Fire protection engineering firms need to manage complex life-safety designs, NFPA compliance, inspections, and AHJ submittals in one place. Track hazard classifications, sprinkler retrofits, and local fire marshal permitting without getting lost in disorganized spreadsheets. This template gives engineering teams a clear view of system designs and compliance deadlines to keep facilities safe and projects on track.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track incoming RFPs and building retrofit inquiries. Accounts
Manage property groups and municipal agencies. Contacts
Organize facility managers and code officials. Opportunities
Forecast sprinkler design and calculation projects. Campaigns
Coordinate compliance reminders and trade events. Inspections
Schedule and log NFPA 25 flow and alarm tests. Systems
Track installed suppression and alarm hardware details. Permits
Manage AHJ plan reviews and approval cycles.Lead
Robert Vance
New
Contacted
Qualified
Converted
Details
Notes
Files
Primary Information
First NameRobert✎
Last NameVance✎
TitleFacilities Director✎
CompanyVance Warehousing✎
Phone(555) 123-4567✎
Lead OwnerDavid Chen✎
StatusNew✎
RatingHot✎
Lead SourceWebsite RFP✎
Primary Service InterestSprinkler Design✎
Facility & Hazard Details
Building Size (sq ft)120,000✎
Hazard ClassificationStorage Hazard✎
Sprinkler Retrofit NeededYes✎
Occupancy TypeIndustrial / High-Pile✎
AHJ JurisdictionCounty Fire Marshal✎
Expected NFPA StandardNFPA 13✎
Water Supply Test NeededYes✎
Special Hazards PresentFlammable Liquids✎
Construction TypeType II (Non-Combustible)✎
Insurance Carrier ReqFM Global Standard✎
TimelineImmediate / Under Violation✎
Urgent Storage Rack Change
Client is upgrading to high-pile rack storage. The AHJ flagged their current density as insufficient for Class IV commodities. Needs immediate hydraulic calc evaluation.
Water Pressure Concerns
City main pressure has dropped in this area over the last 5 years. We will likely need to specify a fire pump. Require flow test ASAP.
Insurance Requirements
Client is insured by FM Global. Make sure design criteria meets FM data sheet 8-9 requirements, not just NFPA 13 baseline.
Account
Apex Properties
Details
Contacts
Opportunities
Inspections
Systems
Permits
Notes
Files
Account Information
Account NameApex Properties✎
Phone(555) 111-2222✎
Websitewww.apexproperties.example.com✎
Billing CityChicago✎
Property Management CoSelf-Managed✎
Total Managed Sq Ft2,500,000✎
Portfolio Risk LevelHigh-Rise Complex✎
Account OwnerSarah Jenkins✎
IndustryCommercial Real Estate✎
Account TypeDirect Facility Owner✎
Contract TypeAnnual Maintenance Retainer✎
Preferred AHJ LiaisonMichael Vance✎
Primary Suppression SystemWet Pipe✎
Master Service AgreementActive - Expires 2028✎
MSA Renegotiated
Apex locked in their MSA through 2028. Includes all NFPA 25 quarterly inspections and discounted rates on system design alterations.
Dry System Compressor Issues
The parking garage dry system compressor is short cycling. Maintenance team warned that if it fails, the valve will trip. Quoted a replacement.
Billing Preferences
Client requests all inspection invoices be split per building rather than one lump sum for the campus.
Contact
Marcus Wright
Details
Notes
Files
Contact Information
First NameMarcus✎
Last NameWright✎
TitleProject Manager✎
Phone(555) 123-4567✎
Site Access RequirementsOSHA 10 Required✎
Contact OwnerSarah Jenkins✎
DepartmentFacilities & Maintenance✎
Contact RoleDecision Maker✎
Communication PreferenceEmail✎
Certification RequirementPE Required for Sign-off✎
Primary FacilityApex Tower 2✎
FLS Director StatusCertified✎
Site Access Protocol
Marcus handles access badges for Tower 2. Inspectors need to email him 24 hours in advance to bypass security.
NFPA Code Knowledge
He is very sharp on NFPA 25 requirements but relies on us for NFPA 13 retrofit design rules. Walk him through calculations carefully.
Budget Approval
Marcus has signing authority up to $25k. Anything over requires Janet Lewis (Director of Facilities) approval.
Opportunity
Apex Tower 2 Sprinkler Retrofit
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Project Information
Opportunity NameApex Tower 2 Sprinkler Retrofit✎
Amount$145,000.00✎
Close Date8/15/2026✎
StageProposal✎
Probability70%✎
Project TypeRetrofit / Renovation✎
Building Footprint45,000 sq ft✎
Total Floors12✎
Ceiling Height10 ft✎
Riser ConfigurationCombined Standpipe✎
Pump RequirementExisting - Upgrade Needed✎
Opportunity OwnerSarah Jenkins✎
TypeExisting Client Expansion✎
Lead SourceFire Marshal Referral✎
Primary CompetitorJohnson Controls✎
Proposal StatusDelivered✎
Approval ProbabilityLikely✎
NFPA Code EditionNFPA 13 (2022)✎
Local Ordinance RequirementHigh-Rise Retrofit Ordinance✎
Fire Alarm Tie-InRequired - Addressable✎
Design Software PreferredAutoSPRINK✎
BIM Coordination RequiredYes - LOD 300✎
Submittal PhasePreliminary Design Review✎
Pump Sizing Clarification
The existing 500 GPM pump won't meet the new density demands for the upper floors. We need to specify a 750 GPM unit in the proposal.
