Classification
Tier 1 - Strategic
✎
Payment Terms
Net 45
✎
Delivery Method
Design-Build
✎
Active Projects Vol
$10M - $50M
✎
Preferred Contract Type
Lump Sum (Fixed Price)
✎
QA/QC Standard
High - Rigorous Peer Review
✎
Structural Risk Profile
Moderate
✎
Quarterly Review Meeting
Met with Frank to review the ongoing Riverfront project. They are happy with our turnaround times on RFIs and want us to bid on the new Medical Center.
Insurance Requirement Update
Apex has updated their subcontractor requirements. We need to provide a new Certificate of Insurance (COI) with $5M umbrella coverage before the next contract signing.
Site Safety Stand-down
Apex held a mandatory safety stand-down across all sites today due to a crane incident at a competitor's site. No impact to our field inspectors.
Contact
Sarah Connor
Details
Notes
Files
Contact Information
First NameSarah✎
Last NameConnor✎
TitleDesign Director✎
Contact Role
Design Lead
✎
Decision Authority
Influencer
✎
Professional Credential
AIA
✎
Contact OwnerSarah Jenkins✎
Phone555-773-2288✎
Mobile555-773-9999✎
Communication Pref
Email
✎
Involvement Phase
Schematic Design (SD)
✎
Approval Frequency
Weekly
✎
Design Charette Notes
Sarah wants the structure for the new tower to accommodate a column-free lobby space. We need to evaluate transfer trusses or a mega-column approach.
Sustainability Requirements
She stressed the importance of tracking embodied carbon for the concrete mix designs to help them achieve LEED Platinum.
Lunch & Learn Attendee
Sarah attended our firm's Lunch & Learn on Mass Timber structural behavior. She is highly interested in using it for their mid-rise portfolio.
Opportunity
Downtown Tower Structural Design
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Contract Information
Opportunity NameDowntown Tower Structural Design✎
Type
New Business
✎
Stage
Negotiation
✎
Service Type
Full Structural Design
✎
Opportunity OwnerMichael Torres✎
Close Date10/15/2026✎
Amount$450,000✎
Probability (%)80%✎
Next StepFinalize T&C redlines✎
Complexity Rating
High
✎
Engineering Scope Specifications
Building Height Tier
High-Rise (10+ Stories)
✎
Delivery Schedule
Aggressive/Fast-Track
✎
Modeling Software
Revit + ETABS
✎
Code Standard
IBC 2021 / ASCE 7-22
✎
Peer Review Req
Yes - City Mandated
✎
Feasibility Phase
Completed
✎
Material Base
Composite (Steel/Concrete)
✎
Environmental Load
High Wind (Category IV)
✎
Retrofit Indicator
New Construction
✎
Submittal Tier
Full BIM LOD 300
✎
Insurance Requirement
$5M Professional Liability
✎
Bid Status
Shortlisted
✎
Legal Redline Status
Apex's legal counsel returned our redlines on the limitation of liability clause. We are pushing for a hard cap at our fee ($450k) rather than full project value.
Scope Clarification
Updated the proposal to clarify that steel connection design is delegated to the fabricator, and we are only performing review. Adjusted hours accordingly.
Shortlist Notification
Frank called to let us know we made the final two. Our BIM capabilities and prior experience with this soil type gave us the edge.
Campaign
High-Rise Seismic Seminar
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameHigh-Rise Seismic Seminar✎
Type
Webinar
✎
Status
In Progress
✎
Is Active
Yes
✎
Campaign OwnerMarketing Team✎
Start Date10/01/2026✎
End Date10/01/2026✎
Budget Allocated
$2,500
✎
Targeting & Performance
Target Sector
Commercial Real Estate
✎
Expected Response
12%
✎
Campaign Objective
Lead Generation (New Bids)
✎
Actual Cost$1,150✎
Outreach Method
Digital / Email Invites
✎
Region Focus
West Coast (Seismic Zones)
✎
Presentation Dry Run
The engineering principles dry run went well. Need to add a slide comparing viscous dampers to tuned mass dampers for the LA market segment.
Target List Pulled
Pulled all contacts and leads in West Coast regions with active or past high-rise projects. Sent the first email blast today.
AIA CEU Credit Approval
We received approval from AIA to offer 1.0 Learning Unit (LU) for attendees of this webinar. This should drive up registration.
