Grid security requires constant vigilance. This template helps security vendors manage the lifecycle of physical security assessments, NERC CIP compliance consulting, and the deployment of advanced surveillance technology at critical substations and generating facilities.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Qualify inbound inquiries from utility security directors. Accounts
Manage utility clients, IPPs, and co-ops. Contacts
Track compliance officers and site security managers. Opportunities
Manage pipeline for perimeter defense and audit services. Campaigns
Track attendance at NERC CIP and physical security conferences. Sites
Log critical infrastructure locations and threat levels. Audits
Track compliance timelines, findings, and remediation. Hardware
Manage deployed cameras, sensors, and access controls.Lead
Marcus Vance
New
Contacted
Discovery
Qualified
Converted
Details
Notes
Files
Primary Information
Lead NameMarcus Vance✎
CompanyOakhaven Power Co-op✎
TitleDirector of Security✎
Phone(555) 234-5678✎
Utility Type
Electric Cooperative
✎
Lead OwnerRegional Sales✎
Lead Status
Contacted
✎
Lead Source
Webinar
✎
Interest Area
Perimeter Defense
✎
Rating
Warm
✎
Security Profile
Number of Sites
10-25 Substations
✎
NERC CIP Applicability
Medium Impact Assets
✎
Recent Security Incident
Copper Theft (Recent)
✎
Current Camera System
Legacy Analog (PTZ)
✎
VMS Integration Needed
Milestone Systems
✎
Access Control System
Standard Keypad/Fob
✎
Perimeter Fencing
Standard Chain Link
✎
Primary Challenge
False Alarms from Wildlife
✎
Budget Timeline
Next Fiscal Year (Q1)
✎
Site Audit Status
Requested Assessment
✎
Initial Inquiry
Marcus attended our "Reducing False Alarms in Substation Monitoring" webinar. They have 15 rural substations where their legacy motion sensors are constantly tripped by deer and coyotes, causing expensive false dispatch for security personnel.
Follow-up Call
Discussed our thermal cameras with AI classification. He is very interested but needs to know if the system integrates with their existing Milestone VMS. Confirmed full integration is supported.
Next Steps
Marcus requested a formal site assessment at their primary transmission substation to build a business case for the Q1 budget request. Scheduled for next Tuesday.
Account
Apex Power Grid
Details
Contacts
Opportunities
Sites
Audits
Hardware
Notes
Files
Account Overview
Account NameApex Power Grid✎
Phone(555) 888-9999✎
HeadquartersChicago, IL✎
Account Type
Investor-Owned Utility (IOU)
✎
Account OwnerEnterprise Sales✎
Client Status
Active Client
✎
NERC Region
MRO (Midwest)
✎
Fleet Size
100+ Substations
✎
Security & Compliance Profile
Primary Compliance Focus
CIP-014 (Physical Security)
✎
VMS Platform
Genetec Security Center
✎
Access Control Platform
LenelS2 OnGuard
✎
Current Service Level
Enterprise Master Agreement
✎
Preferred Integrator
Convergint Technologies
✎
SOC Monitoring
Internal GSOC (24/7)
✎
Latest Audit Finding
Clear (Passed last cycle)
✎
Primary Challenge
Integrating Legacy Sites
✎
Quarterly Business Review
Met with Elaine Brooks (CSO). They are very happy with the false-alarm reduction at North Hub since we installed the thermal analytics. They want a proposal to roll this out to 15 more substations (Phase 2) before the end of the year.
Audit Preparation Alert
Thomas Vance informed us they received notice for a regional NERC audit in early 2027. We need to ensure all camera maintenance logs and firmware version histories are exported and ready for his compliance binder.
Integrator Hand-off
Convergint has been selected as the prime contractor for the Phase 2 install. We will supply the hardware and software licenses directly to Apex, and Convergint will handle the labor. Needs to be structured carefully in the quote.
