Selling industrial equipment requires deep coordination across factory floors, procurement teams, and site engineers. This environment streamlines the entire lifecycle from initial facility assessment to complex quoting, heavy machinery delivery, and recurring maintenance intervals. Core sales, installation tracking, and routine service scheduling are integrated to keep assembly lines moving and reduce operational downtime.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
L Leads
Track potential equipment buyers and assess early technical requirements.A Accounts
Manage factory locations, compliance status, and procurement relationships.C Contacts
Organize site engineers, floor managers, and corporate buyers.O Opportunities
Drive complex machinery sales cycles and detailed equipment quoting.C Campaigns
Execute trade shows, machinery demonstrations, and targeted outreach.E Equipment Models
Maintain a standardized catalog of machinery specs and power needs.I Installations
Monitor site readiness, delivery logistics, and commissioning phases.M Maintenance Schedules
Schedule preventative maintenance and warranty service intervals.Interactive Template Below
L
Leads
| Name | Company | Title | Status | Phone | Owner | |
|---|---|---|---|---|---|---|
| Sarah Jenkins | Apex Manufacturing | Plant Manager | Site Visit Scheduled | (555) 234-9812 | [email protected] | Marcus Cole |
| Robert Cho | Cho Industrial | Procurement Director | Engaged | (555) 912-3488 | [email protected] | Elena Rostova |
| David Miller | Miller Steelworks | Chief Engineer | New | (555) 441-2993 | [email protected] | Marcus Cole |
| Amanda Baines | Central Assembly | Operations Head | Needs Analysis | (555) 773-1029 | [email protected] | Elena Rostova |
| Kenneth Ford | Ford Machinery | Facilities Director | Attempting Contact | (555) 662-8114 | [email protected] | Marcus Cole |
L
Lead
Sarah Jenkins - Apex Manufacturing
New
Attempting Contact
Engaged
Site Visit Scheduled
Needs Analysis
Quote Sent
Converted
Details
Notes
Files
Primary Lead Information
NameSarah Jenkins✎
CompanyApex Manufacturing✎
Lead SourceTrade Show✎
Industry VerticalAutomotive Assembly✎
Facility Size50k - 100k Sq Ft✎
Current MachineryMixed Legacy Fleet✎
Lead OwnerMarcus Cole✎
Lead StatusSite Visit Scheduled✎
Decision Maker RolePlant Manager✎
Power Availability480V Three Phase✎
Budget TimelineQ3 Approved✎
Urgency LevelHigh - Line Down✎
Contact & Logistics Requirements
Phone(555) 234-9812✎
Preferred Contact TimeMorning Shift (6AM-10AM)✎
Purchase TypeCapital Expense (CapEx)✎
Project ScopeSingle Machine Replacement✎
Installation RegionMidwest Industrial Hub✎
Financing MethodStandard Net 30/60/90✎
Safety Compliance NeedOSHA Tier 1✎
Lead Quality RatingWarm✎
Follow-up PriorityHigh✎
Site Prep Discussion
Confirmed they have 480V ready at the proposed installation bay. Will need to verify floor load limits before bringing in the heavy press.
Created by Marcus Cole • August 1, 2026
Initial Trade Show Chat
Met Sarah at the Chicago Mfg Expo. Their current conveyor is bottlenecking final assembly. Looking to upgrade capacity by 30%.
Created by Marcus Cole • July 28, 2026
Safety Requirements Addendum
Must ensure any proposed machinery meets strict OSHA Tier 1 standards per their internal compliance mandate.
