Power generation equipment sales require tracking complex multi-year engineering cycles, preventative maintenance agreements, and installed base serial data. This interactive template organizes capital equipment proposals alongside long-term service agreements (LTSAs) for generators, turbines, and switchgear.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Qualify RFQs for backup power and prime generation retrofits. Accounts
Manage EPCs, utilities, hospitals, and industrial facilities. Contacts
Track consulting engineers, facility directors, and procurement. Opportunities
Drive equipment sales and service contract negotiations. Campaigns
Promote new product lines and seasonal maintenance specials. Equipment
Log installed base serial numbers, run hours, and capacities. Service Contracts
Monitor PM schedules, load bank testing, and warranty periods. Project Eng
Track submittals, drawing approvals, and startup commissioning.Lead
Robert Vance - Apex EPC Partners
New
Contacted
Technical Review
Sizing Complete
Converted
Details
Notes
Files
Primary Inquiry Information
NameRobert Vance✎
CompanyApex EPC Partners✎
TitleLead Electrical Engineer✎
Lead StatusTechnical Review✎
Firm TypeEPC / Contractor✎
Lead SourceDodge Construction Data✎
Lead OwnerMike Ross✎
Phone555-0122✎
Project NameTexas Grid Microgrid Pilot✎
Target Install StateTX✎
Equipment & Application Sizing
Target ApplicationPrime Power✎
Est. Total Capacity (kW)2,500✎
Fuel Type PreferenceNatural Gas✎
Voltage Requirement277/480V (3-Phase)✎
Paralleling Required?Yes (Utility Paralleling)✎
EPA Emissions TierNon-Emergency / Prime✎
Enclosure / PackagingWalk-In Sound Attenuated✎
Target Delivery QuarterQ2 Next Year✎
Are we Basis of Design?No - Caterpillar is✎
Turnkey / Installation Req?Equipment Only + Startup✎
Service Agreement (LTSA)Requesting 5-Year Quote✎
Sizing Tool Request
Forwarded the single-line diagram to our applications engineer. We need to verify if a single 2500kW unit or paralleled 2x 1250kW units will better handle their motor starting loads.
Emissions Requirement Note
Robert confirmed this is for a peak-shaving microgrid application in Texas, so it will run >100 hours/year. We must quote the Prime-rated natural gas engine to pass TCEQ air permitting.
Initial RFQ Receipt
Picked up this lead from Dodge Data. They are bidding against three other EPCs. We are not the basis of design, but Robert is open to our value-engineered package if we can beat the Caterpillar lead time.
Account
Mercy Health Systems
Details
Contacts
Opportunities
Equipment
Service Contracts
Project Eng
Notes
Files
Account Information
Account NameMercy Health Systems✎
Account TypeEnd User / Facility✎
Market SegmentHealthcare✎
Websitemercyhealth.example.com✎
Account OwnerLinda Hayes✎
Phone555-8821✎
HQ CityColumbus✎
HQ StateOH✎
Fleet & Commercial Details
Installed Base Units (Our Brand)4✎
Installed Base Units (Competitor)2✎
Total Installed Capacity (kW)6,000✎
Active Service Agreements (LTSA)4✎
Joint Commission (JCAHO) Req?Yes (Strict Compliance)✎
Primary Fleet AgeAging (10-15 Years)✎
Competitor Takeover Strategy
Marcus is frustrated with the local CAT dealer's response time on the South Wing unit. We currently hold a PM-only contract on it. Good opportunity to pitch a replacement quote for our brand next budget cycle.
NFPA 110 Compliance Audit
Mercy has an upcoming Joint Commission audit in March. Service team needs to ensure all monthly run logs and annual load bank test certificates are uploaded to their compliance portal by February.
