Managing complex engineering projects requires precise tracking of project phases, resource allocation, and document control. This preconfigured workspace organizes proposals, technical specifications, and client engagements in a single system. From initial site surveys and RFP responses to structural delivery, maintain clear visibility over engineering milestones and ensure no critical deadlines are missed.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
L Leads
Track incoming inquiries for structural and civil design.A Accounts
Manage developers, agencies, and partner firms.C Contacts
Store project managers, directors, and principals.O Opportunities
Manage pipeline for feasibility studies and design.C Campaigns
Coordinate technical webinars and industry trade shows.P Projects
Track ongoing structural, MEP, and civil assignments.S Site Surveys
Monitor geotechnical and boundary field assessments.R RFPs
Manage complex municipal and private proposal bids.Interactive Template Below
L
Leads
| Name | Company | Role | Status | Preference | Owner |
|---|---|---|---|---|---|
| Robert Vance | Apex Civil Group | Principal | New | Mark Benson | |
| Lydia Chen | Horizon Energy | Project Manager | Contacted | Phone | Mark Benson |
| Derek Stone | Midwest Structural | Director | Qualified | Sarah Croft | |
| Evelyn Davis | Riverfront Developments | VP Construction | New | Sarah Croft | |
| Tom Patel | Metro Transit Authority | Procurement | Contacted | Phone | Mark Benson |
L
Lead
Robert Vance
New
Contacted
Qualified
Converted
Details
Notes
Files
Primary Lead Information
Lead NameRobert Vance✎
CompanyApex Civil Group✎
RolePrincipal✎
Contact PreferenceEmail✎
Lead SourceTrade Show✎
Lead OwnerMark Benson✎
Lead StatusNew✎
Discipline InterestStructural✎
RegionMidwest✎
UrgencyHigh✎
Budget StatusPending Approval✎
Engineering Requirements
Project TypeCommercial High-Rise✎
Estimated Square Footage100,000 - 250,000✎
Delivery MethodDesign-Bid-Build✎
Current PhaseFeasibility Study✎
Sustainability GoalLEED Silver✎
SectorPrivate✎
Procurement TypeDirect Select✎
Competitor PresenceLow✎
Authority LevelDecision Maker✎
Next StepSend Capability Statement✎
Met at Midwest Structural Expo
Robert stopped by the booth. They are looking for a structural engineering partner for an upcoming 15-story commercial build in Chicago.
Created by Mark Benson • July 28, 2026
Follow-up Call
Confirmed budget is pending final zoning approval. They will know by mid-August. Wants our structural capability statement.
Created by Mark Benson • July 30, 2026
LEED Requirements
City mandates LEED Silver minimum. Emphasize our green building portfolio in the next correspondence.
Created by Mark Benson • July 31, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| BusinessCard_RVance.jpg | JPG | 1.2 MB | July 28, 2026 |
| Capability_Statement_Structural_2026.pdf | 4.5 MB | July 30, 2026 | |
| Preliminary_Site_Plan.pdf | 8.9 MB | July 31, 2026 |
A
Accounts
| Account Name | Industry | Region | Type | Owner |
|---|---|---|---|---|
| Apex Civil Group | Construction | Midwest | Partner | Mark Benson |
| Midwest Structural | Engineering | Midwest | Competitor | Sarah Croft |
| Metro Transit Authority | Government | Northeast | Client | Mark Benson |
| Riverfront Developments | Real Estate | Southwest | Client | Sarah Croft |
| Horizon Energy | Utilities | West Coast | Client | Mark Benson |
A
Account
Metro Transit Authority
Details
Contacts
Opportunities
Projects
Site Surveys
RFPs
Notes
Files
Account Information
Account NameMetro Transit Authority✎
Partnership LevelStrategic✎
Industry SectorGovernment✎
Account OwnerMark Benson✎
Account TypeClient✎
Client SizeEnterprise✎
Billing RegionNortheast✎
Partnership Details
TierTier 1✎
Preferred DeliveryDesign-Bid-Build✎
Contract TypeMaster Services Agreement✎
Engagement StatusActive✎
Payment TermsNet 60✎
Risk ProfileLow✎
C Contacts
| Name | Title | Phone | |
|---|---|---|---|
| Tom Patel | Procurement Director | [email protected] | (555) 341-9988 |