Created by Elena Rostova • July 22, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Factory_Floorplan_Draft.pdf | 4.2 MB | August 2, 2026 | |
| Apex_Vendor_Compliance_Reqs.docx | Word | 1.1 MB | July 30, 2026 |
| Initial_Spec_Sheet_Request.pdf | 2.8 MB | July 29, 2026 |
A
Accounts
| Account Name | Account Type | Industry Sector | Primary Material Handled | Owner |
|---|---|---|---|---|
| Titan Heavy Industries | Direct Buyer | Heavy Fabrication | Steel / Metals | Marcus Cole |
| Nova Plastics Corp | Direct Buyer | Plastics Molding | Polymers | Elena Rostova |
| Midwest Assembly Partners | Distributor | Automotive Assembly | Mixed Materials | Marcus Cole |
| Global Processors Inc | Direct Buyer | Food Processing | Food Grade Organic | Elena Rostova |
| Vertex Aero Components | Direct Buyer | Aerospace Components | Aluminum / Composites | Marcus Cole |
A
Account
Titan Heavy Industries
Details
Contacts
Opportunities
Equipment Models
Installations
Maintenance Schedules
Notes
Files
Account Overview
Account NameTitan Heavy Industries✎
Account TypeDirect Buyer✎
Industry SectorHeavy Fabrication✎
Facility TypePrimary Manufacturing Plant✎
Account OwnerMarcus Cole✎
Account RatingA - Strategic Key Account✎
SLA LevelGold (24hr Response)✎
Procurement CycleAnnual CapEx Planning✎
Operational Details
Billing CityDetroit✎
Primary Material HandledSteel / Metals✎
Operating Shifts3 Shifts (24/5)✎
Annual Revenue$150,000,000✎
Supplier TierTier 1 Vendor✎
Freight PreferenceFOB Destination✎
Contacts
| Name | Title | Department | Phone |
|---|---|---|---|
| Michael Vance | VP of Operations | Operations | (555) 123-4567 |
| Linda Croft | Lead Engineer | Engineering | (555) 123-4568 |
| Sam Gorski | Procurement Mgr | Purchasing | (555) 123-4569 |
| Kelly Zhang | Safety Inspector | Compliance | (555) 123-4570 |
| Tom Hanes | Maintenance Lead | Maintenance | (555) 123-4571 |
Opportunities
| Opportunity Name | Stage | Amount | Close Date |
|---|---|---|---|
| Titan - Press Line Upgrade | Negotiation | $450,000 | Aug 15, 2026 |
| Titan - CNC Replacement | Closed Won | $125,000 | Jan 10, 2026 |
| Titan - Conveyor Automation | Proposal Sent | $210,000 | Sep 30, 2026 |
| Titan - Generator Backup | Discovery | $85,000 | Nov 15, 2026 |
| Titan - Welding Robots | Closed Lost | $320,000 | Mar 05, 2026 |
Equipment Models (Installed Base)
| Model Name | Category | Serial Number | Install Date |
|---|---|---|---|
| HD-Press 5000 | Heavy Press | SN-9001-A | Jan 15, 2024 |
| CNC Master V2 | Machining | SN-8812-B | Feb 12, 2025 |
| Auto-Conveyor 300 | Material Handling | SN-3344-C | Mar 20, 2022 |
| Weld-Bot X-1 | Robotics | SN-7766-D | Jul 10, 2023 |
| PowerGen Pro 900 | Power Supply | SN-1122-E | Nov 05, 2021 |
Installations
| Installation Name | Status | Scheduled Date | Team Lead |
|---|---|---|---|
| INST-2026-001 (Press Line) | Site Prep | Sep 01, 2026 | Dave Harris |
| INST-2025-088 (CNC Master) | Completed | Feb 20, 2025 | Sarah Lin |
| INST-2024-045 (Press 5000) | Completed | Jan 25, 2024 | Dave Harris |
| INST-2023-112 (Weld-Bot) | Completed | Jul 15, 2023 | Mark Torel |
| INST-2022-090 (Conveyor) | Completed | Mar 25, 2022 | Sarah Lin |
Maintenance Schedules
| Schedule Name | Frequency | Next Service | Status |
|---|---|---|---|
| PM-Press-Quarterly | Quarterly | Sep 15, 2026 | Scheduled |
| PM-CNC-Annual | Annually | Feb 12, 2027 | Active |
| PM-Conveyor-BiAnnual | Bi-Annually | Oct 20, 2026 | Scheduled |
| PM-WeldBot-Monthly | Monthly | Aug 10, 2026 | Overdue |
| PM-Generator-Annual | Annually | Nov 05, 2026 | Active |
Annual Account Review
Met with VP of Operations. They are expanding Bay 4 and will need to update power infrastructure before any new heavy equipment goes in.
Created by Marcus Cole • July 10, 2026
Credit Hold Warning Resolved
Accounting cleared the net-90 delay from last quarter. Account is back in good standing for new CapEx orders.
Created by Finance System • June 15, 2026
Safety Audit Prep
Provided the compliance team with all UL and OSHA certificates for the existing installed base ahead of their state inspection.
