Developing next-generation technology hardware requires strict tracking of engineering processes, components, and client relationships. This customized environment manages the complete hardware lifecycle. From the initial schematic and PCB layout to physical prototyping and final assembly, tracking revisions and vendor relationships is straightforward. Built for technology hardware engineering teams, it ensures seamless collaboration across procurement, design, and manufacturing stages.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Qualify inbound engineering RFQs and hardware specs. Accounts
Manage OEMs, component vendors, and fab partners. Contacts
Track interactions with lead hardware and systems engineers. Opportunities
Drive NRE quoting, DFM reviews, and production bids. Campaigns
Measure ROI on tech conferences and component mailers. Prototypes
Track EVT, DVT, and PVT hardware build phases. Designs
Monitor schematic progress, layouts, and thermal routing. RMAs
Log field failures, board reworks, and warranty claims.Lead
David Okafor - NovaTech Energy
New
Contacted
NDA Signed
Scoping
Converted
Details
Notes
Files
Primary Information
Lead NameDavid Okafor✎
Company NameNovaTech Energy✎
Phone(555) 345-6789✎
Job TitleHardware Engineering Lead✎
Lead OwnerAlan Turing✎
Lead StatusNDA Signed✎
Urgency LevelHigh✎
Preferred TimelineQ3 Prototype✎
NRE Budget$50,000 - $100,000✎
Preferred Comm MethodVideo Call✎
Technical Requirements
Hardware CategoryIndustrial IoT✎
Lead SourceTech Conference✎
Estimated Volume10k Units/Year✎
Required CertificationUL Listed✎
Application ContextRemote Sensing✎
Form Factor RequirementDIN Rail Mount✎
Operating Temp Range-40 to 85C✎
Target Unit Cost$45.00✎
Prototyping Budget$15,000✎
Compliance NeedStrict RoHS 3✎
NDA Execution
Mutual NDA signed by both parties. We can now review their initial block diagrams and processor requirements.
Initial Scoping Call
They need a robust sensor node for extreme environments. Must operate reliably at -40C. They prefer an ARM Cortex-M4 architecture.
Component Shortage Warning
Warned client that the specific BLE transceiver they requested currently has a 32-week lead time. Proposing an alternative.
Account
NovaTech Parent
Details
Contacts
Opportunities
Prototypes
Designs
RMAs
Notes
Files
Primary Information
Account NameNovaTech Parent✎
Phone(555) 111-2222✎
Websitewww.novatech.energy✎
Billing Address4500 Tech Parkway, San Jose, CA✎
Account OwnerAlan Turing✎
Account TypeOEM Partner✎
Account StatusActive Client✎
Preferred Fab HouseFoxconn✎
Financial & Engineering Data
Industry SegmentEnergy & Utility✎
Annual Revenue$150,000,000✎
Primary Manufacturing PartnerCircuitBoard Pros✎
Standard Payment TermsNet 60✎
Total BOM Spend$4,200,000✎
NDA StatusActive - Mutual✎
Master Service Agreement
NovaTech requires net-60 terms on all NRE above $50k. Approved by VP of Engineering.
Component Sourcing Shift
They are moving away from STM32 chips due to allocation issues, shifting designs to NXP processors.
Holiday Gift Sent
Sent the prototype housing mockup as a holiday gift to David.
Contact
David Okafor
Details
Notes
Files
Contact Information
Contact NameDavid Okafor✎
Mobile Phone(555) 111-2223✎
Contact OwnerAlan Turing✎
Role/TitleHardware Eng Lead✎
StatusActive Client✎
Preferred Contact MethodVideo Call✎
Technical Profile
Engineering DisciplineElectrical / PCB✎
Technical ProficiencyExpert✎
Hardware Lifecycle PhasePrototyping (EVT/DVT)✎
Influence LevelDecision Maker✎
Trade Show OriginHardwareCon 2025✎
Technical Preference
David strictly prefers Altium Designer for all PCB files. He will reject Eagle or KiCad formats.
Personal Note
Huge fan of Formula 1. Talked about the recent race in Austin for 10 minutes before diving into the BOM review.
Communication Style
Very direct. Hates marketing fluff. Always start meetings by sharing screen on the schematics.
Opportunity
NovaTech Gen 2 Scoping
Discovery
Scoping
DFM Review
Quoting
Negotiation
Closed
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NameNovaTech Gen 2 Scoping✎
Amount$120,000✎
Expected Yield98.5%✎
Target ApplicationIndustrial Control✎
Opportunity OwnerAlan Turing✎
StageScoping✎
Close DateSep 15, 2026✎
Probability (%)40%✎
Contract TypeNRE + Turnkey✎
Manufacturing RegionNorth America✎
Engineering & Hardware Details
Primary CompetitorPlexus✎
Design ComplexityHigh Density (HDI)✎
IP OwnershipClient Owned✎
Tooling Cost Estimate$15,000✎
Lead SourceExisting Client Expand✎
NRE Payment Schedule50/40/10 Milestone✎
Production Run Size5,000 Units/Mo✎
DFM Review StatusPending Specs✎
BOM ReadinessPartial - Awaiting Subs✎
Prototyping PhaseEVT✎
Expected Lifecycle5 Years✎
Compliance TargetFCC Class B✎
DFM Complexity Warning
The BGA packages they selected have a 0.4mm pitch. We need to quote higher tier fabrication for the microvias.
Volume Commitment
Client is asking if we can amortize NRE into the unit cost if they sign an LOI for 20k units in Year 1. Sent to VP for approval.
