Template Hub Template Hub

Sales Cloud Template for Industrial Engineering Firms

Industrial engineering requires precise oversight of facility layouts, process flow optimizations, and equipment integrations. This CRM template is built specifically for industrial engineering and plant design firms. Track project phases, time studies, and process layouts seamlessly. Streamline your firm operations and maintain rigorous project oversight.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Marcus Wright - Summit Manufacturing

New
Contacted
Qualified
Pending RFP
Converted
Details
Notes
Files

Primary Information

First NameMarcus✎
Last NameWright✎
TitleVP of Operations✎
Lead Status Contacted ✎
Project Category Facility Expansion ✎
Lead OwnerSarah Jenkins✎
Phone555-102-3948✎
Service Required Facility Layout Design ✎
Desired Schedule Q3 Start ✎
Priority Rating High ✎

Operational Requirements

Lead Source Referral ✎
Facility Type Discrete Manufacturing ✎
Primary Challenge Space Constraints ✎
Target Facility Size 100,000 - 250,000 sq ft ✎
Plant Address400 Industrial Way✎
Simulation Software FlexSim Required ✎
Current OEE 65% (Estimated) ✎
Budget Status Approved for Design ✎
Automation Level Semi-Automated ✎
City/State/ZipDetroit, MI 48226✎
Initial Meeting Notes
Marcus indicated they need to increase capacity of the assembly line by 30% without adding square footage. They want us to perform a facility layout redesign and simulate material flow.
Created by Sarah Jenkins • August 1, 2026
Budget Clarification
Confirmed the design budget is fully funded. They are looking to issue the engineering RFP by the 15th.
Created by Sarah Jenkins • July 28, 2026
Automation Requirements
Client stressed that integrating Automated Guided Vehicles (AGVs) for material transport must be included in the new layout study.
Created by Michael Torres • July 20, 2026
◄ Back to Accounts List
Account

Apex Manufacturing

Details
Contacts
Opportunities
Projects
Operations Studies
Equipment Integration
Notes
Files

Primary Information

Account NameApex Manufacturing✎
Account TypeManufacturer✎
Industry SectorDiscrete Assembly✎
Billing CityChicago✎
Account OwnerMichael Torres✎
Phone555-882-9911✎
Websitewww.apex-mfg.com✎

Engineering Business Details

Primary MarketMidwest Industrial✎
Typical Project Size$1M - $5M CAPEX✎
Procurement MethodMaster Service Agreement✎
Active StatusActive Client✎
Preferred DeliveryConsulting/Design Only✎
Engineering TierTier 1 - Strategic✎
Payment TermsNet 45✎
Quarterly Review Meeting
Met with Frank to review the ongoing Layout Redesign project. They are happy with our turnaround times on the time studies and want us to bid on the new Conveyor Spec study.
Created by Michael Torres • July 15, 2026
MSA Renewal Update
Apex has sent over the updated Master Service Agreement for 2027. We need our legal team to review the updated IP clauses regarding simulation models.
Created by System • June 10, 2026
Production Stand-down
Apex held a mandatory safety stand-down across the plant today due to a minor forklift incident. All field observations for the AGV integration project are paused until next week.
Created by Michael Torres • May 20, 2026
◄ Back to Contacts List
C
Contact

Sarah Connor

Details
Notes
Files

Contact Information

First NameSarah✎
Last NameConnor✎
Account NameSkyline Logistics✎
TitleFacility Engineer✎
Contact OwnerSarah Jenkins✎
Phone555-773-2288✎
Mobile555-773-9999✎

Engineering Role & Preferences

Contact RoleDesign Lead✎
Decision AuthorityTechnical Evaluator✎
Project Phase InvolvementConcept/Planning✎
Communication PrefEmail✎
Discipline PreferenceFacility Layout✎
Approval FrequencyMilestone Only✎
Layout Review Notes
Sarah wants the new warehouse layout to minimize forklift travel time between the receiving dock and the high-bay racking. We need to evaluate a cross-docking workflow.
Created by Sarah Jenkins • July 22, 2026
Simulation Requirements
She stressed the importance of tracking peak season order volumes in the FlexSim model to ensure the proposed conveyor system won't bottleneck.
Created by Sarah Jenkins • June 15, 2026
Webinar Attendee
Sarah attended our firm's Webinar on AGV vs AMR integration. She is highly interested in integrating this into their future capex planning.
Created by Marketing • May 10, 2026
◄ Back to Opportunities List
O
Opportunity