| Susan Wright | Chief Engineer | [email protected] | (555) 341-9989 |
| Gary Lewis | Project Manager | [email protected] | (555) 341-9990 |
| Nina Boyd | Compliance Officer | [email protected] | (555) 341-9991 |
| Chris Hall | Facilities Director | [email protected] | (555) 341-9992 |
O Opportunities
| Opportunity Name | Stage | Amount | Close Date |
|---|---|---|---|
| Transit Center Feasibility | Proposal | $45,000 | Sep 15, 2026 |
| Substation MEP Design | Closed Won | $120,000 | Jan 10, 2026 |
| Rail Yard Structural Audit | Discovery | $65,000 | Oct 01, 2026 |
| Station Canopy Retrofit | Negotiation | $88,500 | Aug 30, 2026 |
| Phase 1 Bridge Inspection | Closed Lost | $35,000 | Mar 22, 2026 |
P Projects
| Project Name | Status | Primary Discipline | Completion Date |
|---|---|---|---|
| Substation Upgrade | In Progress | MEP | Dec 01, 2026 |
| Downtown Tunnel Rehab | Design Phase | Civil | May 15, 2027 |
| Station Elevator Modernization | Bidding | Structural | Nov 30, 2026 |
| Bus Depot Expansion | Completed | Civil | Feb 10, 2026 |
| Platform Extension Design | Completed | Structural | Oct 12, 2025 |
S Site Surveys
| Survey ID | Project | Type | Status |
|---|---|---|---|
| SURV-1011 | Substation Upgrade | Boundary | Completed |
| SURV-1045 | Downtown Tunnel Rehab | Geotechnical | Scheduled |
| SURV-1062 | Station Elevator Modernization | Utility Markout | Field Work |
| SURV-0988 | Bus Depot Expansion | Topographic | Completed |
| SURV-0912 | Platform Extension Design | Structural Assessment | Completed |
R RFPs
| RFP Name | Service Requested | Due Date | Status |
|---|---|---|---|
| State Transit Expansion RFP | Civil Design | Oct 15, 2026 | Drafting |
| Annual Bridge Inspection | Structural | Sep 01, 2026 | Submitted |
| Substation MEP Task Order | MEP Design | Jan 05, 2026 | Won |
| Tunnel Feasibility Study | Geotechnical | Aug 10, 2026 | Submitted |
| Bus Depot Paving Bid | Civil Design | Dec 10, 2025 | Won |
MSA Renewal Complete
The Master Services Agreement has been renewed for another 3 years. Net 60 terms remain in effect.
Created by Mark Benson • Jan 10, 2026
New Procurement Portal
MTA is moving to a new vendor portal. All future RFPs must be submitted via the digital system rather than hard copies.
Created by Proposal Team • April 22, 2026
DBE Requirements Updated
For all transit projects in 2026, the Disadvantaged Business Enterprise (DBE) participation goal has been increased to 25%.
Created by Mark Benson • July 15, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| MTA_MSA_Executed_2026.pdf | 3.1 MB | Jan 12, 2026 | |
| Vendor_Portal_Instructions.pdf | 420 KB | April 22, 2026 | |
| DBE_Compliance_Guidelines.pdf | 1.8 MB | July 15, 2026 |
C
Contacts
| Name | Account | Title | Owner | |
|---|---|---|---|---|
| Tom Patel | Metro Transit Authority | Procurement Director | [email protected] | Mark Benson |
| Sarah Croft | Midwest Structural | Principal Engineer | [email protected] | Mark Benson |
| Susan Wright | Metro Transit Authority | Chief Engineer | [email protected] | Mark Benson |
| Gary Lewis | Metro Transit Authority | Project Manager | [email protected] | Mark Benson |
| Evelyn Davis | Riverfront Developments | VP Construction | [email protected] | Sarah Croft |
C
Contact
Tom Patel
Details
Notes
Files
Contact Information
Contact NameTom Patel✎
Office LocationHeadquarters✎
Engagement LevelHigh✎
Contact OwnerMark Benson✎
Decision RoleBudget Owner✎
DepartmentProcurement✎
Seniority LevelDirector✎
Professional Details
Lead SourceRFP Database✎
Preferred ContactEmail✎
Tech DisciplineN/A✎
Comm FrequencyMonthly✎
CertificationNone✎
Primary InterestContract Compliance✎
Strict on deadlines
Tom handles all RFP compliance checks. If a proposal is 1 minute late or misses a form, he will disqualify it. No exceptions.
Created by Proposal Team • July 22, 2026
DBE Advocate
He strongly favors proposals that exceed the 25% DBE requirement. Mention our JV partnerships in all covers letters addressed to him.
