Template Hub Template Hub

Sales Cloud Template for Pipeline Maintenance & Inspection

Pipeline maintenance and integrity management require precise tracking of inline inspections, asset conditions, and anomaly digs. This interactive template centralizes your pipeline data from initial smart pigging runs to final recoating and regulatory compliance reporting. Manage your field crews, track wall loss metrics, and schedule preventative maintenance in one unified system.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Sarah Jenkins - Midwest Midstream

New
Contacted
Scoping
Qualified
Converted
Details
Notes
Files

Primary Information

NameSarah Jenkins✎
CompanyMidwest Midstream✎
TitleIntegrity Management Director✎
StatusContacted✎
Segment TypeTransmission Mainline✎
Product TransportedSweet Natural Gas✎
Lead OwnerAlex Chen✎
Phone555-0199✎
Est. Mileage125✎
Operating Pressure (psig)850✎
Pipeline MaterialCarbon Steel (API 5L)✎

Technical Details

RegionMidwest✎
Coating TypeFusion Bonded Epoxy (FBE)✎
Service InterestILI Tool Run✎
Lead SourceTrade Show✎
Year Installed1985✎
Expected ScheduleQ2 Next Year✎
Est. Budget$250,000✎
CompetitorRosen✎
Preferred NDT MethodMagnetic Flux Leakage (MFL)✎
Next StepSchedule scoping call with Engineering✎
Initial Meeting Notes
Met Sarah at the Pipeline Pigging conference. They have a 125-mile 12" segment that is due for its 7-year integrity assessment next Spring. They suspect some internal corrosion near the booster station.
Created by Alex Chen • Aug 1, 2026
Trap Verification Needed
Need to verify if the existing launcher/receiver traps are rated for our high-resolution MFL tools, or if temporary traps will be required. Added to the scoping checklist.
Created by Alex Chen • Aug 2, 2026
Follow-up Call
Left a voicemail for Sarah to schedule the engineering review call. Sent the preliminary spec sheet for our 12" tool fleet.
Created by Alex Chen • Aug 3, 2026
◄ Back to Accounts List
Account

Midwest Midstream

Details
Contacts
Opportunities
Inspections
Assets
Work Orders
Notes
Files

Account Profile

Account NameMidwest Midstream✎
Account TypeTransmission Operator✎
Parent CompanyGlobal Energy Partners✎
Websitemidwestmidstream.example.com✎
Account OwnerJessica Vance✎
Phone555-8822✎
Billing StateIL✎
Operational RegionMidwest✎

Pipeline Portfolio

Total Miles Operated3,500✎
Primary ProductSweet Natural Gas✎
Regulatory BodyPHMSA✎
Integrity Management PlanActive / Approved✎
High Consequence Areas (HCA)850 Miles✎
Preferred ILI VendorUs (Primary)✎
Quarterly Review Summary
Met with Marcus to discuss the upcoming Line 4A ILI run. They are very focused on minimizing operational downtime. Assured him our new high-speed MFL tool can run at normal flow rates without choking back production.
Created by Jessica Vance • Aug 01, 2026
Master Service Agreement Renewal
Procurement flagged that our MSA expires in January. They want to standardize pricing across all Midwest operations before renewing. Sent over the new rate card for 2027.
Created by Jessica Vance • Jul 15, 2026
Competitor Intel
They used Baker Hughes for the Line 9 crack detection last year and had severe issues with data delivery delays. Good opportunity for us to win that segment back next cycle.
Created by Jessica Vance • May 10, 2026
◄ Back to Contacts List
C
Contact

Marcus Wright

Details
Notes
Files

Contact Information

Contact NameMarcus Wright✎
Account NameMidwest Midstream✎
TitleVP Integrity Mgmt✎
Contact OwnerJessica Vance✎
Phone555-8823✎
Mobile555-9011✎
Project RoleEconomic Buyer✎

Certifications & Communication

Safety CertificationsOQ Qualified (NACE)✎
Department/DivisionIntegrity Management✎
Primary LanguageEnglish✎
Influence StatusChampion✎
Preferred Contact MethodEmail✎
Do Not CallNo✎
Budget Cycle Priorities
Marcus noted his priority for 2027 is standardizing their NDT vendor pool. He wants to reduce the number of contractors executing anomaly digs to improve safety metrics and data consistency.
Created by Jessica Vance • Aug 01, 2026
NACE Certification
He recently renewed his NACE Senior Internal Corrosion Technologist certification. A good touchpoint for future conversations.
Created by Jessica Vance • May 15, 2026
◄ Back to Opportunities List
O
Opportunity

