Template Hub Template Hub

Sales Cloud Template for Metallurgical Engineering

Metallurgical engineering requires rigorous tracking of material samples, destructive and non-destructive testing, and complex failure analyses. This environment streamlines the intake of client requests for alloy characterization, corrosion studies, and weld evaluations. Manage laboratory workflows, track analytical equipment utilization, and deliver defensible technical reports that support manufacturing quality and litigation.

✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Robert Vance - Orion Aerospace

New
Contacted
Qualified
Converted
Details
Notes
Files

Primary Lead Information

First NameRobert✎
Last NameVance✎
TitleVP of Quality✎
CompanyOrion Aerospace✎
Phone(555) 123-4567✎
Lead OwnerDavid Chen✎
Lead StatusNew✎
RatingHot✎
Lead SourceWebsite RFQ✎
RegionMidwest✎
Target IndustryAerospace & Defense✎

Testing & Analysis Requirements

Inquiry TypeFailure Analysis✎
Primary MaterialTitanium Alloy✎
Required TestingSEM / EDS Analysis✎
Sample ConditionFractured Component✎
Sample Size/WeightSmall (< 5 lbs)✎
Timeline NeedExpedited (3-5 Days)✎
Estimated Budget$15,000✎
Certifications NeededAS9100D✎
Destructive ApprovalPending✎
Return PolicyReturn to Client✎
Initial Scope Assessment
Robert needs failure analysis on a fractured titanium bracket from an aerospace assembly. They are seeing premature fatigue failures and suspect a heat treatment issue.
Created by David Chen • Aug 01, 2026
SEM/EDS Requirement
I suggested a full fractography review using SEM and EDS to check for inclusion defects before we proceed with tensile testing. He agreed.
Created by David Chen • Aug 02, 2026
AS9100 Requirements
They require full material traceability and certified reports per AS9100D standards. Confirmed our QA team is aligned and current on certification.
Created by Sarah Jenkins • Aug 03, 2026
◄ Back to Accounts List
Account

Titanium Forge Works

Details
Contacts
Opportunities
Samples
Analyses
Reports
Notes
Files

Account Information

Account NameTitanium Forge Works✎
Phone(555) 111-2222✎
Websitewww.titaniumforge.example.com✎
Billing CityCleveland✎
Account OwnerSarah Jenkins✎
Industry Sub-SectorHeavy Manufacturing✎
Account TierStrategic Account✎
SLA LevelGold (5-Day Turnaround)✎

Client Protocols

Primary Testing NeedRoutine QA Verification✎
Quality Standard (ISO)ISO 9001:2015✎
Sample Volume / Mo25-50✎
Destructive ApprovalPre-Approved (Routine)✎
Return/Disposal PolicyDispose after 60 Days✎
Contract StatusActive MSA✎
MSA Rate Update
Negotiated a 4% rate increase across all routine tensile and hardness testing for the 2026 cycle. Complex failure analysis remains project-priced.
Created by Sarah Jenkins • Jan 10, 2026
Expedited Handling Agreement
Titanium Forge opted into the Gold SLA, meaning we guarantee 5-day turnaround on routine QA samples. Ensure the lab coordinator flags their inbound shipments.
Created by David Chen • Mar 22, 2026
Vendor Portal Change
They are moving from SAP Ariba to Coupa for vendor billing starting in Q3. Ensure finance is registered so test reports don't face payment delays.
Created by Finance Team • May 05, 2026
◄ Back to Contacts List
C
Contact

Janet Lewis

Details
Notes
Files

Contact Information

First NameJanet✎
Last NameLewis✎
TitleDirector of Quality✎
Account NameTitanium Forge Works✎
Contact OwnerDavid Chen✎
DepartmentQuality Assurance✎
RoleTechnical Evaluator✎
Comm PreferenceEmail✎

