Petroleum engineering consultants navigate complex variables—from reservoir characterization and decline curve analysis (DCA) to drilling program design and A&D evaluations. This template consolidates client technical requirements, tracks well and asset data, and organizes your project lifecycle to ensure accurate reserves reporting and optimized field development.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track RFPs for reservoir studies and drilling programs. Accounts
Manage E&P operators, midstream clients, and investors. Contacts
Organize asset managers, geologists, and completion engineers. Opportunities
Forecast reserves reporting and A&D due diligence projects. Campaigns
Coordinate SPE conference outreach and technical webinars. Wells
Track well API numbers, formation targets, and status. Reservoirs
Log lithology, porosity, EUR targets, and decline metrics. Field Assets
Manage battery facilities, compressors, and gathering lines.Lead
Robert Vance
New
Contacted
Qualified
Converted
Details
Notes
Files
Primary Lead Information
First NameRobert✎
Last NameVance✎
TitleVP Operations✎
CompanyPermian Basin E&P✎
Phone(555) 123-4567✎
Lead OwnerSarah Jenkins✎
Lead StatusNew✎
RatingHot✎
Lead SourceWebsite Inquiry✎
Basin/RegionPermian Basin✎
Project Requirements
Service FocusReservoir Characterization✎
Asset TypeUnconventional Shale✎
Well Count12 Planned✎
Commodity FocusOil / Liquids Rich✎
Target FormationWolfcamp B✎
Estimated Budget$85,000✎
Project TimelineQ4 Spud Date✎
Software RequiredAries✎
Data AvailabilityOffset Logs & Core Data✎
Primary ChallengeParent/Child Interference✎
NDA StatusPending Signature✎
Initial Scope Assessment
Robert is looking for an independent reservoir study on a 12-well pad they plan to spud in Q4. They are concerned about parent/child well interference impacting EURs.
Aries Database Integration
Client specifically requested all decline curve models be delivered in an Aries database format so their internal team can merge it easily. Confirmed our capability.
NDA Execution
Sent our mutual NDA template. Once signed, they will provide access to the secure data room with offset well logs and preliminary frac designs.
Account
Vanguard Energy Partners
Details
Contacts
Opportunities
Wells
Reservoirs
Field Assets
Notes
Files
Account Information
Account NameVanguard Energy Partners✎
Phone(555) 111-2222✎
Websitewww.vanguardenergy.example.com✎
Billing CityHouston✎
Account OwnerDavid Chen✎
Industry Sub-SectorE&P Operator✎
Account TierStrategic Account✎
Contract StatusActive MSA✎
Operational Profile
Primary BasinEagle Ford✎
Operated Well Count350+✎
Daily Production Est.45,000 BOE/d✎
Primary SoftwarePHDWin✎
Reserves AuditorRyder Scott✎
A&D Activity LevelHigh (Active Buyer)✎
MSA Rate Update
Negotiated a 5% rate increase across all reservoir consulting services for the 2026-2028 MSA cycle. Specifically covers due diligence and decline curve analysis.
Acquisition Focus
Vanguard is heavily focused on acquiring PDP-heavy assets in the Eagle Ford to balance their cash flow. Pitch our rapid A&D evaluation turnaround times.
Data Room Access
They are moving from physical data rooms to Intralinks for all M&A activity starting in Q3. Ensure our analyst team is registered.
Contact
Elena Rostova
Details
Notes
Files
Contact Information
Contact OwnerDavid Chen✎
DepartmentAsset Management✎
RoleDecision Maker✎
CertificationPE (Petroleum)✎
Engagement Details
Comm PreferenceTeams / Webex✎
Decision AuthorityTechnical Vendor Selection✎
Technical FocusAsset Evaluation / A&D✎
A&D Deal Flow
Elena leads the technical evaluation for Vanguard's acquisitions. She prefers to review Type Curves and economic runs in Spotfire before looking at the raw Aries databases.
Software Preferences
She mentioned they are transitioning off PHDWin and moving entirely to Aries for reserves by the end of the year. Keep all our deliverables formatted for Aries going forward.
Meeting Protocol
Prefers 30-minute Teams meetings over long lunches. Send read-ahead materials at least 24 hours before any technical review call.
Opportunity
Q3 Acquisition Due Diligence - Eagle Ford
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NameQ3 Acquisition Due Diligence - Eagle Ford✎
Amount$115,000.00✎
Close Date8/15/2026✎
StageProposal✎
Probability75%✎
Opportunity OwnerDavid Chen✎
TypeExisting Client Expansion✎
Lead SourceDirect Account Work✎
CompetitorNetherland Sewell✎
Contract VehicleMaster Service Agreement✎
Project Scope & Engineering
Service ScopeA&D Due Diligence✎
Target BasinEagle Ford✎
Asset TypeUnconventional Shale✎
Well Count Involved120 PDP / 400 PUD✎
Primary SoftwareAries✎
Deliverable FormatAries DB + Econ Summary✎
Timeline NeedRush - 14 Days✎
Data Room AccessGranted (Intralinks)✎
Commodity PricingNYMEX Strip + Differentials✎
Engineering DisciplineReservoir Engineering✎
Site Visit RequiredNo (Desktop Audit)✎
Approval StatusUnder Client Review✎
Tight Turnaround
Vanguard's bid is due in 16 days. We need to deliver the preliminary Aries database by day 14. We will need to pull 3 engineers to run the DCA concurrently.
Data Room Caveat
Noted in the proposal that the $115k fee assumes the seller's data room has clean lease operating statements (LOE). If we have to scrub raw JIBs, we will need a change order.
