Mechanical engineering firms need robust tracking for MEP design, HVAC load calculations, and equipment specifications. This CRM template is built specifically for mechanical system design and engineering consulting. Track project phases, equipment schedules, and design submittals seamlessly. Streamline your firm operations and maintain rigorous project oversight.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track incoming MEP design bids and inquiries. Accounts
Manage general contractors and developers. Contacts
Organize key stakeholders and building planners. Opportunities
Monitor engineering contracts and proposals. Campaigns
Coordinate technical seminars and events. Projects
Oversee active mechanical design phases. Equipment Specs
Track HVAC units, chillers, and schedules. Design Submittals
Manage shop drawings and field RFIs.Lead
Marcus Wright - Summit Construction
New
Contacted
Qualified
Pending RFP
Converted
Details
Notes
Files
Primary Information
First NameMarcus✎
Last NameWright✎
TitlePreconstruction Manager✎
Lead Status
Contacted
✎
Project Category
Commercial Office
✎
Lead OwnerSarah Jenkins✎
Phone555-102-3948✎
Construction Method
Design-Build
✎
Desired Schedule
Q3 Start
✎
Priority Rating
High
✎
System Requirements
Lead Source
Referral
✎
Building Type
Mid-Rise (4-9 Stories)
✎
Primary System
Chilled Water / VAV
✎
Expected Sq Footage
100,000 - 250,000
✎
Street Address400 Commerce Way✎
HVAC Load Estimate
400 - 800 Tons
✎
Sustainability Goal
LEED Silver
✎
Budget Status
Approved
✎
Industry Sector
Private Developer
✎
City/State/ZipDenver, CO 60204✎
Initial Meeting Notes
Marcus indicated they want to move away from standard RTUs and explore a chilled water system for the new office park. Need to prepare comparative load calcs.
Budget Clarification
Confirmed the core/shell budget is fully funded. They are looking to issue the MEP design RFP by the 15th.
Design-Build Strategy
Client prefers Design-Build. We should partner with Apex Mechanical for the bidding phase.
Account
Apex Mechanical
Details
Contacts
Opportunities
Projects
Equipment Specs
Design Submittals
Notes
Files
Primary Information
Account NameApex Mechanical✎
Account TypeContractor✎
Industry SectorPrivate Developer✎
Billing CityChicago✎
Account OwnerMichael Torres✎
Phone555-882-9911✎
Websitewww.apex-mech.com✎
Engineering Business Details
Primary MarketMidwest Commercial✎
Typical Project Size$10M - $50M✎
Procurement MethodNegotiated Contract✎
Active StatusActive Client✎
Delivery MethodDesign-Build✎
Engineering TierTier 1 - Strategic✎
Payment TermsNet 45✎
Quarterly Review Meeting
Met with Frank to review the ongoing Riverfront project. They are happy with our turnaround times on submittals and want us to bid on the new Medical Center.
Insurance Requirement Update
Apex has updated their subcontractor requirements. We need to provide a new Certificate of Insurance (COI) with $5M umbrella coverage before the next contract signing.
BIM Coordination Stand-down
Apex held a mandatory Navisworks coordination stand-down across all sites today due to persistent clashing. We need to upload our latest LOD 400 models tonight.
Contact
Sarah Connor
Details
Notes
Files
Contact Information
Engineering Role & Preferences
Contact RoleDesign Lead✎
Decision AuthorityInfluencer✎
Project PhaseSchematic Design (SD)✎
Communication PrefEmail✎
Discipline PreferenceHVAC Systems✎
Approval FrequencyWeekly✎
Design Charette Notes
Sarah wants the mechanical systems for the new tower to avoid roof-mounted equipment. We need to evaluate a mid-level mechanical floor for the chillers.
Sustainability Requirements
She stressed the importance of tracking EUI (Energy Use Intensity) to help them achieve LEED Platinum.
Lunch & Learn Attendee
Sarah attended our firm's Lunch & Learn on Variable Refrigerant Flow (VRF) systems. She is highly interested in using it for their mid-rise portfolio.
Opportunity
Downtown Tower MEP Design
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Contract Information
Opportunity NameDowntown Tower MEP Design✎
TypeNew Business✎
StageNegotiation✎
Service TypeFull MEP Design✎
Opportunity OwnerMichael Torres✎
Close Date10/15/2026✎
Amount$450,000✎
Probability (%)80%✎
Next StepFinalize BIM contract✎
Contract TypeLump Sum✎
Engineering Scope Specifications
Project ScopeCore and Shell Only✎
Design PhaseConcept/SD✎
Building ClassificationHigh-Rise Commercial✎
Mechanical ComplexityHigh - Chilled Water Plant✎
BIM RequirementLOD 350 Coordination✎
Lead SourceAccount Penetration✎
Environmental StandardLEED Gold✎
Construction DeliveryDesign-Build✎
Expected Tonnage/CFM1000 - 2000 Tons✎
Quality AssuranceThird Party Commissioning✎
CompetitorSyska Hennessy✎
Bid StatusShortlisted✎
BIM Contract Redline
Apex's BIM manager returned our redlines on the LOD 350 clause. We agreed to model all pipe 2" and larger.
Scope Clarification
Updated the proposal to clarify that fire protection is design-build by the sprinkler contractor, we are only providing performance specs.
Shortlist Notification
Frank called to let us know we made the final two. Our energy modeling capabilities gave us the edge over the competitor.
