Geotechnical engineering requires precise tracking of site investigations, subsurface conditions, and foundation recommendations. This CRM template is built specifically for soil mechanics, foundation engineering, and site assessment consulting. Organize your boring logs, track lab testing, and manage foundation design parameters all in one place.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track inquiries for site investigations and soil testing. Accounts
Manage developers, structural engineers, and municipalities. Contacts
Organize project managers and lead designers. Opportunities
Monitor consulting contracts and boring proposals. Campaigns
Coordinate seminars on soil stabilization and foundations. Projects
Oversee active field explorations and lab testing phases. Boring Logs
Track drilling progress, SPT blow counts, and soil strata. Geotech Reports
Manage bearing capacity and settlement recommendations.Lead
Marcus Wright - Summit Developers
New
Contacted
Qualified
Pending RFP
Converted
Details
Notes
Files
Primary Information
First NameMarcus✎
Last NameWright✎
TitleProject Director✎
Lead Status
Contacted
✎
Project Category
Commercial High-Rise
✎
Lead OwnerDavid Miller✎
Phone555-102-3948✎
Client Type
Private Developer
✎
Desired Schedule
Immediate - Drilling ASAP
✎
Geotechnical Site Requirements
Primary Concern
Deep Foundation Feasibility
✎
Site Access Condition
Urban/Tight Clearance
✎
Est. Number of Borings
10 - 15
✎
Expected Boring Depth
100+ ft (To Bedrock)
✎
Budget Status
Evaluating Cost
✎
Priority Rating
High
✎
Known Geohazards
High Seismic Zone
✎
Building Max Loads
> 1,000 kips/column
✎
Project Acreage
2 - 5 Acres
✎
Lead Source
Referral
✎
City/State/ZipSan Francisco, CA 94105✎
Initial Meeting - Foundation Concerns
Met with Marcus regarding the proposed 30-story tower. The adjacent lot had issues with liquefaction during their seismic review. They need us to perform deep borings to bedrock to assess drilled shaft vs driven pile feasibility.
Logistics & Access
Site is currently an active parking lot in a dense urban area. We will need to coordinate utility locates (USA) carefully and use a track-mounted rig to maneuver around existing structures.
Coordination with Structural
Client requested we coordinate directly with their structural engineer (Apex Structural) to determine the exact boring locations based on the preliminary column grid.
Account
Apex Structural Engineering
Details
Contacts
Opportunities
Projects
Boring Logs
Geotech Reports
Notes
Files
Primary Information
Account NameApex Structural Engineering✎
Account Type
Structural Eng.
✎
Industry Sector
Commercial/Residential
✎
Billing CityChicago✎
Account OwnerLisa Chen✎
Phone555-882-9911✎
Websitewww.apex-structural.com✎
Consulting Business Details
Client Classification
Tier 1 - Strategic Partner
✎
Payment Terms
Net 30
✎
Delivery Method
Design-Bid-Build
✎
Annual Fee Volume
$500k - $1M
✎
Preferred Foundation Type
Drilled Shafts / Caissons
✎
Design Standard Preference
IBC / ASCE 7
✎
Active Status
Active Partner
✎
Quarterly Partner Meeting
Met with Frank to review the ongoing Riverfront project. They are happy with our turnaround times on the preliminary bearing capacity memos and want us to team up with them on the Medical Center bid.
Insurance Requirement Update
Apex has updated their sub-consultant requirements. We need to provide a new Certificate of Insurance (COI) with $2M professional liability (E&O) coverage before the next contract signing.
Drilling Logistics Coordination
Apex agreed to handle the traffic control and permits for the street-side borings on the upcoming project, saving us significant overhead.
Contact
Diane Nguyen
Details
Notes
Files
Contact Information
First NameDiane✎
Last NameNguyen✎
TitleSenior Associate✎
Contact Role
Design Lead
✎
Decision Authority
Technical Evaluator
✎
Project Phase Involvement
Design Development (DD)
✎
Contact OwnerLisa Chen✎
Phone555-882-9913✎
Mobile555-882-0044✎
Communication Pref
Email
✎
Discipline Preference
Deep Foundations
✎
Approval Frequency
Milestone Only
✎
Design Coordination Notes
Diane wants our geotech report to specifically address down-drag (negative skin friction) on the drilled shafts for the tower project, given the compressible clay layer found in boring B-2. We need to provide ultimate and allowable skin friction values.
