Template Hub Template Hub

Sales Cloud Template for Masonry and Concrete

Managing masonry and concrete jobs requires precision and strong tracking. This Salesforce template provides contractors with a straightforward system to track bids, manage heavy equipment, and document specialized mix designs. Organize your site data directly without confusion, maintaining clear visibility on project timelines and materials.

✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Marcus Vance

New
Contacted
Site Visit Scheduled
Qualified
Converted
Details
Notes
Files

Primary Lead Information

NameMarcus Vance✎
CompanyApex Commercial Build✎
Job Type FocusFoundation✎
Property TypeCommercial✎
Lead SourceDodge Report✎
Phone(555) 123-4567✎
Lead OwnerSarah Jenkins✎
Lead StatusNew✎
Material PreferenceCMU Block✎
Est. Square Footage4,500 sq ft✎
Budget TierTier 3 ($50k - $100k)✎

Project Preparation Details

Site Access RatingModerate✎
Permit StatusNot Started✎
Existing Demo NeededYes✎
Timeline RequirementNext 30 Days✎
Union Labor RequiredNo✎
Soil ConditionsUnknown✎
Concrete Grade (Est)4000 PSI✎
Finishing StyleBroom Finish✎
Address400 Industrial Way
Denver, CO 80204
✎
Water Source on SiteYes - City Hookup✎
Site Access Warning
The access road is narrow. We will need to check if standard mixer trucks can navigate the turn or if we need to pump from the street.
Created by Sarah Jenkins • July 25, 2026
Initial Call
Spoke with Marcus. They are pushing for a 30-day timeline on the foundation pour. Needs structural plans verified.
Created by Sarah Jenkins • July 22, 2026
Dodge Report Data
Imported lead from Dodge. Budget looks solid. Competitors likely bidding include Titan Concrete.
Created by System • July 20, 2026
◄ Back to Accounts List
Account

Apex Commercial Build

Details
Contacts
Opportunities
Projects
Equipment
Mix Designs
Notes
Files

Primary Information

Account NameApex Commercial Build✎
Account TypeGeneral Contractor✎
Credit StatusApproved Net 30✎
Phone(555) 123-0000✎
Account OwnerSarah Jenkins✎
Billing StateColorado✎
Union AffiliationNon-Union✎
Websiteapexbuild.test✎

Contractor Details

Preferred Mix SupplierRocky Mountain Ready Mix✎
Typical Job SizeTier 4 ($100k - $250k)✎
Safety Rating (EMR)0.85 (Excellent)✎
Primary Pumping Co.Mile High Pumps✎
Waste ManagementRoll-Off Containers Needed✎
Insurance Cert on FileValid (Expires Dec)✎
Net 30 Approval
Accounting approved Net 30 terms based on past performance. Max credit limit $100k.
Created by Sarah Jenkins • Mar 15, 2026
Safety Requirements update
Apex now requires high-vis and hard hats at all times, no exceptions. Ensure crews are briefed.
Created by Sarah Jenkins • Jan 10, 2026
Preferred Supplier Note
They strongly prefer Rocky Mountain Ready Mix due to aggregate matching requirements on their jobs.
Created by Sarah Jenkins • Dec 05, 2025
◄ Back to Contacts List
C
Contact

Lisa Tran

Details
Notes
Files

Primary Information

NameLisa Tran✎
Account NameApex Commercial Build✎
Job TitleSite Superintendent✎
Phone(555) 123-4568✎
Contact OwnerSarah Jenkins✎
Contact RoleSite Supervision✎
Authority LevelCan Approve Field Changes✎

Field Operations Details

Preferred Contact MethodText Message✎
Shift HoursEarly (6am - 2pm)✎
OSHA CertificationOSHA 30✎
BilingualYes - Spanish✎
Current Site AssignmentRetail Center Sidewalks✎
Subcontractor RelationsExcellent✎
Texting Preference
Lisa prefers texts for quick field questions (pour times, truck ETAs). Do not call before 7am unless emergency.
Created by Sarah Jenkins • May 10, 2026
Change Order Approvals
Lisa can approve field changes up to $2,500 on the spot. Anything over requires Marcus's signature.
Created by Sarah Jenkins • May 05, 2026
Site Walk
Walked the retail center job with Lisa. She is meticulous about washout areas. Ensure our crews respect the designated washout bins.
Created by Sarah Jenkins • Apr 28, 2026
◄ Back to Opportunities List
O
Opportunity

