Retail solar sales require tracking high-velocity residential and light commercial projects from initial consultation to final permission to operate (PTO). This CRM environment organizes property qualifications, system designs, financing approvals, and AHJ permitting in a clear, sequential format to reduce cycle times and prevent stalled installs.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Qualify homeowners, verify roof age, and estimate shading. Accounts
Manage residential households and small business properties. Contacts
Communicate with primary decision makers and tenants. Opportunities
Track proposals, financing approvals, and system sizing. Campaigns
Monitor door-to-door canvassing, direct mail, and web ads. Site Surveys
Log roof pitch, main panel upgrades (MPU), and drone measurements. System Designs
Manage CAD drafts, inverter stringing, and offset calculations. Permits & Interconnections
Track AHJ approvals, inspection dates, and utility PTO status.Lead
Robert Vance
New
Contacted
Qualified
Site Visit Scheduled
Converted
Details
Notes
Files
Primary Information
Lead NameRobert Vance✎
Address123 Sunshine Rd, San Diego, CA 92101✎
Phone(555) 123-4567✎
Lead SourceInbound Web✎
StatusSite Visit Scheduled✎
Lead OwnerAlex Chen✎
Property TypeSingle Family Detached✎
Homeowner AssociationNo HOA✎
Roof TypeComposite Shingle✎
Roof Age6-10 Years✎
Shading AssessmentFull Sun✎
Utility & Interest Details
Average Monthly Bill$301 - $400✎
Utility ProviderSan Diego Gas & Electric✎
MotivationSave Money✎
Desired FinancingSolar Loan (Standard)✎
Preferred Timeline1-3 Months✎
Current Electrical Panel200 Amp✎
Battery Storage InterestYes - Critical Loads✎
EV Charger NeedsWant One Installed✎
Primary LanguageEnglish✎
Credit Rating EstimateGood (680-719)✎
Site Visit Coordination
Customer requested a Thursday afternoon. Advised them we need to look in the attic and access the main breaker panel in the garage. They confirmed the panel is clear.
Utility Bill Analysis
Uploaded SDG&E 12-month usage graph. They use a lot of power in the summer for pool pumps. We need to size this system for ~14,000 kWh annually.
Initial Qualification Call
Inbound web lead. They just bought an EV and their electric bill doubled. Very interested in adding a battery for time-of-use rate arbitrage. Credit seems solid.
Account
The Smith Household
Details
Contacts
Opportunities
Site Surveys
System Designs
Permits
Notes
Files
Account Information
Account NameThe Smith Household✎
Phone(555) 987-6543✎
Billing Address550 Cypress Ln, Riverside, CA✎
Account TypeResidential Customer✎
Account OwnerLinda Hayes✎
Customer StatusActive Installation✎
Primary LanguageEnglish✎
Customer SatisfactionSatisfied✎
Property Specifications
Main Utility ProviderSCE✎
Total System Size (kW)8-10 kW✎
Property TypeSingle Family Detached✎
Roof TypeConcrete Tile✎
Main Service Panel125 Amp✎
Maintenance PlanStandard Warranty✎
Installation Scheduled
Permits cleared yesterday. We have scheduled the installation crew for August 20-21. The main panel upgrade will happen on day one, so power will be out for ~4 hours. Customer is aware.
HOA Approval Delay
The HOA kicked back the original design because they didn't want conduit visible on the front elevation. Designer rerouted the conduit through the attic space. Second submission approved.
Financing Cleared
GoodLeap financing loan docs have been signed and counter-signed. NTP (Notice to Proceed) issued to operations.
Contact
John Smith
Details
Notes
Files
Contact Details
Contact NameJohn Smith✎
Mobile Phone(555) 987-6543✎
Contact OwnerLinda Hayes✎
Role in HouseholdPrimary Decision Maker✎
Preferred Contact MethodText Message✎
Contact StatusActive✎
Sales Preferences
Technical KnowledgeBeginner✎
Key Buying FactorBest Equipment✎
Communication FrequencyOnly Major Milestones✎
Referral SourceExisting Customer✎
Financing PreferenceStandard Loan✎
Availability for Site VisitsFlexible✎
Installation Scheduling
John prefers text messages. Sent him the text confirming the crew arrival window between 7:30 AM and 8:30 AM on August 20th. He said the driveway will be clear for the truck.
