Marine engineering firms need specialized tools to manage naval architecture, vessel conversions, and classification society approvals. This CRM template is built specifically for marine design and naval engineering consulting. Track vessel particulars, drydock schedules, and drawing submittals seamlessly. Streamline your firm operations and maintain rigorous project oversight.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track incoming vessel design bids and conversion inquiries. Accounts
Manage shipyards, fleet operators, and owners. Contacts
Organize port engineers and fleet technical directors. Opportunities
Monitor engineering contracts and naval architecture proposals. Campaigns
Coordinate technical seminars and marine trade events. Projects
Oversee active naval design and conversion phases. Vessels
Track hull particulars, class details, and main engine specs. Drawing Submittals
Manage Class/Flag state approvals and shipyard RFIs.Lead
Marcus Wright - Summit Shipping Lines
New
Contacted
Qualified
Pending RFP
Converted
Details
Notes
Files
Primary Information
First NameMarcus✎
Last NameWright✎
TitleFleet Technical Director✎
Lead Status
Contacted
✎
Project Category
Retrofit/Conversion
✎
Lead OwnerSarah Jenkins✎
Phone555-102-3948✎
Service Required
Naval Architecture
✎
Desired Schedule
Next Scheduled Drydock
✎
Priority Rating
High
✎
Marine Requirements
Lead Source
Referral
✎
Vessel Type
Offshore Supply Vessel (OSV)
✎
Primary Challenge
Crane Addition/Stability
✎
Vessel Length (LOA)
250 - 300 ft
✎
Flag StateMarshall Islands✎
Classification Society
ABS (American Bureau of Shipping)
✎
Design Software Req
AutoCAD / Rhino
✎
Budget Status
Approved for Design
✎
Target Shipyard
Gulf Coast Yards
✎
Home PortHouston, TX✎
Initial Meeting Notes
Marcus indicated they need to retrofit an existing OSV (Hull 4502) with a 50-ton AHC deck crane. We need to perform a structural analysis of the deck and run a new stability booklet.
Budget Clarification
Confirmed the engineering design budget is fully funded. They are looking to issue the design RFP by the 15th to hit a Q4 drydock window.
Class Approval Requirement
Client stressed that all drawings must be submitted and approved by ABS before cutting steel. We will act as the liaison for Class approval.
Account
Apex Marine Offshore
Details
Contacts
Opportunities
Projects
Vessels
Drawing Submittals
Notes
Files
Primary Information
Account NameApex Marine Offshore✎
Account TypeFleet Owner✎
Industry SectorOffshore Oil & Gas✎
Billing CityHouston✎
Account OwnerMichael Torres✎
Phone555-882-9911✎
Websitewww.apex-marine-osv.com✎
Engineering Business Details
Primary MarketGulf of Mexico (GOM)✎
Fleet Size15 - 50 Vessels✎
Procurement MethodMaster Service Agreement✎
Active StatusActive Client✎
Preferred DeliveryDesign to Production✎
Engineering TierTier 1 - Strategic✎
Payment TermsNet 45✎
Quarterly Review Meeting
Met with Frank to review the ongoing CTV Newbuild project. They are happy with our turnaround times on the structural drawings and want us to bid on the Hybrid Battery Retrofit for the Apex Explorer.
MSA Renewal Update
Apex has sent over the updated Master Service Agreement for 2027. We need our legal team to review the updated IP clauses regarding the 3D hull models.
Drydock Schedule Change
Apex pushed the drydock date for the Voyager back by 3 weeks due to operational commitments. We need to adjust our scanning and survey mobilization schedule accordingly.
Contact
Sarah Connor
Details
Notes
Files
Contact Information
Engineering Role & Preferences
Contact RoleDesign Lead✎
Decision AuthorityTechnical Evaluator✎
Project Phase InvolvementProduction Engineering✎
Communication PrefEmail✎
Discipline PreferenceStructural/Hull Design✎
Approval FrequencyMilestone Only✎
Design Review Notes
Sarah wants our production drawings to be fully compatible with their ShipConstructor NC routing software. We need to ensure the layer naming conventions match their shipyard standards perfectly.
