Template Hub Template Hub

Sales Cloud Template for Flooring Installation

Welcome to the Trade Services Flooring Installation configuration layout. This setup streamlines tracking for material sourcing, subfloor preparation requirements, crew deployment, and final walkthroughs. By organizing project timelines and site-specific needs directly in the records, your dispatch team and installers remain aligned from the initial estimate to the final epoxy coating or LVP acclimation phase. Explore the environment to see how specialized fields map directly to your daily operations.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Sarah Jenkins - Main St Remodel

New Inquiry
Measurement Scheduled
Quote Provided
Converted
Details
Notes
Files

Primary Information

Lead NameSarah Jenkins✎
Phone555-019-3827✎
Company / ProjectMain St Remodel✎
Lead SourceWebsite Form✎
Lead StatusMeasurement Scheduled✎
Lead OwnerMark Davis✎
Site Address1240 Main St, Suite B✎
Preferred Contact MethodEmail✎
Flooring Type InterestLVP✎
UrgencyHigh✎
Square Footage1000 - 2500 sq ft✎

Job Requirements

Subfloor ConditionUnknown✎
Existing MaterialOld Carpet✎
Building TypeCommercial Office✎
Access RestrictionsNone✎
Budget Range$5k - $10k✎
Installation TimelineNext 30 Days✎
Demo RequiredYes - Full Demo✎
Dumpster Space AvailableYes - Driveway✎
Required PermitsNone✎
Lead RatingWarm✎
Initial Call Notes
Customer wants to replace aging carpet with durable LVP in the main office area. High traffic space.
Created by Mark Davis • August 1, 2026
Measurement Setup
Scheduled site measure for Thursday morning. Reminded them to clear small items from the corners.
Created by Sarah Smith • August 2, 2026
Material Inquiry
Sent digital catalog links for commercial grade 20-mil wear layer vinyl planks. Customer leaning towards grey tones.
Created by Mark Davis • August 3, 2026
◄ Back to Accounts List
Account

Apex Construction Group

Details
Contacts
Opportunities
Projects
Install Crews
Work Orders
Notes
Files

Account Information

Account NameApex Construction Group✎
Phone555-827-1192✎
IndustryConstruction✎
Account TypeGeneral Contractor✎
Account OwnerJohn Smith✎
Service RegionNorth Zone✎
Priority LevelCritical✎

Billing & Logistics

Billing Address400 Industrial Way, North City✎
Payment TermsNet 30✎
Tax StatusTaxable✎
Primary Delivery LocationSite Specific✎
Loading Dock AccessYes✎
Freight ElevatorN/A✎
Quarterly Review Meeting
Met with Bill Anderson to review upcoming pipeline. They have 4 new medical clinics breaking ground this year and want us to standardise the LVP specifications across all of them.
Created by John Smith • July 28, 2026
Safety Requirements Updated
Apex now requires all our install crews to have OSHA 30 certifications for commercial sites over 10,000 sq ft. Updated crew requirements accordingly.
Created by Lisa Wong • June 15, 2026
Invoice Processing Change
Karen in AP requested all progress billing invoices be submitted via their Procore portal rather than email. Noted on the billing file.
Created by Accounts Receivable • May 10, 2026
◄ Back to Contacts List
C
Contact

Bill Anderson

Details
Notes
Files

Contact Details

Contact NameBill Anderson✎
Related AccountApex Construction Group✎
Phone555-827-1193✎
Contact OwnerJohn Smith✎
TitleSenior Project Manager✎
DepartmentOperations✎
Role in ProjectDecision Maker✎

Preferences & Logistics

Preferred CommunicationEmail✎
Availability WindowMorning (8am-11am)✎
Site Access AuthorityFull Access Granter✎
Language PreferenceEnglish✎
Decision Maker StatusPrimary Sign-off✎
SMS Opt-InOpted In - Project Alerts Only✎
Site Meeting Summary
Bill is very particular about material staging. Wants all LVP pallets dropped inside the loading bay, not the street.
Created by John Smith • July 10, 2026
Communication Preference
Requested we only text him for urgent site access issues. Otherwise, standard email for change orders.
Created by Lisa Wong • June 02, 2026
Initial Intro
Met Bill at the GC networking event. He manages all healthcare builds for Apex in the North zone.
Created by John Smith • January 15, 2026
◄ Back to Opportunities List
O
Opportunity