Anomaly Digs - Segment 2

Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files

Opportunity Details

Opportunity NameAnomaly Digs - Segment 2✎
Account NameMidwest Midstream✎
Opportunity TypeAnomaly Dig / Repair✎
StageProposal✎
Next StepFollow up on Dig Plan Proposal✎
Lead SourceExisting Customer✎
Opportunity OwnerJessica Vance✎
Close DateDec 05, 2026✎
Probability (%)60%✎
Amount$280,000✎
Est. Field Days14✎
CompetitorTDW Services✎

Scope & Logistics

Target AssetSegment 2✎
Pigging Run TypeN/A (Repair Only)✎
Defect MitigationType A Sleeve / Composite Wrap✎
Soil ConditionClay / Saturated✎
Weld Inspection ReqYes (Phased Array UT)✎
Expected Coating RepairLiquid Epoxy (Plural Component)✎
ROW Clearance NeededYes - Matting Required✎
DOT/PHMSA ReportingRequired (Actionable Digs)✎
Dig Crew AssignedMidwest Region - Crew B✎
Standby Safety EquipStandard Shoring Box✎
Traffic Control ReqNo (Rural ROW)✎
Weather ContingencyPumps & Mats Required✎
Proposal Submitted
Emailed the formal proposal and SOW for the 4 anomaly digs based on the recent ILI data. Highlighted the extra cost for the timber matting due to the saturated clay conditions near the creek crossing.
Created by Jessica Vance • Aug 01, 2026
ILI Report Review
Reviewed the final ILI report from last month's run. There are 4 distinct anomalies showing >40% wall loss. Three are cluster pitting, one is a severe dent with metal loss. All meet PHMSA criteria for immediate repair.
Created by Analyst Team • Jul 15, 2026
Scoping Call
Discussed repair methodologies with Robert Lin. He prefers composite wrap for the pitting, but the dent will require a Type B welded sleeve or a cutout depending on the NDE findings once exposed. We quoted wrap for all 4 to establish a baseline.
Created by Jessica Vance • Jul 10, 2026
◄ Back to Campaigns List
C
Campaign

Q3 ILI Tech Seminar

Details
Campaign Members
Notes
Files

Campaign Information

Campaign NameQ3 ILI Tech Seminar✎
StatusIn Progress✎
TypeEvent / Seminar✎
Focus AreaInline Inspection (ILI) Tech✎
Campaign OwnerMarketing Team✎
Start DateAug 01, 2026✎
End DateAug 15, 2026✎
Region FocusMidwest Hub (Chicago)✎

Metrics & Tracking

Budgeted Cost$15,000✎
Actual Cost$12,450✎
Target Audience ProfileIntegrity Engineers✎
Num Sent (Invites)450✎
Responses (RSVPs)65✎
Opportunities Created4✎
Post-Event Follow-up
The live demonstration of the new high-resolution MFL tool was a hit. Robert Lin from Midwest Midstream asked for a specific follow-up meeting to discuss running it in their Line 4A segment.
Created by Marketing Team • Aug 02, 2026
Venue Coordination
Confirmed catering and AV setup at the Chicago Marriott. We have space for 75 attendees comfortably.
Created by Event Coordinator • Jul 15, 2026
◄ Back to Inspections
I
Inspection Record

ILI-2026-Line4A

Scheduled
Tool Launched
Data Recovery
Analyst Review
Final Report
Details
Notes
Files

Inspection Overview

Inspection IDILI-2026-Line4A✎
Related AssetLine 4A - Mainline✎
Inspection TypeILI Tool Run✎
StatusTool Launched✎
Primary ToolHigh-Res MFL + Caliper✎
Tool Diameter (Inches)12"✎
Pig VendorUs (Internal Tool Fleet)✎
Inspection Owner (Field)Field Ops Team✎
Scheduled Launch DateAug 03, 2026✎
Expected Completion DateAug 04, 2026✎
Run Length (Miles)65✎
Flow Rate (BPD/Mcf)85,000 Mcf/d✎
Run Pressure (psig)750✎
Launch Trap IDTRP-L-04A✎
Receiver Trap IDTRP-R-04A✎

