Developing geothermal energy projects involves tracking complex subsurface data, navigating environmental permitting, and coordinating power purchase agreements. This CRM template is customized to help geothermal operators track resource leases, manage exploration drilling campaigns, and monitor active power plant generation.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track potential land leases and exploration rights. Accounts
Manage landowners, utilities, and drilling contractors. Contacts
Organize geologists, site managers, and regulators. Opportunities
Monitor Power Purchase Agreements (PPAs) and grants. Campaigns
Coordinate community outreach and investor relations. Leases
Manage surface and subsurface mineral rights agreements. Wells
Track production, injection, and observation well metrics. Plants
Monitor binary, flash, and dry steam facility operations.Lead
Eleanor Vance
New
Contacted
Discovery
Qualified
Converted
Details
Notes
Files
Primary Information
Lead NameEleanor Vance✎
Company / EntityVance Cattle Co.✎
TitleOwner✎
Phone(555) 345-6789✎
Target Interest
Land Lease (Exploration)
✎
Lead OwnerLand Acquisition✎
Status
Contacted
✎
Rating
Warm
✎
Lead Source
GIS Desktop Study
✎
Estimated Timeline
1 - 3 Years
✎
Resource & Site Details
Location (State/Region)Nevada (Churchill County)✎
Acreage Estimate4,500 Acres✎
Resource Type
Hydrothermal (Blind)
✎
Estimated Temperature
150°C - 200°C
✎
Surface Rights
Private (Fee Simple)
✎
Mineral/Geothermal Rights
Split Estate (Federal Minerals)
✎
Distance to Transmission
5 - 10 Miles
✎
Existing Data Available
Legacy Gravity/Mag Survey
✎
Environmental Sensitivity
Moderate (Sage Grouse Habitat)
✎
Potential Capacity (MWe)
20 MW - 50 MW
✎
Permitting Jurisdiction
BLM & State (NDOM)
✎
Initial Landowner Contact
Spoke with Eleanor. She is open to leasing the surface rights for a geophysics survey, but noted that the mineral rights are held by the BLM. We will need to nominate the parcels for the next BLM competitive lease sale.
Desktop Study Results
Geoscience team ran the play fairway analysis. Structural setting looks favorable (step-over fault). Found some legacy gravity data from a 1980s mineral survey that shows a distinct anomaly under the eastern pasture.
Transmission Check
There is a 120kV NV Energy line approximately 6 miles north of the property line. Substation capacity needs to be verified.
Account
Nevada Grid Alliance
Details
Contacts
Opportunities
Leases
Wells
Plants
Notes
Files
Account Information
Account NameNevada Grid Alliance✎
Phone(555) 777-8888✎
Location (City/State)Reno, NV✎
Account Type
Offtaker (Utility)
✎
Account OwnerOrigination✎
Status
Active PPA Customer
✎
Industry Sector
Electric Utility (IOU)
✎
Offtaker / Market Details
Clean Energy Mandate
RPS Goal (50% by 2030)
✎
PPA Capacity Under Contract
50 MW (Active)
✎
Resource Adequacy Value
High (Firm Baseload Need)
✎
Interconnection Territory
NV Energy Control Area
✎
Typical PPA Term Length
15 - 20 Years
✎
Market RFP Cycle
Annual Renewables RFP
✎
IRP Filing Update
Nevada Grid Alliance filed their Integrated Resource Plan (IRP) last week. They explicitly carved out a 150MW requirement for "firm, zero-carbon baseload" over the next 5 years. Huge opportunity for our EGS pipeline.
Curtailment Discussion
Met with Sarah Jenkins. During the spring "duck curve" they are asking if we have flexibility to turn down the Blue Mountain plant. Need to check our turbine turndown ratios with Ops.
Interconnection Queue
David Chen confirmed our Oakhaven project cleared the Phase 1 cluster study. No major network upgrades identified yet.
Contact
Marcus Wright
Details
Notes
Files
Contact Information
Contact NameMarcus Wright✎
TitleVP Procurement✎
Phone(555) 777-8881✎
Contact OwnerOrigination✎
Role in Buying Center
Economic Buyer
✎
Influence Level
High
✎
Preferred Contact Method
Email
✎
PPA & Offtake Preferences
Primary Interest
Firm, Dispatchable Base Load
✎
Price Sensitivity
Moderate (Values Reliability over Price)
✎
ESG/Carbon Goals
State Mandated RPS
✎
Contract Structure Pref
Physical PPA (Busbar)
✎
Technology Stance
Open to EGS / Advanced Tech
✎
Board / PUC Approval
Requires PUC Sign-off
✎
PPA Extension Discussion
Marcus indicated that if we can guarantee 95% availability on the Silver Peak plant, they will consider a flat $75/MWh extension rather than adding an annual escalator.