Alternative Components
Proposed swapping the TI power regulator for an Analog Devices equivalent to drop BOM cost by $1.20 per unit.
Campaign
Embedded Systems Expo 2026
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameEmbedded Systems Expo 2026✎
StatusIn Progress✎
Start DateAug 10, 2026✎
End DateAug 14, 2026✎
Event LocationSan Jose Convention Center✎
Hardware FocusEmbedded Processors✎
Target PersonaHardware Engineering Leads✎
Campaign OwnerAlan Turing✎
TypeTrade Show✎
Expected Revenue$500,000✎
Budgeted Cost$18,000✎
Actual Cost$19,250✎
Leads Generated84✎
ROI StatusPending✎
Booth Setup Issue
The union labor for drayage pushed us $1,250 over the initial budget. Next year we need to ship the hardware racks lighter.
Lead Scanning App
Make sure all reps are using the official API connected scanner app to push leads directly into Salesforce without CSV export.
Key Messaging
Focus the demo stations on our new high-speed SMT placement capabilities and automated optical inspection accuracy.
Prototype
Proto-GTW-EVT
Planning
Sourcing
Assembly
Testing
Approved
Details
Notes
Files
Prototype Spec
Prototype NameProto-GTW-EVT✎
Hardware Revisionv2.0✎
Board TypeFlex-Rigid✎
Microcontroller ModelNXP i.MX RT1060✎
Prototype OwnerAlan Turing✎
StageTesting✎
Firmware VersionFW-0.9.4-Beta✎
Form FactorCustom Enclosure✎
Target Unit Cost$85.00✎
Tested Operating Temp-20C to 80C✎
Manufacturing & Testing Data
Antenna ConfigurationPCB Trace✎
Assembly VendorCircuitBoard Pros✎
Component Lead TimeCritical > 20 Wks✎
PCB Layers6 Layers✎
Impedance ControlYes - Strict✎
Power Consumption250mA (Active)✎
Interface StandardsI2C, SPI, UART✎
Housing MaterialPolycarbonate UV✎
DFM Score88/100✎
Estimated Ship DateAug 15, 2026✎
Thermal Runaway Issue
During stress testing at 80C, the LDO voltage regulator hit thermal shutdown. We need to increase the copper pour area for heat dissipation on v2.1.
Solder Paste Stencil
The QFN packages had bridging on the initial SMT run. Adjusted the stencil thickness from 5 mil to 4 mil. Solved the issue for the rest of the batch.
Enclosure Fitment
The 3D printed SLA enclosures fit perfectly. Ready to authorize the hard tooling for injection molding.
Design
DSN-GTW-v2.1-Patch
Concept
Schematic Capture
PCB Layout
Review
Final Release
Details
Notes
Files
PCB Design Info
Design NameDSN-GTW-v2.1-Patch✎
Schematic Version2.1✎
PCB Layout FileGTW_Layout_v2.1.PcbDoc✎
CAD SoftwareAltium Designer✎
Thermal Simulation StatusPassed✎
Design OwnerAlan Turing✎
Approval StatusPending Review✎
Reviewer NameSenior Hardware Architect✎
Release Date--✎
Signal Integrity CheckComplete - Passing✎
Design Rule Check (DRC)0 Errors, 4 Warnings✎
Hardware & Enclosure Metadata
Number of Components215✎
Pin Count1450✎
FPGA UsedNone✎
Enclosure Dimensions120 x 80 x 35 mm✎
Waterproof RatingIP67✎
RF Certification TargetFCC Part 15✎
Shock/Vibration ToleranceIndustrial (5G RMS)✎
Weight Estimate340 grams✎
RoHS CompliantYes✎
Revision Historyv2.1 expands copper pour on LDO✎
DRC Warnings
The 4 DRC warnings are intentional clearance violations near the RF matching circuit. Approving these waivers based on the SI simulation results.
LDO Copper Pour Update
Expanded the top layer copper pour attached to the voltage regulator thermal pad by 40%. Added stitching vias to inner ground planes to act as a heat sink.
Component Swap
Swapped out the 10uF 0603 caps for 0805s on the 24V rail to meet the new voltage derating guidelines.
RMA
RMA-9102 - Firmware Brick
Requested
Received
Diagnosing
Rework/Replace
Closed
Details
Notes
Files
RMA Information
RMA NumberRMA-9102✎
Original Product NameSN-Gen1 Gateway✎
Serial NumberSN-GTW-004452✎
Batch CodeLOT-2025-Q4✎
RMA OwnerSupport Tech✎
RMA StatusBoard Rework✎
Warranty StatusIn Warranty✎
Defect CategoryFirmware Brick✎
Receipt DateMay 15, 2026✎
Date of PurchaseDec 01, 2025✎
Diagnostics & Resolution
Failure DescriptionUnit unresponsive after OTA update. Status LED solid red.✎
Field ApplicationOil Pump Monitoring✎
Diagnostic Tool UsedJTAG Debugger✎
Firmware at Failurev1.4.2✎
Technician NameBob Solder✎
Estimated Repair Cost$0 (Warranty)✎
Refund Amount$0✎
Replacement SentNo - Repairing✎
Resolution CodePending Rework✎
Closure Date--✎
JTAG Connection
The bootloader got corrupted during the OTA update due to a brief power failure on their end. I'm hooking it up to the JTAG to flash the bootloader manually.
Initial Triage
Verified unit draws standard standby power but processor does not wake. Confirmed solid red status LED. No physical burn marks or water damage detected.
Client Communication
Let David know we will just re-flash it here and ship it back, rather than sending a new unit. He is okay with the 1-week turnaround.