Seismic Parameters
She requested a site-specific seismic response analysis rather than just the code-based Site Class D parameters to potentially optimize the structural steel tonnage.
Lunch & Learn Attendee
Diane attended our firm's Lunch & Learn on Liquefaction Mitigation techniques (stone columns/aggregate piers). She is highly interested in using ground improvement to avoid deep foundations on smaller adjacent structures.
Opportunity
Downtown Tower Geotech Investigation
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Contract Information
Opportunity NameDowntown Tower Geotech Investigation✎
Type
New Business
✎
Stage
Negotiation
✎
Service Type
Geotechnical Investigation
✎
Opportunity OwnerLisa Chen✎
Close Date10/15/2026✎
Amount$45,000✎
Probability (%)80%✎
Next StepFinalize drilling allowance✎
Contract Type
Lump Sum Estimate
✎
Consulting Scope Specifications
Project Scope
Deep Foundation Design
✎
Phase Alignment
Pre-Design / Due Diligence
✎
Building Classification
High-Rise Commercial
✎
Geotech Complexity
High - Liquefaction Potential
✎
Expected Boring Depth
120 feet (To Bedrock)
✎
Lead Source
Partner Firm Referral
✎
Design Standard
IBC 2021 / ASCE 7
✎
Delivery Method
Design-Bid-Build
✎
Drilling Access
Urban/Tight Clearance
✎
Laboratory Testing Req
Advanced (Triaxial/Consolidation)
✎
Competitor
Terracon
✎
Bid Status
Shortlisted
✎
Drilling Allowance Redline
Apex's PM returned our redlines regarding the drilling allowance. We agreed to an NTE (Not to Exceed) limit of $25k for the drilling portion based on estimated depth to bedrock. If rock is shallower, we bill less; if deeper, we issue a change order.
Scope Clarification
Updated the proposal to clarify that Phase I Environmental Site Assessment (ESA) is NOT included in our scope, per their request.
Shortlist Notification
Diane called to let us know we made the final two. Our proposed site-specific seismic response analysis (Site Class optimization) gave us the edge over Terracon.
Campaign
Seismic Site Response Webinar
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameSeismic Site Response Webinar✎
Type
Webinar
✎
Status
In Progress
✎
Is Active
Yes
✎
Campaign OwnerMarketing Team✎
Start Date10/01/2026✎
End Date10/01/2026✎
Budget Allocated
$2,500
✎
Targeting & Performance
Target Audience
Structural Engineers
✎
Expected Response
12%
✎
Campaign Objective
Lead Generation (New Bids)
✎
Actual Cost$1,150✎
Outreach Method
Digital / Email Invites
✎
Region Focus
West Coast (High Seismic)
✎
Presentation Dry Run
The engineering principles dry run went well. Need to add a slide breaking down the difference between Site Class D code values vs site-specific response spectrum benefits.
Target List Pulled
Pulled all contacts and leads in the West Coast region with active or past structural engineering projects. Sent the first email blast today.
PDH Credit Approval
We received approval from ASCE to offer 1.0 Professional Development Hour (PDH) for attendees of this webinar. This should drive up registration.
Project
PRJ-2026-001 (Riverfront Geotech Study)
Proposal / Planning
Field Exploration
Lab Testing
Report Drafting
Completed
Details
Notes
Files
Project Overview
Project NamePRJ-2026-001 (Riverfront Geotech Study)✎
Phase
Field Exploration
✎
Delivery Model
Design-Bid-Build
✎
Primary Service Type
Geotechnical Investigation
✎
Project ManagerLisa Chen✎
Start Date01/15/2026✎
Estimated Completion12/01/2027✎
Current Status
Active - Field Work
✎
CAD Standard
AutoCAD 2D (Site Plan)
✎
Contract Type
Lump Sum Estimate
✎
Geotechnical Specifics & Progress
Geology Setting
Alluvial Deposits over Bedrock
✎
Drilling Method
Mud Rotary
✎
Client Type
Structural Engineer
✎
Priority
High
✎
Site Address45 Riverfront Ave✎
Primary Design Target
Deep Foundation Parameters
✎
Shift Schedule Base
Standard Business Hours
✎
Review Cycle
Milestone Only
✎
Drilling Status
Rig on Site (50% Complete)
✎
Field Risk Warning
Medium - Shallow Groundwater
✎
Drilling Progress Update
The rig is on site and has completed 5 of the 10 planned borings. We hit groundwater shallower than expected (8 feet BGS) in B-2. Had to switch to mud rotary earlier than planned to keep the hole open.
