Running a material science and testing laboratory requires precise tracking of testing requests, sample batches, and equipment calibrations. Our custom Salesforce setup provides a streamlined environment for engineering labs to manage client relationships, track material properties, and ensure ISO 17025 compliance without operational bottlenecks. Explore the interactive environment below to see how this customized workflow supports laboratory professionals in delivering accurate results.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Capture inquiries for metallurgical analysis, polymer testing, and NDT services. Accounts
Manage aerospace, automotive, and medical device manufacturing clients. Contacts
Track quality managers, chief metallurgists, and R&D engineers. Opportunities
Drive testing contracts and large-scale material analysis projects. Campaigns
Monitor trade shows, technical webinars, and standards update notices. Testing Requests
Log specific client requests for tensile strength, spectrometry, or failure analysis. Sample Batches
Track physical material samples received, stored, and prepared for analysis. Equipment Calibrations
Ensure compliance by tracking schedules for spectrometers and testing rigs.Lead
Sarah Jenkins - Aerospace Components Inc.
New
Contacted
Qualified
Converted
Details
Notes
Files
Primary Lead Information
First NameSarah✎
Last NameJenkins✎
CompanyAerospace Components Inc.✎
Phone(555) 234-9102✎
TitleLead Metallurgist✎
Lead OwnerDavid Smith✎
Lead StatusNew✎
IndustryAerospace✎
RatingHot✎
Lead SourceWebinar✎
Websitewww.aerocomponents.com✎
Material Testing Requirements
Primary Material TypeMetals & Alloys✎
Requested Test CategoryFatigue Testing✎
Projected Annual Volume100-500 Samples✎
TimelineMonthly Batch✎
Compliance StandardASTM International✎
Secondary MaterialComposites✎
NDA RequiredYes✎
Sample AvailabilityReady to Ship✎
Current Lab ProviderCompetitor Lab A✎
Procurement MethodDirect Purchase Order✎
Initial Technical Consultation
Spoke with Sarah regarding their new titanium alloy components. They are experiencing premature fatigue failures in their prototype stage.
Standard Requirement Check
Confirmed they require testing strictly to ASTM E466 for axial fatigue. They will need our 100kN servohydraulic frame.
Pricing Inquiry
Sarah asked for volume discounts if they commit to 200 samples per quarter. Sent request to pricing desk.
Account
Stellar Dynamics
Details
Contacts
Opportunities
Testing Requests
Sample Batches
Equip Calibrations
Notes
Files
Primary Account Info
Account NameStellar Dynamics✎
Phone(555) 123-4567✎
Websitewww.stellardynamics.com✎
Billing CitySeattle✎
Account OwnerDavid Smith✎
TypeCustomer✎
IndustryAerospace✎
SLA LevelGold✎
Lab & Testing Profile
Primary Testing FacilityChicago Main Lab✎
Preferred Test StandardASTM International✎
NDA StatusActive✎
Sample Return PolicyScrap After Testing✎
Billing TermsNet 30✎
Approved Supplier StatusApproved Tier 1✎
Annual Audit Results
Stellar Dynamics successfully passed their annual lab provider audit. We remain a Tier 1 supplier for all destructive testing.
New Plant Opening in Seattle
Client is opening a new manufacturing facility. We need to pitch them on handling all overflow NDT work.
Invoice Dispute Resolved
Resolved the pricing discrepancy on invoice #9021. Ensure all future composite tests include the expedited fee as a separate line item.
Contact
Robert Vance
Details
Notes
Files
Primary Contact Info
Contact OwnerDavid Smith✎
Phone(555) 123-4501✎
Preferred Contact MethodEmail✎
Engineering Role Details
DepartmentQuality Assurance✎
Technical ExpertiseMetallurgy✎
CertificationsASNT Level III✎
Role in ProcurementFinal Decision Maker✎
Sample Submission AuthorityAuthorized✎
Report Delivery PreferenceEncrypted PDF via Portal✎
Promotion to Director
Robert was recently promoted from Quality Manager to Director of Quality. Congratulate him on the next call.
Preference on Failure Reports
Robert specifically requested that all failure analysis reports include high-resolution SEM images in the appendix.
Out of Office Notes
Robert takes extended vacation every August. Route all urgent approvals to Lisa Chen during that time.
Opportunity
Q3 Titanium Fatigue Testing
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NameQ3 Titanium Fatigue Testing✎
Amount$45,000.00✎
Close DateAug 15, 2026✎
StageNegotiation✎
Next StepFinalize Volume Discount✎
Opportunity OwnerDavid Smith✎
Probability75%✎
Forecast CategoryCommit✎
TypeExisting Business✎
Lead SourceDirect Account✎
CompetitorNational Labs LLC✎
Testing Scope & Requirements
Test ProtocolStandard Regulatory✎
Material BaseTitanium Alloy✎
Expedited ProcessingNo✎
Regulatory RequirementFAA✎
Sample Quantity200 Units✎
On-Site Inspection RequiredNo✎
Certification RequirementISO 17025 Certificate✎
Environmental ConditionElevated Temperature✎
Subcontracting AllowedNo✎
Deliverable FormatComprehensive PDF✎
Retain SamplesReturn to Client✎
Failure Analysis IncludedYes✎
Discount Approval
Approved a 10% volume discount on the fatigue tests to win this against National Labs LLC.
Capacity Check
Confirmed with the Chicago lab that we have machine availability in September to handle 200 samples without delaying other work.
Machining Constraints
The titanium alloy is grade 5. Machining shop noted they will need to order specific tooling. Factored into the proposal timeline.
