This customized Salesforce environment helps signage and awning contractors manage site surveys, design proofs, municipal permitting, shop fabrication, and final installations. Stay on top of project stages from the initial client inquiry through to final mounting.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
L Leads
Track inbound requests for new signs or retrofits.A Accounts
Manage corporate clients, franchises, and developers.C Contacts
Maintain details for property managers and business owners.O Opportunities
Develop estimates for channel letters, pylons, and awnings.C Campaigns
Organize promotions for LED upgrades and seasonal cleaning.D Design Proofs
Track artwork versions, client approvals, and engineering.F Fabrication Jobs
Manage shop timelines, materials, and quality checks.I Installations
Schedule bucket trucks, crews, and final site assembly.Interactive Template Below
L
Leads
| Name | Company | Interest Type | Status | Phone | Owner | |
|---|---|---|---|---|---|---|
| Marcus Cole | Cole Retail Solutions | Storefront Signage | Contacted | (555) 123-4567 | [email protected] | Sarah Jenkins |
| Elena Rostova | Bayside Diner | Fabric Awning | New | (555) 234-5678 | [email protected] | David Cho |
| Thomas Bale | Bale Logistics | Pylon Sign | Survey Scheduled | (555) 345-6789 | [email protected] | Sarah Jenkins |
| Anita Ward | City Med Clinic | LED Retrofit | Quoted | (555) 456-7890 | [email protected] | David Cho |
| Frank Gable | Gable Auto Group | Monument Sign | Converted | (555) 567-8901 | [email protected] | Sarah Jenkins |
L
Lead
Marcus Cole
New
Contacted
Survey Scheduled
Quoted
Converted
Details
Notes
Files
Primary Information
Lead NameMarcus Cole✎
CompanyCole Retail Solutions✎
Phone(555) 123-4567✎
Interest TypeStorefront Signage✎
Lead OwnerSarah Jenkins✎
StatusContacted✎
RatingWarm✎
Survey NeededYes - Requires Bucket Truck✎
Permitting ReqStandard Review✎
Lighting PreferenceLED Internal✎
Additional Details
Property TypeStrip Mall✎
Timeline30-60 Days✎
Lead SourceWebsite Form✎
Budget Range$2,500 - $5,000✎
Existing SignageRequires Removal✎
Mounting SurfaceBrick/Masonry✎
Preferred ContactEmail✎
SubstrateAcrylic✎
CompetitorLocal Neon Shop✎
AuthorityDecision Maker✎
Storefront access details
Client noted that installation must happen before 9 AM due to mall traffic rules.
Created by Sarah Jenkins • July 22, 2026
Logo files received
They emailed the vector logo files. Uploaded to the files tab for the design team.
Created by Sarah Jenkins • July 20, 2026
Initial inquiry notes
Looking for standard LED channel letters on a raceway to replace their old neon sign.
Created by System • July 18, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Cole_Retail_Logo.eps | Vector | 1.2 MB | July 20, 2026 |
| Storefront_Photo_1.jpg | Image | 3.4 MB | July 18, 2026 |
| Landlord_Sign_Criteria.pdf | 800 KB | July 18, 2026 |
A
Accounts
| Account Name | Account Type | Industry | Phone | City | Owner |
|---|---|---|---|---|---|
| Downtown Retail Plaza | Property Manager | Real Estate | (555) 222-3333 | Springfield | Sarah Jenkins |
| Apex Corporate Center | Direct Client | Corporate Office | (555) 444-5555 | Springfield | David Cho |
| Riverfront Dining Group | Franchise | Hospitality | (555) 666-7777 | Capital City | Sarah Jenkins |
| City Medical Clinic | Direct Client | Healthcare | (555) 888-9999 | Shelbyville | David Cho |
| Northside Auto Mall | Direct Client | Automotive | (555) 000-1111 | Springfield | Sarah Jenkins |
A
Account
Downtown Retail Plaza
Details
Contacts
Opportunities
Design Proofs
Fabrication Jobs
Installations
Notes
Files
Primary Information
Account NameDowntown Retail Plaza✎
Account NumberACC-1049✎
Phone(555) 222-3333✎
Billing CitySpringfield✎
Account OwnerSarah Jenkins✎
Account RatingA - High Volume✎
TermsNet 30✎
Fleet SizeN/A✎
Account Specifics
Account TypeProperty Manager✎
IndustryReal Estate✎
RegionMidwest✎
Property OwnershipLandlord✎