Regulatory Requirements
She stressed the importance of ensuring all structural fire protection boundaries are clearly marked on the arrangement drawings before submission to USCG.
Webinar Attendee
Sarah attended our firm's Webinar on FEA analysis for crane foundations. She is highly interested in integrating this into their future heavy-lift barge builds.
Opportunity
OSV Hybrid Battery Retrofit
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Contract Information
Opportunity NameOSV Hybrid Battery Retrofit✎
TypeExisting Business - Expansion✎
StageNegotiation✎
Service TypeDetailed Engineering✎
Opportunity OwnerMichael Torres✎
Close Date10/15/2026✎
Amount$450,000✎
Probability (%)80%✎
Next StepFinalize deliverables list✎
Contract TypeLump Sum✎
Engineering Scope Specifications
Project ScopeVessel Conversion/Retrofit✎
Design PhaseDetailed Design✎
Vessel TypeOffshore Supply Vessel (OSV)✎
Technical ComplexityHigh - Hybrid System Integration✎
Deliverables RequiredClass Drawings & Stability Book✎
Lead SourceAccount Penetration✎
Regulatory StandardABS Rules & USCG Sub I✎
Project ExecutionLump Sum Engineering✎
Target Imprv. GoalReduce Emissions (DP Ops)✎
Analysis Method3D Laser Scan + FEA✎
CompetitorGibbs & Cox✎
Bid StatusShortlisted✎
Deliverables Contract Redline
Apex's PM returned our redlines on the deliverables clause. We agreed to provide the native Rhino 3D files upon project completion, provided they sign the liability waiver for production use.
Scope Clarification
Updated the proposal to clarify that electrical integration for the battery racks is excluded, as they have contracted a dedicated electrical integrator for that scope.
Shortlist Notification
Frank called to let us know we made the final two. Our previous experience handling Class approvals for hybrid systems gave us the edge over the competitor.
Campaign
Hybrid Vessel Integration Webinar
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameHybrid Vessel Integration Webinar✎
TypeWebinar✎
StatusIn Progress✎
Is ActiveYes✎
Campaign OwnerMarketing Team✎
Start Date10/01/2026✎
End Date10/01/2026✎
Budget Allocated$2,500✎
Targeting & Performance
Target AudienceFleet Owners✎
Expected Response12%✎
Campaign ObjectiveLead Generation (Retrofit Bids)✎
Actual Cost$1,150✎
Outreach MethodDigital / Email Invites✎
Region FocusGulf Coast Hubs✎
Presentation Dry Run
The naval architecture principles dry run went well. Need to add a slide showing the intact stability variance between conventional diesel and lithium-ion hybrid configurations.
Target List Pulled
Pulled all contacts and leads in the Gulf Coast regions with active or past offshore vessel operations. Sent the first email blast today.
SNAME Credit Approval
We received approval from SNAME to offer 1.0 Continuing Education Unit (CEU) for attendees. This should drive up registration among engineers.
Project
PRJ-2026-001 (CTV Design Package)
Concept/Feasibility
Basic/Class Stage
Detailed Design
Production/Lofting
Trials/Commissioning
Details
Notes
Files
Project Overview
Project NamePRJ-2026-001 (CTV Design Package)✎
PhaseDetailed Design✎
Delivery ModelDesign to Production✎
Primary Service SystemNaval Architecture✎
Project ManagerMichael Torres✎
Start Date01/15/2026✎
Estimated Completion12/15/2027✎
Current StatusActive - Detailed Eng✎
CAD StandardRhino/AutoCAD✎
Contract TypeLump Sum✎
Engineering Specifics & Progress
Vessel TypeCrew Transfer Vessel (CTV)✎
Regulatory ClassDNV +1A HSLC✎
Client TypeFleet Owner✎
PriorityHigh✎
Hull MaterialMarine Grade Aluminum✎
Target Metric Imprv.Meet 25 Knot Cruise✎
Propulsion TypeWaterjet (Quad)✎
Review CycleBi-Weekly Design✎
Implementation StatusHull Lines Finalized✎
Technical RiskMedium - Weight Control✎
Target ShipyardGulf Coast Region✎
Weight Estimate Update
Coordinated with Apex on the lightship weight estimate. The current aluminum extrusion selections for the superstructure are pushing us too close to the draft limit. We need to evaluate thinner plate with closer stiffener spacing.