PUD Locations
Seller is claiming 400 PUD locations. Elena wants us to heavily scrutinize the well spacing assumptions in the lower Eagle Ford.
Campaign
URTeC Conference 2026
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameURTeC Conference 2026✎
TypeTrade Show✎
StatusIn Progress✎
Start Date7/20/2026✎
Campaign OwnerMarketing Team✎
Target AudienceE&P Engineers & Asset Mgrs✎
Delivery MethodIn-Person Booth & Paper✎
End Date7/22/2026✎
Target Metrics
Service FocusUnconventional Reservoir Eng✎
Budgeted Cost$25,000.00✎
Actual Cost$23,400.00✎
Region FocusNational Focus✎
Expected Revenue$250,000.00✎
Responses112✎
Technical Paper Presentation
Sarah Jenkins presented our paper on "Optimizing Fracture Spacing in the Wolfcamp Shale" to a packed room on day 2. Generated 30 high-quality leads immediately after.
Booth Setup
The new interactive Spotfire dashboard display at the booth worked well to draw in reservoir engineers. Keep this setup for the SPE ATCE conference in October.
Lead Follow-up
All scanned badges have been uploaded. The sales team needs to complete initial follow-up calls by Friday while the technical paper is still fresh in their minds.
Well
Vanguard State 1H
Permitted (PUD)
Drilling
Completion
Producing
Plugged (P&A)
Details
Notes
Files
Well Identification
Well NameVanguard State 1H✎
API Number42-255-32101✎
County/ParishKarnes✎
StateTX✎
Field NameKarnes Trough✎
Record OwnerDavid Chen✎
Well StatusProducing (PDP)✎
Well TypeOil Well✎
TrajectoryHorizontal✎
Surface Latitude28.91023✎
Surface Longitude-97.89231✎
Geology & Drilling Metrics
True Vertical Depth (TVD)10,540 ft✎
Measured Depth (MD)18,200 ft✎
Lateral Length7,250 ft✎
Spud Date2/10/2024✎
Completion Date4/15/2024✎
First Production Date5/01/2024✎
Frac Stages45✎
Proppant Intensity2,500 lbs/ft✎
Artificial LiftGas Lift✎
Gas Lift Optimization Needed
Production has declined below the type curve. Water cut has increased to 40%. The client wants us to evaluate resizing the gas lift valves or transitioning to an ESP.
Frac Hit Interference
Noticed a sharp pressure drop on this well in March when the offset 2H well was being zipper fracked. Potential communication between the fracture networks.
Reservoir
Eagle Ford Lower - State Unit
Exploration
Delineation
Development
Mature/Decline
Secondary Recovery
Details
Notes
Files
Geological Properties
Reservoir NameEagle Ford Lower - State Unit✎
Associated FieldKarnes Trough✎
Primary LithologyCalcareous Shale✎
Average Depth (TVD)10,500 ft✎
Net Pay Thickness120 ft✎
OwnerDavid Chen✎
Development StageDevelopment✎
Drive MechanismSolution Gas Drive✎
Average Porosity8.5%✎
Average Permeability450 nD (nanoDarcies)✎
Water Saturation (Sw)22%✎
Fluid & Production Parameters
Primary Fluid TypeVolatile Oil✎
Oil Gravity (API)42°✎
Initial GOR (scf/bbl)1,200✎
Initial Reservoir Press.6,800 psi✎
Reservoir Temperature230° F✎
Type Curve EUR (Oil)450 MBO✎
Initial Decline Rate (Di)65%✎
Terminal Decline Rate6%✎
b-Factor (Hyperbolic)1.2✎
Current Recovery Factor4.5%✎
Bubble Point Pressure
PVT analysis from the core sample indicates a bubble point pressure of 4,200 psi. We need to maintain BHP above this to avoid premature gas breakout in the matrix.
b-Factor Justification
Client pushback on the 1.2 b-factor. They want it closer to 1.4 for higher EURs. I have scheduled a call to walk them through the Arps methodology and justify our conservative approach for SEC compliance.
Field Asset
State Unit Central Battery
Design/FEED
Construction
Commissioning
Active Ops
Decommissioned
Details
Notes
Files
Asset Details
Asset NameState Unit Central Battery✎
Asset ID TagFAC-KRN-1002✎
Asset TypeTank Battery✎
Location/FieldKarnes Trough✎
Asset OwnerMichael Torres✎
StatusActive Ops✎
Commission Date10/15/2023✎
Last Inspection5/10/2026✎
Compliance ConcernFlaring Limits (TCEQ)✎
Capacity & Equipment Specs
Design Capacity (Liquids)5,000 BPD✎
Current Throughput3,800 BPD✎
Storage Capacity4 x 500 bbl Tanks✎
Vapor Recovery UnitInstalled & Active✎
Separator Types3-Phase (High & Low Press)✎
Design Pressure Max1,440 psi (ANSI 600)✎
Telemetry/SCADAEmerson ROC800✎
Containment IntegrityPass (Steel Dike)✎
Offload MethodLACT to Pipeline✎
Power SourceGrid Connected✎
Bottleneck Identified
Throughput is capped at 3,800 BPD because the low-pressure separator is undersized for the current gas-oil ratio. We need to evaluate adding a parallel vessel before bringing Vanguard State 2H online.
Emissions Audit
FLIR camera inspection picked up minor fugitive emissions around the VRU compressor seals. Maintenance ticket issued to tighten the packing.