Created by Elena Rostova • May 22, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Titan_Master_Service_Agreement.pdf | 5.1 MB | January 10, 2026 | |
| Plant_Floor_Layout_2026_Update.dwg | CAD | 14.2 MB | July 05, 2026 |
| Tax_Exempt_Certificate_Titan.pdf | 0.8 MB | February 01, 2026 |
C
Contacts
| Name | Account Name | Title | Department | Phone |
|---|---|---|---|---|
| Michael Vance | Titan Heavy Industries | VP of Operations | Operations | (555) 123-4567 |
| Linda Croft | Titan Heavy Industries | Lead Engineer | Engineering | (555) 123-4568 |
| Greg Focker | Nova Plastics Corp | Procurement Dir. | Purchasing | (555) 987-6543 |
| Alice Vance | Midwest Assembly Partners | Safety Coordinator | Compliance | (555) 333-2211 |
| Omar Khalid | Global Processors Inc | Maintenance Lead | Maintenance | (555) 444-5566 |
C
Contact
Michael Vance
Details
Notes
Files
Contact Information
NameMichael Vance✎
TitleVP of Operations✎
DepartmentOperations✎
Communication PreferenceEmail (Business Hours)✎
Contact OwnerMarcus Cole✎
Buying InfluenceFinal Decision Maker✎
Technical CompetenceExpert (Former Engineer)✎
Safety CertificationOSHA 30 Hour✎
Engagement Details
LinkedIn Profilelinkedin.com/in/mvance✎
Equipment InterestHeavy Presses & Automation✎
Warranty ContactPrimary Escalation✎
Budget Approval Process
Michael confirmed he has sign-off authority for CapEx up to $500k without board approval. Anything over requires a 45-day review cycle.
Created by Marcus Cole • July 2, 2026
Lunch Meeting Recap
Discussed the ongoing labor shortage on their floor. They are highly motivated to invest in automation retrofits to reduce manual handling.
Created by Marcus Cole • May 18, 2026
Technical Preference
He strongly prefers Allen-Bradley controllers. We need to ensure any proposed custom equipment defaults to that architecture.
Created by Sales Engineering • January 10, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| M_Vance_Business_Card.jpg | Image | 1.2 MB | March 15, 2025 |
| Titan_Org_Chart_Ops.pdf | 0.5 MB | January 10, 2026 | |
| Email_Approval_Thread_Press.msg | 0.1 MB | August 10, 2026 |
O
Opportunities
| Opportunity Name | Account Name | Amount | Stage | Close Date | Owner |
|---|---|---|---|---|---|
| Titan - Press Line Upgrade | Titan Heavy Industries | $450,000 | Negotiation | Aug 15, 2026 | Marcus Cole |
| Nova - Polymer Extruder | Nova Plastics Corp | $285,000 | Proposal Sent | Sep 10, 2026 | Elena Rostova |
| Midwest - Robotic Welders | Midwest Assembly Partners | $620,000 | Discovery | Nov 01, 2026 | Marcus Cole |
| Global Process - Sorting Line | Global Processors Inc | $195,000 | Needs Analysis | Oct 15, 2026 | Elena Rostova |
| Vertex - 5-Axis CNC | Vertex Aero Components | $340,000 | Site Assessment | Aug 30, 2026 | Marcus Cole |
O
Opportunity
Titan - Press Line Upgrade
Discovery
Needs Analysis
Site Assessment
Proposal Sent
Negotiation
Verbal Approval
Closed
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NameTitan - Press Line Upgrade✎
Opportunity TypeExisting Customer - Upgrade✎
Lead SourceDirect Rep Visit✎
Machine CategoryHeavy Press✎
Freight TermsIncluded in Price (FOB Dest)✎
Opportunity OwnerMarcus Cole✎
StageNegotiation✎
Probability80%✎
Amount$450,000.00✎
Delivery ReadinessSite Prep Required✎
Custom EngineeringStandard Setup✎
Technical & Strategic Details
Implementation PartnerDirect Installation✎
Financing StatusInternal Budget Approved✎
CompetitorSchuler Group✎
Voltage Requirement480V 3-Phase✎
Production Output NeedHigh Volume / Continuous✎
Factory LayoutCAD File Provided✎
Decision CriteriaSpeed / Cycle Time✎
Warranty Tier3-Year Extended Plus✎
Installation TypeTurnkey Delivery & Setup✎
Target CommissioningSeptember 2026✎
Service AgreementIncluded - Year 1 PMs✎
Risk LevelLow - Loyal Customer✎
P Line Items
| Line Item Name | Product Code | Quantity | Sales Price | Total Price | Weight (lbs) |
|---|---|---|---|---|---|
| HD-Press 5000 Model Base | HDP-5K-BAS | 1.00 | $380,000.00 | $380,000.00 | 24,500 |
| Automated Feed Conveyor | CNV-AF-300 | 1.00 | $45,000.00 | $45,000.00 | 3,200 |
| Safety Light Curtain Kit | SAF-LC-4X | 2.00 | $2,500.00 | $5,000.00 | 45 |
| Turnkey Install & Commissioning | SRV-TRN-INS | 1.00 | $20,000.00 | $20,000.00 | 0 |
Pricing Concession Discussion
They pushed back on the $20k installation fee. I agreed to bundle the Safety Light Curtain Kit at no charge to keep the install margin intact. Awaiting signature.