Apex - Industrial Park Foundation

Discovery & Takeoff
Proposal / Bid Submitted
Negotiation / Review
Verbal Award
Closed (Won/Lost)
Details
Line Items
Notes
Files

Bid Information

Opportunity NameApex - Industrial Park Foundation✎
Account NameApex Commercial Build✎
Bid TypeHard Bid✎
Total Amount$185,000.00✎
Expected Start DateSep 15, 2026✎
Probability (%)60%✎
Opportunity OwnerSarah Jenkins✎
StageProposal / Bid Submitted✎
Close Date (Bid Due)Aug 15, 2026✎
Job Type CategoryFoundation (Commercial)✎
Prevailing Wage Job?No✎
Competitor IdentifiedTitan Concrete✎

Takeoff & Estimating Details

Estimated CY Concrete450 CY✎
Rebar / Wire Mesh Est.Includes #4 Rebar Grids✎
Pump Required?Yes - Boom Pump✎
Est. Days on Site14 Days✎
Winter Conditions Est.Not Included✎
Permits Included in BidNo (GC Responsibility)✎
Primary Material Type4000 PSI Exterior✎
Forming MethodSymons Panels✎
Vapor Barrier Included15 mil Stego✎
Soil Spoils RemovalLeave on Site✎
Water/Washout PlanUsing GC Dumpster✎
Estimator AssignedJohn Davis✎
Bid Submitted
Uploaded proposal via Procore portal. Emailed Marcus a courtesy copy. Excluded winter conditions as requested.
Created by Sarah Jenkins • Jul 26, 2026
Takeoff Complete
John finished takeoff. Volume is slightly higher than architectural schematic suggested. Priced at 450 CY to be safe.
Created by John Davis • Jul 20, 2026
Pump Access
Confirmed boom pump can reach entire foundation footprint from the east access road.
Created by Sarah Jenkins • Jul 18, 2026
◄ Back to Campaigns List
C
Campaign

Colorado Builders Expo 2026

Details
Campaign Members
Notes
Files

Campaign Information

Campaign NameColorado Builders Expo 2026✎
TypeTrade Show✎
StatusIn Progress✎
Start DateAug 01, 2026✎
Campaign OwnerSarah Jenkins✎
Target AudienceGeneral Contractors✎
Booth LocationAisle 4, Booth 402✎
End DateAug 03, 2026✎

Metrics & Budget

Expected Leads50✎
Budgeted Cost$8,500.00✎
Primary GiveawayBranded Tape Measures✎
Actual Leads12✎
Actual Cost$9,100.00✎
Lead Quality RatingModerate✎
Day 1 Recap
Traffic was decent near the masonry aisle. Gave away 40 tape measures. Got 5 solid RFPs to follow up on next week.
Created by Sarah Jenkins • Aug 01, 2026
Budget Overrun
Power hookup for the booth monitor was an extra $600 not in the original budget. Approved by management.
Created by Sarah Jenkins • Jul 28, 2026
Booth Shipping
Backdrop and marketing collateral arrived at the convention center loading dock. Pick up tag #4459.
Created by Marketing Team • Jul 25, 2026
◄ Back to Projects List
P
Project

PROJ-0042 - Retail Center Sidewalks

Mobilization
Excavation/Prep
Forming/Rebar
Pouring
Curing/Finishing
Completed
Details
Notes
Files

Project Overview

Project NamePROJ-0042 - Retail Center Sidewalks✎
Related AccountApex Commercial Build✎
Related OpportunityApex - Retail Center Sidewalks✎
Project StatusActive✎
Job TypeFlatwork / Paving✎
Start DateMay 15, 2026✎
Project Manager (Owner)Sarah Jenkins✎
Site ForemanMike Torres✎
PhasePouring✎
Est. Completion DateAug 10, 2026✎
Site ContactLisa Tran✎

