Managing a hydroelectric facility requires precise coordination of heavy engineering, environmental compliance, and continuous generation output. This template configures your environment to track power plant assets, schedule turbine maintenance, and manage modernization contracts efficiently.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track inquiries for plant modernization and new projects. Accounts
Manage utilities, IPPs, and cooperative partners. Contacts
Organize plant managers and dam safety engineers. Opportunities
Monitor turbine upgrades and penstock repair bids. Campaigns
Coordinate trade shows and compliance seminars. Plants
Manage run-of-river, pumped storage, and dam details. Generators
Log Francis, Pelton, and Kaplan turbine specifications. Inspections
Track FERC compliance and cavitation analysis.Lead
Thomas Vance
New
Contacted
Discovery
Qualified
Converted
Details
Notes
Files
Primary Information
Lead NameThomas Vance✎
Company NameNorthern River Co-op✎
TitleChief Engineer✎
Phone(555) 987-6543✎
Project Type
Turbine Upgrade
✎
Lead OwnerHydro Sales✎
Lead Status
Contacted
✎
Lead Rating
Warm
✎
Lead Source
HydroVision Trade Show
✎
Facility Capacity Target
10-50 MW
✎
Funding Mechanism
CapEx Budget
✎
Technical & Site Details
Estimated Head
Medium Head (30-300m)
✎
Estimated Flow Rate
50-100 m3/s
✎
Water Source Type
Major River
✎
Environmental Permit Status
Cleared
✎
Grid Interconnection
Sub-Transmission (34-69kV)
✎
Preferred Turbine Type
Francis
✎
Target Commissioning
2-3 Years
✎
Feasibility Study
Completed & Positive
✎
Primary Pain Point
Low Efficiency
✎
Budget Approval
Board Review Pending
✎
Initial Outreach Call
Spoke with Thomas about upgrading their older Francis units. The units are nearing 40 years old and efficiency has dropped significantly.
Feasibility Report Review
They shared their recent feasibility study. Flow rates are stable, but head variations suggest a newer runner design could yield 12% more capacity.
Budget Timing
The Co-op board meets in September to vote on the CapEx for 2027. We need to have a preliminary proposal ready before then.
Account
Pacific Power Generation
Details
Contacts
Opportunities
Plants
Generators
Inspections
Notes
Files
Account Overview
Account NamePacific Power Generation✎
Account NumberACT-10928✎
Billing CitySeattle✎
Operating Region
Pacific Northwest
✎
Account OwnerMajor Projects✎
Account Type
Investor-Owned Utility
✎
Operating Status
Active Client
✎
Fleet MW Capacity
500MW - 1GW
✎
Fleet & Regulatory
Primary Regulatory Body
FERC
✎
Number of Active Plants
6 - 10 Plants
✎
Total Annual Generation
1,000 - 5,000 GWh
✎
Primary Equipment Vendor
Voith Hydro
✎
Dam Safety Rating
Satisfactory
✎
Asset Modernization Phase
Executing Upgrades
✎
Quarterly Review Meeting
Met with Robert Vance and Linda Zheng. The Blue River U3 rewind is progressing on schedule. They are preparing a budget request for the Grizzly Spillway project next year.
FERC Part 12D Extension
Sarah Jenkins noted they received a 6-month extension from FERC for the Pine Gorge stability analysis. This gives us more time to submit our NDT report.
Procurement Requirements Update
Marcus Wright circulated new supplier diversity requirements. We need to ensure 10% of sub-contractor spend on future projects uses registered diverse businesses.
Contact
Linda Zheng
Details
Notes
Files
Contact Information
Contact NameLinda Zheng✎
TitleChief Engineer - Hydro✎
Phone(555) 111-2225✎
Professional Details
Certifications
Professional Engineer (PE)
✎
Preferred Contact Method
Email (Detailed Specs)
✎
Event Attendance
HydroVision Frequent
✎
Primary Language
English
✎
Facility Access
All Fleet Plants
✎
Secondary Role
Equipment Specification
✎
Technical Deep Dive Call
Linda requested detailed MTBF (Mean Time Between Failures) data for the proposed gate seals on the Grizzly Spillway project. Highly detail-oriented.