Campaign
Webinar: Advances in NDT
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameWebinar: Advances in NDT✎
Is ActiveYes✎
Start DateJuly 15, 2026✎
End DateJuly 15, 2026✎
Campaign OwnerMarketing Team✎
StatusCompleted✎
TypeWebinar✎
Target AudienceQuality Managers✎
Technical Focus & Metrics
Primary SubjectNon-Destructive Testing✎
Featured Test MethodUltrasonic Inspection✎
Expected Response15%✎
Industry VerticalAerospace & Defense✎
Asset TypeLive Video & Slides✎
Lead Generation SourceLinkedIn Ads✎
Webinar Follow-up
The Q&A section went 15 minutes over. Lots of interest in our new phased array ultrasonic testing capabilities. Sales to follow up with all 'Attended' members.
Technical Glitch
Audio cut out for 30 seconds around slide 14. Have edited the recording before posting to the on-demand portal.
Ad Spend ROI
LinkedIn ads converted at 12%, higher than our benchmark. Suggest re-running similar ad copy for the next event.
Testing Request
TR-2026-8991
Submitted
Approved
Testing In Progress
Reporting
Completed
Details
Notes
Files
Request Information
Request NameTR-2026-8991✎
Submission DateJuly 15, 2026✎
Required By DateAug 10, 2026✎
Project CodePRJ-ALPHA-99✎
Request OwnerLab Tech Marcus✎
StatusIn Progress✎
PriorityHigh✎
Request TypeStandard Analysis✎
Testing FacilityChicago Main Lab✎
Quote SentYes✎
Testing Specifications
Primary Test MethodTensile Testing✎
Secondary Test MethodMetallography✎
Specification StandardASTM E8✎
Expected Yield Strength850 MPa✎
Failure CriteriaComplete Fracture✎
Material Alloy/GradeTi-6Al-4V✎
Sample Preparation NeededCNC Machining✎
Specimen GeometryRound Bar✎
Destructive NatureFully Destructive✎
Environmental ExposureAmbient Room Temp✎
Setup Configuration
Configuring the 100kN frame with V-wedge grips for the round bar specimens. Extensometer calibrated this morning.
Sample Receipt Anomaly
Batch arrived with 51 samples instead of the stated 50. Client verified the extra is a spare to be used for setup if needed.
Client Approval to Proceed
Robert Vance approved the revised test plan which includes the secondary metallography step on broken specimens.
Sample Batch
SB-10442
Expected
Logged In
Under Analysis
Completed
Disposed/Returned
Details
Notes
Files
Batch Details
Batch IDSB-10442✎
Date ReceivedJuly 16, 2026✎
Shipped ViaFedEx Priority✎
Tracking Number772390192833✎
Batch OwnerReceiving Dept✎
Batch StatusUnder Analysis✎
Condition Upon ReceiptGood/Undamaged✎
Storage RequirementStandard Shelf✎
Hazard LevelNone (Standard)✎
Chain of Custody RequiredNo✎
Material Characteristics
Material CategoryMetals & Alloys✎
Form FactorMachined Blanks✎
Dimensions20mm Dia x 150mm L✎
Coating TypeNone✎
Manufacturing ProcessForged✎
Weight ClassificationLight (Under 1kg)✎
Heat Treatment StateSolution Treated & Aged✎
Expected MicrostructureAlpha-Beta Equiaxed✎
Sub-surface DefectsTo Be Determined✎
Surface RoughnessRa 1.6✎
Unboxing Inspection
Box arrived secure. All 51 samples individually wrapped in bubble wrap and VCI paper to prevent corrosion. Logged into Shelf B-12.
Transferred to Machine Shop
Moved batch from Shelf B-12 to the machine shop queue for final threading of the grip ends according to ASTM E8.
Machining Completed
All 51 samples successfully threaded. No defects noted during machining. Batch moved to the mechanical testing holding rack.
Equipment Calibration
CAL-0991 (100kN Servohydraulic Frame)
Scheduled
Calibration In Progress
Reviewing Certificate
Certified Active
Details
Notes
Files
Calibration Record
Record IDCAL-0991✎
Equipment Name100kN Servohydraulic Frame✎
ManufacturerMTS Systems✎
Serial NumberSN-8849201A✎
Last Calibration DateNov 15, 2025✎
Next Due DateNov 15, 2026✎
Record OwnerQuality Team✎
StatusCertified Active✎
Equipment TypeLoad Frame✎
LocationChicago Mechanical Bay A✎
Criticality LevelTier 1 - Mission Critical✎
Calibration ProviderOEM Direct Service✎
Technical Constraints
Calibration StandardASTM E4 (Force)✎
Measurement Range1kN to 100kN✎
Accuracy Tolerance+/- 0.5% of Reading✎
Resolution limit0.01 kN✎
Drift RateNegligible (<0.1%/yr)✎
Operating Temperature20C to 25C (Controlled)✎
Humidity ConstraintUnder 60% RH✎
Maintenance IntervalAnnually✎
Out of Tolerance ActionTag Out & Recall Tests✎
Certification TypeA2LA Accredited Cert✎
Successful Annual Calibration
OEM technician completed the annual verification to ASTM E4. The load cell is performing perfectly within the 0.5% tolerance band across the entire 100kN range.
Hydraulic Fluid Change
While on site, the tech also performed the preventative maintenance on the hydraulic pump and changed the fluid and filters.
Next Year Scheduling
Need to ensure we book the OEM at least 3 months in advance for the 2026 calibration due to technician shortages in the Chicago area.
