Fuel tank installation, testing, and compliance demand precise tracking of underground storage tanks (USTs), aboveground storage tanks (ASTs), piping configurations, and strict regulatory deadlines. This interactive template centralizes your pipeline from initial site surveys to tank removals, leak detection upgrades, and routine compliance testing.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Qualify retail gas stations, fleets, and municipal fueling depots. Accounts
Manage multi-site operators, contractors, and environmental firms. Contacts
Track facility managers, EHS directors, and local inspectors. Opportunities
Drive tank installations, line replacements, and removal projects. Campaigns
Execute compliance reminder mailers and service promotions. Facilities
Log physical site locations, canopy specs, and dispenser counts. Tanks
Track UST/AST specs, capacities, install dates, and materials. Compliance
Monitor line tightness tests, ATG certifications, and sump inspections.Lead
Robert Vance - Midwest Logistics Corp
New
Contacted
Site Survey Scheduled
Qualified
Converted
Details
Notes
Files
Primary Inquiry Information
NameRobert Vance✎
CompanyMidwest Logistics Corp✎
TitleFleet Operations Manager✎
Lead StatusSite Survey Scheduled✎
Service RequestedNew AST Installation✎
Lead SourceWebsite Form✎
Lead OwnerAlex Chen✎
Phone555-0199✎
Facility TypeFleet Depot✎
CityChicago✎
StateIL✎
Project Scope Details
Product TypeDiesel✎
Est. Tank Capacity (Gal)10,000✎
Tank OrientationHorizontal✎
Tank Material PrefDouble-Wall Steel✎
Dispenser ScopeSkid-Mounted Fleet Dispenser✎
Fuel Management System?Yes (Cardlock/FOB)✎
Spill/Overfill Prevention?Yes (Required)✎
Environmental AssessmentClear (New Site)✎
Target Install QuarterQ4 This Year✎
Permitting ResponsibilityWe Handle Permitting✎
Initial Discovery Call
Robert is expanding their delivery fleet and they are tired of paying retail diesel prices. They want a 10,000-gallon AST installed at their new Chicago hub. Need to verify local fire marshal setback requirements during the site survey.
Site Survey Scheduled
Scheduled our estimator to visit the site next Tuesday. Robert will provide the civil drawings for the new concrete pad.
Account
Express Mart LLC
Details
Contacts
Opportunities
Facilities
Tanks
Compliance
Notes
Files
Account Information
Account NameExpress Mart LLC✎
Account TypeRetail Fuel Operator✎
Fuel Brand FlagUnbranded (Independent)✎
Websiteexpressmart-il.example.com✎
Account OwnerJessica Vance✎
Phone555-8822✎
HQ CityPeoria✎
HQ StateIL✎
Portfolio & Operations Details
Total Facilities Maintained12✎
Total Active Tanks36✎
Preferred ATG SystemVeeder-Root TLS-450✎
Service Contract StatusActive (Compliance Plan)✎
Environmental AgencyIllinois EPA / OSFM✎
Risk ProfileMedium (Aging Infrastructure)✎
Store #04 Line Test Failure
The annual line test at Store #04 failed on the unleaded regular line. Suspect a bad fitting near the submersible turbine pump (STP). We locked out the pump and reported to Elena. Discussing full tank replacement since the fiberglass tanks are 28 years old anyway.
New Acquisition - Store #15
Marcus informed us they bought an old independent station in Normal, IL. They want us to inspect the tanks and upgrade the dispensers to EMV-compliant Wayne Ovations before reopening.
Contact
Elena Martinez
Details
Notes
Files
Contact Information
NameElena Martinez✎
TitleEnvironmental Compliance Mgr✎
Contact OwnerJessica Vance✎
Phone (Desk)555-8825✎
Mobile (24/7)555-9033✎
Project RoleCompliance/EHS Lead✎
Communication & Preferences
DepartmentEnvironmental / Safety✎
Influence LevelHigh✎
Class A/B Operator Cert?Yes✎
Preferred Contact MethodEmail✎
Do Not CallNo✎
Portal Access LevelCompliance Reports Only✎
Store 04 Notice of Violation Risk
Elena is highly stressed about the line test failure at Store 04. She needs our repair/replace proposal immediately so she can show the OSFM inspector that they are acting in good faith.
Portal Training
Walked Elena through our new customer portal where she can download all the annual line and leak detector test results directly. She loved it.
Opportunity
Store #04 UST Replacement (3 Tanks)
Discovery
Estimating/Site Walk
Proposal Delivered
Negotiation
Closed Won
Details
Line Items
Notes
Files
Project Information
Opportunity NameStore #04 UST Replacement (3 Tanks)✎
Project TypeUST Remove & Replace✎
StageNegotiation✎
Opportunity OwnerJessica Vance✎
Close DateNov 15, 2026✎
Probability (%)80%✎
Total Amount$425,000✎
Primary DriverFailed Compliance Test✎
Scope & Equipment
Tank Material QuotedFiberglass (FRP) Double-Wall✎
Total Tanks3✎
Total Capacity (Gal)30,000✎
Piping SystemFlexible Double-Wall✎
Dispensers Included?No (Reuse Existing)✎
Soil Remediation Est.Included Allowance ($15k)✎
ATG Upgrade Req?Yes (TLS-450)✎
Permit ResponsibilityWe Handle (OSFM/City)✎
Est. Duration (Weeks)3✎
CompetitorSeneca Companies✎
Pricing Negotiation
Marcus pushed back on the $425k total, saying Seneca came in at $405k. I reminded him that we included a $15k soil remediation allowance and Seneca likely excluded it. Waiting for him to review the fine print.
