Manage your commercial and residential glazing operations with precision. Track IGUs, storefront framing, curtain wall projects, and custom mirror installations. Keep your glaziers and estimators aligned to deliver accurate bids and flawless site executions.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track inbound requests for glass repair and installations. Accounts
Manage general contractors and property portfolios. Contacts
Store site managers, vendors, and client details. Opportunities
Estimate and bid on storefronts and curtain walls. Campaigns
Market custom shower doors and commercial retrofits. Projects
Track installation milestones and glazier scheduling. Measurements
Log site dimensions, laser scans, and framing specs. Fabrications
Track glass orders, tempering, and manufacturing.Lead
Robert Vance
New
Attempting Contact
Connected
Site Visit Scheduled
Estimating
Details
Notes
Files
Primary Lead Information
NameRobert Vance✎
CompanyVance Property Mgmt✎
Phone(555) 111-2222✎
Property TypeCommercial Office✎
Application TypeStorefront✎
Lead OwnerSarah Glaze✎
StatusNew✎
RatingHot✎
Preferred Glass TypeInsulated Glass Unit (IGU)✎
Expected Budget$15,000✎
Project Specs & Requirements
Rough Dimensions20ft x 10ft✎
Existing Glass StateShattered / Boarded Up✎
Preferred ScheduleASAP - Urgent✎
Framing ConditionNeeds Replacement✎
Lead SourceWeb Form✎
Hardware NeededFloor Closer & Panic Device✎
AccessibilityGround Floor Exterior✎
Union Labor RequiredNo✎
Permit RequiredUnknown✎
Glazing MethodDry Glazed✎
Follow-up PriorityHigh✎
Initial Inquiry
Client reports a shattered storefront glass panel due to a break-in. It is currently boarded up. They need a fast replacement.
Framing Damage
The mullions might be bent. Advised the client we need an estimator to do a proper site survey before ordering glass.
Hardware Upgrade Request
Client asked if we can install a new electric strike while we are replacing the glass and framing.
Account
Apex Builders
Details
Contacts
Opportunities
Projects
Measurements
Fabrications
Notes
Files
Account Information
Account NameApex Builders✎
Phone(555) 987-6543✎
Billing Address400 Construction Way, Metro City✎
Account TypeGeneral Contractor✎
IndustryConstruction✎
Contract StatusMaster Service Agreement Active✎
Account OwnerMike Smith✎
Credit Limit$150,000✎
RegionNorth District✎
Vendor TierTier 1 - Preferred✎
Payment TermsNet 30✎
Active StatusActive✎
SLA LevelStandard Support✎
MSA Renewal Requirements
Apex requires updated certificate of insurance before renewing our MSA next month. Need to have admin send the latest COI.
Site Supervisor Preferences
Dwight prefers early morning deliveries (before 7 AM) to avoid conflict with framing crews.
Billing Follow-up
Angela in AP needs all invoices submitted via their Procore portal, not just emailed.
Contact
Jim Halpert
Details
Notes
Files
Contact Information
Contact NameJim Halpert✎
TitleProject Manager✎
Phone(555) 123-1111✎
RolePrimary Contact✎
LocationMain Office✎
Contact OwnerMike Smith✎
Preferred ContactEmail✎
LanguageEnglish✎
Decision MakerYes✎
Site Access BadgeRequired for Tower C✎
Do Not CallNo✎
ActiveYes✎
Communication Preference
Jim handles all the scheduling changes for Apex. Email him directly if there is a delay in fabrication.
Pricing Discussions
He requires line-item breakdowns on all storefront proposals to match their internal cost codes.
Out of Office
Will be on vacation the second week of September. Route urgent Tower C issues to Dwight.
Opportunity
Apex - Riverfront Storefront
Discovery
Takeoff / Measurement
Quote Preparation
Proposal Presented
Negotiation
Contracting
Closed
Details
Line Items
Notes
Files
Opportunity Details
Opportunity NameApex - Riverfront Storefront✎
StageNegotiation✎
Amount$45,000.00✎
Close DateAug 15, 2026✎
Primary ApplicationStorefront Framing & Glass✎
Framing FinishClear Anodized✎
Square Footage1,250 sqft✎
Number of Units3 Elevations✎
Lift Equipment NeededScissor Lift✎
Site RestrictionsStreet Parking Only✎
Expected Start DateSep 15, 2026✎
Opportunity OwnerMike Smith✎
Probability85%✎
Next StepReview value engineering options✎
Lead SourceExisting Client✎
Glazing SystemDry Glazed✎
Glass Make-up1" IGU Low-E over Clear✎
Spacer TypeWarm Edge Black✎
Gas FillArgon✎
Hardware TypeConcealed Closer & Panic✎
Sealant ColorBlack✎
Installation MethodStandard Frame-In✎
CompetitorMetro Glass Co.✎
Value Engineering
Apex wants to knock $2k off the price. We offered to switch from Dark Bronze to Clear Anodized framing which will save them money and reduce lead times.
Site Condition
The curb isn't fully poured yet. Reminded Jim that we cannot perform final laser measurements until the concrete and rough openings are complete.
Hardware Change
Switched the door closers to concealed overhead per the designer's request. Updated the line items.
