Manufacturing engineering services require precise control over CAD iterations, BOMs, tooling procurement, and production rollouts. Maintain strict oversight on new product introductions (NPI), factory floor layout optimizations, and automated equipment integration. Manage your client engagements from prototype testing to full-scale DFMA reviews in one centralized system.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track RFQs for process design and component sourcing. Accounts
Manage OEMs, contract manufacturers, and suppliers. Contacts
Keep a roster of plant managers and lead engineers. Opportunities
Pipeline for DFMA consulting and tooling contracts. Campaigns
Organize trade show outreach and capability webinars. Projects
Execute NPI phases, plant layout, and quality plans. Prototypes
Track first articles, FMEA testing, and tooling iterations. Equipment
Log CNC, PLC assets, maintenance, and OEE metrics.Lead
Robert Vance - Orion Aerospace
New
Contacted
Qualified
Converted
Details
Notes
Files
Primary Lead Information
First NameRobert✎
Last NameVance✎
TitleVP of Operations✎
CompanyOrion Aerospace✎
Phone(555) 123-4567✎
Lead OwnerDavid Chen✎
Lead StatusNew✎
Lead SourceTrade Show✎
RatingHot✎
Target IndustryAerospace & Defense✎
Lead PriorityHigh✎
Manufacturing Requirements
Mfg Process NeededCNC Machining (5-Axis)✎
Annual Volume Est10,000 Units✎
Material TypeTitanium Alloy✎
Tolerance ReqsHigh (+/- 0.001")✎
Timeline NeedQ3 Launch✎
Competitor EvaluatedProtolabs✎
Certifications NeededAS9100D✎
Budget StatusApproved Capex✎
Product Lifecycle StageDesign Verification✎
NDA StatusExecuted✎
Initial Scope Assessment
Robert needs a 5-axis CNC partner for a new titanium bracket assembly. They are struggling with tool wear and scrap rates on their current internal machines.
DFMA Review Needed
I suggested a Design for Manufacturability (DFMA) review before we cut the first prototype. He agreed. I will send the NDA so we can review their STEP files.
AS9100 Requirements
They require full material traceability and first article inspection (FAI) reports per AS9100D standards. Confirmed our QA team is aligned.
Account
Titanium Forge Works
Details
Contacts
Opportunities
Projects
Prototypes
Equipment
Notes
Files
Account Information
Account NameTitanium Forge Works✎
Phone(555) 111-2222✎
Websitewww.titaniumforge.example.com✎
Billing CityCleveland✎
Account OwnerSarah Jenkins✎
Industry Sub-SectorHeavy Manufacturing✎
Account TierStrategic Account✎
SLA LevelGold (24hr Support)✎
Facility & Operations Details
Plant Sq Ft250,000✎
Primary Production MethodDrop Forging✎
ERP SystemSAP S/4HANA✎
Quality Standard (ISO)ISO 9001:2015✎
Union StatusUnionized Facility✎
Contract StatusActive MSA✎
MSA Rate Update
Negotiated a 4% rate increase across all engineering design services for the 2026 cycle. Covers DFMA and PLC programming.
Robotics Integration Push
Titanium Forge is heavily incentivizing their plant managers to automate material handling. Pitch our Fanuc integration turnaround times.
Vendor Portal Change
They are moving from SAP Ariba to Coupa for vendor billing starting in Q3. Ensure finance is registered.
Contact
Alex Vance
Details
Notes
Files
Contact Information
Contact OwnerSarah Jenkins✎
DepartmentOperations & Production✎
RoleDecision Maker✎
Comm PreferenceEmail✎
Technical Focus
Technical FocusRobotic Cell Automation✎
Decision AuthorityFinal CapEx Sign-off✎
Engineering CertPE (Mechanical)✎
Plant Tour Protocol
Alex requires full steel-toe boots and safety glasses for any vendor entering the forge floor. He prefers plant walk-throughs before any formal presentation.
Focus on OEE
He mentioned his KPIs this quarter are tied to Overall Equipment Effectiveness (OEE) on the Fanuc lines. Pitch our data logging and PLC monitoring solutions.
CAD Preferences
Alex strictly uses SolidWorks for viewing assemblies. Do not send STEP files; send native SW files or eDrawings.
Opportunity
Automated Forging Line Design
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NameAutomated Forging Line Design✎
Amount$225,000.00✎
Close Date8/15/2026✎
StageProposal✎
Probability60%✎
Opportunity OwnerSarah Jenkins✎
TypeExisting Client Expansion✎
Lead SourceDirect Account Work✎
Primary CompetitorATS Automation✎
Contract VehicleMaster Service Agreement✎
Project Scope & Engineering
Project ScopeRobotic Cell Design✎
NPI PhaseProcess Validation✎
GD&T ComplexityHigh (Tight Tolerances)✎
Prototype RequiredYes - End of Arm Tooling✎
Tooling RequiredCustom Jigs & Fixtures✎
Deliverable FormatTurnkey System (EF&I)✎
Risk LevelMedium - Integration Issue✎
Delivery RegionMidwest Hub✎
Materials Supplied ByClient Sourced✎
QA/QC StandardISO 9001 Compliant✎
NDA / IP TermsClient Retains All IP✎
Approval StatusUnder Client Review✎
Controls Integration Limitation
Client is supplying their own Allen Bradley controllers. We are only responsible for the ladder logic programming and the handshaking with the Fanuc robots.
Safety Guarding Requirement
Added a line item for the physical safety fencing (Lexan panels) and light curtains. They specifically requested Category 3 safety circuits.