Expedited Proposal Delivery
Rushed the estimate through. The line leak means they are shut down on the unleaded side. High urgency to get this moving.
Opportunity Created from Failure
Converted from the failed line test at Store 04. Tanks are 28 years old; patching the line doesn't make sense. Pitching a full scrape and replace.
Campaign
Q3 Fleet AST Installation Promo
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameQ3 Fleet AST Installation Promo✎
StatusIn Progress✎
TypeEmail Outreach✎
Focus AreaNew Installations (AST)✎
Campaign OwnerMarketing Team✎
Start DateJul 01, 2026✎
End DateSep 30, 2026✎
Metrics & Tracking
Budgeted Cost$1,200✎
Actual Cost$850✎
Target Audience ProfileLogistics & Fleet Managers✎
Num Sent1,500✎
Responses28✎
Opportunities Created4✎
Mid-Campaign Review
The "Stop Paying Retail for Diesel" messaging is working well. We generated 4 solid leads for 10k ASTs so far. Alex Chen is working the Midwest Logistics lead now.
List Segmentation Issue
Accidentally included about 200 retail C-Store contacts in the first blast. Removed them for the follow-up wave.
Facility
Store #04 (Main St)
Proposed / Permitting
Under Construction
Open / Active
Under Renovation
Closed / Remediated
Details
Tanks
Compliance
Notes
Files
Location Details
Facility NameStore #04 (Main St)✎
StatusOpen / Active✎
Facility TypeRetail C-Store✎
State Facility ID (OSFM)FAC-88992✎
Forecourt & Equipment Configuration
Total Dispenser Count6 (12 Fueling Positions)✎
Dispenser Brand/ModelGilbarco Encore 700 S✎
POS SystemVerifone Commander✎
EMV Compliant?Yes✎
Total USTs on site3✎
ATG System InstalledVeeder-Root TLS-450✎
Pumping SystemSubmersible (STP)✎
Canopy Clearance14' 6"✎
Site Locked Out - Unleaded
Following the line test failure, we locked and tagged out the STPs for TNK-04-A and B. Diesel is still flowing. Awaiting customer signature on the replacement proposal.
Single Wall Tanks (Aging)
Noted during the ATG cert that these are 1998 vintage single-wall fiberglass tanks. They are approaching 30 years old and do not meet modern interstitial monitoring standards. High priority for a scrape/replace.
Storage Tank
TNK-04-A (Unleaded)
Proposed
In Service
Temporarily Out of Service
Permanently Closed
Removed
Details
Compliance Tests
Notes
Files
Tank Identity & Specs
Tank ID (Local)TNK-04-A (Unleaded)✎
State Registration #IL-UST-88992-01✎
StatusIn Service (Locked Out)✎
Product StoredUnleaded 87✎
Capacity (Gallons)12,000✎
Placement TypeUnderground (UST)✎
Tank MaterialFiberglass (FRP) Single-Wall✎
Piping MaterialFiberglass Single-Wall✎
Install DateMay 15, 1998✎
ManufacturerXerxes✎
Monitoring & Containment
Primary Leak DetectionATG (In-Tank)✎
Line Leak DetectionMechanical LLD✎
Overfill PreventionDrop Tube Shutoff Valve✎
Spill Containment Bucket?Yes (5-Gallon)✎
STP Sump Installed?Yes (Single-Wall)✎
Dispenser Sumps?No (Direct Bury)✎
Lockout / Tagout Applied
Following the line test failure, the STP breaker was locked out. Tank is isolated and cannot pump fuel until repairs or replacement is completed.
Single-Wall Risk
This is a 1998 single-wall system. A leak in the line means product went directly into the backfill. We are quoting a full removal and soil sampling.
Compliance Record
COMP-2026-08-S04-L1 (Line Tightness Test)
Scheduled
Test Performed
Failed (Action Req)
Repaired / Retested
Reported to Agency
Details
Notes
Files
Testing Details
Record IDCOMP-2026-08-S04-L1✎
Test TypeLine Tightness Test (0.1 gph)✎
Testing Equipment UsedAlert 8200 (Hasstech)✎
Date PerformedAug 10, 2026✎
Result StatusFailed✎
Technician NameJohn Davis✎
Technician License #IL-T-4492✎
Agency Reported DateAug 13, 2026✎
Testing Metrics
Test Pressure (psi)50.0✎
Duration (Minutes)45✎
Calculated Bleed Rate (gph)0.24✎
Pass/Fail Threshold (gph)0.10✎
Subsequent ActionSystem Locked Out✎
Test Failure Details
Pressurized the unleaded regular line to 50 psi. Pressure dropped steadily. Calculated bleed rate is 0.24 gph, well above the 0.1 gph allowable limit. Per OSFM regulations, immediately locked out the STP breaker. Notified store manager and our account rep.
OSFM Notification
Uploaded the failed test results to the Illinois OSFM portal. A 24-hour incident report was filed since this is a suspected release from a single-wall system.