Campaign
Q3 Shower Enclosure Promo
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameQ3 Shower Enclosure Promo✎
TypeEmail✎
StatusIn Progress✎
Start DateAug 01, 2026✎
End DateSep 30, 2026✎
Budget$1,500✎
Target AudienceRecent Residential Clients✎
Campaign OwnerMarketing Team✎
Expected Revenue$20,000✎
Region FocusWest Suburbs✎
Material PromotedFrameless Heavy Glass✎
Lead Generation Target15 High Quality Leads✎
Actual Cost$800✎
Season FocusSummer Remodel✎
Offer Details
Offering 10% off hardware upgrades (handles, hinges) for any heavy glass frameless shower booked before September 30.
List Filtering
Filtered out any clients who already had a shower install in the last 5 years. Focusing on custom mirror clients who might want to upgrade their bathrooms.
Early Performance
Open rate is hovering around 24%. Two site visits already scheduled. Hardware discount seems to be a good hook.
Project
PRJ-845 - Office Partition Setup
Site Prep
Fabrication Pending
Installation Active
Punch List
Completed
Details
Notes
Files
Project Summary
Project NamePRJ-845 - Office Partition Setup✎
Start DateAug 01, 2026✎
Expected CompletionAug 15, 2026✎
Job Site AddressFloor 3, 400 Construction Way✎
Project OwnerOperations Team✎
StageInstallation Active✎
Project ManagerSarah Glaze✎
Glazier Crew LeadFrank Install✎
Permitting StatusPulled & Approved✎
Execution Logistics
Number of Floors1 (Floor 3 only)✎
Scaffold RequiredNo✎
Swing Stage RequiredNo✎
Prevailing WageNo✎
Final Inspection StatusPending✎
Weather Delays0 Days✎
Punch List StatusNot Started✎
Equipment RentalA-Frame Carts✎
Site Safety PlanSubmitted & Approved✎
Waste DisposalOn-Site Dumpster (GC)✎
Delivery Access
Freight elevator is only available from 5am - 7am for glass deliveries. A-frames must fit through standard double doors (72" width).
Framing Adjustment
The drywall opening on the north wall was 1/2" tighter than the shop drawings. We had to field-cut the aluminum track to fit.
Hardware Defect
One of the floor closers arrived leaking fluid. Submitted RM/re-order. Temp blocking door open for now.
Measurement
MSR-1080 - Exterior Mullion Check
Requested
Scheduled
On Site
Drafting / Modeling
Completed
Details
Notes
Files
Survey Details
Measurement NameMSR-1080 - Exterior Mullion Check✎
Date ScheduledAug 05, 2026✎
Site Address400 Construction Way✎
Contact on SiteDwight Schrute✎
Measurement OwnerSurvey Team✎
StatusScheduled✎
Accessibility IssuesMuddy Site / Needs Boots✎
Wall PlumbnessPending Check✎
Floor LevelnessPending Check✎
Technical Specifications
Rough Opening Count14✎
Field TechnicianTom Survey✎
Laser Scanner UsedYes - Leica 3D✎
Templates RequiredNo✎
Weather ConditionClear✎
Frame Modification NeededNo✎
Dimensions VerifiedPending✎
Special EquipmentHarness & Tie-Off Kit✎
Shop Drawings RequiredYes - Full Elevation✎
Client ApprovalPending Draft✎
Reschedule ReasonNone✎
Site Prep Warning
The GC said the steel lintels are placed, but fireproofing is still active. Need to wear full PPE.
Point Cloud Strategy
Will use the Leica scanner for the curved elevation on the south side. Standard tape is fine for the straight runs.
Clearance Issue Check
Make sure to check the clearance from the mullion face to the concrete column on Grid Line D. It looked tight on the architectural plans.
Fabrication Order
FAB-3042 - Tempered Partitions
Order Placed
In Production
In Transit
Received at Shop
Delivered to Site
Details
Notes
Files
Order Details
Fab Order NameFAB-3042 - Tempered Partitions✎
Vendor NameNational Glass Distributors✎
Order DateJul 10, 2026✎
Required Delivery DateAug 05, 2026✎
Material TypeTempered✎
Overall Thickness1/2" (12mm)✎
Glass CoatingClear✎
Fabrication OwnerProcurement Team✎
StatusIn Transit✎
Edge PolishFlat Polish (All Exposed Edge)✎
Tint ColorNone✎
Quantity14 Panels✎
Tempering RequiredYes✎
Lamination RequiredNo✎
Spacer TypeN/A (Monolithic)✎
Logistics & Tracking
Gas FillN/A✎
Framing PreparationHinge Notches (See CAD)✎
Delivery MethodVendor Truck to Site✎
Quality CheckPassed Factory QC✎
Freight CarrierNational Glass Direct Logistics✎
Damage ReportedNone✎
Delivery Update
Vendor called and confirmed the A-frame is loaded and on the truck. Expected at the site tomorrow by 8:00 AM.
Notch Verification
Double checked the CAD files for the CRL patch hardware cutouts. Vendor confirmed receipt of Revision 2 drawing.
Tempering Logo
Requested the tempering bug (logo) to be placed in the bottom right corner of all panels so they are consistent across the partition wall.


