Template Hub Template Hub

Sales Cloud Template for Robotics Systems Integrators

Robotics Systems Integrators face complex sales cycles, from initial automation discovery to Factory Acceptance Testing and final deployment on the plant floor. This template provides a customized environment to track technical integrations, robotic work cells, payload specifications, and ongoing service level agreements.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Mark Roberts - Apex Manufacturing

New
Contacted
Qualified
Site Visit
Converted
Details
Notes
Files

Primary Lead Information

First NameMark✎
Last NameRoberts✎
CompanyApex Manufacturing✎
TitlePlant Manager✎
Phone(555) 111-2222✎
Lead OwnerSarah Jenkins✎
StatusQualified✎
Timeline3-6 Months✎
Lead SourceTrade Show✎
Budget$250k - $500k✎
RegionMidwest✎

Technical Automation Requirements

Facility TypeAutomotive Assembly✎
Automation GoalIncrease Throughput✎
Existing Robot BrandFANUC✎
Payload Requirement20kg to 50kg✎
Integration ComplexityLevel 4 - Vision Guided✎
Footprint AvailableModerate (Retrofit)✎
End Effector TypeCustom Mechanical Gripper✎
Vision System Needs3D Bin Picking✎
Safety StandardRIA R15.06 compliance✎
Network ProtocolEtherNet/IP✎
Initial Qualification Call
Mark is looking to automate a manual assembly station. They need to handle 25kg aluminum castings. Current cycle time is 45s, target is 30s.
Created by Sarah Jenkins • Oct 10, 2026
Vision System Constraint
The castings have inconsistent finishes, so standard 2D vision won't work. Recommended a 3D bin picking scanner for part location.
Created by Sarah Jenkins • Oct 12, 2026
Competitor Insight
They are already using FANUC on another line. We need to bid a FANUC system to stay compatible with their existing maintenance training.
Created by Sarah Jenkins • Oct 15, 2026
◄ Back to Accounts List
Account

Global Automotive Corp

Details
Contacts
Opportunities
Deployments
Work Cells
Service Contracts
Notes
Files

Facility Information

Account NameGlobal Automotive Corp✎
Parent AccountGlobal Holdings✎
Client IndustryAutomotive Tier 1✎
Phone(555) 654-3210✎
Account OwnerDavid Miller✎
SLA TierPlatinum (24/7 Support)✎
Preferred PLC BrandAllen-Bradley (Rockwell)✎
Fleet Size100+ Robots✎

Operational Details

Billing CityDetroit✎
Plant SizeOver 500,000 sq ft✎
Shift Schedule24/7 Continuous✎
Procurement CycleQ4 Annual CapEx✎
Safety ComplianceInternal EHS Committee✎
Network InfrastructurePlant-Wide EtherNet/IP✎
Controls Standard Update
Global Auto is standardizing all new cells on Allen-Bradley GuardLogix. Older Siemens panels will be phased out by 2028.
Created by David Miller • Jan 15, 2026
Safety Walk-through
EHS team now requires Area Scanners instead of pressure mats for all new floor-level robotic integrations.
Created by Sarah Jenkins • July 5, 2026
Vendor Portal Requirement
All invoices over $50k must be routed through their Ariba procurement portal.
Created by Accounting • March 22, 2026
◄ Back to Contacts List
C
Contact

John Smith

Details
Notes
Files

Contact Information

First NameJohn✎
Last NameSmith✎
Account NameGlobal Automotive Corp✎
TitleLead Controls Engineer✎
Contact OwnerDavid Miller✎
RoleTechnical Evaluator✎
Influence LevelHigh✎
Robotics ExperienceAdvanced (Robot Programmer)✎

Contact Methods & Aptitude

Phone(555) 333-4444✎
Mobile(555) 333-5555✎
Preferred Comm MethodText Message✎
Training LevelFANUC Certified✎
Technical AptitudeStrong Advocate✎
PLC Preference Insight
John is highly experienced with Rockwell Studio 5000 and specifically requested Add-On Instructions (AOIs) for the new robot cells.
Created by David Miller • July 2, 2026
Shift Coverage
He usually works 1st shift but comes in early. Best time to call him is between 6:00 AM and 7:30 AM before morning production meetings.
Created by Admin • July 20, 2026
Feedback on FAT
He was very happy with the wire routing and clean panel build during the last Factory Acceptance Test. Make sure we use the same panel shop.
Created by David Miller • Feb 10, 2025
◄ Back to Opportunities List
O
Opportunity