Vendor PreferencePreferred Vendor✎
StandingGood Standing✎
C Contacts
| Contact Name | Title | Phone | |
|---|---|---|---|
| Janice Smith | Property Manager | [email protected] | (555) 123-0001 |
| Mark Johnson | Facilities Director | [email protected] | (555) 123-0002 |
| Lisa Chang | Leasing Agent | [email protected] | (555) 123-0003 |
| Robert Vance | Owner | [email protected] | (555) 123-0004 |
| Karen Fillipelli | Accounts Payable | [email protected] | (555) 123-0005 |
O Opportunities
| Opportunity Name | Stage | Amount | Close Date |
|---|---|---|---|
| Plaza Monument Reface | Closed Won | $8,500 | Jan 15, 2026 |
| Suite 102 Awning Install | Negotiation | $4,200 | Aug 30, 2026 |
| Parking Garage Wayfinding | Proposal | $12,000 | Sep 15, 2026 |
| Tenant Pylon Panels Q3 | Discovery | $3,500 | Oct 10, 2026 |
| LED Retrofit Full Site | Closed Lost | $25,000 | Nov 01, 2025 |
D Design Proofs
| Proof Name | Status | Round | Designer |
|---|---|---|---|
| Monument Reface v1 | Approved | v2 | Pam Beesly |
| Suite 102 Awning Concept | Pending Client Review | v1 | Pam Beesly |
| Wayfinding Map Layout | In Design | v1 | Jim Halpert |
| Pylon Panel Updates | Not Started | v1 | Pam Beesly |
| LED Retrofit Specs | Archived | v1 | Jim Halpert |
F Fabrication Jobs
| Job Name | Status | Shop Dept | Priority |
|---|---|---|---|
| Monument Polycarb Faces | Completed | Vinyl/Print | Normal |
| Suite 102 Awning Frame | In Fabrication | Welding | High |
| Suite 102 Canvas Cover | Awaiting Frame | Sewing | High |
| Garage Level 1 Signs | Queued | Routing | Normal |
| Garage Level 2 Signs | Queued | Routing | Normal |
I Installations
| Install Name | Status | Crew Size | Truck Assignment |
|---|---|---|---|
| Monument Face Swap | Completed | 2-Man Crew | Service Van 2 |
| Suite 102 Awning Mount | Scheduled | 3-Man Crew | Bucket Truck A |
| Garage Wayfinding Setup | Pending Schedule | 2-Man Crew | Box Truck |
| Pylon Tenant Swaps | Pending Fabrication | 2-Man Crew | Crane Truck |
| LED Wall Pack Fix | Completed | 1-Man Crew | Service Van 1 |
Awning Permitting Rules
Janice reminded us that all new awnings at the plaza must be black or dark grey Sunbrella fabric. No glossy finishes allowed.
Created by Sarah Jenkins • August 2, 2026
COI Updated
Our certificate of insurance has been updated with the property manager. Good until next year.
Created by System • January 15, 2026
Night Installs Only for Garage
Mark requested that any work inside the parking garage happen between 9 PM and 5 AM.
Created by Sarah Jenkins • November 10, 2025
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Plaza_Signage_Criteria.pdf | 2.1 MB | Jan 10, 2026 | |
| Site_Map_Tenant_Locations.pdf | 4.5 MB | Jan 05, 2026 | |
| Vendor_Approval_Letter.pdf | 1.1 MB | Jan 02, 2026 |
C
Contacts
| Name | Account Name | Title | Phone | Owner | |
|---|---|---|---|---|---|
| Janice Smith | Downtown Retail Plaza | Property Manager | (555) 123-0001 | [email protected] | Sarah Jenkins |
| Michael Trent | Apex Corporate Center | Facilities Director | (555) 987-6543 | [email protected] | David Cho |
| Sarah Lin | Riverfront Dining Group | Brand Manager | (555) 345-6789 | [email protected] | Sarah Jenkins |
| Robert Fines | City Medical Clinic | Operations Lead | (555) 876-5432 | [email protected] | David Cho |
| Elena Rostova | Northside Auto Mall | GM | (555) 234-5678 | [email protected] | Sarah Jenkins |
C
Contact
Janice Smith
Details
Notes
Files
Contact Information
Contact OwnerSarah Jenkins✎
Contact MethodEmail Preferred✎
Authority LevelSignatory✎
LanguageEnglish✎
Preferences & Roles
AvailabilityStandard Hours✎
Opt-inSubscribed✎
DepartmentProperty Mgmt✎
Prefers PDF proofs
Janice requested we always send design proofs as PDFs, as she forwards them directly to the board.
Created by Sarah Jenkins • June 12, 2026
Install Scheduling
Always CC Mark Johnson (Facilities) when scheduling any bucket truck work on site.