Line 4 Ergonomic Assessment

Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files

Contract Information

Opportunity NameLine 4 Ergonomic Assessment✎
Account NameApex Manufacturing✎
TypeExisting Business - Expansion✎
StageNegotiation✎
Primary ContactDiane Nguyen✎
Service TypeConsulting Study✎
Opportunity OwnerMichael Torres✎
Close Date10/15/2026✎
Amount$45,000✎
Probability (%)80%✎
Next StepFinalize deliverables list✎
Contract TypeLump Sum✎

Engineering Scope Specifications

Project ScopeWorkcell Redesign✎
Design PhaseConcept/Feasibility✎
Process TypeManual Assembly✎
Technical ComplexityMedium - High Variability✎
Deliverables RequiredErgo Report & Workcell CAD✎
Lead SourceAccount Penetration✎
Regulatory StandardOSHA Ergonomics✎
Project ExecutionLump Sum Consulting✎
Target Metric Imprv.Reduce Cycle Time 15%✎
Analysis MethodVideo Time/Motion Study✎
CompetitorLocal Boutique Firm✎
Bid StatusShortlisted✎
Deliverables Contract Redline
Apex's CI Lead returned our redlines on the deliverables clause. We agreed to provide the raw video footage from the time studies upon project completion, provided they sign the data privacy waiver.
Created by Michael Torres • August 2, 2026
Scope Clarification
Updated the proposal to clarify that sizing calculations for the new pneumatic lift assists are included, but the actual procurement of the hoists is by others.
Created by Michael Torres • July 25, 2026
Shortlist Notification
Diane called to let us know we made the final two. Our experience with NIOSH lifting equations for this specific assembly type gave us the edge over the competitor.
Created by Michael Torres • July 20, 2026
◄ Back to Campaigns List
C
Campaign

FlexSim Integration Webinar

Details
Campaign Members
Notes
Files

Campaign Details

Campaign NameFlexSim Integration Webinar✎
TypeWebinar✎
StatusIn Progress✎
Is ActiveYes✎
Campaign OwnerMarketing Team✎
Start Date10/01/2026✎
End Date10/01/2026✎
Budget Allocated$2,500✎

Targeting & Performance

Target AudienceManufacturers✎
Expected Response12%✎
Campaign ObjectiveLead Generation (Simulation Bids)✎
Actual Cost$1,150✎
Outreach MethodDigital / Email Invites✎
Region FocusMidwest Hubs✎
Presentation Dry Run
The simulation principles dry run went well. Need to add a slide showing the 3D visualization output compared to standard 2D layout planning.
Created by Marketing • August 1, 2026
Target List Pulled
Pulled all contacts and leads in the Midwest regions with active or past facility layout projects. Sent the first email blast today.
Created by Marketing • July 25, 2026
IISE Credit Approval
We received approval from IISE to offer 1.0 Continuing Education Unit (CEU) for attendees. This should drive up registration.
Created by Marketing • July 15, 2026
◄ Back to Projects List
P
Project

PRJ-2026-001 (Layout Redesign Ph 1)

Current State Analysis
Concept/Feasibility
Detailed Design
Implementation Support
Post-Launch Opt.
Details
Notes
Files

Project Overview

Project NamePRJ-2026-001 (Layout Redesign Ph 1)✎
PhaseImplementation Support✎
Delivery ModelConsulting/Design Only✎
Primary Service SystemFacility Layout Design✎
Project ManagerMichael Torres✎
Start Date01/15/2026✎
Estimated Completion12/15/2026✎
Current StatusActive - Implementation✎
CAD StandardAutoCAD 2D Layouts✎
Contract TypeLump Sum✎

Engineering Specifics & Progress

Process TypeDiscrete Assembly✎
Simulation UsedNone - Static Math Model✎
Client TypeManufacturer✎
PriorityHigh✎
Site Address400 Industrial Way✎
Target ImprovementReduce Footprint 15%✎
Shift Schedule Base2 Shifts / 5 Days✎
Review CycleBi-Weekly Design✎
Implementation StatusEquipment Relocation✎
Operational RiskMedium - Downtime Required✎
RegionMidwest✎
Installation Coordination Issue
Coordinated with Apex on the relocation of CNC Machine 4. The new footprint overlaps with an existing trench drain that wasn't on the original as-builts. We need to shift the cell layout 2 feet west.
Created by Michael Torres • August 1, 2026
Design Approval Complete
Finished the final review of the 2D layout drawings with the plant manager. Marked "Approved for Construction". Issued to the rigging contractor.
Created by Michael Torres • July 20, 2026
Area Clearing Complete
The operations team has successfully cleared out the WIP inventory from the target zone. The area is ready for the new tape marking and riggers to arrive next week.
Created by Field Tech • June 15, 2026
◄ Back to Operations Studies List
O
Operations Study