Created by Marcus Cole • August 2, 2026
Site Assessment Complete
Engineering verified the concrete foundation in Bay 4 is sufficient to handle the 24,500 lb load without additional reinforcement. We are good to quote standard delivery.
Created by Sales Engineering • July 20, 2026
Discovery Notes
Current press is experiencing 15% downtime due to hydraulic leaks. They need the new unit operational by end of September to meet Q4 production spikes.
Created by Marcus Cole • July 01, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Quote_QT-99201_Titan_v2.pdf | 1.4 MB | August 1, 2026 | |
| Engineering_Site_Report.pdf | 3.8 MB | July 22, 2026 | |
| Competitor_Battlecard_Schuler.pdf | 0.9 MB | July 10, 2026 |
C
Campaigns
| Campaign Name | Status | Type | Start Date | Owner |
|---|---|---|---|---|
| 2026 IMTS Chicago Booth | In Progress | Trade Show | Sep 10, 2026 | Marketing Team |
| Q3 Automation Retrofit Promo | In Progress | Jul 01, 2026 | Marketing Team | |
| Robotics Safety Webinar | Completed | Webinar | May 15, 2026 | Marketing Team |
| Midwest Plant Managers Dinner | Planned | Event | Oct 20, 2026 | Marcus Cole |
| End of Year Tax Write-off Push | Planned | Direct Mail | Nov 01, 2026 | Marketing Team |
C
Campaign
2026 IMTS Chicago Booth
Details
Campaign Members
Notes
Files
Campaign Details
Campaign Name2026 IMTS Chicago Booth✎
TypeTrade Show✎
StatusIn Progress✎
Region TargetNorth America✎
Campaign OwnerMarketing Team✎
Equipment FocusCNC & Robotics✎
Buyer Persona TargetPlant Managers✎
Lead Source DriverIn-Person Scanning✎
Planning & Metrics
Start DateSep 10, 2026✎
Expected ResponseHigh (20%+)✎
ChannelIndustry Event✎
End DateSep 15, 2026✎
Budget CategoryTier 1 Event (>$50k)✎
Follow-up Sequence3-Touch Email + Rep Call✎
Campaign Members
| Name | Company | Status | Type |
|---|---|---|---|
| Sarah Jenkins | Apex Manufacturing | Registered | Lead |
| Michael Vance | Titan Heavy Industries | Attended | Contact |
| Greg Focker | Nova Plastics Corp | Sent Invite | Contact |
| Robert Cho | Cho Industrial | Registered | Lead |
| David Miller | Miller Steelworks | Responded | Lead |
Booth Setup Details
We have secured a 20x20 island booth. Logistics needs to ensure the working CNC model is crated and shipped by Sept 1. Requires 220V drop at the booth.
Created by Marketing Team • August 1, 2026
VIP Dinner Resveration
Booked the private room at Gibson's for Wednesday night during the show. Sales reps need to submit their VIP invites (max 12 clients) by Friday.
Created by Event Coordinator • July 25, 2026
Lead Scanning App
Confirmed integration between the IMTS badge scanners and Salesforce. Leads will auto-route to reps based on regional territory assignment overnight.
