Template Hub Template Hub

Sales Cloud Template for Specialized Heavy Haulers

Managing specialized heavy haul transportation requires precise coordination of oversize load permits, multi-axle equipment allocation, and escort vehicle routing. This Salesforce template provides a centralized system for heavy haulers to track industrial shipping leads, manage multi-state route surveys, and coordinate complex moves. Operations teams can maintain full visibility on DOT permit applications, bridge formula compliance, and lowboy trailer availability across their entire fleet.

✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Robert Vance

New
Contacted
Qualified - Route Checked
Converted
Details
Notes
Files

Primary Prospect Information

First Name Robert ✎
Last Name Vance ✎
Company Titan Energy Solutions ✎
Title Logistics Coordinator ✎
Email [email protected] ✎
Phone (555) 482-9931 ✎
Lead Owner Sarah Miller ✎
Lead Source Trade Show ✎
Lead Status Contacted ✎
Priority Level High ✎
Route Origin Houston, TX ✎
Route Destination Odessa, TX ✎

Load Characteristics & Equipment

Commodity Category Industrial Generators ✎
Est. Weight (lbs) 185,000 ✎
Max Width (in) 168 ✎
Max Height (in) 180 ✎
Max Length (ft) 45 ✎
Trailer Type Needed Modular Trailer ✎
Escort Cars Required? Yes ✎
DOT Permit Status Pending Application ✎
Target Move Date 10/15/2026 ✎
Est. Budget $45,000 ✎
Bridge Formula Check Needed
Due to the 185k lbs gross weight, we need engineering to verify if the 14-axle modular trailer will pass Texas DOT bridge formula requirements for the Odessa route.
Created by Sarah Miller • July 28, 2026
Utility Lift Requirement
Robert indicated the generator height sits at exactly 15 feet loaded. We will definitely need bucket trucks to lift utility lines on the county roads near the destination.
Created by Route Planning Team • July 26, 2026
Trade Show Introduction
Met Robert at the Heavy Transport Expo. He was impressed by our recent successful transformer haul in NM and wants a quote for this generator move by end of month.
Created by Sarah Miller • July 20, 2026
◄ Back to Accounts List
Account

Atlas Crane & Rigging

Details
Contacts
Opportunities
Haul Projects
Heavy Equipment
Route Surveys
Notes
Files

Account Profile

Account Name Atlas Crane & Rigging ✎
Phone (555) 201-9988 ✎
Website www.atlascrane.ex ✎
Billing City Charlotte ✎
Account Owner Sarah Miller ✎
Account Type Active Client ✎
Industry Segment Heavy Construction ✎

Operational Metrics

Primary Freight Construction Machinery ✎
Preferred Trailer Type Lowboy ✎
Max Axle Capacity Req. 9-Axle Configuration ✎
Master Service Agmt. Signed - Valid ✎
Active Haul Projects 3 ✎
Credit Limit $250,000 ✎
Safety Rating Satisfactory (FMCSA) ✎
Crawler Crane Project Logistics
The upcoming Nashville to Dallas move requires breaking the crawler crane into 4 separate loads. Tracks and main body will require 9-axle setups to pass the Arkansas bridge formulas.
Created by Route Planning Team • July 25, 2026
Safety Rating Update
Atlas maintained their FMCSA Satisfactory rating during the recent site audit. We can proceed with using their loaders for the terminal rigging without secondary insurance riders.
Created by Safety Coordinator • June 10, 2026
Annual Rate Agreement
Signed the 2026 Master Service Agreement. We secured a 4% increase on all standard RGN lane rates to account for rising pilot car vendor costs.
Created by Sarah Miller • Jan 10, 2026
◄ Back to Contacts List
C
Contact

David Briggs

Details
Notes
Files

Contact Details

First Name David ✎
Last Name Briggs ✎
Account Name Atlas Crane & Rigging ✎
Title VP of Rigging Ops ✎
Contact Owner Sarah Miller ✎
Role Focus Project Executive ✎
Site Access Clearance TWIC Approved ✎

Communication & Preferences

Email [email protected] ✎
Phone (555) 201-9989 ✎
Contact Preference Cell Phone Only ✎
Emergency Contact Yes ✎
On-site Availability First Shift Only ✎
Escort Certification N/A ✎
Do Not Call False ✎
Site Coordination Preference
David prefers that all our drivers check in with Jessica Lopez upon arriving at the rigging yard. David should only be called if there is a catastrophic load shift or permit failure.
Created by Sarah Miller • July 22, 2026
Contract Negotiation Authority
David is the final signature for all master service agreements. He pushes hard on detention fees but is flexible on linehaul rates if we guarantee 9-axle availability.
Created by Sarah Miller • Jan 10, 2026
TWIC Renewal Alert
His TWIC card is up for renewal next month. Reminded him so we don't face access issues at the Charleston port for the upcoming barge retrieval project.
Created by Compliance Team • June 15, 2026
◄ Back to Opportunities List
O
Opportunity