Apex - Northside Medical LVP

Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files

Deal Information

Opportunity NameApex - Northside Medical LVP✎
Related AccountApex Construction Group✎
Amount$42,500.00✎
Close DateAugust 15, 2026✎
StageProposal✎
Lead SourceExisting Client✎
Opportunity OwnerJohn Smith✎
Next StepReview proposal with Bill✎
Win Probability60%✎
Deal TypeNew Construction Install✎
Competitor StatusBidding Against 2 Others✎
Payment ScheduleProgress Billing✎

Scope & Execution

Primary Flooring MaterialCommercial LVP✎
Estimated Square Footage5000 - 10000 sq ft✎
Moisture MitigationRequires Testing First✎
Baseboard ReplacementVinyl Cove Base✎
Adhesives NeededPressure Sensitive✎
Transitions NeededRubber Reducers✎
Subfloor Leveling RequiredSelf-Leveling Compound✎
Asbestos Testing StatusN/A - New Build✎
Furniture Moving RequiredNo - Empty Space✎
After-Hours InstallationNo - Standard Hours✎
Warranty TierCommercial 10-Year✎
Expected Margin35 - 40%✎
Pricing Negotiation
Bill asked if we can drop the labor rate by 10% if they handle all the floor sweeping and trash removal to their on-site dumpsters. Agreeable.
Created by John Smith • August 4, 2026
Material Availability
Checked with the distributor. Shaw LVP in the selected 'Grey Ash' color has plenty of stock. 3-day lead time to our warehouse.
Created by Procurement • August 1, 2026
Site Walkthrough Findings
Concrete slab looks very clean, just a few expansion joints that will need feathering before the LVP goes down.
Created by John Smith • July 25, 2026
◄ Back to Campaigns List
C
Campaign

Q3 Builder Outreach - Epoxy

Details
Campaign Members
Notes
Files

Campaign Overview

Campaign NameQ3 Builder Outreach - Epoxy✎
Start DateJuly 1, 2026✎
End DateSeptember 30, 2026✎
StatusIn Progress✎
Campaign OwnerSarah Smith✎
TypeB2B Outreach✎
Target AudienceGeneral Contractors✎
Regional FocusAll Zones✎

Metrics & Budget

Expected Response5%✎
Budget Allocation$5,000 - $10,000✎
Promotion ChannelCold Call & Email Combo✎
Material Discount CodeEPOXY15✎
Partner ManufacturerSherwin-Williams✎
Success MetricQualified Quotes Generated✎
Mid-Campaign Review
Epoxy outreach is performing well in the warehouse sector, but poorly with residential builders. Shifting the remaining call list to industrial GCs.
Created by Sarah Smith • August 1, 2026
List Upload Completed
Uploaded 400 new contacts from the local Builder Association directory. Tagged them all as 'Sent' for the initial email blast.
Created by Marketing Admin • July 01, 2026
Discount Code Setup
EPOXY15 code is live in the estimating software. Applies 15% off material cost for industrial resin floors only.
Created by Operations • June 28, 2026
◄ Back to Projects List
P
Project

PRJ-1024: Northside Med Install

Planning & Material Proc
Site Prep & Demo
Installation
Finishing & Trim
Walkthrough & Complete
Details
Notes
Files

Project Details

Project NamePRJ-1024: Northside Med Install✎
Related AccountApex Construction Group✎
Start DateAugust 20, 2026✎
Target CompletionSeptember 10, 2026✎
Project StatusPlanning✎
Site SupervisorBill Anderson✎
Project OwnerJohn Smith✎
Related OpportunityApex - Northside Medical LVP✎
Overall Progress10%✎
Weather DependencyNo (Indoor Install)✎
Noise RestrictionModerate (Office Hours)✎
Parking AvailabilityReserved Spaces Provided✎