Created by RevOps Admin • July 10, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| IMTS_2026_Booth_Rendering.png | Image | 4.5 MB | July 28, 2026 |
| Show_Floor_Map_Highlighted.pdf | 2.1 MB | July 15, 2026 | |
| Staff_Schedule_Chicago.xlsx | Excel | 0.3 MB | August 2, 2026 |
E
Equipment Models
| Model Name | Category | Power Requirements | Base Price | Status |
|---|---|---|---|---|
| HD-Press 5000 | Heavy Press | 480V Three Phase | $380,000 | Active Product |
| CNC Master V2 | Machining | 240V Three Phase | $125,000 | Active Product |
| Auto-Conveyor 300 | Material Handling | 208V Three Phase | $45,000 | Active Product |
| Weld-Bot X-1 | Robotics | 480V Three Phase | $85,000 | Active Product |
| HD-Press 4000 (Legacy) | Heavy Press | 480V Three Phase | $310,000 | Discontinued |
E
Equipment Model
HD-Press 5000
Details
Notes
Files
Model Specifications
Model NameHD-Press 5000✎
CategoryHeavy Press✎
Sub-CategoryHydraulic Stamping✎
Power Requirements480V Three Phase✎
Footprint SizeLarge (10x10 to 20x20 ft)✎
Cooling TypeClosed Loop Chiller✎
Product ManagerEngineering Team✎
Product StatusActive Product✎
Weight TierClass 4 (> 20,000 lbs)✎
Voltage Tolerance+/- 5% Steady State✎
Motor TypeServo Driven Hydraulic✎
Frame MaterialCast Iron Monoblock✎
Pricing & Operations
Base Price$380,000.00✎
Automation LevelFully Automated (PLC)✎
Compliance StandardCE & UL Listed✎
Controller TypeAllen-Bradley ControlLogix✎
Display Type15" Color Touch HMI✎
Warranty Years1 Year Standard✎
Operating EnvironmentStandard Factory Floor✎
Spares KitLevel 2 (Wear Parts + Sensors)✎
Noise LevelModerate (70-85 dB)✎
Maintenance CycleQuarterly PM Required✎
V2 Hardware Update
Engineering released the updated hydraulic manifold block. This resolves the micro-leaks reported in early 2024 models. All new builds ship with V2.
Created by Product Team • January 15, 2026
Lead Time Alert
Due to cast iron supply chain issues, standard lead time on the 5000 series is currently 14-16 weeks. Please communicate this to all active opportunities.
Created by Supply Chain • June 10, 2026
Controller Chip Shortage
Allen-Bradley components are secured for the next 50 units. If a customer requests Siemens, add 4 weeks to delivery time.
Created by Procurement • March 22, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| HDP5000_Spec_Sheet_Customer.pdf | 2.4 MB | February 01, 2026 | |
| Install_Footprint_Guide_HDP5000.pdf | 5.8 MB | January 15, 2026 | |
| HDP5000_3D_Model_Viewer.step | CAD | 28.5 MB | November 20, 2025 |
I
Installations
| Installation Name | Account | Phase | Scheduled Date | Team Lead |
|---|---|---|---|---|
| INST-2026-001 (Press Line) | Titan Heavy Industries | Site Prep | Sep 01, 2026 | Dave Harris |
| INST-2026-042 (Extruder) | Nova Plastics Corp | Equipment En Route | Aug 20, 2026 | Sarah Lin |
| INST-2026-015 (Robotic Welders) | Midwest Assembly Partners | Commissioning | Aug 05, 2026 | Mark Torel |
| INST-2026-011 (Sorting Line) | Global Processors Inc | Completed | Jul 10, 2026 | Sarah Lin |
| INST-2026-088 (5-Axis CNC) | Vertex Aero Components | Awaiting Sign-off | Aug 02, 2026 | Dave Harris |
I
Installation
INST-2026-001 (Press Line)
Order Received
Site Prep
Equipment En Route
Rigging & Setup
Commissioning
Awaiting Sign-off
Completed
Details
Notes
Files
Installation Logistics
Installation NameINST-2026-001 (Press Line)✎
PhaseSite Prep✎
Site ReadinessPending Foundation Cure✎
Power Hookup StatusElectrician Scheduled✎
Crane AvailabilityOverhead Bridge (20T)✎
Install OwnerDave Harris✎
Priority LevelHigh - Revenue Recognition✎
Safety AuditApproved for Entry✎
Team AssignedMidwest Heavy Riggers (Internal)✎
Anchor PointsChemical Epoxied Bolts✎
Clearance VerificationPassed (Roll-up door is 14ft)✎
Execution & Sign-off
Scheduled DateSep 01, 2026✎
Unloading MethodDrive-in Flatbed to Bay✎
Floor ReinforcementCompleted by Customer✎
Alignment CheckRequires Laser Tramming✎
Firmware LoadVersion 4.2 Factory Preloaded✎
Est. CompletionSep 05, 2026✎
Operator Training2 Days Classroom + Floor✎
Handover Sign-offPending Acceptance Run✎
Waste DisposalCustomer Dumpster Provisioned✎
Setup ResultPending✎
Foundation Cure Check
Customer poured the reinforced pad on August 1st. Requires 28 days to fully cure for the anchor load. We cannot begin rigging before Sept 1.
