Robotics Systems Integrators face complex sales cycles, from initial automation discovery to Factory Acceptance Testing and final deployment on the plant floor. This template provides a customized environment to track technical integrations, robotic work cells, payload specifications, and ongoing service level agreements.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track incoming automation requests and payload needs. Accounts
Manage manufacturing facilities and preferred PLC brands. Contacts
Organize plant managers and controls engineers. Opportunities
Drive automation projects through to integration sign-off. Campaigns
Measure ROI from trade shows and automation webinars. Deployments
Track FAT, SAT, and onsite mechanical installations. Work Cells
Manage EOAT, vision systems, and robotic hardware. Service Contracts
Monitor preventative maintenance and remote support.Lead
Mark Roberts - Apex Manufacturing
New
Contacted
Qualified
Site Visit
Converted
Details
Notes
Files
Primary Lead Information
First NameMark✎
Last NameRoberts✎
CompanyApex Manufacturing✎
TitlePlant Manager✎
Phone(555) 111-2222✎
StatusQualified✎
Timeline3-6 Months✎
Lead SourceTrade Show✎
Budget$250k - $500k✎
RegionMidwest✎
Technical Automation Requirements
Facility TypeAutomotive Assembly✎
Automation GoalIncrease Throughput✎
Existing Robot BrandFANUC✎
Payload Requirement20kg to 50kg✎
Integration ComplexityLevel 4 - Vision Guided✎
Footprint AvailableModerate (Retrofit)✎
End Effector TypeCustom Mechanical Gripper✎
Vision System Needs3D Bin Picking✎
Safety StandardRIA R15.06 compliance✎
Network ProtocolEtherNet/IP✎
Initial Qualification Call
Mark is looking to automate a manual assembly station. They need to handle 25kg aluminum castings. Current cycle time is 45s, target is 30s.
Vision System Constraint
The castings have inconsistent finishes, so standard 2D vision won't work. Recommended a 3D bin picking scanner for part location.
Competitor Insight
They are already using FANUC on another line. We need to bid a FANUC system to stay compatible with their existing maintenance training.
Account
Global Automotive Corp
Details
Contacts
Opportunities
Deployments
Work Cells
Service Contracts
Notes
Files
Facility Information
Account NameGlobal Automotive Corp✎
Client IndustryAutomotive Tier 1✎
Phone(555) 654-3210✎
SLA TierPlatinum (24/7 Support)✎
Preferred PLC BrandAllen-Bradley (Rockwell)✎
Fleet Size100+ Robots✎
Operational Details
Billing CityDetroit✎
Plant SizeOver 500,000 sq ft✎
Shift Schedule24/7 Continuous✎
Procurement CycleQ4 Annual CapEx✎
Safety ComplianceInternal EHS Committee✎
Network InfrastructurePlant-Wide EtherNet/IP✎
Controls Standard Update
Global Auto is standardizing all new cells on Allen-Bradley GuardLogix. Older Siemens panels will be phased out by 2028.
Safety Walk-through
EHS team now requires Area Scanners instead of pressure mats for all new floor-level robotic integrations.
Vendor Portal Requirement
All invoices over $50k must be routed through their Ariba procurement portal.
Contact
John Smith
Details
Notes
Files
Contact Information
RoleTechnical Evaluator✎
Influence LevelHigh✎
Robotics ExperienceAdvanced (Robot Programmer)✎
Contact Methods & Aptitude
Preferred Comm MethodText Message✎
Training LevelFANUC Certified✎
Technical AptitudeStrong Advocate✎
PLC Preference Insight
John is highly experienced with Rockwell Studio 5000 and specifically requested Add-On Instructions (AOIs) for the new robot cells.
Shift Coverage
He usually works 1st shift but comes in early. Best time to call him is between 6:00 AM and 7:30 AM before morning production meetings.
Feedback on FAT
He was very happy with the wire routing and clean panel build during the last Factory Acceptance Test. Make sure we use the same panel shop.
Opportunity
Line 4 Welding Cell Upgrades
Discovery
Concept Design
Proposal
Negotiation
Closed Won
Details
Line Items
Notes
Files
Project Scope & Core Info
Opportunity NameLine 4 Welding Cell Upgrades✎
Project TypeSpot Welding✎
Payload ClassHeavy (100kg-500kg)✎
Reach RequirementExtended (2000mm+)✎
StageProposal✎
Amount$850,000.00✎
Close Date11/15/2026✎
Probability (%)75%✎
Start Date2/1/2027✎
Technical & Competitive Details
Cycle Time TargetUnder 30 Seconds✎
Environmental ConditionsWeld Spatter / Harsh✎
Delivery MethodTurnkey Integration✎
Expected ROI12-18 Months✎
Integration MethodExisting Line Retrofit✎
Robot ManufacturerFANUC✎
Funding StatusCapEx Approved✎
CompetitorBastian Solutions✎
Risk LevelMedium (Line Downtime)✎
Decision DriverTechnical Capability✎
Software PlatformRoboguide (Simulation)✎
Warranty Term1 Year Standard✎
Simulation Review
Presented the Roboguide simulation to John Smith. The reach looks good, but we need to ensure the weld gun dress pack doesn't catch on the fixturing. Adding a cable management retract system.
Controls Specs Check
Confirmed with Global Auto that we must use the 1756-L81ES safety controller. The older L7 series is no longer acceptable.
Installation Window constraint
They only have a 2-week shutdown window in July 2027 to install this. We must have the entire system pre-built and FAT'd by May.