Created by Mark Benson • May 14, 2026
Out of office
Tom is usually out of the office on Fridays. Direct urgent procurement questions to his deputy, Nina Boyd.
Created by Admin • Dec 10, 2025
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Tom_Patel_Contact_Card.vcf | VCF | 5 KB | May 10, 2026 |
| Procurement_Guidelines_2026.pdf | 1.4 MB | May 12, 2026 | |
| NDA_Signed_TPatel.pdf | 900 KB | July 22, 2026 |
O
Opportunities
| Opportunity Name | Account Name | Amount | Stage | Close Date | Owner |
|---|---|---|---|---|---|
| Transit Center Feasibility | Metro Transit Authority | $45,000 | Proposal | Sep 15, 2026 | Mark Benson |
| Substation MEP Design | Metro Transit Authority | $120,000 | Closed Won | Jan 10, 2026 | Mark Benson |
| High-Rise Structural Design | Riverfront Developments | $250,000 | Discovery | Oct 01, 2026 | Sarah Croft |
| Campus HVAC Upgrades | Horizon Energy | $185,500 | Negotiation | Aug 30, 2026 | Mark Benson |
| Phase 1 Bridge Inspection | Metro Transit Authority | $35,000 | Closed Lost | Mar 22, 2026 | Mark Benson |
O
Opportunity
Transit Center Feasibility
Discovery
Proposal
Negotiation
Closed Won
Closed Lost
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NameTransit Center Feasibility✎
Amount$45,000.00✎
Close DateSep 15, 2026✎
StageProposal✎
Project TypePublic Infrastructure✎
Opportunity OwnerMark Benson✎
Probability50%✎
Forecast CategoryPipeline✎
Engineering DisciplineCivil✎
ComplexityHigh✎
Delivery ModelDesign-Bid-Build✎
Project Scope & Details
Lead SourceRFP Database✎
RFP RequiredYes✎
Subconsultant NeedGeotech✎
Drafting SoftwareCivil 3D✎
Proposal FormatDigital PDF✎
Contract StructureFixed Fee✎
Risk LevelModerate✎
Permitting ScopeState & Local✎
Site ConditionBrownfield✎
Funding SourceMunicipal Bond✎
Payment TermsNet 60✎
Loss Reason--✎
P Line Items
| Service Name | Code | Hours (Est) | Hourly Rate | Total Price | Discipline |
|---|---|---|---|---|---|
| Civil Feasibility Study | CIV-FEAS | 120.00 | $150.00 | $18,000.00 | Civil |
| Geotechnical Review | GEO-REV | 40.00 | $175.00 | $7,000.00 | Geotech |
| Traffic Impact Analysis | TRF-IA | 80.00 | $150.00 | $12,000.00 | Traffic |
| Conceptual Renderings | CAD-RND | 64.00 | $125.00 | $8,000.00 | Drafting |
Subconsultant Quotas
Because this is MTA funded, we must hit a 25% DBE goal. I've allocated the Traffic Impact Analysis to Smith & Associates to meet the requirement.
Created by Mark Benson • July 25, 2026
Site Condition Challenge
The current site has an active bus depot. We need to account for phased feasibility studies so we don't interrupt their traffic. Added hours for staging plans.
Created by Sarah Croft • July 23, 2026
Presentation Format
Tom prefers high-level graphics in the executive summary. Have the CAD team generate 3D conceptual renderings for the cover page.
Created by Mark Benson • July 24, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Feasibility_Draft_v2.pdf | 5.5 MB | July 25, 2026 | |
| Subconsultant_Quotes.zip | ZIP | 12.4 MB | July 24, 2026 |
| MTA_RFP_Requirements.pdf | 2.1 MB | July 23, 2026 |
C
Campaigns
| Campaign Name | Status | Type | Start Date | Owner |
|---|---|---|---|---|
| Q3 Structural Standards Webinar | In Progress | Webinar | July 01, 2026 | Marketing Team |
| Municipal RFP Outreach | Planned | Aug 15, 2026 | Marketing Team | |
| Q2 Civil Engineering Expo | Completed | Trade Show | May 10, 2026 | Marketing Team |
| Green Energy Design Mailer | In Progress | Direct Mail | June 01, 2026 | Marketing Team |
| MEP Retrofit Newsletter | Planned | Content Sync | Sep 01, 2026 | Marketing Team |
C
Campaign
Q3 Structural Standards Webinar
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameQ3 Structural Standards Webinar✎
Start DateJuly 01, 2026✎
End DateSep 30, 2026✎
TypeWebinar✎
Campaign OwnerMarketing Team✎
StatusIn Progress✎
Target SectorReal Estate Developers✎
Region FocusNational✎
Performance & Targeting
InitiativeLead Generation✎
Content TypeRegulatory Update✎
Lead Gen Goal150 SQLs✎
Budgeted Cost$5,000.00✎
Actual Cost$4,200.00✎
Expected Revenue$150,000.00✎
M Campaign Members
| Name | Company | Status | Type |
|---|---|---|---|
| Robert Vance | Apex Civil Group | Attended | Lead |
| Sarah Croft | Midwest Structural | Registered | Contact |
| Evelyn Davis | Riverfront Developments | Attended | Lead |
| Tom Patel | Metro Transit Authority | No Show | Contact |
| Lydia Chen | Horizon Energy | Registered | Lead |
High registration rate
The new IBC (International Building Code) updates are driving record attendance. We should create a follow-up checklist PDF outlining the changes.