Site & Material Execution

Primary Mix DesignMIX-4000-EXT✎
Total CY Ordered to Date120 CY✎
Weather Delay Days2 Days✎
Forming System UsedLumber / Stakes✎
Curing MethodLiquid Membrane Compound✎
Ready Mix SupplierRocky Mountain Ready Mix✎
Inspection StatusPre-Pour Passed✎
Safety IncidentsNone✎
Saw Cutting Required?Yes - Relief Joints✎
Equipment On Site2 Mixers, 1 Saw✎
Testing Cylinder Req?Yes (7 and 28 Day)✎
Pour schedule change
Pushed pour #2 to Thursday due to rain on Tuesday. Supplier confirmed truck availability.
Created by Mike Torres • Aug 01, 2026
Inspection passed
City inspector signed off on formwork and rebar placement for section A. Good to pour.
Created by Mike Torres • Jul 28, 2026
Saw cuts
Reminder to get the early-entry saw out there within 6 hours of finishing. The heat is making it cure fast.
Created by Sarah Jenkins • Jul 25, 2026
◄ Back to Equipment List
E
Equipment

EQ-MIX-04 - Towable Mortar Mixer

Details
Notes
Files

Asset Details

Equipment IDEQ-MIX-04✎
Equipment NameTowable Mortar Mixer✎
CategoryMixing✎
ManufacturerMultiquip✎
Serial NumberMQ-988344✎
Ownership TypeOwned✎
Asset OwnerFleet Mgr✎
StatusOn Site✎
Current Location / ProjectPROJ-0042✎
Assigned ForemanMike Torres✎
Power SourceGasoline (Honda GX)✎

Maintenance & Lifecycle

Last Maintenance DateJun 01, 2026✎
Next Service DueSep 01, 2026✎
Engine Hours450 hrs✎
Maintenance PriorityRoutine✎
Daily Rental Rate (Int)$65.00✎
Purchase DateApr 15, 2022✎
Purchase Price$3,200.00✎
ConditionGood✎
Cleaning RequirementDaily Washout Mandatory✎
Tow Hitch TypePintle Ring✎
Storage LocationYard A - Mixing Row✎
Spark Plug replaced
Swapped the spark plug during the June service. Engine running smooth.
Created by Fleet Mgr • Jun 01, 2026
Pintle ring wear
Keep an eye on the pintle hitch ring. Starting to show wear. May need replacement before winter.
Created by Fleet Mgr • Apr 10, 2026
Deployed to Retail Center
Sent to site for the sidewalk crew to mix small batches of patch and grout.
Created by Dispatch • Jul 28, 2026
◄ Back to Mix Designs List
M
Mix Design

MIX-4000-EXT - Exterior Flatwork

Details
Notes
Files

Mix Specifications

Mix IDMIX-4000-EXT✎
DescriptionExterior Flatwork (Air Entrained)✎
Primary SupplierRocky Mountain Ready Mix✎
Supplier Mix CodeRM-4000-AE-CDOT✎
Compressive Strength4000 PSI @ 28 Days✎
Target Slump4 inches (+/- 1)✎
Record OwnerEng. Dept✎
StatusActive✎
Application CategoryExterior Flatwork✎
Air Entrainment5% - 7%✎
Max Aggregate Size3/4 inch✎

Additives & Costing

Fly Ash / Slag Blended?20% Fly Ash (Class F)✎
Fiber Mesh AdditiveMicro-fiber included✎
Water Reducer TypeMid-Range (MRWR)✎
Base Cost per CY$148.00 / CY✎
Color/PigmentNatural Gray✎
Engineering Sign-offApproved for 2026✎
Fly Ash limits
City of Boulder restricts Fly Ash to 20% on exterior flatwork to prevent scaling issues during freeze-thaw. Ensure supplier adheres to this on Boulder jobs.
Created by Eng. Dept • Jan 15, 2026
Pricing Update
Rocky Mountain increased base price from $142 to $148/CY effective March 1st due to cement shortages.
Created by Procurement • Feb 20, 2026
Winter Admixtures
Do not use calcium chloride accelerators in this mix if it contains any rebar, it will cause corrosion. Use non-chloride accelerator (NCA).
Created by Eng. Dept • Nov 10, 2025