Created by Sarah Jenkins • May 10, 2026
Tenant Signage Authority
She is the final sign-off for any tenant cabinet faces or channel letters installed at the plaza.
Created by System • March 15, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Janice_Smith_BusinessCard.jpg | Image | 400 KB | Mar 20, 2026 |
| Vendor_Approval_Auth.pdf | 1.5 MB | Apr 02, 2026 | |
| Sign_Criteria_Guidelines.pdf | 850 KB | May 10, 2026 |
O
Opportunities
| Opportunity Name | Account Name | Amount | Stage | Close Date | Owner |
|---|---|---|---|---|---|
| Suite 102 Awning Install | Downtown Retail Plaza | $4,200 | Negotiation | Aug 30, 2026 | Sarah Jenkins |
| Apex Entry Monument | Apex Corporate Center | $18,500 | Proposal | Sep 15, 2026 | David Cho |
| Riverfront Channel Letters | Riverfront Dining Group | $6,200 | Discovery | Oct 01, 2026 | Sarah Jenkins |
| City Med Exterior Wayfinding | City Medical Clinic | $24,000 | Negotiation | Aug 15, 2026 | David Cho |
| Auto Mall LED Retrofit | Northside Auto Mall | $11,100 | Proposal | Sep 20, 2026 | Sarah Jenkins |
O
Opportunity
Suite 102 Awning Install
Discovery & Survey
Design Proofing
Proposal
Negotiation
Closed Won
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NameSuite 102 Awning Install✎
Amount$4,200.00✎
Close DateAug 30, 2026✎
Signage TypeFabric Awning✎
Installation TypeNew Install - Brick✎
Opportunity OwnerSarah Jenkins✎
StageNegotiation✎
Probability80%✎
Material GradePremium (Sunbrella)✎
IlluminationNon-Illuminated✎
Awning FabricJet Black (Standard)✎
Project Scoping & Logistics
ScopeFabrication & Install✎
Survey StatusCompleted✎
Permit StatusPending Sign-off✎
Design PhaseApproved✎
Warranty Req1-Year Craftsmanship✎
Prevailing WageNo✎
Graphics MethodHeat Transfer Vinyl✎
Equipment NeededBucket Truck✎
CompetitorCity Awning Co✎
Margin Target35%✎
Decision CriteriaAesthetic & Durability✎
Next StepFinalize deposit✎
P Line Items
| Line Item Name | Product Code | Quantity | Unit Price | Total Price | Category |
|---|---|---|---|---|---|
| Custom Shed Awning Frame | FRM-SHD | 1.00 | $1,200.00 | $1,200.00 | Fabrication |
| Sunbrella Fabric - Black | FAB-SUN-BLK | 14.00 | $65.00 | $910.00 | Materials |
| Heat Transfer Logo Graphics | GFX-HT-01 | 2.00 | $145.00 | $290.00 | Graphics |
| Bucket Truck Installation | INST-BT-2M | 1.00 | $1,800.00 | $1,800.00 | Labor |
Negotiation Update
Property manager asked if we can discount the installation if they do the demo themselves. Advised against it due to liability.
Created by Sarah Jenkins • August 1, 2026
Design Revisions
Changed the valance style from scalloped to straight edge per landlord criteria.
Created by Pam Beesly • July 22, 2026
Permit Warning
City requires an engineering stamp on the awning frame because it projects more than 48 inches over the sidewalk.
Created by System • July 15, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Proposal_Suite102_Awning_v2.pdf | 2.4 MB | Aug 01, 2026 | |
| Awning_Proof_StraightValance.jpg | Image | 1.2 MB | July 22, 2026 |
| Site_Survey_Photos.zip | ZIP | 18.1 MB | July 10, 2026 |
C
Campaigns
| Campaign Name | Status | Type | Start Date | Expected Revenue | Owner |
|---|---|---|---|---|---|
| Spring Awning Recover Promo | Completed | Direct Mail | Mar 01, 2026 | $45,000 | Marketing Team |
| Q3 LED Retrofit Push | In Progress | Jul 01, 2026 | $85,000 | Marketing Team | |
| Local Retail Association Expo | Planned | Trade Show | Sep 15, 2026 | $60,000 | Sarah Jenkins |
| Winter Storm Damage Repair | Planned | Digital Ad | Nov 01, 2026 | $30,000 | Marketing Team |
| New Franchise Outreach | Completed | Cold Call | Jan 10, 2026 | $120,000 | David Cho |
C
Campaign
Q3 LED Retrofit Push
Details
Campaign Members
Notes
Files
Campaign Info
Campaign NameQ3 LED Retrofit Push✎
Start DateJul 01, 2026✎
End DateSep 30, 2026✎
Expected Revenue$85,000.00✎
Campaign OwnerMarketing Team✎
StatusIn Progress✎
Budgeted Cost$2,500.00✎
TypeEmail✎
Strategy & Targeting
Target AudienceExisting Commercial✎
Region FocusMidwest Metro✎
Product FocusLED Retrofit✎
ChannelMailChimp Blast✎
IncentiveFree Energy Audit✎
Success MetricSurveys Booked✎
C Campaign Members
| Name | Title | Status | Response Date |
|---|---|---|---|
| Janice Smith | Property Manager | Responded | Aug 03, 2026 |
| Michael Trent | Facilities Director | Sent | Aug 01, 2026 |
| Sarah Lin | Brand Manager | Responded | Aug 04, 2026 |
| Robert Fines | Operations Lead | Bounced | Aug 01, 2026 |
| Elena Rostova | GM | Sent | Aug 01, 2026 |
First batch results
Open rate is currently at 24%. Generating 4 solid survey requests so far.
