Template Hub Template Hub

Sales Cloud Template for Glass and Glazing Services

Manage your commercial and residential glazing operations with precision. Track IGUs, storefront framing, curtain wall projects, and custom mirror installations. Keep your glaziers and estimators aligned to deliver accurate bids and flawless site executions.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Robert Vance

New
Attempting Contact
Connected
Site Visit Scheduled
Estimating
Details
Notes
Files

Primary Lead Information

NameRobert Vance✎
CompanyVance Property Mgmt✎
Phone(555) 111-2222✎
Property TypeCommercial Office✎
Application TypeStorefront✎
Lead OwnerSarah Glaze✎
StatusNew✎
RatingHot✎
Preferred Glass TypeInsulated Glass Unit (IGU)✎
Expected Budget$15,000✎

Project Specs & Requirements

Rough Dimensions20ft x 10ft✎
Existing Glass StateShattered / Boarded Up✎
Preferred ScheduleASAP - Urgent✎
Framing ConditionNeeds Replacement✎
Lead SourceWeb Form✎
Hardware NeededFloor Closer & Panic Device✎
AccessibilityGround Floor Exterior✎
Union Labor RequiredNo✎
Permit RequiredUnknown✎
Glazing MethodDry Glazed✎
Follow-up PriorityHigh✎
Initial Inquiry
Client reports a shattered storefront glass panel due to a break-in. It is currently boarded up. They need a fast replacement.
Created by Sarah Glaze • Aug 01, 2026
Framing Damage
The mullions might be bent. Advised the client we need an estimator to do a proper site survey before ordering glass.
Created by Sarah Glaze • Aug 01, 2026
Hardware Upgrade Request
Client asked if we can install a new electric strike while we are replacing the glass and framing.
Created by Sarah Glaze • Aug 02, 2026
◄ Back to Accounts List
Account

Apex Builders

Details
Contacts
Opportunities
Projects
Measurements
Fabrications
Notes
Files

Account Information

Account NameApex Builders✎
Phone(555) 987-6543✎
Billing Address400 Construction Way, Metro City✎
Primary ContactJim Halpert✎
Account TypeGeneral Contractor✎
IndustryConstruction✎
Contract StatusMaster Service Agreement Active✎
Account OwnerMike Smith✎
Credit Limit$150,000✎
RegionNorth District✎
Vendor TierTier 1 - Preferred✎
Payment TermsNet 30✎
Active StatusActive✎
SLA LevelStandard Support✎
MSA Renewal Requirements
Apex requires updated certificate of insurance before renewing our MSA next month. Need to have admin send the latest COI.
Created by Mike Smith • Aug 01, 2026
Site Supervisor Preferences
Dwight prefers early morning deliveries (before 7 AM) to avoid conflict with framing crews.
Created by Tom Survey • Jul 25, 2026
Billing Follow-up
Angela in AP needs all invoices submitted via their Procore portal, not just emailed.
Created by Admin Team • Jul 10, 2026
◄ Back to Contacts List
C
Contact

Jim Halpert

Details
Notes
Files

Contact Information

Contact NameJim Halpert✎
Account NameApex Builders✎
TitleProject Manager✎
Phone(555) 123-1111✎
RolePrimary Contact✎
LocationMain Office✎
Contact OwnerMike Smith✎
Preferred ContactEmail✎
LanguageEnglish✎
Decision MakerYes✎
Site Access BadgeRequired for Tower C✎
Do Not CallNo✎
ActiveYes✎
Communication Preference
Jim handles all the scheduling changes for Apex. Email him directly if there is a delay in fabrication.
Created by Mike Smith • Jun 12, 2026
Pricing Discussions
He requires line-item breakdowns on all storefront proposals to match their internal cost codes.
Created by Sarah Glaze • Jul 01, 2026
Out of Office
Will be on vacation the second week of September. Route urgent Tower C issues to Dwight.
Created by Mike Smith • Aug 01, 2026
◄ Back to Opportunities List
O
Opportunity