Line 4 Welding Cell Upgrades

Discovery
Concept Design
Proposal
Negotiation
Closed Won
Details
Line Items
Notes
Files

Project Scope & Core Info

Opportunity NameLine 4 Welding Cell Upgrades✎
Account NameGlobal Automotive Corp✎
Primary ContactJohn Smith✎
Project TypeSpot Welding✎
Payload ClassHeavy (100kg-500kg)✎
Reach RequirementExtended (2000mm+)✎
Opportunity OwnerDavid Miller✎
StageProposal✎
Amount$850,000.00✎
Close Date11/15/2026✎
Probability (%)75%✎
Start Date2/1/2027✎

Technical & Competitive Details

Cycle Time TargetUnder 30 Seconds✎
Environmental ConditionsWeld Spatter / Harsh✎
Delivery MethodTurnkey Integration✎
Expected ROI12-18 Months✎
Integration MethodExisting Line Retrofit✎
Robot ManufacturerFANUC✎
Funding StatusCapEx Approved✎
CompetitorBastian Solutions✎
Risk LevelMedium (Line Downtime)✎
Decision DriverTechnical Capability✎
Software PlatformRoboguide (Simulation)✎
Warranty Term1 Year Standard✎
Simulation Review
Presented the Roboguide simulation to John Smith. The reach looks good, but we need to ensure the weld gun dress pack doesn't catch on the fixturing. Adding a cable management retract system.
Created by David Miller • August 2, 2026
Controls Specs Check
Confirmed with Global Auto that we must use the 1756-L81ES safety controller. The older L7 series is no longer acceptable.
Created by David Miller • July 28, 2026
Installation Window constraint
They only have a 2-week shutdown window in July 2027 to install this. We must have the entire system pre-built and FAT'd by May.
Created by Sarah Jenkins • July 15, 2026
◄ Back to Campaigns List
C
Campaign

Automate Expo 2026

Details
Campaign Members
Notes
Files

Campaign Information

Campaign NameAutomate Expo 2026✎
Target IndustryBroad Manufacturing✎
TypeTrade Show✎
StatusIn Progress✎
Campaign OwnerSarah Jenkins✎
Event FormatIn-Person Large Expo✎
Demo TypePhysical Robot Cell✎
Outreach ChannelAssociation List✎

Budget & Metrics

Start Date8/10/2026✎
End Date8/14/2026✎
Lead Gen Goal100+ Qualified Leads✎
Budgeted Cost$45,000.00✎
Actual Cost$48,250.00✎
Expected Revenue$1,500,000.00✎
Booth Setup
The live demo cell with the FANUC CRX cobot is drawing huge crowds. Make sure we have enough brochures printed for tomorrow.
Created by Sarah Jenkins • Aug 11, 2026
Logistics Issue Resolved
The freight company delivered the compressor late, but we got the pneumatics hooked up before the show floor opened.
Created by Admin • Aug 9, 2026
Staffing
David is taking the morning shift to answer technical controls questions. Sarah is handling initial lead capture.
Created by Sarah Jenkins • Aug 8, 2026
◄ Back to Deployments List
D
Deployment

Door Panel Assembly Rollout

Design/Build
FAT Complete
Site Prep
SAT in Progress
Completed
Details
Notes
Files

Deployment Overview

Deployment NameDoor Panel Assembly Rollout✎
Related AccountGlobal Automotive Corp✎
Related OpportunityDoor Panel Assembly Line✎
System TypeMulti-Robot Sync✎
FAT StatusPassed - Unconditional✎
SAT StatusIn Progress✎
Deployment OwnerDavid Miller✎
StageSAT in Progress✎
Target Go-Live9/1/2026✎
Actual Go-Live-✎
Implementation PartnerIn-House Team✎
Current BlockerNone✎