Contact
Thomas Vance
Details
Notes
Files
Contact Information
Contact NameThomas Vance✎
TitleDir of NERC Compliance✎
Phone(555) 888-1002✎
Contact OwnerCompliance Sales✎
Role in Buying Center
Economic Buyer
✎
Influence Level
High
✎
Preferred Contact Method
Email (Send Pre-reads)
✎
Professional & Industry Profile
Primary Responsibility
Audit Readiness & Policy
✎
Background / Experience
Former Auditor/Regulator
✎
Certifications
CPP (Certified Protection Pro)
✎
Key Value Driver
Avoiding Fines / Compliance
✎
Software Access Level
Reporting / Audit View Only
✎
Event Attendance
GridSecCon Frequent
✎
Audit Preparation Call
Thomas is heavily focused on the upcoming 2027 regional audit. He needs a standardized report format from our system that proves camera uptime and retention periods for all medium-impact sites. If we can automate this report, he will easily approve the Phase 2 expansion budget.
Budget Clarification
He clarified that physical security upgrades tied to compliance findings do not go through the standard IT procurement queue; he controls a separate CapEx budget specifically for CIP-014 remediation.
Introductory Meeting
Met Thomas at GridSecCon. He's a former regional auditor and is extremely knowledgeable. Do not try to use marketing fluff with him; stick to technical compliance mapping.
Opportunity
Phase 2: Thermal Perimeter Retrofits
Discovery
Site Walk / Design
Proposal
Negotiation
Closed Won
Details
Equipment List
Notes
Files
Opportunity Information
Opportunity NamePhase 2: Thermal Perimeter Retrofits✎
Amount$850,000✎
Close DateNov 30, 2026✎
Stage
Proposal
✎
Project Type
Hardware Rollout (Expansion)
✎
Opportunity OwnerEnterprise Sales✎
Probability60%✎
Forecast Category
Best Case
✎
Lead Source
Internal Expansion (QBR)
✎
Integrator Partner
Convergint Technologies
✎
Technical Scope & Logistics
Number of Sites
15 Substations
✎
Primary Hardware
Thermal/Optical PTZ Cameras
✎
Analytics Requirement
AI Human/Vehicle Classification
✎
Connectivity Assumption
Utility Private LTE (Cellular)
✎
VMS Integration
Existing Genetec Server
✎
Primary Value Driver
Reducing Guard Dispatch Costs
✎
Budget Source
CIP-014 CapEx Budget
✎
Hardware Lead Time Risk
Low (Items in Stock)
✎
Competitor Firm
Axis Communications
✎
Next Step
Review Proposal w/ CSO
✎
Proposal Delivered
Emailed the proposal to Elaine Brooks. Highlighted that the AI classification on the thermal cameras will eliminate 95% of the wildlife false alarms they are experiencing at these rural sites.
Integrator Alignment
Met with Convergint's project manager. They confirmed the $205k labor estimate covers all 15 sites, assuming Apex provides the bucket trucks for pole mounting. Added this assumption to the quote notes.
Site Walks Completed
Finished the virtual site walks using Google Earth and substation diagrams provided by Apex engineering. We determined 4 cameras per site provides 100% perimeter coverage.
Campaign
Reducing False Alarms Webinar
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameReducing False Alarms Webinar✎
Start DateOct 15, 2026✎
End DateOct 15, 2026✎
Type
Webinar
✎
Campaign OwnerMarketing Team✎
Status
Completed
✎
Budgeted Cost$2,500 (Zoom + Ads)✎
Expected Revenue$850,000 Pipeline✎
Targeting & Strategy
Target Audience
GSOC Managers / Ops Leads
✎
Theme/Topic Focus
AI Thermal Analytics
✎
Expected Response
Medium Volume (100-200)
✎
Geographic Target
National (US/Canada)
✎
Call to Action
Request Technical Demo
✎
Lead Routing
Regional Sales (Round Robin)
✎
Webinar Debrief
Solid turnout. We had 115 live attendees. The live demonstration of the thermal camera classifying a deer versus a human generated excellent questions in the Q&A.
Lead Import & Routing
All 115 attendees and 85 no-shows processed. 8 attendees clicked the 'Request Demo' CTA and were routed immediately to Regional Sales. The rest are entering the Q4 nurture sequence.