Created by Dave Harris • August 2, 2026
Crane Coordination
Confirmed with Titan facilities that their 20-ton overhead bridge crane will be locked out for our exclusive use on Sept 2nd for the main lift.
Created by Dave Harris • July 28, 2026
Pre-Install Meeting
Reviewed the safety protocol. All our riggers must watch the Titan 30-minute safety video before badge access is granted.
Created by Operations Desk • July 15, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Rigging_Plan_Signoff.pdf | 1.2 MB | July 29, 2026 | |
| Foundation_Core_Test_Results.pdf | 0.5 MB | August 2, 2026 | |
| Titan_Contractor_Badges.xlsx | Excel | 0.1 MB | July 15, 2026 |
M
Maintenance Schedules
| Schedule Name | Equipment Model | Status | Next Service Date | Technician |
|---|---|---|---|---|
| PM-Press-Quarterly | HD-Press 5000 | Scheduled | Sep 15, 2026 | Tom Hanes |
| PM-WeldBot-Monthly | Weld-Bot X-1 | Overdue | Aug 10, 2026 | Sarah Lin |
| PM-CNC-Annual | CNC Master V2 | Active | Feb 12, 2027 | Tom Hanes |
| PM-Conveyor-BiAnnual | Auto-Conveyor 300 | Scheduled | Oct 20, 2026 | Mark Torel |
| PM-Generator-Annual | PowerGen Pro 900 | Active | Nov 05, 2026 | Dave Harris |
M
Maintenance Schedule
PM-Press-Quarterly
Details
Notes
Files
Service Protocol
Schedule NamePM-Press-Quarterly✎
StatusScheduled✎
FrequencyQuarterly (90 Days)✎
Severity LevelTier 2 Preventative✎
Fluid ReplacementHydraulic Oil Top-off✎
Schedule OwnerTom Hanes✎
PriorityMedium - Routine✎
Downtime Required4 Hours (Lockout/Tagout)✎
Filter ChangeAir & Hydraulic Return✎
Belt TensionCheck & Adjust✎
Calibration NeedRam Parallelism Check✎
Scheduling & Results
Next Service DateSep 15, 2026✎
Technician Skill LevelLevel 2 (Mechanical/Hydraulic)✎
Bearing LubricationAuto-Greaser Refill✎
Software UpdateCheck for Minor Patches✎
Coolant FlushNot Applicable (Hydraulic)✎
Last Service DateJun 15, 2026✎
Audit PassPending Execution✎
Vibration AnalysisBaseline Comparison✎
Thermal ImagingScan Main Motor Panel✎
Action RequiredOrder Filter Kit PM-22✎
Last PM Recap
June service went well. Noticed slight wear on the main hydraulic return line. Not leaking yet, but we should bring a spare hose to the September service just in case.
Created by Tom Hanes • June 16, 2026
Downtime Scheduling
Customer requested we perform the September PM during their 3rd shift (11 PM - 3 AM) to avoid disrupting the daytime assembly line. Note added to work order.
Created by Dispatch • July 20, 2026
Filter Kit Ordered
Parts dept confirmed the PM-22 filter kit is on the shelf and reserved for this ticket. Tom will pick it up morning of the job.
Created by Parts Dept • August 1, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| PM_Checklist_HD_Press.pdf | 0.6 MB | June 01, 2026 | |
| Thermal_Scan_Report_June.jpg | Image | 2.1 MB | June 16, 2026 |
| Oil_Analysis_Lab_Results.pdf | 1.1 MB | June 22, 2026 |