Campaign
High-Efficiency Chiller Seminar
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameHigh-Efficiency Chiller Seminar✎
TypeWebinar✎
StatusIn Progress✎
Is ActiveYes✎
Campaign OwnerMarketing Team✎
Start Date10/01/2026✎
End Date10/01/2026✎
Budget Allocated$2,500✎
Targeting & Performance
Target AudienceCommercial Real Estate✎
Expected Response12%✎
Campaign ObjectiveLead Generation (New Bids)✎
Actual Cost$1,150✎
Outreach MethodDigital / Email Invites✎
Region FocusMidwest Hubs✎
Presentation Dry Run
The engineering principles dry run went well. Need to add a slide comparing magnetic bearing chillers vs traditional centrifugal.
Target List Pulled
Pulled all contacts and leads in the Midwest regions with active or past central plant projects. Sent the first email blast today.
PDH Credit Approval
We received approval from the board to offer 1.0 Professional Development Hour (PDH) for attendees. This should drive up registration.
Project
PRJ-2026-001 (Riverfront Chillers)
Design
Permitting
Bidding/Fabrication
Construction
Closeout
Details
Notes
Files
Project Overview
Project NamePRJ-2026-001 (Riverfront Chillers)✎
PhaseConstruction Administration✎
Delivery ModelDesign-Build✎
Primary HVAC SystemChilled Water Plant✎
Project ManagerMichael Torres✎
Start Date01/15/2026✎
Estimated Completion12/01/2027✎
Current StatusActive - Construction✎
BIM LODLOD 400 (Fabrication)✎
Engineering Specifics
Secondary SystemVAV Reheat✎
Sustainability StandardLEED Gold✎
Client TypeCommercial Developer✎
PriorityHigh✎
Site Address45 Riverfront Ave✎
Construction TypeNew Build✎
Climate ZoneZone 4A✎
Review CycleMonthly EOR Review✎
Submittal StatusUnder Review✎
Mechanical RiskModerate✎
RegionMidwest✎
Piping Coordination Clash
Coordinated with Apex on the Level 3 chilled water loop. Piping clashes with the main electrical tray near column line F4. Generating RFI to clarify routing.
Submittal Review Complete
Finished reviewing the batch 4 AHU shop drawings. Marked "Approved as Noted". Required larger access doors for filter replacement.
Chiller Pad Pour
Concrete contractor has completed the chiller pad pour on the roof. We are ready to receive the main equipment next week.
Equipment Spec
EQ-CH-001 (Air Cooled Chiller)
Draft
Bidding
Pending Review
Approved
Procured
Details
Notes
Files
Primary Specification Details
Spec IDEQ-CH-001✎
Equipment CategoryAir Cooled Chiller✎
ManufacturerCarrier✎
Model Number30XV-500✎
StatusApproved✎
Engineer in ChargeMichael Torres✎
Spec Date05/10/2026✎
Procurement PhaseOrder Placed✎
Approval StatusApproved as Noted✎
Lead Time16-20 Weeks✎
Technical Equipment Data
Mounting LocationRoof/Outdoors✎
Power Requirement460V / 3 Phase / 60Hz✎
Heat RejectionAir Cooled (Ambient)✎
Energy Efficiency12.5 EER✎
Dimensions240" L x 88" W x 95" H✎
Voltage/Phase460/3✎
Control SystemBACnet IP Integration✎
Operating Weight14,500 lbs✎
Service Clearance48" Minimum All Sides✎
Sound RatingLow Noise Fans (65 dBA)✎
Warranty Req5-Year Compressor✎
Lead Time Warning
Manufacturer representative warned that VFD shortages are pushing lead times to 20 weeks. We need to release this order immediately to hit the crane pick schedule.
Acoustic Review
Acoustical consultant reviewed the sound power data. The low noise fan option is approved, no additional sound barriers needed for the roof parapet.
Electrical Coordination
Confirmed with the Electrical Engineer that the 460V 3-phase feeds are sized correctly for the Max Overcurrent Protection (MOCP) specified on this unit.
Design Submittal
SUB-MEP-092 - Duct Layout Clarification
Received
Under Review
Pending Consultant
Returned to GC
Closed
Details
Notes
Files
Submittal Information
Submittal IDSUB-MEP-092✎
Submittal TypeField RFI✎
DisciplineDuct Layout✎
Lead ReviewerSarah Jenkins✎
Received Date08/01/2026✎
Due Date08/05/2026✎
Returned DatePending✎
Action TakenPending✎
Impact & Resolution
PriorityMedium✎
Current StatusOpen✎
Impact LevelConstructability Clash✎
Code StandardSMACNA Duct Const.✎
Review IterationRev 0 (Initial)✎
Deviation from SpecRerouting Required✎
Cost ImpactNone Anticipated✎
Schedule ImpactNone (If resolved by 8/5)✎
Clash DetectedHVAC vs Structural Beam✎
Submittal FormatBIM Model (Navisworks)✎
Delivery MethodProcore Integration✎
Initial Assessment
The GC notes that the 24x24 supply duct clashing with structural beam W18x40 on level 3. We can flatten the duct to 36x16 to clear the beam without losing CFM or violating SMACNA standards.
Coordination Call
Called the structural engineer. They cannot penetrate the web of the beam. Flattening the duct is the only viable option. I will draft a sketch (ASK-012) to formalize this.
Drafting Sketch
Sketch ASK-012 is with the CAD team. Should be ready for EOR stamp by tomorrow afternoon.