Campaign
Automate Expo 2026
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameAutomate Expo 2026✎
Target IndustryBroad Manufacturing✎
TypeTrade Show✎
StatusIn Progress✎
Event FormatIn-Person Large Expo✎
Demo TypePhysical Robot Cell✎
Outreach ChannelAssociation List✎
Budget & Metrics
Start Date8/10/2026✎
End Date8/14/2026✎
Lead Gen Goal100+ Qualified Leads✎
Budgeted Cost$45,000.00✎
Actual Cost$48,250.00✎
Expected Revenue$1,500,000.00✎
Booth Setup
The live demo cell with the FANUC CRX cobot is drawing huge crowds. Make sure we have enough brochures printed for tomorrow.
Logistics Issue Resolved
The freight company delivered the compressor late, but we got the pneumatics hooked up before the show floor opened.
Staffing
David is taking the morning shift to answer technical controls questions. Sarah is handling initial lead capture.
Deployment
Door Panel Assembly Rollout
Design/Build
FAT Complete
Site Prep
SAT in Progress
Completed
Details
Notes
Files
Deployment Overview
Deployment NameDoor Panel Assembly Rollout✎
System TypeMulti-Robot Sync✎
FAT StatusPassed - Unconditional✎
SAT StatusIn Progress✎
StageSAT in Progress✎
Target Go-Live9/1/2026✎
Actual Go-Live-✎
Implementation PartnerIn-House Team✎
Current BlockerNone✎
Technical Installation Checklist
Electrical SignoffCompleted✎
Mechanical SignoffCompleted✎
Safety AuditScheduled for 8/15✎
Software ConfigTweaking Cycle Time✎
Control Panel StatusInstalled & Powered✎
Training StatusScheduled for Week 3✎
Documentation StatusDrafting Manuals✎
Tooling StatusInstalled & Tested✎
Network IntegrationConnected to Plant MES✎
Firmware Versionv4.2.1 (Latest)✎
SAT Day 2 Update
The multi-robot sync is working flawlessly, but we are seeing a 1.5s delay on the safety scanner zone clear. Need to adjust the muted zone logic in the GuardLogix.
Rigging Success
Both 2000iC arms were dropped onto the floor plates without issue. Anchoring is complete and epoxy is curing overnight.
FAT Signoff
John Smith visited our shop for FAT. He was very happy with the EOAT design and signed off on shipping the system to Detroit.
Work Cell
Cell A1 - Spot Welding
Design
Build
Commissioning
Active/Running
Decommissioned
Details
Notes
Files
Hardware Specifications
Work Cell NameCell A1 - Spot Welding✎
Robot ModelFANUC R-2000iC✎
Base MountingFloor Mounted✎
Cell Footprint20ft x 20ft✎
Fencing TypeWire Mesh (Standard)✎
StatusCommissioning✎
Max Payload210 kg✎
Axis Count6-Axis Articulated✎
Cycle Time28.5 seconds✎
Controls & Tooling
Light CurtainKeyence GL-R✎
Area ScannerSick microScan3✎
Main ControllerAllen-Bradley ControlLogix✎
HMI PanelPanelView Plus 7✎
Vision CameraCognex In-Sight 3D✎
End of Arm ToolingServo Spot Weld Gun✎
Part PresentationRotary Indexer✎
Conveyor IntegrationNone✎
Power Requirement480V 3-Phase✎
Pneumatic SupplyNot Required (All Servo)✎
Calibration StatusMastered & Zeroed✎
Weld Gun Dress Pack
The cable management on Axis 3 was rubbing against the casting fixture during the simulated run. Adjusted the retractor tension and updated the path programming to give an extra 50mm clearance.
Safety Scanner Zones
Programmed the Sick microScan3 with two zones: a 2m warning zone (slows robot to 250mm/s) and a 1m protection zone (E-Stop). Verified via safety PLC logic.
TCP Calibration
Set the Tool Center Point (TCP) for the new servo weld gun. Accuracy is within 0.1mm. Recorded the values in the handover manual.
Service Contract
Plant-Wide SLA (Platinum)
Drafting
Pending Signature
Active
Renewing
Expired
Details
Notes
Files
Contract Overview
Contract NamePlant-Wide SLA (Platinum)✎
Coverage TypeFull Coverage (Parts + Labor)✎
PM FrequencyQuarterly✎
Response Time SLA4 Hours On-Site✎
StatusActive✎
Start Date1/1/2026✎
End Date12/31/2026✎
Contract Value$120,000.00✎
Renewal LikelihoodHigh✎
Service Deliverables
Parts IncludedConsumables & Wear Items✎
Remote Support24/7 Unlimited Call Support✎
Software UpdatesMajor & Minor Releases✎
Training Hours40 Hours / Year✎
On-Site LaborUnlimited Emergency Visits✎
Billing CycleMonthly✎
Primary TechnicianTom Harris✎
Escalation TierTier 3 (Engineering)✎
Last PM Visit7/5/2026✎
Next PM Visit10/5/2026✎
Grease Change Complete
Completed the annual harmonic drive grease change on all 4 FANUC units in the spot welding line during the July shutdown.
Remote VPN Access Fixed
Global Auto IT updated their firewall rules. We can now remotely ping the cell PLCs directly for remote support without WebEx.
Battery Replacement Upcoming
Noted that the encoder batteries on Cell C1 will expire in November. Adding 4 batteries to the parts order for the Q4 PM visit.