Site Acceptance Test (SAT)
Final 20% payment will be held back until the SAT shows a 99% OEE over a continuous 48-hour run. I agreed to this condition in the SOW.
Campaign
IMTS Trade Show 2026
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameIMTS Trade Show 2026✎
TypeTrade Show✎
StatusIn Progress✎
Start Date8/10/2026✎
Campaign OwnerMarketing Team✎
Target AudienceOEMs & Plant Managers✎
Delivery MethodIn-Person Booth✎
End Date8/13/2026✎
Target Metrics
Service FocusTurnkey Automation✎
Budgeted Cost$45,000.00✎
Actual Cost$42,200.00✎
Region FocusNational✎
Expected Revenue$450,000.00✎
Responses145✎
Booth Shipping Details
Booth materials and the demo robot cell shipped via FedEx Freight. Tracking #88492001. Deliverable directly to McCormick Place.
Live Demo Set Up
We are running a live simulation of the Fanuc pick-and-place cell every hour on the hour. Ensure compressed air drop is ordered for the booth.
Lead Scanning App Setup
Ensure all attendees download the IMTS Lead Scanner app on their iPads and sync credentials before arrival.
Project
PRJ-8012: Forge Automation
Kickoff
Engineering
Prototyping/Procurement
Implementation
Handover
Details
Notes
Files
Project Overview
Project NamePRJ-8012: Forge Automation✎
Start Date6/01/2026✎
Target Completion12/01/2026✎
Project StageEngineering✎
Project OwnerSarah Jenkins✎
Project TypeLine Automation✎
Deployment RegionMidwest Hub✎
Engineering DisciplineRobotics/Controls✎
Risk LevelMedium✎
Engineering Execution
Phase Output3D Layout & Ladder Logic✎
DFMA ScopeCompleted✎
FMEA RequiredYes - Process FMEA✎
BOM ManagementReleased to Procurement✎
Resource Allocation2 Eng, 1 PLC Tech✎
CAD PlatformSolidWorks 2026✎
Revision NumberRev 2✎
Material Lead Time6 Weeks (Robots)✎
Regulatory ComplianceOSHA / RIA 15.06✎
Current Phase Progress50%✎
Layout Constraints Resolved
Moved the safety enclosure back 2 feet to allow forklift access to aisle B. Client approved the Rev 2 drawings yesterday.
PLC Code Handshake
The Allen Bradley PLC is successfully talking to the Fanuc controller in simulation mode. No ladder logic faults detected during the virtual run.
Lead Time Warning
Fanuc warned that the M-20iA delivery might slip from 6 weeks to 8 weeks due to port delays. We are monitoring closely.
Prototype
PROTO-442: Gripper Claw
Design
Fabrication
In Testing
Approved
Details
Notes
Files
Prototype Overview
Prototype IDPROTO-442: Gripper Claw✎
Part NameEnd of Arm Tooling (Gripper)✎
Material Spec7075 Aluminum✎
Iteration NumberRev B✎
StatusIn Testing✎
OwnerDavid Chen✎
Fabrication MethodCNC Milling✎
Tolerance Target+/- 0.002"✎
Finish RequirementHard Anodize Type III✎
Delivery Date8/01/2026✎
Testing & Metrics
Weight (lbs)4.2 lbs✎
Dimensions8" x 4" x 3"✎
Setup Time1.5 hours✎
Run Time45 mins✎
Assembly RequiredYes✎
Test Criteria50kg Load Cycle✎
Pass/Fail ResultPending✎
Failure ModeN/A✎
Cost Per Unit$450.00✎
Scrap Rate0%✎
Rev B Improvements
Rev A failed due to deflection under a 40kg load. Rev B thickened the primary strut by 4mm and switched from 6061 to 7075 Aluminum. Testing looks promising so far.
Machining Notes
The new pocket geometry required an extended reach endmill, which slowed down the run time by 12 minutes. Acceptable trade-off for the added rigidity.
Anodize Wait Time
Parts arrived from the anodizer a day late, but the Type III hardcoat is exactly what we needed to prevent galling on the contact surfaces.
Equipment
Fanuc M-20iA Robot
Procured
Installed
Commissioning
Active Production
Details
Notes
Files
Asset Information
Equipment NameFanuc M-20iA Robot✎
ManufacturerFanuc✎
Model NumberM-20iA/20M✎
StatusCommissioning✎
OwnerDavid Chen✎
Asset CategoryRobotics✎
Condition RatingNew✎
Last Service DateN/A✎
Next Calibration Date8/01/2027✎
Warranty Expiration8/01/2029✎
Technical Specifications
Controller TypeR-30iB Plus✎
Spindle Speed / Velocity2000 mm/sec✎
Axis Count6-Axis✎
Floor Space Req4ft x 4ft (Base)✎
Power Requirement480V 3-Phase✎
OEE MetricN/A (Commissioning)✎
Downtime ReasonNone✎
Safety GuardingLexan Enclosure + Light Curtain✎
Integration ProtocolEthernet/IP✎
Max Payload20 kg✎
Installation Complete
Robot has been bolted to the floor plate. Ethernet/IP communications with the Allen Bradley PLC established successfully.
Payload Optimization
We are utilizing 18kg of the 20kg max payload. Inertia calculations look good, but we need to ensure the end of arm tooling doesn't exceed its 4.2 lb weight limit.
Safety Validation
Light curtains successfully tied into the dual-channel safety relay. Breaking the beam drops servo power immediately.