OPS-TS-001 (Time & Motion Study)

Data Collection
Analysis/Calculations
Pending Review
Approved
Recommendations Issued
Details
Notes
Files

Primary Study Details

Study IDOPS-TS-001✎
ProjectPRJ-2026-001✎
Study CategoryTime & Motion Study✎
MethodologyContinuous Video Analysis✎
StatusApproved✎
Study EngineerMichael Torres✎
Study OwnerMichael Torres✎
Request Date05/10/2026✎
Field Data CollectionComplete✎
Approval StatusApproved by Client✎
Due Date09/01/2026✎
Software PlatformProTime Estimation✎

Technical Metrics & Findings

Target WorkcellAssembly Line 4 - Stations 1-5✎
Number of Observations120 Cycles✎
Current Cycle Time45.5 Seconds✎
Takt Time Goal42.0 Seconds✎
Pace Rating (Avg)95% (Westinghouse)✎
Identified BottleneckStation 3 (Testing)✎
Non-Value Added Time18% (Primarily Travel)✎
Standard Time Calc48.2 Seconds (+ Allowances)✎
Remediation ReqRedistribute Tasks St.2-3✎
Allowance Factor12% (PFD)✎
Cycle Time Variance
Observation notes show high variance at Station 3. The operator is frequently walking 10 feet to fetch dunnage for packaging. This is driving the non-value added time up to 18%. Recommending gravity flow racks right at the workstation.
Created by Michael Torres • August 1, 2026
Client Review Complete
The plant manager reviewed the draft report. They agreed with the line balancing recommendations to shift the pre-assembly step from Station 3 back to Station 2. Report is now finalized and approved.
Created by Michael Torres • July 20, 2026
Video Collection Complete
Finished the 2-day recording session across all shifts. Capturing 120 usable cycles. Uploading to ProTime for element breakdown.
Created by System • June 15, 2026
◄ Back to Integration List
E
Equipment Integration

INT-AGV-092 - AGV Fleet Route Clarification

Received
Under Review
Pending Integrator
Returned to GC
Closed
Details
Notes
Files

Integration Submittal Information

Integration IDINT-AGV-092✎
ProjectPRJ-2026-001✎
Integrator/VendorBeacon Integrators✎
Submittal TypeField RFI✎
DisciplineMaterial Handling✎
Equipment TagsAGV-01 to AGV-05✎
Lead IE ReviewerSarah Jenkins✎
Received Date08/01/2026✎
Due Date08/05/2026✎
Returned DatePending✎
Action TakenPending✎
PriorityHigh✎

Impact & Resolution

Current StatusUnder Review✎
Impact LevelLayout Clash / Aisle Width✎
Safety StandardANSI/ITSDF B56.5✎
Review IterationRev 0 (Initial)✎
Deviation from SpecRerouting Required✎
Cost ImpactNone Anticipated✎
Schedule Impact1-3 Days (Pending Verify)✎
Clash DetectedAGV Path vs Structural Column✎
Submittal Format2D CAD Overlay✎
Delivery MethodProcore Integration✎
Initial Assessment
The integrator submitted a request for information regarding the AGV magnetic tape routing in Aisle 4. The proposed path brings the vehicle within 6 inches of structural column F4, violating the 18-inch safety clearance required by ANSI B56.5. We must verify if the aisle racking can be shifted.
Created by Sarah Jenkins • August 2, 2026
Coordination Call
Called the facility manager. They confirmed we can shift the racking row in Aisle 4 over by 12 inches to accommodate the clearance. I will draft a layout sketch (ASK-012) to formalize this change.
Created by Sarah Jenkins • August 3, 2026
Drafting Sketch
Sketch ASK-012 is with the CAD team. It will update the overall block layout. Should be ready for sign-off by tomorrow afternoon.
Created by Sarah Jenkins • August 3, 2026