Utility Clearance Passed
The private utility locator cleared all 10 boring locations. We had to offset B-4 by about 5 feet to avoid an unmarked abandoned telecom line.
Permit Approval Received
The city approved the street-use permit for the rig to park in the loading zone for borings B-9 and B-10. We are good to mobilize next week.
Boring Log
B-1045 - Riverfront Project
Scheduled
In Progress (Field)
Pending Lab Data
Review/QA
Finalized
Details
Notes
Files
Primary Boring Details
Boring IDB-1045✎
Boring Category
Deep Structural Boring
✎
Drill Rig Type
CME 55 (Track Mounted)
✎
Status
In Progress (Field)
✎
Location/Zone
Northwest Corner (Proposed Tower)
✎
Field GeologistDavid Miller✎
Drill Date08/02/2026✎
Sampling Method
Standard Penetration Test (SPT)
✎
Lab Testing Required
Yes - Pending Assign
✎
Surface Elevation14.5 ft (NAVD88)✎
Software Platform
gINT (Bentley)
✎
Strata & Field Findings
Current Depth65 ft (Ongoing)✎
Target Depth120 ft✎
Groundwater Depth (Encountered)8.5 ft BGS✎
Groundwater Depth (Static/24hr)Pending✎
Predominant Soil Type
Lean Clay (CL)
✎
Average SPT N-Value
12 blows/ft (Medium Stiff)
✎
Refusal Encountered?
No (Not Yet)
✎
Rock Core Recovery (REC)N/A✎
Rock Quality Designation (RQD)
N/A
✎
Field Issue Flag
Heaving Sand/Blowing In
✎
Drilling Condition - Heaving Sand
Encountered a loose, saturated sand layer at 45 feet that is heaving into the augers. We had to switch to mud rotary drilling techniques to maintain borehole stability and retrieve accurate SPT samples. Drilling is progressing slower than anticipated.
Shelby Tube Attempt
Attempted to push a Shelby tube in the soft clay layer at 35 feet, but recovery was poor (only 12 inches). Will try another push at 55 feet if clay is encountered again to get a good consolidation sample.
Utility Coordination Clear
Verified the marked gas line is a safe 15 feet away from this boring location. Began augering at 0800.
Geotech Report
RPT-0089 - Deep Foundation Recommendations
Analysis/Calcs
Draft Review
Pending EOR Signoff
Issued Draft to Client
Issued Final
Details
Notes
Files
Report Information
Report IDRPT-0089✎
Report Type
Comprehensive Geotechnical Report
✎
Primary Discipline
Deep Foundation Design
✎
Related Boring LogsB-1044, B-1045, B-1050✎
Primary AuthorLisa Chen✎
Engineer of Record (EOR)Frank Costello, PE✎
Draft Target Date08/15/2026✎
Final Due Date09/01/2026✎
Current Status
Draft Review
✎
Priority
High
✎
Engineering Recommendations
Primary System Rec.Drilled Shafts (End Bearing)✎
Allowable Bearing Capacity80 ksf (Bedrock)✎
Allowable Skin Friction1.5 ksf✎
Estimated Settlement< 0.5 inches✎
Groundwater Consideration
Casing/Slurry Req. for Drilling
✎
Seismic Site Class
Site Class D
✎
Liquefaction Risk
Moderate - Mitigation Req.
✎
Lateral Earth Pressure (At-Rest)60 pcf (Equivalent Fluid)✎
Subgrade Preparation
Overexcavate and Replace 2ft
✎
Software Tool Used
L-PILE & SHAFT
✎
Internal QA Review
I've reviewed the preliminary L-PILE runs. Because of the liquefiable layer between 20-35 feet, we must discount skin friction in that zone (down-drag effect). I've updated the tables in Section 5.0 to reflect this. Please have Frank review before we issue the draft.
Coordination Call with Structural
Called Diane at Apex. They confirmed that a maximum settlement of 0.5 inches is acceptable for their steel framing design. The end-bearing shafts into the bedrock easily meet this criteria.
Lab Testing Data Integrated
Received the final unconfined compressive strength tests for the rock cores from B-1044. The bedrock is very competent (Avg 4,500 psi). We can comfortably recommend 80 ksf allowable bearing.