Apex - Riverfront Storefront

Discovery
Takeoff / Measurement
Quote Preparation
Proposal Presented
Negotiation
Contracting
Closed
Details
Line Items
Notes
Files

Opportunity Details

Opportunity NameApex - Riverfront Storefront✎
Account NameApex Builders✎
StageNegotiation✎
Amount$45,000.00✎
Close DateAug 15, 2026✎
Primary ApplicationStorefront Framing & Glass✎
Framing FinishClear Anodized✎
Square Footage1,250 sqft✎
Number of Units3 Elevations✎
Lift Equipment NeededScissor Lift✎
Site RestrictionsStreet Parking Only✎
Expected Start DateSep 15, 2026✎
Opportunity OwnerMike Smith✎
Probability85%✎
Next StepReview value engineering options✎
Lead SourceExisting Client✎
Glazing SystemDry Glazed✎
Glass Make-up1" IGU Low-E over Clear✎
Spacer TypeWarm Edge Black✎
Gas FillArgon✎
Hardware TypeConcealed Closer & Panic✎
Sealant ColorBlack✎
Installation MethodStandard Frame-In✎
CompetitorMetro Glass Co.✎
Value Engineering
Apex wants to knock $2k off the price. We offered to switch from Dark Bronze to Clear Anodized framing which will save them money and reduce lead times.
Created by Mike Smith • Aug 03, 2026
Site Condition
The curb isn't fully poured yet. Reminded Jim that we cannot perform final laser measurements until the concrete and rough openings are complete.
Created by Tom Survey • Aug 01, 2026
Hardware Change
Switched the door closers to concealed overhead per the designer's request. Updated the line items.
Created by Sarah Glaze • Jul 28, 2026
◄ Back to Campaigns List
C
Campaign

Q3 Shower Enclosure Promo

Details
Campaign Members
Notes
Files

Campaign Details

Campaign NameQ3 Shower Enclosure Promo✎
TypeEmail✎
StatusIn Progress✎
Start DateAug 01, 2026✎
End DateSep 30, 2026✎
Budget$1,500✎
Target AudienceRecent Residential Clients✎
Campaign OwnerMarketing Team✎
Expected Revenue$20,000✎
Region FocusWest Suburbs✎
Material PromotedFrameless Heavy Glass✎
Lead Generation Target15 High Quality Leads✎
Actual Cost$800✎
Season FocusSummer Remodel✎
Offer Details
Offering 10% off hardware upgrades (handles, hinges) for any heavy glass frameless shower booked before September 30.
Created by Marketing Team • Jul 25, 2026
List Filtering
Filtered out any clients who already had a shower install in the last 5 years. Focusing on custom mirror clients who might want to upgrade their bathrooms.
Created by Marketing Team • Jul 28, 2026
Early Performance
Open rate is hovering around 24%. Two site visits already scheduled. Hardware discount seems to be a good hook.
Created by Marketing Team • Aug 04, 2026
◄ Back to Projects List
P
Project

PRJ-845 - Office Partition Setup

Site Prep
Fabrication Pending
Installation Active
Punch List
Completed
Details
Notes
Files

Project Summary

Project NamePRJ-845 - Office Partition Setup✎
Account NameApex Builders✎
Opportunity NameApex - Retail Buildout✎
Start DateAug 01, 2026✎
Expected CompletionAug 15, 2026✎
Job Site AddressFloor 3, 400 Construction Way✎
Project OwnerOperations Team✎
StageInstallation Active✎
Project ManagerSarah Glaze✎
Glazier Crew LeadFrank Install✎
Permitting StatusPulled & Approved✎