Created by Marketing Team • July 10, 2026
Speaker Confirmed
Our lead structural engineer, David Hall (PE), is confirmed to present the technical segment.
Created by Marketing Team • June 15, 2026
Lead follow-up script
Distributed the call script to sales. The focus is to convert attendees into structural design opportunities for 2027 projects.
Created by Mark Benson • July 25, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Webinar_Slide_Deck_Final.pptx | PPTX | 15.2 MB | July 18, 2026 |
| Sales_FollowUp_Script.docx | DOCX | 45 KB | July 25, 2026 |
| Attendee_List_Raw.csv | CSV | 110 KB | July 20, 2026 |
P
Projects
| Project Name | Account | Primary Discipline | Status | Target Date |
|---|---|---|---|---|
| Substation Upgrade | Metro Transit Authority | MEP | In Progress | Dec 01, 2026 |
| Downtown Tunnel Rehab | Metro Transit Authority | Civil | Design Phase | May 15, 2027 |
| Tower 2 Structural Design | Riverfront Developments | Structural | Bidding | Nov 30, 2026 |
| Campus MEP Retrofit | Horizon Energy | MEP | Completed | Feb 10, 2026 |
| Bridge 405 Rehab | Apex Civil Group | Civil | Completed | Oct 12, 2025 |
P
Project
Substation Upgrade
Initiation
Design Phase
In Progress
Construction Admin
Completed
Details
Notes
Files
Project Details
Project NameSubstation Upgrade✎
Start DateFeb 01, 2026✎
Estimated CompletionDec 01, 2026✎
Principal in ChargeSarah Croft✎
Project ManagerJames Ford✎
Project OwnerSarah Croft✎
StatusIn Progress✎
Primary DisciplineMEP✎
Delivery MethodDesign-Bid-Build✎
Billing Phase60% CD✎
Health ScoreGreen✎
Scope & Execution
Drafting PlatformRevit✎
Structural MaterialSteel✎
Sustainability RatingNone✎
Geotech RiskLow✎
Permitting StatusApproved✎
Subconsultant RoleFire Protection✎
Quality QA/QCUnder Review✎
Budget VarianceOn Budget✎
Schedule VarianceOn Time✎
Client FeedbackPositive✎
60% Design Review Meeting
Met with MTA engineers. They approved the transformer pad layout but requested a change to the cooling system routing. Updating Revit models now.
Created by James Ford • July 25, 2026
Fire Protection Sub
The fire protection subconsultant missed the deadline for the sprinkler riser diagrams. Escalate to their principal if not received by tomorrow.
Created by Sarah Croft • July 24, 2026
Permit Approved
City electrical permit was approved this morning. Uploaded stamped copies to the file section.