Technical Installation Checklist

Electrical SignoffCompleted✎
Mechanical SignoffCompleted✎
Safety AuditScheduled for 8/15✎
Software ConfigTweaking Cycle Time✎
Control Panel StatusInstalled & Powered✎
Training StatusScheduled for Week 3✎
Documentation StatusDrafting Manuals✎
Tooling StatusInstalled & Tested✎
Network IntegrationConnected to Plant MES✎
Firmware Versionv4.2.1 (Latest)✎
SAT Day 2 Update
The multi-robot sync is working flawlessly, but we are seeing a 1.5s delay on the safety scanner zone clear. Need to adjust the muted zone logic in the GuardLogix.
Created by David Miller • August 10, 2026
Rigging Success
Both 2000iC arms were dropped onto the floor plates without issue. Anchoring is complete and epoxy is curing overnight.
Created by David Miller • August 5, 2026
FAT Signoff
John Smith visited our shop for FAT. He was very happy with the EOAT design and signed off on shipping the system to Detroit.
Created by Sarah Jenkins • July 25, 2026
◄ Back to Work Cells List
W
Work Cell

Cell A1 - Spot Welding

Design
Build
Commissioning
Active/Running
Decommissioned
Details
Notes
Files

Hardware Specifications

Work Cell NameCell A1 - Spot Welding✎
Related DeploymentDoor Panel Assembly Rollout✎
Robot ModelFANUC R-2000iC✎
Base MountingFloor Mounted✎
Cell Footprint20ft x 20ft✎
Fencing TypeWire Mesh (Standard)✎
Cell OwnerDavid Miller✎
StatusCommissioning✎
Max Payload210 kg✎
Axis Count6-Axis Articulated✎
Cycle Time28.5 seconds✎

Controls & Tooling

Light CurtainKeyence GL-R✎
Area ScannerSick microScan3✎
Main ControllerAllen-Bradley ControlLogix✎
HMI PanelPanelView Plus 7✎
Vision CameraCognex In-Sight 3D✎
End of Arm ToolingServo Spot Weld Gun✎
Part PresentationRotary Indexer✎
Conveyor IntegrationNone✎
Power Requirement480V 3-Phase✎
Pneumatic SupplyNot Required (All Servo)✎
Calibration StatusMastered & Zeroed✎
Weld Gun Dress Pack
The cable management on Axis 3 was rubbing against the casting fixture during the simulated run. Adjusted the retractor tension and updated the path programming to give an extra 50mm clearance.
Created by David Miller • August 10, 2026
Safety Scanner Zones
Programmed the Sick microScan3 with two zones: a 2m warning zone (slows robot to 250mm/s) and a 1m protection zone (E-Stop). Verified via safety PLC logic.
Created by John Smith • August 8, 2026
TCP Calibration
Set the Tool Center Point (TCP) for the new servo weld gun. Accuracy is within 0.1mm. Recorded the values in the handover manual.
Created by David Miller • August 5, 2026
◄ Back to Service Contracts List
S
Service Contract

Plant-Wide SLA (Platinum)

Drafting
Pending Signature
Active
Renewing
Expired
Details
Notes
Files

Contract Overview

Contract NamePlant-Wide SLA (Platinum)✎
Related AccountGlobal Automotive Corp✎
Related DeploymentMultiple (Plant-Wide)✎
Coverage TypeFull Coverage (Parts + Labor)✎
PM FrequencyQuarterly✎
Response Time SLA4 Hours On-Site✎
Contract OwnerSarah Jenkins✎
StatusActive✎
Start Date1/1/2026✎
End Date12/31/2026✎
Contract Value$120,000.00✎
Renewal LikelihoodHigh✎

Service Deliverables

Parts IncludedConsumables & Wear Items✎
Remote Support24/7 Unlimited Call Support✎
Software UpdatesMajor & Minor Releases✎
Training Hours40 Hours / Year✎
On-Site LaborUnlimited Emergency Visits✎
Billing CycleMonthly✎
Primary TechnicianTom Harris✎
Escalation TierTier 3 (Engineering)✎
Last PM Visit7/5/2026✎
Next PM Visit10/5/2026✎
Grease Change Complete
Completed the annual harmonic drive grease change on all 4 FANUC units in the spot welding line during the July shutdown.
Created by Tom Harris • July 6, 2026
Remote VPN Access Fixed
Global Auto IT updated their firewall rules. We can now remotely ping the cell PLCs directly for remote support without WebEx.
Created by David Miller • May 10, 2026
Battery Replacement Upcoming
Noted that the encoder batteries on Cell C1 will expire in November. Adding 4 batteries to the parts order for the Q4 PM visit.
Created by Tom Harris • July 6, 2026