Created by Marketing Team • August 5, 2026
Offer Clarification
Make sure reps know the free energy audit just means calculating neon vs LED power consumption during the survey.
Created by Marketing Team • July 28, 2026
List Segmentation
Excluded clients who purchased signs within the last 3 years as they already have LEDs.
Created by System • July 25, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Retrofit_Email_Graphic.png | Image | 1.2 MB | July 30, 2026 |
| Old_Client_List_Export.csv | Data | 350 KB | July 29, 2026 |
| Energy_Savings_Calc_Sheet.pdf | 120 KB | July 25, 2026 |
D
Design Proofs
| Proof Name | Account | Designer | Status | Round | Owner |
|---|---|---|---|---|---|
| Suite 102 Awning Concept | Downtown Retail Plaza | Pam Beesly | Pending Client Review | v1 | Design Dept |
| Apex Entry Monument v2 | Apex Corporate Center | Jim Halpert | In Design | v2 | Design Dept |
| Riverfront Channel Letters | Riverfront Dining Group | Pam Beesly | Approved | v1 | Design Dept |
| City Med Exterior Wayfinding | City Medical Clinic | Jim Halpert | Pending Engineering | v3 | Design Dept |
| Auto Mall Pylon Graphics | Northside Auto Mall | Pam Beesly | Revisions Requested | v2 | Design Dept |
D
Design Proof
Suite 102 Awning Concept
Concept & Drafting
Client Review
Engineering/Permitting
Final Revisions
Approved to Fab
Details
Notes
Files
Proof Tracking
Proof NameSuite 102 Awning Concept✎
DesignerPam Beesly✎
Concept Versionv1 - Initial Concept✎
ColorsBlack canvas, white logo✎
Proof OwnerDesign Dept✎
StatusPending Client Review✎
Revision Round1✎
Approval FormatDigital Signature (DocuSign)✎
Rush ReqStandard Turnaround✎
Brand GuidelinesProvided by Client✎
Specifications & Output
TypographyHelvetica Bold✎
Rendering Type2D Night/Day Render✎
Awning StyleTraditional Shed✎
Mounting HardwareFlush Mount Anchors✎
Client ReviewSent via Email✎
Municipal CodeCompliant✎
Engineering StampRequired - Pending✎
Output FormatPDF for Review✎
Fabrication FileNot Created Yet✎
Final DecisionPending✎
Valance update
I updated the valance from scalloped to straight-edge based on the landlord's sign criteria document. Resent to client.
Created by Pam Beesly • July 22, 2026
Vector graphics missing
Client sent a low-res JPEG. Had to auto-trace it. Waiting for them to confirm if the trace looks correct.
Created by Pam Beesly • July 20, 2026
Engineering Requirement
City requires a wet stamp for wind load because it projects over the sidewalk. Let's send to our PE once client approves art.