Project
PRJ-2026-001 (Riverfront Mixed-Use)
Design
Permitting
Bidding/Fabrication
Construction
Closeout
Details
Notes
Files
Project Overview
Project NamePRJ-2026-001 (Riverfront Mixed-Use)✎
Phase
Construction Administration
✎
Delivery Model
Design-Build
✎
Structural System
Post-Tensioned Slabs with Shear Cores
✎
Project Owner (PM)Michael Torres✎
Project Start Date01/15/2026✎
Estimated Completion12/01/2027✎
Current Status
Active - Construction
✎
Primary Material
Reinforced Concrete
✎
Engineering Specifics & Progress
Foundation System
Drilled Shafts
✎
BIM LOD
LOD 400 (Fabrication)
✎
Sustainability Goal
LEED Gold
✎
Floor Count14 + 2 Subgrade✎
Fabrication Status
In Progress - 40%
✎
Seismic Category
Design Category D
✎
Wind Exposure
Exposure C (Open Terrain)
✎
Risk Category
Risk Category III (High Occupancy)
✎
Shop Drawing Review
Level 3 - Concrete Submittals
✎
Field Issue Severity
Low - Routine RFIs
✎
Slab Pour 3 Coordination
Coordinated with Apex on the Level 3 slab pour. PT tendon layout looks good, but inspector noted a slight discrepancy near column line F4. Generating RFI to clarify.
Submittal Review Complete
Finished reviewing the batch 4 rebar shop drawings. Marked "Approved as Noted". We required heavier lap splices in the shear wall boundary elements.
Drilled Shaft Completion
Foundation contractor has completed the last drilled shaft. Geotech report confirms bearing capacity met. We are officially out of the ground.
Site Inspection
INS-1045 - PRJ-2026-001
Scheduled
In Progress
Pending Remediation
Passed
Report Filed
Details
Notes
Files
Inspection Details
Inspection IDINS-1045✎
Inspection Type
Steel Connection/Weld
✎
Element Checked
Moment Frame Connections
✎
Discrepancy Level
Moderate (Fix Required)
✎
Inspection OwnerGreg Jenkins✎
Inspection Date08/02/2026✎
Start Time09:00 AM✎
End Time11:30 AM✎
Status
Pending Remediation
✎
Field Verification Findings
Concrete Test Status
N/A
✎
Steel Connection Status
Weld Porosity Found
✎
Fireproofing Status
Not Inspected
✎
Weather Condition
Clear / Dry
✎
Access Method
Scissor Lift
✎
Code Compliance
Non-Compliant - AWSD1.1
✎
Rebar Placement
N/A
✎
Weld Quality
Fail - Undercut/Porosity
✎
Bolt Torque
Pass (Snug Tight)
✎
Remediation Req
Gouge and Reweld
✎
Final Sign-off
Pending Re-inspection
✎
Weld Inspection Failure - Grid Line 4
Performed UT on the moment frame connections at grid line 4. Discovered unacceptable porosity in the full penetration weld at the bottom flange of column C4. Gouging and re-welding is required per AWS D1.1.
Contractor Notified
Notified the steel erector superintendent on site. They will mobilize the welding rig back to this section tomorrow morning. Re-inspection scheduled for tomorrow afternoon.
Bolting Check Passed
All shear tab bolting on the secondary beams in this bay passed visual and tension checks. The issue is isolated to the moment connection.
RFI
RFI-0092 - Slab Edge Detail Clarification
Draft/Received
Under Review
Pending Client Info
Responded
Closed
Details
Notes
Files
RFI Information
RFI NumberRFI-0092✎
RFI Type
Constructability Issue
✎
Structural Element
Slab Edge Detail
✎
RFI Owner (Reviewer)Sarah Jenkins✎
Date Received08/01/2026✎
Date Required08/06/2026✎
Status
Open
✎
Priority
Medium
✎
Impact & Resolution
Discipline
Structural Design
✎
Reason for RFI
Curtain Wall Anchor Clash
✎
Impact on Schedule
None (If resolved by 8/6)
✎
Cost Impact
Potential Change Order
✎
Resolution Category
Detail Modification
✎
Review Phase
EOR Reviewing
✎
Approval Status
Pending
✎
Mitigation Strategy
Shift Rebar 2" Inboard
✎
Clash Detection
Structural vs Envelope
✎
Response Tier
Standard (5 Days)
✎
Closure Method
Pending Issued Sketch
✎
Initial Assessment
The GC notes that the embed plates for the curtain wall are clashing with the perimeter PT tendons on level 3. If we shift the PT tendons 2" inboard, we maintain structural integrity but need to verify with the PT supplier.
Coordination Call
Called the PT supplier. They confirmed shifting the tendons 2" inboard on the north elevation is acceptable and doesn't require a resubmittal. I will draft a sketch (ASK-012) to formalize this.
Drafting Sketch
Sketch ASK-012 is with the drafting team. Should be ready for EOR stamp by tomorrow afternoon, well ahead of the required date.