Equipment Preferences
During the design review, John specifically asked for Enphase microinverters due to a friend's recommendation. We updated the design from string inverters to accommodate.
Referral Connection
Referred by the Johnson family (completed install last month). Make sure to send the Johnsons their $500 referral check once the Smith project hits PTO.
Opportunity
8.5kW Solar System - Smith
Discovery
Design & Pricing
Proposal Presented
Negotiation
Closed Won
Details
Line Items
Notes
Files
Opportunity Information
Opportunity Name8.5kW Solar System - Smith✎
StageClosed Won✎
System Size (kW)8.5✎
Number of Panels21✎
Panel BrandQcells✎
Opportunity OwnerLinda Hayes✎
Close DateJul 10, 2026✎
Amount$28,500✎
Probability (%)100%✎
Inverter TypeMicroinverters✎
Inverter BrandEnphase✎
Financing & Design
Financing Type20-Year Loan✎
Finance PartnerGoodLeap✎
Dealer Fee (%)21-25%✎
Battery Included?Quoted but Declined✎
Battery BrandN/A✎
Roof ConditionGood - Ready for Solar✎
Main Panel Upgrade?200A MPU Required✎
Utility CompanySCE✎
Est. Year 1 Production (kWh)13,850✎
Offset Percentage (%)101-110%✎
Contract Signed DateJul 10, 2026✎
CompetitorSunrun✎
Financing Approved
GoodLeap approved the $28.5k loan amount. Dealer fee is 22%. NTP has been issued to the design team to start the CAD drafting.
Battery Upsell Lost
Customer declined the Powerwall add-on during closing. The $14k added cost pushed the monthly payment out of their budget. Created a new opportunity for 6 months out to try and sell them on a retrofit battery once they secure their tax credit.
Competitive Situation
Beat out Sunrun on this one. Sunrun was offering a PPA but the customer wanted to own the system to claim the 30% federal tax credit themselves.
Campaign
Q3 NEM 3.0 Battery Retrofit
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameQ3 NEM 3.0 Battery Retrofit✎
TypeEmail Newsletter✎
StatusIn Progress✎
Target RegionSouthern California✎
Campaign OwnerMarketing Team✎
Start DateJul 01, 2026✎
End DateSep 30, 2026✎
Target AudienceOlder Homes (Solar Only)✎
Performance Metrics
Budgeted Cost$1,500✎
Actual Cost$850✎
Expected Revenue$150,000✎
Leads Generated45✎
Appointments Set12✎
Primary MessagingPower Outage Protection✎
NEM 3.0 Export Value Drop
Messaging is focusing heavily on the fact that grid exports are worth pennies under NEM 3.0. A battery allows them to store their midday production for evening use. Finding good traction with this angle.
List Generation
Filtered the database for all customers installed prior to April 2023 who did not include a battery storage system in their original contract. Yielded about 4,500 contacts.
Site Survey
SRV-10294 (The Smith Household)
Scheduled
Dispatched
In Progress
Under Review
Completed
Details
Notes
Files
Survey Details
Survey Name/IDSRV-10294✎
Property Address550 Cypress Ln, Riverside, CA✎
Scheduled DateJul 15, 2026✎
StatusCompleted✎
Surveyor AssignedMark Taylor✎
OwnerLinda Hayes✎
Roof TypeConcrete Tile✎
Roof PitchStandard (20-30 deg)✎
Number of Stories2 Story✎
Rafter Spacing24 inches OC✎
Drone Measurement Used?Yes - Full Roof✎
Electrical & Structural
Main Service Panel Size125A✎
Main Breaker Size125A✎
Panel BrandSquare D✎
Panel LocationExterior Wall✎
MPU Required?Yes - Full Upgrade✎
Trenching Required?No Trenching✎
Structural Damage Found?None✎
Shading ObstructionsVent Pipes Only✎
Attic AccessAccessible - Clear✎
Final Survey Sign-offApproved for Design✎
MPU Confirmation
The existing 125A Square D panel does not have the busbar capacity for a 40A solar breaker under the 120% rule. We absolutely need the 200A MPU. Added photos of the panel interior.