EGS Technology Appetite
Met for coffee during the Geothermal Rising Conference. He is tracking our Oakhaven EGS pilot closely. If we prove flow rates >40 kg/s, they want first right of refusal on the PPA.
Regulatory Hurdle
Marcus noted the PUC is becoming strict on long-term contracts. We need to ensure all environmental attributes (RECs) are bundled in future bids to pass the prudence review.
Opportunity
Silver Peak PPA Extension
Discovery
Proposal
Term Sheet / Term Sheet
Negotiation
Closed Won
Details
Pricing Model
Notes
Files
Opportunity Information
Opportunity NameSilver Peak PPA Extension✎
Close DateNov 30, 2026✎
Stage
Proposal
✎
Opportunity Type
PPA Extension
✎
Opportunity OwnerOrigination✎
Probability60%✎
Forecast Category
Pipeline
✎
Lead Source
Existing Asset Rollover
✎
Term Length
10 Years
✎
Estimated COD / Start Date
Jan 01, 2028 (End of current term)
✎
Contract & Pricing Details
Capacity (MW)
25 MW
✎
Est. Annual Generation
208,000 MWh
✎
Target PPA Price ($/MWh)
$75.00 Flat
✎
Annual Escalator
0% (Flat)
✎
Product Bundling
Energy + RECs + Capacity
✎
Delivery Point
Silver Peak Busbar
✎
Availability Guarantee
95% Mechanical Availability
✎
Curtailment Risk
Buyer Takes Economic Curtailment
✎
Credit Requirement
Letter of Credit (Standard)
✎
Competitor Firm
Utility Self-Build Solar/Storage
✎
Loss Reason
N/A
✎
Next Step
Draft Term Sheet
✎
Pricing Strategy Update
Met with Marcus. He confirmed that a flat $75/MWh all-in price (Energy+REC+Capacity) is palatable to the PUC for a 10-year term, provided we take the 95% availability guarantee.
Asset Management Input
Checked with Ops. The Silver Peak reservoir has shown 1% temperature decline over 5 years. They are confident the field can sustain 25MW net output for the 10-year term without requiring make-up injection wells.
Initial Proposal Drafted
Drafted the indicative term sheet. Forwarded to legal to review the liquidated damages clauses regarding the availability guarantee.
Campaign
Oakhaven Town Hall / Permitting Prep
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameOakhaven Town Hall / Permitting Prep✎
Start DateAug 01, 2026✎
End DateAug 31, 2026✎
Type
Public Relations
✎
Campaign OwnerGovt Affairs✎
Status
In Progress
✎
Budgeted Cost$15,000✎
Expected RevenueN/A (Risk Mitigation)✎
Targeting & Strategy
Target Audience
Local Residents & Officials
✎
Theme/Topic Focus
EGS Safety & Water Usage
✎
Expected Response
Medium (50 - 100 Attendees)
✎
Geographic Target
Oakhaven County, NV
✎
Call to Action
Provide Public Comment
✎
Associated Project
Oakhaven EGS Pilot
✎
Messaging Strategy Setup
The primary goal of this town hall is to get ahead of the NEPA public comment period for our EGS drilling permits. We need to clearly explain that stimulation does not equal fracking and that induced seismicity risks are negligible.
Water Rights Discussion
Ranchers (like Eleanor) are highly concerned about our consumptive water use during the drilling phase. The presentation must emphasize that we have secured closed-basin water rights and will not tap the agricultural aquifer.
Mailers Sent
Direct mail invitations were sent to all addresses within a 15-mile radius of the proposed pad site. Expecting 50-70 attendees at the Community Center next Thursday.
Land / Mineral Lease
NVN-098712 (Oakhaven Federal)
Nominated
Auction Won
Active (Primary Term)
Unitized
Producing (Held by Prod.)