BIM Coordination
Client is very strict about clash detection. Included LOD 300 modeling in AutoSPRINK to ensure no collisions with HVAC ducts.
Expediting Fees
Added $10k for expediting. The city is currently running 8 weeks behind on reviews, and they need this stamped by October.
Campaign
NFPA 25 Annual Reminder Q3
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameNFPA 25 Annual Reminder Q3✎
TypeEmail✎
StatusIn Progress✎
Start Date8/01/2026✎
End Date8/31/2026✎
Budgeted Cost$500.00✎
Target OccupancyCommercial Real Estate✎
Campaign OwnerMarketing Team✎
Expected Revenue$45,000.00✎
Actual Cost$120.00✎
Responses14✎
Delivery MethodMass Email✎
RegionState Level✎
Primary FocusClient Retention✎
Email Copy Approval
Copy emphasizes the liability of skipping annual flow tests. Approved by legal and sent out to the Q3 expiration list.
High Open Rate
We are seeing a 40% open rate. Property managers are very responsive to code violation warnings this year.
Follow-up Call List
Generated a list of "Clickers" for the service coordination team to cold call starting next week.
Inspection
INSP-2026-801
Scheduled
In Progress
Review
Completed
Details
Notes
Files
Inspection Details
Inspection NumberINSP-2026-801✎
Facility NameApex Tower 1✎
Inspection Date8/01/2026✎
Inspector NameMichael Vance✎
System Type TestedWet Pipe Sprinkler✎
Inspection OwnerService Department✎
StatusCompleted✎
Inspection CategoryRoutine Maintenance✎
FrequencyAnnual✎
Pass/FailPassed with Deficiencies✎
Deficiency SeverityNon-Critical✎
Technical Findings
NFPA 25 RequirementMet✎
Flow Test Result65 psi @ 1200 gpm✎
Main Drain PressureStatic 90 / Res 75✎
Valve StatusOpen & Secured✎
Alarm Panel ConditionNormal (No Faults)✎
AHJ Submission ReqYes - The Compliance Engine✎
Corrective Action NeededReplace 3 Painted Heads✎
Repair Estimate$450.00✎
Follow-up Date8/15/2026✎
Customer Sign-offObtained✎
Painted Heads Found
Found 3 sprinkler heads in the 3rd floor stairwell that were painted over by contractors. Tagged as a non-critical deficiency. Will quote replacement.
Main Drain Test Good
Main drain test showed no significant degradation in supply pressure compared to last year's report.
Submitted to TCE
Uploaded the final NFPA 25 report to The Compliance Engine for city review.
System
SYS-WET-Tower1
Design
Installation
Commissioned
Active Maintenance
Details
Notes
Files
Hardware Details
System IDSYS-WET-Tower1✎
System TypeWet Pipe Sprinkler✎
ManufacturerVictaulic / Tyco✎
Install Date5/12/2015✎
Zone CoverageFloors 1-6✎
System OwnerService Department✎
StatusActive Maintenance✎
Condition RatingGood✎
Last Service Date8/01/2026✎
Next Required Service8/01/2027✎
Warranty ExpirationExpired✎
Specifications
Flow Rate (GPM)1250 GPM✎
Pipe MaterialSchedule 40 Steel✎
Head TypeQuick Response Pendent✎
Hazard LevelLight Hazard✎
Backup Power ConnectedYes✎
Monitoring CompanySimplexGrinnell✎
FDC LocationSouth Wall / Main Ent.✎
Tamper Switch StatusWired and Active✎
Antifreeze PresentNo✎
System NotesRiser located in basement mech room.✎
Internal Piping Exam Due
The 5-year internal piping examination will be due next year (2027). Add this to the next contract renewal discussion.
Tamper Switch Replacement
Replaced the OS&Y tamper switch on the main control valve during the annual inspection. Wired into module A4.
Hydraulic Placard
Hydraulic placard on the riser is faded but legible. Design density is 0.10 gpm/sq ft over 1500 sq ft.
Permit
PRM-26-881
Drafting
Submitted
AHJ Review
Approved
Details
Notes
Files
Permit Details
Permit NumberPRM-26-881✎
Permit TypeSprinkler Alteration✎
StatusApproved✎
Submission Date6/15/2026✎
Permit OwnerDavid Chen✎
Fire Marshal AssignedCapt. Reynolds✎
Expedited ProcessingYes✎
Submittal FormatElectronic Portal✎
Hydrant Flow Data IncludedYes - Recent within 1 yr✎
Review & Approvals
Review CycleCycle 2✎
AHJ NameCity Fire Dept✎
Plan CheckerJim Henderson, PE✎
Review NotesApproved with standard conditions.✎
Re-submittal Date7/10/2026✎
Calculation SoftwareAutoSPRINK✎
Stamping EngineerDavid Chen, PE✎
Fee Amount$850.00✎
Payment StatusPaid✎
Approval Date7/25/2026✎
Expiration Date7/25/2027✎
Cycle 1 Corrections
City rejected Cycle 1 because the pump curve data was missing from the hydraulic calcs. We appended the data and resubmitted on 7/10.
Expediting Success
Paid the $200 expediting fee via the portal. Review turnaround was reduced from 4 weeks to 2 weeks.
Approval Conditions
Approved. Condition: Hydrostatic test must be witnessed by Capt. Reynolds prior to ceiling grid installation.