Technical Focus

Phone(555) 123-4568✎
Mobile(555) 999-5555✎
Technical FocusRoutine QA & Certifications✎
Decision AuthorityTechnical Vendor Selection✎
Engineering CertSix Sigma Black Belt✎
Report Format Preference
Janet prefers our reports to include a 1-page executive summary highlighting Pass/Fail metrics before diving into the detailed micrograph images. She forwards these directly to their automotive clients.
Created by David Chen • Aug 01, 2026
ISO 9001 Audit Support
She relies heavily on our ISO 17025 accredited test results to maintain their internal ISO 9001 certification. Always ensure calibration certificates are appended to her reports.
Created by Sarah Jenkins • Aug 02, 2026
Sample Handling
Janet is very particular about chain of custody. Ensure the intake lab scans and countersigns her specific intake forms when FedEx drops off their batches.
Created by David Chen • Jul 30, 2026
◄ Back to Opportunities List
O
Opportunity

Bracket Fatigue Failure Investigation

Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files

Opportunity Information

Opportunity NameBracket Fatigue Failure Investigation✎
Account NameOrion Aerospace✎
Amount$32,000.00✎
Close Date8/20/2026✎
StageNegotiation✎
Probability85%✎
Opportunity OwnerSarah Jenkins✎
TypeNew Business✎
Lead SourceWebsite RFQ✎
Primary CompetitorExponent✎
Primary ContactElena Rostova✎
Contract VehiclePurchase Order Only✎

Testing Scope Details

Project ScopeFailure Analysis✎
Testing RegimenMicrostructure + SEM✎
Material TypeTitanium Alloy✎
Sample Count Expected3✎
Destructive PermittedYes - Full Destructive✎
Deliverable FormatComprehensive Written Report✎
Litigation RiskMedium - Possible Subrogation✎
Turnaround NeedExpedited (5 Days)✎
Field Visit RequiredNo - Samples Shipped✎
Subcontractor ReqNone✎
NDA / IP TermsExecuted✎
Approval StatusUnder Client Review✎
Expedite Fee Negotiation
Elena requested a 5-day turnaround to meet a production deadline. I added a 20% expedite surcharge to the lab testing line items. She is reviewing the budget with finance today.
Created by Sarah Jenkins • Aug 05, 2026
Destructive Testing Clarification
Clarified in the proposal that the 3 fractured brackets will be permanently sectioned and mounted in epoxy. They cannot be returned in their original state. Client acknowledged.
Created by David Chen • Aug 02, 2026
Subrogation Warning
If our analysis shows a heat treatment defect, Orion plans to subrogate against their supplier. Ensure our chain of custody paperwork is pristine in case this goes to litigation.
Created by Sarah Jenkins • Aug 01, 2026
◄ Back to Campaigns List
C
Campaign

MS&T Trade Show 2026

Details
Campaign Members
Notes
Files

Campaign Information

Campaign NameMS&T Trade Show 2026✎
TypeTrade Show✎
StatusIn Progress✎
Start Date10/10/2026✎
Campaign OwnerMarketing Team✎
Target AudienceMaterials Engineers & OEMs✎
Delivery MethodIn-Person Booth✎
End Date10/14/2026✎

Target Metrics

Service FocusFailure Analysis Services✎
Budgeted Cost$35,000.00✎
Actual Cost$12,200.00✎
Region FocusNational✎
Expected Revenue$250,000.00✎
Responses0 (Pending Start)✎
Booth Setup Focus
We are highlighting our new 3D X-Ray CT scanning capabilities at the booth. Make sure the marketing brochures emphasize non-destructive failure analysis.
Created by Marketing Team • Aug 01, 2026
Speaker Slot Confirmed
David Chen is confirmed for the Wednesday afternoon technical session to present on "Identifying Micro-inclusions in Additive Manufactured Titanium".
Created by Marketing Team • Jul 15, 2026
Client Dinners
Sales team needs to finalize the invite list for the VIP client dinner on Tuesday night. Budget is capped at $5k.
Created by Sarah Jenkins • Aug 05, 2026
◄ Back to Samples List
S
Sample

SMP-4421: Fractured Turbine Blade Root

Received/Logged
Preparation
In Testing
Testing Complete
Returned/Disposed
Details
Notes
Files

Sample Identification

Sample IDSMP-4421✎
DescriptionFractured Turbine Blade Root✎
Account LinkTitanium Forge Works✎
Client Ref / PO NumberPO-99281-TF✎
Receive Date8/01/2026✎
Sample OwnerLab Team✎
StatusIn Testing✎
Current CustodianDr. Helen Troy✎
Storage LocationSEM Prep Station 2✎
Chain of Custody LevelStandard Commercial✎