Contact
Marcus Wright
Details
Notes
Files
Contact Information
NameMarcus Wright✎
TitleDirector of Facilities✎
Contact OwnerLinda Hayes✎
Phone (Desk)555-8823✎
Phone (Mobile)555-9011✎
Role & Preferences
Project RoleEconomic Buyer✎
Technical FocusBudget & Compliance✎
Influence StatusChampion✎
Preferred Contact MethodEmail✎
Do Not CallNo✎
Decision AuthorityApproves Service Contracts✎
Budget Cycle Priorities
Marcus noted his priority for 2027 is consolidating their PM contracts. He is tired of managing three different vendors (us, local CAT dealer, and a fire pump guy). Opportunity to pitch a Master LTSA.
Compliance Frustration
He complained heavily about the manual paperwork for the Joint Commission audits. I demonstrated our digital service portal and automated NFPA 110 reporting. He loved it.
Opportunity
East Campus Gen Replacement (1000kW)
Discovery
Sizing / Tech Review
Proposal
Negotiation
PO Received / Closed
Details
Line Items
Notes
Files
Opportunity Details
Opportunity NameEast Campus Gen Replacement (1000kW)✎
Sales TypeNew Equipment (Capital)✎
StageNegotiation✎
Target ApplicationEmergency Backup✎
Equipment LocationEast Campus Central Plant✎
Opportunity OwnerLinda Hayes✎
Close DateDec 05, 2026✎
Probability (%)85%✎
Amount$185,000✎
Lead SourceService Technician Lead✎
CompetitorKohler Power Systems✎
Technical & Delivery Requirements
Total kW (Standby)1,000✎
Fuel TypeDiesel (ULSD)✎
Voltage / Phase277/480V (3-Phase)✎
Emissions TierTier 2 (Emergency)✎
Enclosure RequiredSound Attenuated (Level 2)✎
Fuel Tank Sizing48-Hour Sub-Base✎
Transfer Switch (ATS) Included?No (Using Existing)✎
Current Factory Lead Time22-26 Weeks✎
Target Ship DateMay 15, 2027✎
Scope of SupplyFOB Jobsite + Startup✎
Next StepReview T&Cs on Hospital PO✎
Pricing & T&Cs Negotiation
Marcus verbally awarded us the deal over Kohler. However, their standard hospital purchasing T&Cs require Net 90 payment terms. I requested a concession for Net 30 upon shipment, Net 60 for startup. Sent to Legal for review.
Sizing Tool Verification
Ran the loads through our sizing software. The 1000kW unit handles the maximum step load (the chiller restart) with a maximum voltage dip of 12%. Well within their 15% spec limit.
Service Tech Lead
Our PM tech noted the existing 15-year old unit failed its load bank test twice due to a cracked engine block. Recommended replacement rather than repair. Great cross-selling.
Campaign
Q4 Load Bank Testing Promo
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameQ4 Load Bank Testing Promo✎
StatusIn Progress✎
TypeEmail Outreach✎
Focus AreaService / Aftermarket✎
Campaign OwnerMarketing Team✎
Start DateOct 01, 2026✎
End DateDec 31, 2026✎
Outreach Metrics
Budgeted Cost$1,500✎
Actual Cost$850✎
Expected Revenue$85,000✎
Target AudienceExisting Customers (No LTSA)✎
Num Sent850✎
Responses42✎
Opportunities Created18✎
Promotion Details
Offering a 15% discount on a 2-hour or 4-hour resistive load bank test if scheduled before December 15th. Intended to fill the service technician schedule during the slower pre-holiday period.
List Segmentation
Filtered the installed base to only include diesel generators that have not had a load bank test recorded in the system in the last 24 months. Excluded active Platinum LTSA customers (since it's included in their plan).