Execution Logistics

General ContractorJim Halpert✎
Number of Floors1 (Floor 3 only)✎
Scaffold RequiredNo✎
Swing Stage RequiredNo✎
Prevailing WageNo✎
Final Inspection StatusPending✎
Weather Delays0 Days✎
Punch List StatusNot Started✎
Equipment RentalA-Frame Carts✎
Site Safety PlanSubmitted & Approved✎
Waste DisposalOn-Site Dumpster (GC)✎
Delivery Access
Freight elevator is only available from 5am - 7am for glass deliveries. A-frames must fit through standard double doors (72" width).
Created by Frank Install • Aug 01, 2026
Framing Adjustment
The drywall opening on the north wall was 1/2" tighter than the shop drawings. We had to field-cut the aluminum track to fit.
Created by Frank Install • Aug 04, 2026
Hardware Defect
One of the floor closers arrived leaking fluid. Submitted RM/re-order. Temp blocking door open for now.
Created by Sarah Glaze • Aug 05, 2026
◄ Back to Measurements List
M
Measurement

MSR-1080 - Exterior Mullion Check

Requested
Scheduled
On Site
Drafting / Modeling
Completed
Details
Notes
Files

Survey Details

Measurement NameMSR-1080 - Exterior Mullion Check✎
Account NameApex Builders✎
Date ScheduledAug 05, 2026✎
Site Address400 Construction Way✎
Contact on SiteDwight Schrute✎
Measurement OwnerSurvey Team✎
StatusScheduled✎
Accessibility IssuesMuddy Site / Needs Boots✎
Wall PlumbnessPending Check✎
Floor LevelnessPending Check✎

Technical Specifications

Rough Opening Count14✎
Field TechnicianTom Survey✎
Laser Scanner UsedYes - Leica 3D✎
Templates RequiredNo✎
Weather ConditionClear✎
Frame Modification NeededNo✎
Dimensions VerifiedPending✎
Special EquipmentHarness & Tie-Off Kit✎
Shop Drawings RequiredYes - Full Elevation✎
Client ApprovalPending Draft✎
Reschedule ReasonNone✎
Site Prep Warning
The GC said the steel lintels are placed, but fireproofing is still active. Need to wear full PPE.
Created by Mike Smith • Aug 01, 2026
Point Cloud Strategy
Will use the Leica scanner for the curved elevation on the south side. Standard tape is fine for the straight runs.
Created by Tom Survey • Aug 02, 2026
Clearance Issue Check
Make sure to check the clearance from the mullion face to the concrete column on Grid Line D. It looked tight on the architectural plans.
Created by Sarah Glaze • Aug 03, 2026
◄ Back to Fabrications List
F
Fabrication Order

FAB-3042 - Tempered Partitions

Order Placed
In Production
In Transit
Received at Shop
Delivered to Site
Details
Notes
Files

Order Details

Fab Order NameFAB-3042 - Tempered Partitions✎
Vendor NameNational Glass Distributors✎
Order DateJul 10, 2026✎
Required Delivery DateAug 05, 2026✎
Material TypeTempered✎
Overall Thickness1/2" (12mm)✎
Glass CoatingClear✎
Fabrication OwnerProcurement Team✎
StatusIn Transit✎
Edge PolishFlat Polish (All Exposed Edge)✎
Tint ColorNone✎
Quantity14 Panels✎
Tempering RequiredYes✎
Lamination RequiredNo✎
Spacer TypeN/A (Monolithic)✎

Logistics & Tracking

Gas FillN/A✎
Framing PreparationHinge Notches (See CAD)✎
Delivery MethodVendor Truck to Site✎
Quality CheckPassed Factory QC✎
Freight CarrierNational Glass Direct Logistics✎
Damage ReportedNone✎
Delivery Update
Vendor called and confirmed the A-frame is loaded and on the truck. Expected at the site tomorrow by 8:00 AM.
Created by Procurement Team • Aug 04, 2026
Notch Verification
Double checked the CAD files for the CRL patch hardware cutouts. Vendor confirmed receipt of Revision 2 drawing.
Created by Sarah Glaze • Jul 12, 2026
Tempering Logo
Requested the tempering bug (logo) to be placed in the bottom right corner of all panels so they are consistent across the partition wall.
Created by Sarah Glaze • Jul 10, 2026