Content Repurposing
The product marketing team is clipping the animal-classification demo into a 30-second video for LinkedIn ads next month.
Protected Site / Facility
North Hub Substation
Site Survey
Design/Engineering
Installation
Commissioning
Monitored / Active
Details
Notes
Files
Site Identification
Site NameNorth Hub Substation✎
AddressCounty Road 14, Rural IL✎
Coordinates (Lat/Long)41.8781, -88.1042✎
Facility Type
Transmission Substation
✎
Site OwnerEnterprise Sales✎
Status
Monitored
✎
Risk Profile
High (CIP-014)
✎
Operating Voltage
345 kV
✎
Security Infrastructure
Perimeter Fencing
Anti-Climb / High Security
✎
Camera Coverage
Full Perimeter (Thermal)
✎
Access Control
Keypad + Card Swipe
✎
Lighting System
Motion Activated LED
✎
Intrusion Detection
AI Video Analytics
✎
Network Connectivity
Fiber Optic (Utility On-Net)
✎
Power Availability
120V AC at Perimeter Poles
✎
VMS Integration
Genetec Security Center
✎
Monitoring Center
Apex GSOC
✎
Last Maintenance Visit
Mar 15, 2026
✎
Installation Hand-off
The Phase 1 camera upgrade was successfully handed over. The AI thermal cameras are effectively ignoring the deer population while reliably tracking human movement near the fenceline. GSOC reports a 90% drop in false alarms.
Gate Controller Issue
The main gate access controller went offline after a lightning strike nearby. Raised a service ticket for the integrator to replace the surge suppressor board.
CIP-014 Audit Preparation
This site is in scope for the 2027 NERC audit. Verified that 90-day video retention is active on the local NVR and failover to the cloud is functioning.
Audit / Assessment
AUD-APX-2027-01
Details
Notes
Files
Audit Information
Audit IDAUD-APX-2027-01✎
Target Site/RegionRegional Fleet (MRO)✎
Audit Type
Official NERC CIP Audit
✎
Audit Start DateFeb 15, 2027✎
Audit OwnerCompliance Support✎
Status
Preparation Phase
✎
Auditor Entity
MRO (Midwest Reliability Org)
✎
Expected CompletionMar 15, 2027✎
Scope & Findings
Standard Focus
CIP-014 (Physical) & CIP-006
✎
Our Solution Scope
Camera Logs & Access Records
✎
Evidence Gathering %
40%
✎
Audit Outcome
Pending
✎
Mitigation Plan Required
No
✎
Data Request Kickoff
Thomas sent over the initial Reliability Standard Audit Worksheet (RSAW) for CIP-014. We need to pull the 90-day video retention logs and the preventative maintenance tickets for the North Hub cameras.
Mock Audit Strategy
Apex has engaged our consulting team to run a dry-run mock audit in December to ensure all documentation formats match MRO expectations.
Field Device
ACS-NH-MAIN
Provisioned
Installed
Online
Fault / Offline
Decommissioned
Details
Notes
Files
Device Information
Device IDACS-NH-MAIN✎
MAC Address / SN00:1A:2B:3C:4D:5E✎
Device Type
Gate Access Controller
✎
Manufacturer
LenelS2
✎
Hardware OwnerO&M Support✎
Operational Status
Offline (Fault)
✎
Hardware Model
LNL-2220 Intelligent Controller
✎
Firmware Version
v1.2.4
✎
Install DateMar 15, 2024✎
Network & Troubleshooting
IP Address
10.45.2.110
✎
Connectivity Type
Hardwired Ethernet
✎
VMS/PACS Integration
OnGuard
✎
Last Ping/Heartbeat
May 25, 2026 14:32
✎
Current Fault Code
ERR_POWER_LOSS
✎
Active Service Ticket
TKT-88902 (Dispatched)
✎
Power Loss Alert
The controller went offline immediately following a local lightning strike. The upstream PoE switch is still online, indicating the issue is localized to the access panel or its surge protector.
Integrator Dispatched
Convergint has been dispatched under the break/fix SLA. They are bringing a replacement surge board and a spare LNL-2220 controller. Gate is currently secured via physical padlock.