Material & Condition

Material TypeTi-6Al-4V✎
Condition Upon ReceiptFractured into 2 pieces✎
Initial Weight (g)450g✎
Dimensions (mm)120 x 40 x 15✎
Hazardous ProfileNone (Clean Metal)✎
Destructive Auth.Approved via Protocol✎
Sectioning PlanCut 1" behind fracture face✎
Mounting RequiredYes - Bakelite✎
Post-Test DispositionReturn Remnants to Client✎
Due Date8/10/2026✎
Initial Inspection Findings
Sample received in two pieces. Fracture face appears to exhibit beach marks indicative of high-cycle fatigue starting from the leading edge. No visible corrosion products.
Created by Dr. Helen Troy • Aug 01, 2026
Sectioning Completed
Sectioned the sample 1 inch behind the fracture face using the slow-speed diamond saw to avoid altering the microstructure. Mounted in conductive Bakelite for SEM analysis.
Created by Lab Tech • Aug 02, 2026
◄ Back to Analyses List
A
Analysis

ANL-8012: SEM / EDS on Fracture Surface

Scheduled
Instrument Run
Data Processing
Peer Review
Completed
Details
Notes
Files

Analysis Setup

Analysis IDANL-8012✎
Test TypeSEM / EDS Analysis✎
Sample LinkSMP-4421✎
Instrument UsedZeiss EVO MA10 SEM✎
Analyst (Owner)Dr. Helen Troy✎
StatusData Processing✎
Date Scheduled8/02/2026✎
Date Completed--✎
Reviewing EngineerDavid Chen✎

Testing Parameters & Results

Standard/SpecificationASTM E1508✎
Magnification Range50x to 5000x✎
Accelerating Voltage20 kV✎
Detector UsedSE / BSE / EDS✎
Primary FindingAlpha-Case Brittle Failure✎
Anomaly DetectedYes✎
EDS Element FlagsHigh Oxygen content at surface✎
Data ValidationIn Progress✎
SEM Findings Summary
Initial scans at 500x show clear intergranular fracture near the root surface. Moving to 2000x BSE to look for oxide inclusions.
Created by Dr. Helen Troy • Aug 02, 2026
EDS Spectrum Results
EDS point analysis on the fracture initiation site indicates a spike in Oxygen and Carbon. This strongly suggests Alpha-case formation during forging/heat treat, making the surface brittle.
Created by Dr. Helen Troy • Aug 03, 2026
Peer Review Request
I have compiled the micrograph TIFFs and the EDS spectra graphs. Sending over to David Chen to review the conclusion regarding the alpha-case before we pull it into the final report.
Created by Dr. Helen Troy • Aug 03, 2026
◄ Back to Reports List
R
Report

REP-26-085: Turbine Blade Failure Analysis

Data Gathering
Drafting
Peer Review
PE Stamping
Delivered
Details
Notes
Files

Report Information

Report IDREP-26-085✎
SubjectTurbine Blade Failure Analysis✎
Account LinkTitanium Forge Works✎
Target Delivery Date8/12/2026✎
Primary AuthorDavid Chen✎
StatusDrafting✎
Report TypeComprehensive Failure Analysis✎
Confidentiality LevelStrict NDA (Do Not Publish)✎
Delivery FormatSecure PDF Portal✎

Review & Approval Workflow

Drafting ProgressSection 3: Findings✎
Data Inputs CompleteYes✎
Peer ReviewerSarah Jenkins✎
PE Stamp RequiredYes✎
Stamping EngineerDavid Chen, PE✎
State of LicensureOhio✎
Revision Count0✎
Legal Privilege CheckNot Required✎
Drafting Note: Conclusions
Based on the SEM and EDS data from Dr. Troy, I am writing the conclusion to state that the primary failure mechanism was brittle fracture caused by Alpha-case formation due to improper atmospheric control during the forging process.
Created by David Chen • Aug 04, 2026
Formatting Requirement
Remember that Janet requested the 1-page executive summary highlighting Pass/Fail metrics before the body of the report. I will draft that separately and append it.
Created by David Chen • Aug 04, 2026