Created by James Ford • July 23, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Substation_60PCT_Drawings.pdf | 24.5 MB | July 24, 2026 | |
| City_Electrical_Permit.pdf | 250 KB | July 23, 2026 | |
| BIM_Clash_Report_v2.xlsx | XLSX | 1.1 MB | July 22, 2026 |
S
Site Surveys
| Survey ID | Project | Type | Status | Scheduled Date |
|---|---|---|---|---|
| SURV-1045 | Downtown Tunnel Rehab | Geotechnical | Scheduled | Aug 05, 2026 |
| SURV-1011 | Substation Upgrade | Boundary | Completed | Feb 15, 2026 |
| SURV-1062 | Station Elevator Modernization | Utility Markout | Field Work | July 31, 2026 |
| SURV-0988 | Bus Depot Expansion | Topographic | Completed | Oct 10, 2025 |
| SURV-0912 | Platform Extension Design | Structural Assessment | Completed | Nov 12, 2025 |
S
Site Survey
SURV-1045
Scheduled
Field Work
Data Processing
QA Review
Completed
Details
Notes
Files
Survey Details
Survey IDSURV-1045✎
Scheduled DateAug 05, 2026✎
Site Address4th Ave & Main St Tunnel Access✎
Lead SurveyorAlex Rivera✎
Survey TypeGeotechnical✎
Survey OwnerAlex Rivera✎
StatusScheduled✎
Site TerrainUrban Subsurface✎
Weather ConditionClear✎
Drone RequiredNo✎
Access ClearanceApproved✎
Findings & Logistics
Equipment LevelDrill Rig✎
Hazard IdentificationConfined Space✎
Traffic ControlRequired (Flaggers)✎
Utility MarkoutsCompleted✎
Soil ConditionTBD✎
Deliverable FormatPDF Report & Logs✎
Boundary DisputeNo✎
Field Notes StatusPending Field Work✎
QA ReviewerSarah Croft✎
Final ApprovalPending✎
Night work required
Due to transit schedules, drilling can only occur between 1:00 AM and 4:30 AM. Adjusting crew schedules to accommodate.
Created by Alex Rivera • July 25, 2026
Confined Space Permits
Obtained confined space entry permits for the tunnel ventilation shafts. All crew members must bring their respirators and monitors.
Created by Alex Rivera • July 22, 2026
Police Detail Booked
Street-level staging requires a police detail. Confirmed 2 officers for the shift on Aug 5th.
Created by Admin • July 20, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Confined_Space_Permits.pdf | 1.2 MB | July 22, 2026 | |
| Utility_Markout_Ticket.pdf | 450 KB | July 20, 2026 | |
| Boring_Location_Plan.pdf | 3.4 MB | July 18, 2026 |
R
RFPs
| RFP Name | Account | Service Requested | Due Date | Status |
|---|---|---|---|---|
| State Transit Expansion RFP | Metro Transit Authority | Civil Design | Oct 15, 2026 | Drafting |
| Annual Bridge Inspection | Metro Transit Authority | Structural | Sep 01, 2026 | Submitted |
| Highway 90 Drainage Study | Apex Civil Group | Civil Design | Aug 20, 2026 | Review Phase |
| Water Plant Modernization | Horizon Energy | MEP Design | Jul 10, 2026 | Won |
| Federal Barracks Structural Retrofit | Midwest Structural | Structural | Mar 01, 2026 | Lost |
R
RFP
State Transit Expansion RFP
Evaluation
Drafting
Review Phase
Submitted
Awarded
Details
Notes
Files
RFP Overview
RFP NameState Transit Expansion RFP✎
Issue DateJuly 15, 2026✎
Due DateOct 15, 2026✎
SectorPublic Infrastructure✎
Service RequestedCivil Design✎
RFP OwnerProposal Team✎
StatusDrafting✎
Win ProbabilityHigh (60%+)✎
Procurement MethodQualifications Based (QBS)✎
Funding SourceFederal Infrastructure Bill✎
Competitor ThreatHigh✎
Proposal Strategy
Lead EstimatorMark Benson✎
Teaming PartnerApex Civil Group✎
Bonding RequiredPerformance & Payment✎
MBE/WBE Goal30%✎
Submission FormatDigital Portal✎
Go/No-Go DecisionGo✎
Pricing StrategyAggressive (Win Work)✎
Technical ApproachInnovation Focused✎
Interview RequiredYes✎
Review PhaseRed Team✎
Go/No-Go Meeting Outcome
Unanimous "Go" from the executive team. This is a must-win project to secure our footprint in state transit for the next decade.
Created by Mark Benson • July 22, 2026
Teaming Agreement Sent
Sent the JV Teaming Agreement to Apex Civil Group. They will handle 40% of the civil drainage scope to help us meet DBE and local resource requirements.
Created by Proposal Team • July 25, 2026
SF330 Resumes Needed
We need updated SF330 format resumes for all key personnel by next Friday. Reminded engineering leads to update their project lists.
Created by Proposal Team • July 28, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| State_Transit_Expansion_RFP.pdf | 15.8 MB | July 15, 2026 | |
| Go_No_Go_Matrix.xlsx | XLSX | 45 KB | July 22, 2026 |
| Draft_Teaming_Agreement_Apex.docx | DOCX | 120 KB | July 25, 2026 |