Blue River U3 Outage
She will be on-site at Blue River for the critical lift of the rotor next week. Will be offline for 3 days.
New Environmental Regulations
Linda mentioned she is heavily focused on the new state fish passage requirements. May delay some CapEx budgets next year.
Opportunity
Pine Gorge Penstock Coating
Discovery
Site Inspection / RFQ
Proposal Submitted
Negotiation
Closed / Contract Signed
Details
Line Items
Notes
Files
Opportunity Details
Opportunity NamePine Gorge Penstock Coating✎
Amount$850,000✎
Close DateOct 10, 2026✎
Stage
Negotiation
✎
Opportunity Type
Penstock Repair
✎
Opportunity OwnerMajor Projects✎
Probability75%✎
Lead Source
Existing Contract Roll-over
✎
Forecast Category
Commit
✎
Primary Competitor
Andritz Hydro
✎
Contract Term
Project-Based (Fixed Price)
✎
Technical Scope
Project Scope
Civil/Structural Repair
✎
Outage Window Required
1 - 3 Months
✎
Turbine Design
Kaplan
✎
Head Range
Medium Head (30-300m)
✎
Generator Rating Limit
50 MW - 100 MW
✎
Control System Standard
IEC 61850 (Modern)
✎
Environmental Constraint
Fish Migration Season Restriction
✎
Regulatory Filing
FERC Non-Capacity Amendment
✎
Funding Source
CapEx Budget Approved
✎
Installation Partner
Internal Crews
✎
Pricing Negotiation Update
Pacific Power procurement asked for a 5% discount on the scaffolding line item. We agreed to bundle the QC inspection to keep the margin intact. Contract is moving to legal.
Outage Window Confirmation
Linda Zheng confirmed the outage window is locked for October 15th to November 15th to avoid the salmon migration restrictions.
Proposal Walkthrough
Walked the engineering team through our epoxy application method. They were satisfied with our 10-year warranty on the coating.
Campaign
HydroVision International 2026
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameHydroVision International 2026✎
Start DateJul 14, 2026✎
End DateJul 16, 2026✎
Type
Trade Show
✎
Campaign OwnerMarketing Team✎
Status
Completed
✎
Budgeted Cost$65,000✎
Expected Revenue$2,500,000 Pipeline✎
Strategy & Targeting
Target Audience
Utility Executives & Engineers
✎
Theme
Plant Modernization & Efficiency
✎
Expected Response
High (200+ Scans)
✎
Region Focus
North America
✎
Call to Action
Schedule Technical Review
✎
Lead Routing
Major Projects Team
✎
Post-Show Debrief
Excellent foot traffic at the booth. The 3D printed Francis runner model was a great conversation starter. We scanned 215 badges, with about 40 qualified leads.
VIP Breakfast Success
Hosted 12 Chief Engineers for breakfast. Good discussions on navigating the new FERC part 12D regulations. Very high ROI on this event.
Lead Import Status
All badge scans have been imported. The 40 qualified leads were routed to the sales team; the rest are entering our Q3 email nurture track.
Hydroelectric Plant
Blue River Hydro
Details
Notes
Files
Facility Identity
Plant NameBlue River Hydro✎
Location (City/State)Blue River, Oregon✎
Commissioning Year1968✎
Hydro Topology
Conventional Impoundment
✎
FERC Project NumberP-12345✎
Plant OwnerMajor Projects✎
Operational Status
Active Base Load
✎
Nameplate Capacity
100-500 MW
✎
Annual Generation Limit
1,000 - 5,000 GWh
✎
Grid Operator / ISO
BPA (Bonneville Power)
✎
Primary River SystemWillamette River Basin✎
Physical & Dam Specs
Dam Type
Concrete Gravity
✎
Dam Height
High (>100m)
✎
Crest Length
Medium (100-500m)
✎
Spillway Type
Gated Ogee Crest
✎
Penstock Count
3 Penstocks
✎
Gross Head
High Head (>300m)
✎
Design Flow Rate
100-500 m3/s
✎
Reservoir Capacity
Large (>100M m3)
✎
Fish Passage
Fish Ladder Installed
✎
Hazard Classification
High Hazard (Loss of Life)
✎
FERC Relicensing Preparation
The operating license for Blue River expires in 2030. They are already beginning environmental scoping studies to prepare the application.