Results & Anomalies

Anomalies DetectedPending Data Recovery✎
Max Wall Loss %TBD✎
Dent Deformation %TBD✎
Weld AnomaliesTBD✎
Review StatusAwaiting Raw Data✎
Immediate Repair Required?TBD✎
PHMSA Notification Req?TBD✎
Data Analyst AssignedSarah Jenkins✎
Software UsedInternal Analytics Platform✎
Next Inspection DueAug 2033 (7-Year Cycle)✎
Tool Launched Successfully
The MFL/Caliper combo tool was successfully launched at 08:15 AM today from the TRP-L-04A facility. AGM tracking shows it is moving at an optimal speed of 3.2 mph. Expected arrival at the receiver trap is tomorrow morning around 04:30 AM.
Created by Field Ops Team • Aug 03, 2026
Pre-Run Cleaning Complete
Ran two cup pigs and a brush pig prior to the smart tool. Recovered roughly 2 lbs of black powder and minor paraffin wax. Line is sufficiently clean for the high-res MFL run.
Created by Field Ops Team • Aug 02, 2026
◄ Back to Assets
A
Asset

Line 4A - Mainline

Proposed
Under Construction
Active Service
Out of Service
Abandoned
Details
Notes
Files

Asset Identity

Asset Name/SegmentLine 4A - Mainline✎
Parent AccountMidwest Midstream✎
Asset TypeTransmission Mainline✎
StatusActive Service✎
Start NodeStation Alpha (MP 0.0)✎
End NodeStation Delta (MP 65.0)✎
Asset OwnerMidwest Engineering Dept✎
Installation Year1985✎
Line Diameter (Inches)12"✎
Wall Thickness (Inches)0.375"✎
MAOP (psig)1,200✎
Normal Operating Pressure850 psig✎

Material & Environmental

Pipe MaterialCarbon Steel (API 5L X52)✎
Seam TypeERW (Electric Resistance Weld)✎
External CoatingFusion Bonded Epoxy (FBE)✎
Internal CoatingBare Steel✎
Cathodic Protection SystemImpressed Current (ICCP)✎
Product TransportedSweet Natural Gas✎
HCA Mileage12.5 Miles✎
Water Crossings3 (Major)✎
Soil TypeMixed Clay / Loam✎
Overall Risk RatingMedium Risk✎
ILI Tool Run in Progress
Line 4A is currently undergoing its 7-year ILI inspection. The high-res MFL tool is currently in the line. Expected to receive the tool tomorrow morning at Station Delta.
Created by Field Ops Team • Aug 03, 2026
Class Location Change
Due to a new residential subdivision built near MP 42, a 1.5-mile section of Line 4A has been upgraded from Class 1 to Class 3. The MAOP review showed the existing pipe wall thickness still meets the safety factor requirements for Class 3, so no pressure reduction or pipe replacement is needed.
Created by Integrity Engineering • May 12, 2026
Cathodic Protection Survey
Annual CIS (Close Interval Survey) completed. Found slightly depressed potentials near the river crossing at MP 15. Added to the maintenance backlog to adjust rectifier output.
Created by CP Tech • Sep 10, 2025
◄ Back to Work Orders
W
Work Order

WO-2026-Dig-045

Assigned
Excavation
Repair Active
Restoration
Closed
Details
Notes
Files

Work Order Details

WO NumberWO-2026-Dig-045✎
Related AssetLine 4A - Mainline✎
Related InspectionILI-2026-Line4A✎
WO TypeAnomaly Dig✎
StatusExcavation✎
PriorityHigh✎
WO Owner (Manager)Alex Chen✎
Scheduled StartAug 02, 2026✎
Target CompletionAug 10, 2026✎
Assigned CrewMidwest Region - Crew B✎
Contractor NameN/A (Self-Perform)✎
Estimated Cost$45,000✎

Field Execution

Excavation Required?Yes (Hydro-Vac)✎
Shoring MethodTrench Box✎
Repair MethodType A Sleeve✎
Coating AppliedPending Repair✎
X-Ray / NDT VerificationPending Repair✎
ROW Restoration StatusNot Started✎
Soil Haul-Off Required?No (Clean Soil)✎
Safety IncidentsNone✎
Sign-off EngineerTBD✎
Actual CostTBD✎
Excavation Started
Hydro-vac crew arrived on site and began daylighting the pipe. Expected to reach the target depth (7 feet) by this afternoon. Trench box is staged and ready for deployment.
Created by Field Supervisor • Aug 03, 2026
One-Call / 811 Cleared
All utility locates are clear. A local fiber optic line was marked 20 feet west of the dig site, but it is well outside our excavation footprint.
Created by Field Supervisor • Aug 01, 2026
Pre-Job Safety Briefing
Conducted the tailgate safety meeting. Discussed heat stress management and the required PPE for the hydro-vac operation. All crew members signed off.
Created by Field Supervisor • Aug 01, 2026