Equipment Asset
SN-8849201 (G-Series 1000 Diesel)
Shipped
Pending Startup
Active (Operational)
Out of Service
Decommissioned
Details
Notes
Files
Asset Identity
Serial NumberSN-8849201✎
Equipment CategoryGenerator Set✎
Brand / OEMOur Brand (Internal)✎
Model NumberG-Series 1000 Diesel✎
Asset StatusActive (Operational)✎
Asset OwnerLinda Hayes✎
Facility LocationEast Campus Central Plant✎
Original OpportunityN/A (Legacy Record)✎
Startup/Commission DateMar 12, 2018✎
Factory Warranty EndMar 12, 2020✎
Technical Specifications & Telemetry
Capacity (kW)1,000✎
Voltage / Phase277/480V (3-Phase)✎
Fuel TypeDiesel✎
Engine Block SerialENG-998822✎
Alternator SerialALT-55432✎
Current Run Hours412.5✎
Telemetry Connected?Yes (Cellular Gateway)✎
Last Ping/CommToday 08:00 EST✎
Active AlarmsNone✎
Controller Firmwarev2.4 (Update Available)✎
Firmware Update Required
Telemetry gateway flagged that the control panel is running v2.4. Added a note to the upcoming PM dispatch ticket to flash the controller to v2.5 to fix a known issue with the block heater relay logic.
Run Hour Increase
Unit accumulated 8 hours of runtime during the utility outage last week. Telemetry shows it carried 650kW load cleanly.
Battery Replacement
Replaced both starting batteries during the last semi-annual PM. Next scheduled replacement is Q3 2029.
Service Contract (LTSA)
LTSA-2022-MH-02
Drafting
Pending Signature
Active
Expiring Soon (< 90 Days)
Expired / Renewed
Details
Notes
Files
Contract Identity
Contract IDLTSA-2022-MH-02✎
Contract StatusActive✎
Coverage TierGold (PM + NFPA 110 Testing)✎
Contract OwnerLinda Hayes✎
Effective DateJan 01, 2024✎
Expiration DateDec 31, 2026✎
Term Length (Years)3✎
Annual Value$6,500✎
Service Deliverables
PM FrequencySemi-Annual✎
Load Bank Testing Included?Yes (Annual 2-Hour)✎
Fluid Sampling Included?Yes (Oil & Coolant)✎
ATS Inspection Included?Yes (1 Switch)✎
Guaranteed Response Time4 Hours (24/7/365)✎
Parts Discount (%)10%✎
Labor Discount (%)15%✎
NFPA Reporting Portal AccessIncluded✎
Renewal Strategy
This contract expires in December. Do not renew this individual contract. Instead, roll this asset, the Main Hospital unit, and the CAT unit into the new Master LTSA proposal we are presenting next week.
Load Bank Exception
Hospital requested we push the annual load bank test from October to November due to planned switchgear maintenance on their end. Service dispatch updated.
Project Engineering
PRJ-ND-014: Datacenter Bldg A 3000kW
Submittal Gen
Client Approval
Manufacturing
Pending Startup
Completed
Details
Notes
Files
Project Overview
Project IDPRJ-ND-014✎
Project NameDatacenter Bldg A 3000kW✎
Related OpportunityDatacenter Phase 1 Gen (Closed Won)✎
Sales RepLinda Hayes✎
Project Manager (PM)Sarah Jenkins✎
Project PhasePending Startup✎
Factory Order NumFO-8833992✎
Target Delivery DateOct 15, 2026 (Delivered)✎
Target Startup DateNov 10, 2026✎
Engineering Milestones
Submittals Sent DateApr 15, 2026✎
Submittal Approval StatusApproved As Noted✎
Release to Mfg DateMay 01, 2026✎
Factory Witness Test Req?Yes (Completed)✎
Shipment MethodDedicated Flatbed (Oversize)✎
Rigging/Setting ByCustomer / EPC✎
Startup Tech AssignedJohn Davis✎
Commissioning NETA TypeNETA Acceptance Testing✎
Site Readiness Check
Spoke with the EPC site super. The pad is poured and cured. They are rigging the unit into place this Thursday. Fuel lines will be connected by next Monday. We are clear for the Nov 10 startup date.
Delivery Confirmation
Unit arrived on site. No freight damage noted on the BOL. Customer signed off on delivery.
Factory Witness Test
Client flew into the factory. Unit held 3000kW 1.0 PF load for 4 hours with no alarms. Client signed off on the test report. Released for shipping.