Basic Design Approval
Finished the final review of the general arrangement (GA) drawings with the fleet director. Marked "Approved for Detailed Design". Issued to the structural team for framing plans.
Hydrostatics Run Complete
The naval architecture team has successfully run the Maxsurf intact stability module. The current hull form meets the DNV High Speed Light Craft criteria at full load departure.
Vessel
Apex Explorer (H-4502)
In Design
Under Construction
Operating
Pending Retrofit
Decommissioned
Details
Notes
Files
Vessel Particulars
Vessel NameApex Explorer✎
Vessel TypeOffshore Supply Vessel (OSV)✎
IMO Number9876543✎
StatusPending Retrofit✎
Lead EngineerMichael Torres✎
Vessel OwnerMichael Torres✎
Hull NumberH-4502✎
Year Built2018✎
Flag StateMarshall Islands✎
Class SocietyABS✎
Next Drydock11/01/2026✎
Technical Specifications
Length Overall (LOA)285.0 ft✎
Beam (Molded)62.0 ft✎
Design Draft18.5 ft✎
Gross Tonnage (GT)3,250 MT✎
Hull MaterialAH36 High-Strength Steel✎
Main Engines2x Cat 3516C (2,000 kW ea)✎
Propulsion TypeZ-Drive Azimuth✎
Dynamic PositioningDP-2 Capable✎
Service Speed12.5 Knots✎
Battery Room Location
Initial review of the general arrangement indicates the best location for the new 1.5 MWh battery racks is the former mud tank room on the lower deck. This keeps the center of gravity low, helping intact stability.
Class Society Coordination
Spoke with the ABS surveyor. They confirmed that since the battery room is adjacent to a fuel oil tank, we will need to install an A-60 fire boundary on that bulkhead. Noted for structural design.
As-Built Documentation Complete
Received the final set of as-built drawings from the shipyard that built the vessel. We will use these as the baseline for the 3D model conversion.
Drawing Submittal
SUB-MACH-092 - Cooling Water Routing Clarification
Drafting
Internal Review
Submitted to Class
Addressing Comments
Approved for Constr.
Details
Notes
Files
Submittal Information
Submittal IDSUB-MACH-092✎
Submittal TypeSystem Diagram/P&ID✎
DisciplineMachinery Piping✎
Drawing NumbersDWG-500 to 503✎
Lead ReviewerSarah Jenkins✎
Draft Date08/01/2026✎
Class Due Date08/05/2026✎
Approval DatePending✎
Action TakenPending Internal QA✎
PriorityHigh✎
Regulatory & Integration
Current StatusInternal Review✎
Target Class SocietyDNV✎
Rule ReferencePt.4 Ch.6 Sec.4 (Piping)✎
Review IterationRev A (Initial Draft)✎
System IntegratedMain Engine Sea Water Cooling✎
Potential IssueValve Accessibility Clash✎
Schedule ImpactNone (If submitted by 8/5)✎
Clash DetectedPiping vs Watertight Bulkhead✎
Submittal Format2D PDF Sheets + Rhino Model✎
Delivery Method✎
Internal Assessment
The drafting team completed the sea water cooling P&ID for the new quad waterjet setup. During my review, I noticed the main sea chest suction valve is located too close to Watertight Bulkhead 15, preventing full rotation of the handwheel.
Coordination Fix
Discussed with the hull structural lead. We can shift the sea chest aft by 600mm. I will update the P&ID and the 3D routing model to reflect this clearance fix before we submit to DNV.
Drafting Update
Drawings DWG-500 and 501 have been updated. Final QA check is pending. Should be ready for EOR stamp and DNV upload by tomorrow.