Crawler Crane Assembly Relocation

Discovery
Route Check & Proposal
Negotiation
Permitting Pipeline
Closed Won
Details
Line Items
Notes
Files

Opportunity & Cargo Information

Opportunity Name Crawler Crane Assembly Relocation ✎
Account Name Atlas Crane & Rigging ✎
Amount $112,000.00 ✎
Close Date 8/30/2026 ✎
Stage Negotiation ✎
Probability (%) 80% ✎
Opportunity Owner Sarah Miller ✎
Commodity Description Dismantled Crawler Crane ✎
Total Weight (lbs) 320,000 (Combined) ✎
Max Width (in) 144 (Main Body) ✎
Max Height (in) 160 (Loaded) ✎
Rig Type Required Multi-Load Fleet ✎

Routing & Permitting Logistics

Contract Type Project Haul Bid ✎
Primary Origin Nashville, TN ✎
Primary Destination Dallas, TX ✎
Est. Transit Days 4 Days ✎
Permit Lead Time 14 Days Required ✎
Pricing Model Lump Sum Project ✎
Pilot Cars Needed Front & Rear Convoy ✎
Police Escort Required? Yes (AR & TX) ✎
Route Survey Attached Yes (SRV-450) ✎
Bridge Formula Check Passed (9-Axle) ✎
Competitor Info Titan Freight Networks ✎
Risk/Delay Factor DOT Permit Backlogs ✎
Discount Negotiation Request
Atlas is asking to shave $5,000 off the convoy escort package. I explained that Arkansas State Police just raised their hourly escort minimums. Holding firm at $112k total.
Created by Sarah Miller • July 28, 2026
Bridge Clearance Verification
The Route Survey (SRV-450) was completed and approved. We will clear the I-30 overpass by a mere 6 inches. Bucket trucks will be on standby for low-hanging fiber lines just off the highway.
Created by Route Planning Team • July 25, 2026
Initial Load Plan
Broke down the total 320k weight into 4 loads. The 9-axle and 7-axle setups are reserved in the Heavy Equipment pool for mid-August.
Created by Fleet Manager • July 20, 2026
◄ Back to Campaigns List
C
Campaign

Heavy Transport Expo 2026

Details
Campaign Members
Notes
Files

Campaign Information

Campaign Name Heavy Transport Expo 2026 ✎
Status Completed ✎
Start Date 7/18/2026 ✎
End Date 7/20/2026 ✎
Campaign Owner Marketing Team ✎
Type Trade Show ✎
Target Audience Industrial Manufacturers ✎
Key Message/Pitch Zero-Incident Multi-Axle Moves ✎

Performance & ROI

Budgeted Cost $18,500.00 ✎
Actual Cost $19,200.00 ✎
Leads Generated 145 ✎
Opportunities Won 2 ✎
Value Won $320,000.00 ✎
Primary Fleet Highlighted Modular Trailers ✎
Booth Setup Feedback
The scaled model of our 13-axle modular setup drew a huge crowd. We should bring the interactive route survey simulator next year, people were very interested in how we map bridge clearances.
Created by Marketing Team • July 22, 2026
Budget Variance
Slight overage on the budget due to expedited shipping costs for the promotional hardhats we handed out. Approved by Finance.
Created by Marketing Team • July 21, 2026
Lead Import Complete
All badge scans have been processed. Passed the top tier energy sector leads to Sarah Miller for immediate follow-up.
Created by Sales Ops • July 20, 2026
◄ Back to Haul Projects List
H
Haul Project

PRJ-8904 - Crawler Main Body

Planning & Permitting
Rigging / Loading
In Transit
Delivered / Offloaded
Invoiced
Details
Notes
Files

Project & Route Core

Project Name PRJ-8904 - Crawler Main Body ✎
Account Atlas Crane & Rigging ✎
Origin State Tennessee (TN) ✎
Destination State Texas (TX) ✎
Project Status In Transit ✎
Distance (Miles) 665 ✎
Project Owner Operations Control ✎
Freight Category Superload (Over-Dimensional) ✎
Required Axles 9-Axle Configuration ✎
Bridge Formula Status Approved Multi-State ✎
DOT Permit Status Approved - Multi-State ✎
Invoice Status Pending Delivery ✎