Details
Notes
Files
Lease Information
Lease Name/SerialNVN-098712✎
Project AssociationOakhaven EGS Pilot✎
Lease Type
Federal Mineral (Geothermal)
✎
Acreage2,500 Acres✎
Lease OwnerLand Acquisition✎
Lease Status
Active (Primary Term)
✎
Effective DateJan 01, 2024✎
Expiration DateDec 31, 2033 (10-Yr Term)✎
County/State
Churchill County, NV
✎
Financials & Obligations
Annual Rental Rate$2.00 / Acre (Yrs 1-10)✎
Next Rental Payment DueJan 01, 2027✎
Royalty Rate (Gross)
1.75% (Federal Std)
✎
Bonus Bid Paid
$45,000
✎
Lithium / Byproduct Royalty
Not Included in Geo Lease
✎
Diligent Exploration Req
Required by Year 4 ($40/acre)
✎
Commercial Generation
Not Producing
✎
Unitization Status
Preparing Unit Agreement
✎
NEPA / EA Status
EA Approved for Exploration
✎
Surface Stipulations
No Surface Occupancy (NSO) - Sector B
✎
Diligent Exploration Reminder
We are entering Year 3 of the primary term. We need to either spend $40/acre in qualifying exploration expenditures next year or submit an intent to unitize to avoid paying the higher in-lieu fee.
NSO Stipulation Check
Geoscience wants to put the first slim hole in Sector B, but that area carries a No Surface Occupancy stipulation. We will have to drill directionally from the adjacent private parcel.
Rental Payment Cleared
Finance confirmed the Year 3 rental payment of $5,000 was wired to the ONRR successfully.
Geothermal Well
OH-14-22 (Production)
Details
Notes
Files
Well Identification
Well Name / APIOH-14-22✎
Well Type
Production
✎
Trajectory
Directional (S-Curve)
✎
Well OwnerOperations✎
Operational Status
Flowing
✎
Spud DateMay 10, 2025✎
Completion DateJul 15, 2025✎
Drilling Contractor
Apex Drilling Services
✎
Reservoir & Engineering Data
Measured Depth (MD)6,500 ft✎
True Vertical Depth (TVD)5,800 ft✎
Bottom Hole Temp (BHT)
185°C
✎
Producing Formation
Fractured Rhyolite
✎
Casing Program
9 5/8" Production Casing
✎
Flow Rate (Average)
65 kg/s
✎
Wellhead Pressure
120 psi
✎
Pump Type Installed
Line Shaft Pump (LSP)
✎
Scaling / Scaling Risk
Moderate (Calcite)
✎
Last Workover Date
Never (New Well)
✎
Pump Performance Review
The Line Shaft Pump has been operating smoothly for 12 months. Drawdown levels in the wellbore have stabilized. Flow rate steady at 65 kg/s.
Scale Inhibitor Change
Noticed slight calcite buildup near the wellhead during the monthly visual check. Adjusted the chemical inhibitor injection rate up by 5%. Will monitor.
Initial Flow Test Results
Initial 30-day flow test completed. Well exceeded expected capacity by 10%. Very clean fluid, low NCG (non-condensable gas) content.
Geothermal Power Plant
Blue Mountain Geothermal
Development
Construction
Commissioning
Operating
Decommissioning
Details
Notes
Files
Plant Specifications
Plant NameBlue Mountain Geothermal✎
Location (State)Nevada✎
Technology Type
Binary Cycle (ORC)
✎
Gross Capacity (MW)58 MW✎
Net Capacity (MW)50 MW✎
Plant OwnerAsset Management✎
Operational Status
Operating (Base Load)
✎
Commercial Operation DateJan 01, 2024✎
Turbine OEM
Ormat Technologies
✎
Working Fluid (Binary)
Isopentane
✎
Performance & Field Metrics
Current Availability Factor
98.5%
✎
Number of Production Wells
6 Active Wells
✎
Number of Injection Wells
4 Active Wells
✎
Total Field Flow Rate
850 kg/s
✎
Plant Inlet Temperature
165°C
✎
Cooling System Type
Air Cooled Condensers (ACC)
✎
Injection Pressure Strategy
Pumped Injection
✎
Lithium Co-Extraction
Evaluating DLE Pilot
✎
Next Scheduled Turnaround
April 2027
✎
Reservoir Decline Rate
1.2% Annually (Stable)
✎
Summer Heatwave Performance
The air cooled condensers are performing well despite ambient temps hitting 105F. We saw a slight derate to 48 MW net during the peak afternoon hours yesterday, which is within design specs.
DLE Pilot Discussion
The brine assay came back at 120 ppm Lithium. Engineering is evaluating if we can slipstream a Direct Lithium Extraction (DLE) pilot unit before the injection pumps without impacting pressure.
Make-up Well Strategy
Reservoir decline is holding steady at 1.2%. We will not need to drill a make-up production well until 2029 at the current depletion rate.