Created by Permit Coordinator • July 18, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Awning_Proof_v1.pdf | 2.1 MB | July 22, 2026 | |
| Photo_Superimpose_Render.jpg | Image | 4.5 MB | July 22, 2026 |
| Client_Logo_Traced.eps | Vector | 1.1 MB | July 20, 2026 |
F
Fabrication Jobs
| Job Name | Account | Status | Priority | Shop Dept | Owner |
|---|---|---|---|---|---|
| Suite 102 Awning Frame | Downtown Retail Plaza | In Fabrication | High | Welding | Shop Foreman |
| Riverfront Channel Letters | Riverfront Dining Group | Awaiting Paint | Normal | Paint Booth | Shop Foreman |
| City Med Directionals | City Medical Clinic | Queued | Normal | Routing | Shop Foreman |
| Auto Mall Pylon Faces | Northside Auto Mall | Completed | Normal | Vinyl/Print | Shop Foreman |
| Apex Monument Core | Apex Corporate Center | Awaiting Materials | High | Welding | Shop Foreman |
F
Fabrication Job
Suite 102 Awning Frame
Queued
Cutting & Welding
Wiring/Illumination
Finishing/Paint
Ready for Install
Details
Notes
Files
Shop Ticket Info
Job NameSuite 102 Awning Frame✎
Start DateAug 05, 2026✎
Metal Type1" Aluminum Square Tube✎
Acrylic TypeN/A✎
Job OwnerShop Foreman✎
StatusIn Fabrication✎
Shop DepartmentWelding✎
PriorityHigh✎
QA CheckPending Dimensions Check✎
Crate/PackNo Crate Needed (Local)✎
Materials & Build Details
Vinyl BrandNone✎
Paint FinishRaw/Unpainted✎
Lighting TechNone✎
Awning FrameStaple-in System✎
Fabric WelderHeat Seal Needed✎
SubcontractorNone (In-House)✎
Scrap RateExpected (<5%)✎
Power SupplyN/A✎
UL ListingExempt (Non-Illuminated)✎
QA ManagerRoy Anderson✎
Aluminum delivery
The 1" square tube stock arrived today. Roy started cutting the frame pieces.
Created by Shop Foreman • August 5, 2026
Fabric routing
Once the frame is welded, send it straight to the sewing dept for the staple-in cover. No paint needed.
Created by Design Dept • August 3, 2026
Job created
Ticket moved to shop queue following design approval.
Created by System • August 1, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Shop_Ticket_Awning102.pdf | 150 KB | Aug 01, 2026 | |
| Frame_Specs_Dimensions.pdf | 1.2 MB | Aug 01, 2026 | |
| Material_Pull_Sheet.csv | Data | 12 KB | Aug 01, 2026 |
I
Installations
| Install Name | Account | Sched Date | Truck | Status | Owner |
|---|---|---|---|---|---|
| Suite 102 Awning Mount | Downtown Retail Plaza | Aug 12, 2026 | Bucket Truck A | Scheduled | Install Manager |
| Apex Monument Footers | Apex Corporate Center | Aug 15, 2026 | Auger Truck | Pending Dig Safe | Install Manager |
| Riverfront Letter Install | Riverfront Dining Group | Aug 10, 2026 | Bucket Truck B | Scheduled | Install Manager |
| City Med Wayfinding Posts | City Medical Clinic | Aug 18, 2026 | Service Van 1 | Tentative | Install Manager |
| Auto Mall Pylon Face Swap | Northside Auto Mall | Aug 08, 2026 | Crane Truck | Completed | Install Manager |
I
Installation
Suite 102 Awning Mount
Pending Schedule
Scheduled
Truck Dispatched
On Site
Completed
Details
Notes
Files
Install Logistics
Install NameSuite 102 Awning Mount✎
Sched DateAug 12, 2026✎
Truck AssignmentBucket Truck A✎
Crew Size3-Man Crew✎
Install OwnerInstall Manager✎
StatusScheduled✎
Site AccessClear Path✎
Fastener TypeMasonry Anchors (Sleeve)✎
Elec HookupNone Required✎
Old Sign DemoTake Down Awning✎
Field Requirements
Lift Height ReqStandard Bucket (35ft)✎
Traffic ControlCones/Barricades Only✎
Dig SafeNot Required✎
Foundation TypeN/A✎
Footing DepthN/A✎
Disposal MethodDumpster at Shop✎
Night WorkNo (Standard Hours)✎
Weather DelayClear Forecast✎
Final PhotoPending✎
Client Sign-offPending✎
Arrive early
Must complete the installation before 9 AM so we don't block the sidewalk for retail customers.
Created by Install Manager • August 5, 2026
Masonry drill bits needed
The facade is hard brick. Ensure Bucket Truck A is stocked with extra masonry bits and sleeve anchors.
Created by Shop Foreman • August 4, 2026
Old Awning Disposal
The old awning frame is bent. Cut it down and throw it in the scrap metal bin back at the shop.
Created by System • August 2, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Install_Ticket_102Awning.pdf | 150 KB | Aug 05, 2026 | |
| Site_Map_Parking.pdf | 1.2 MB | Aug 05, 2026 | |
| Approved_Permit_Copy.pdf | 400 KB | Aug 05, 2026 |