Roof Condition
Concrete tile looks in great shape. No broken tiles observed in the array plane. Rafters are standard 2x4s at 24" OC. Uploaded the drone 3D model to the design folder.
Access Instructions
Customer requested we do not ring the doorbell because the baby is sleeping. Texted upon arrival and customer let me into the side gate to access the MSP.
System Design
DES-88432-v2
Requested
Initial Draft
Revisions Requested
Final Approved
As-Built Completed
Details
Notes
Files
Design Specifications
Design IDDES-88432-v2✎
StatusFinal Approved✎
Designer AssignedAlice Wong✎
Array LayoutTwo Arrays✎
Module Count21-25✎
OwnerLinda Hayes✎
Module Wattage400W✎
Total DC Size (kW)8.40✎
Total AC Size (kW)6.72✎
Inverter Sizing Ratio (DC/AC)1.21 - 1.3✎
Expected Annual Production (kWh)13,850✎
Engineering & Permitting Details
Mounting HardwareIronRidge✎
Attachment TypeTile Hooks✎
Wire Run MethodAttic Run✎
Battery Backup Included?No Battery✎
Single Line Diagram (SLD)Approved✎
Structural Stamp Required?No✎
Fire Setbacks Met?Yes - 3ft Ridge/Edge✎
Electrical Load CalcsCompleted/Passed✎
Estimated Design Time (Days)2 Days✎
Customer ApprovalApproved as is✎
Customer Approved Layout
John reviewed the revised layout via DocuSign. He is fine with moving the 3 panels off the front elevation to the rear West-facing slope, even with the slight production drop. It keeps the HOA happy.
Revision 1 - HOA Requirement
HOA rejected the initial design. They enforce a "no street-facing solar" rule. Moving the 3 front panels to the rear array. Revising the stringing and sending back to the customer.
Initial Draft Complete
Used the drone measurements. Roof planes are completely clear of vents. Stringing 2 arrays with Enphase IQ8+ microinverters. Placed the 200A MPU on the exterior right wall next to the gas meter.
Permits & Interconnections
NEM-SCE-App-01 (The Smith Household)
Part 1 Submitted
Part 1 Approved
Pending Final Sign-off
PTO Submitted
PTO Granted
Details
Notes
Files
Permitting Status
Permit Record IDNEM-SCE-App-01✎
AHJCity of Riverside✎
Permit StatusApproved to Install✎
Submission MethodOnline Portal✎
HOA Approval StatusApproved✎
OwnerPermit Coord✎
Date Submitted to AHJJul 28, 2026✎
Estimated Approval DateAug 05, 2026 (Actual)✎
Permit Fees$450.00✎
Corrections Issued?None✎
Final Inspection DatePending Install✎
Utility Interconnection (PTO)
Utility CompanySCE✎
Net Metering TariffNEM 3.0 (NBT)✎
Interconnection StatusPart 1 Approved✎
Part 1 Submit DateJul 28, 2026✎
Transformer Upgrade Req?No✎
PTO Submit DatePending City Final✎
PTO Granted?Not Submitted✎
Bi-Directional Meter StatusAlready Installed✎
PTO Granted DateN/A✎
Project CloseoutPending PTO✎
Part 1 Approval
SCE approved the initial interconnection application today. No transformer upgrade required. The existing smart meter is already bi-directional capable.
City Permit Issued
City of Riverside approved the permit over-the-counter through their online portal. Job card is printed and placed in the project folder for the install crew.