Unit 3 Outage Scheduled
Unit 3 generator rewind is scheduled for Q1 2027. Plant output will be restricted by ~80 MW during the 3-month window.
Spillway Gate Inspection
Annual inspection of the radial spillway gates showed minor corrosion on Gate 4. Monitoring closely, no immediate repair needed.
Turbine/Generator Unit
Blue River U3
Details
Notes
Files
Unit Identification
Unit Name/IDBlue River U3✎
Manufacturer
Voith Hydro
✎
Date of Manufacture1968✎
Last Rewind Date1995✎
Turbine Type
Francis
✎
Asset OwnerMaintenance Engineering✎
Operational Status
Maintenance
✎
Rated Power Output
50 MW - 100 MW
✎
Rotational Speed
150 - 300 RPM
✎
Generator Voltage
13.8 kV
✎
Frequency Standard
60 Hz (Americas)
✎
Operating Parameters
Rated Net Head
High Head (>300m)
✎
Maximum Discharge
50-100 m3/s
✎
Runner Material
Stainless Steel Alloy
✎
Guide Vane Type
Adjustable Wicket Gates
✎
Cooling System
Closed Loop Water-to-Water
✎
Governor System Type
Digital Electro-Hydraulic
✎
Excitation System
Static Excitation
✎
Bearing Type
Babbitt/Hydrodynamic
✎
Condition Monitoring
Online Vibration & Temp
✎
Maintenance Priority
High (Outage Pending)
✎
Pre-Outage Vibration Data
Vibration on the upper guide bearing has increased by 15% over the last quarter. Validates the decision to pull the rotor and inspect the bearing pads during the upcoming rewind outage.
Wicket Gate Lubrication
Switched the wicket gate linkages from grease to a new self-lubricating bushing design. Should reduce environmental contamination risk in the tailrace.
Exciter Upgrade Completed
The static exciter upgrade was completed successfully. Unit response time to grid voltage fluctuations has improved dramatically.
Field Inspection
INSP-2026-09 (Penstock NDT)
Scheduled
In Progress
Report Pending
Review Findings
Completed
Details
Notes
Files
Inspection Details
Inspection IDINSP-2026-09✎
Scheduled DateAug 01, 2026✎
Inspector LeadContractor (NDT Services LLC)✎
Inspection Type
Penstock NDT
✎
Inspection OwnerEngineering Support✎
Status
Report Pending
✎
Priority
High (Pre-Outage)
✎
Weather Conditions
Clear/Dry
✎
Flow Condition
Dewatered / Isolated
✎
Water Level
Drawn Down for Access
✎
Findings & Follow-up
Structural Integrity
Minor Degradation
✎
Cavitation Damage Level
Not Evaluated
✎
Vibration Analysis
Not Evaluated
✎
Bearing Temperature
Not Evaluated
✎
Control System Check
Not Evaluated
✎
Regulatory Compliance
Report Required by FERC
✎
Corrective Action Required
Yes - Penstock Coating
✎
Estimated Repair Cost
Awaiting Formal Quote
✎
Shutdown Required
Extended Outage (Weeks)
✎
Next Inspection Cycle
5 Year Cycle
✎
Preliminary Ultrasonic Results
The NDT contractor verbally indicated that the steel wall thickness at the lower bend is approaching the minimum tolerance limit. Coating failure is evident. Full report expected next Friday.
Dewatering Process
Unit 1 penstock was successfully dewatered and locked out. Confined space entry permits were issued at 07:00.
Pre-Inspection Briefing
Reviewed the JHA (Job Hazard Analysis) with the NDT diving team. Primary focus is on the weld seams near the bifurcation point.