Material & Labor

Main Flooring SKULVP-SHW-20 (Grey Ash)✎
Underlayment RequiredPre-attached to LVP✎
Sealer TypeN/A✎
Equipment NeedsFloor Scraper, Shop Vacs✎
Waste Disposal PlanGC Providing Dumpster✎
Crew Size Required4-5 Installers✎
Subcontractor UsedNo - In House Only✎
Specialty ToolsGuillotine Cutter for LVP✎
Material Delivery StatusScheduled for Warehouse✎
Site Prep Sign-OffPending Moisture Test✎
Staging Confirmation
Confirmed with Bill that we can drop pallets on August 19th inside the South loading bay. Must move them to the actual floor within 24 hours.
Created by Logistics Team • August 5, 2026
Crew Assignment
Assigned Beta LVP Specialists. Dave Johnson will be the lead on this project. He knows the Apex team well.
Created by Dispatch • August 2, 2026
Pre-Con Meeting
HVAC will be running 4 days prior to our start date, so acclimation won't be an issue. Concrete poured 90 days ago, so moisture should be fine, but we will test anyway.
Created by John Smith • July 30, 2026
◄ Back to Crews List
I
Install Crew

Beta LVP Specialists

Details
Notes
Files

Crew Roster & Info

Crew NameBeta LVP Specialists✎
Crew LeadDave Johnson✎
Phone555-901-2244✎
Start Time6:00 AM✎
Active StatusActive✎
Base RegionNorth Zone✎
Crew OwnerDispatch Mgr✎
Primary VehicleVan 04 (Sprinter)✎
Safety RatingExcellent (No Incidents)✎
Experience LevelMaster (10+ Years)✎
Overtime EligibilityApproved up to 10hrs/wk✎
Language SpokenBilingual (Eng/Spa)✎

Capabilities & Certifications

Carpet CertificationBasic✎
LVP CertificationMaster Installer✎
Tile & Stone CertificationNone✎
Epoxy CertificationNone✎
Hardwood CertificationAdvanced✎
Max Capacity Per Day1000 - 1500 sq ft✎
Tools InventoryFully Equipped✎
Insurance StatusValid - On File✎
Background Check StatusCleared (All Members)✎
Union AffiliationNon-Union✎
Vehicle Maintenance
Van 04 needs new brakes next month. Scheduled them for a light duty week during the shop days.
Created by Fleet Manager • July 20, 2026
Quality Review
Dave's crew has had zero callbacks in the last 6 months for LVP issues. Upgraded their status to Master Installers internally.
Created by Operations • June 15, 2026
Tool Replacement
Replaced their guillotine cutter blade today. Billed to internal overhead.
Created by Warehouse • May 10, 2026
◄ Back to Work Orders List
W
Work Order

WO-4501

Dispatched
On-Site
In Progress
Review / Punch List
Signed Off
Details
Notes
Files

Order Information

Work Order NumberWO-4501✎
Scheduled DateAugust 20, 2026✎
Time BlockFull Day (8am - 4pm)✎
WO StatusDispatched✎
PriorityHigh✎
WO OwnerDispatch Mgr✎
Related Install CrewBeta LVP Specialists✎
Service TypeMain LVP Install✎
Client PresentYes - GC Super Onsite✎
Access CodeSee GC Trailer✎
Power AvailableYes - Temp Power✎

Job Specifics & Sign-Off

Task 1 CategorySweep & Prep✎
Task 2 CategoryLay Planks✎
Floor Demo StatusCompleted Prior✎
Moisture ReadingPending AM Test✎
Leveling RequiredMinor Feathering✎
Acclimation VerifiedYes (48 Hrs)✎
Expansion Gaps CheckedPending Install✎
Cleanup MethodBroom Clean & Dumpster✎
Final WalkthroughPending✎
Customer SignaturePending✎
Dispatch Instructions
Crew is to check in at the main GC trailer before unloading. Steve Gomez is the super on duty. Ensure temp lighting is on before starting.
Created by Dispatch • August 5, 2026
Material Hand-off
Warehouse dropped the 6 pallets of LVP directly onto the slab yesterday. It is acclimating now. DO NOT open boxes until moisture test is done.
Created by Logistics • August 4, 2026
Safety Reminder
Hard hats and safety glasses required in this zone until the ceiling grid is finished next week.
Created by Safety Officer • August 1, 2026