Equipment & Operational Details

Loaded Weight (lbs) 135,000 lbs ✎
Loaded Dimensions 144"W x 160"H x 45'L ✎
Assigned Tractor TRC-990 ✎
Assigned Trailer TRL-104 (RGN) ✎
Pilot Car Vendor Dynamic Escort Services ✎
Police Escort Status Active (Arkansas) ✎
Route Survey ID SRV-450 ✎
Delay Reason None Expected ✎
Departure Date 7/30/2026 ✎
Est. Arrival Date 8/02/2026 ✎
State Border Crossing Update
Convoy successfully crossed the TN/AR border. Handed off from TN State Police to AR Highway Patrol without delays. Next stop is the weigh station outside Little Rock.
Created by Operations Control • July 31, 2026
Curfew Restriction Reminder
Driver was reminded that TX DOT oversize permits for this width mandate parking 30 minutes before sunset. They are scheduled to park at the designated rest area tonight.
Created by Dispatch • July 31, 2026
Loading Completion
Main crawler body secured to TRL-104. Bridge formula load distribution verified on the portable scales before leaving the Nashville site.
Created by Rigging Supervisor • July 30, 2026
◄ Back to Heavy Equipment List
E
Heavy Equipment

TRL-104 - RGN Lowboy

Available
In Use
Under Maintenance
Pending DOT Inspection
Decommissioned
Details
Notes
Files

Equipment Profile

Equipment ID TRL-104 - RGN Lowboy ✎
Manufacturer Trail King Industries ✎
Model Year 2022 ✎
Equipment Type RGN (Removable Gooseneck) ✎
Axle Count 3-Axle ✎
Max Payload (lbs) 110,000 ✎
Asset Owner Fleet Manager ✎
Depot Assignment Dallas Depot ✎
Maintenance Status Cleared / Good ✎
Last Inspection Date 4/15/2026 ✎
Next Inspection Due 10/15/2026 ✎
Tag/Plate Number TX-99144Z ✎

Physical & Utilization Specs

Deck Length (ft) 29 ✎
Deck Height (in) 18 ✎
Availability Status In Use ✎
Condition Rating Excellent ✎
Current Location En Route (Arkansas) ✎
GPS Tracker Link Active Telemetry ✎
Daily Utilization Rate 74% ✎
Suspension Type Air Ride ✎
Gooseneck Type Hydraulic Detachable ✎
Operating Cost/Mile $0.45 ✎
Attached to Active Project
TRL-104 is currently assigned to PRJ-8904 (Crawler Main Body) and matched with TRC-990. Expected to be released back to the Dallas depot on Aug 03.
Created by Fleet Manager • July 30, 2026
Hydraulic Line Replacement
The secondary hydraulic lines for the gooseneck detach mechanism were replaced during the April preventative maintenance. Tested under load, zero leaks detected.
Created by Maintenance Team • April 16, 2026
DOT Inspection Clear
Passed the annual federal DOT inspection with no violations. Decal applied to the front left main beam.
Created by Compliance Team • April 15, 2026
◄ Back to Route Surveys List
S
Route Survey

SRV-450 - Nashville to Dallas

Scheduled
Physical Drive Completed
Engineering Review
Approved
Expired / Needs Recert
Details
Notes
Files

Geography & Core Data

Survey ID SRV-450 - Nashville to Dallas ✎
Linked Haul Project PRJ-8904 ✎
Origin City Nashville, TN ✎
Destination City Dallas, TX ✎
Total Mileage 665 Miles ✎
Surveyor Name Mark Higgins ✎
Survey Owner Route Planning Team ✎
Survey Status Approved ✎
Survey Date 7/20/2026 ✎
State DOT Approval Approved (TN, AR, TX) ✎
Local Muni Approval Approved (Dallas City) ✎
Engineering Review Req. Completed & Signed ✎

Obstructions & Restrictions

Obstruction Count 28 ✎
Bridge Crossings 14 ✎
Utility Line Lifts 6 Required ✎
Railway Crossings 2 (Clearance OK) ✎
Turn Radius Flags 3 Intersections ✎
Escort Cars Recommended Front & Rear (Pole) ✎
Police Escorts Rec. Arkansas & Texas ✎
Weekend Travel Permitted No (State Rules) ✎
Night Travel Permitted No ✎
Max Speed Limit 55 MPH (Hwy) ✎
Utility Lifts in Dallas
The last 3 miles approaching the Dallas Depot require 6 bucket truck utility lifts. The 160" height of the Crawler body will not clear the local fiber drops on industrial parkway. Coordinated with local crews.
Created by Mark Higgins • July 25, 2026
I-30 Bridge Clearance
Measured the I-30 overpass at exit 114. Clearance is exactly 164 inches on the center two lanes. The pole car must verify clearance physically before the main rig attempts passing.
Created by Mark Higgins • July 22, 2026
Route Survey Initiated
Mark has been dispatched with the pole car to drive the I-40 to I-30 corridor. Anticipate final report by end of week to submit for DOT permitting.
Created by Route Planning Team • July 18, 2026