Template Hub Template Hub

Sales Cloud Template for Energy Storage Solutions

Deploying commercial energy storage requires tracking hardware specifications, navigating utility interconnection queues, and managing long-term performance contracts. This template provides a structured environment to monitor site feasibility, battery deployments, and ongoing service agreements.

✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Marcus Vance

New
Contacted
Discovery
Qualified
Converted
Details
Notes
Files

Primary Information

Lead NameMarcus Vance✎
TitleDirector of Facilities✎
Company NameOakhaven Logistics✎
Phone(555) 234-5678✎
Project Type Commercial & Industrial (C&I) ✎
Lead OwnerC&I Sales✎
Status Contacted ✎
Lead Source Webinar Registration ✎
Target Application Peak Shaving / Demand Mgmt ✎
Estimated Power (kW) 500 kW ✎

Site & Technical Details

Site Location (State)California✎
Local Utility PG&E ✎
Current Utility Tariff B-19 (Medium General Service) ✎
Peak Demand Charge Estimate $20 - $30 / kW ✎
Existing On-Site Generation Rooftop Solar Installed ✎
Estimated Energy (kWh) 1 MWh (2-hour duration) ✎
Target Commissioning Date Q4 2026 ✎
Financing Preference Shared Savings / EaaS ✎
Incentive Program Interest SGIP (California) ✎
Space Constraints Outdoor Pad Space Available ✎
Initial Qualification Call
Marcus indicated their cold storage facility is getting hit hard by PG&E peak demand charges during the summer. They already have 250kW of solar but it isn't clipping the late afternoon peaks effectively.
Created by C&I Sales • August 1, 2026
Utility Bill Analysis Request
Requested 12 months of 15-minute interval data and recent utility bills to run our dispatch modeling. Marcus will provide by end of week.
Created by Sales Engineer • August 2, 2026
SGIP Eligibility
Confirmed the facility is in a high fire-threat district (HFTD), meaning they may qualify for the Equity Resiliency budget under SGIP. High priority to process application quickly.
Created by Policy Team • August 3, 2026
◄ Back to Accounts List
Account

Starlight Manufacturing

Details
Contacts
Opportunities
Projects
Assets
Service
Notes
Files

Account Information

Account NameStarlight Manufacturing✎
Phone(555) 789-0123✎
Billing CityChicago✎
Account Type Customer - C&I ✎
Account OwnerC&I Sales✎
Industry Manufacturing ✎
Status Active Customer ✎

Portfolio & Fleet Details

Total Installed Capacity 2 MW / 4 MWh ✎
Number of Sites 2 Sites Active ✎
Primary EMS Software Tier Pro (Demand Mgmt + Solar) ✎
Service Agreement Level Comprehensive (Parts + Labor) ✎
Preferred EPC Partner GridWorks EPC ✎
Utility Territory Focus ComEd (Illinois) ✎
Key Value Driver Resilience / Outage Protection ✎
Quarterly Business Review
Met with James and Evan. Showed them the EMS dashboard proving we saved them $14,000 in demand charges last month across both sites. They are ready to move forward with the Plant 3 proposal.
Created by Account Manager • August 1, 2026
Cooling Fault on Plant 2
The BESS HVAC unit threw an error code due to extreme heat in Chicago this week. System derated output to protect cells. Service tech dispatched.
Created by NOC Support • August 3, 2026
Service Contract Renewal
Began discussions for renewing the O&M contract for Plant 1. Evan asked for a quote to add performance guarantees (98% uptime).
Created by Services Sales • July 15, 2026
◄ Back to Contacts List
C
Contact

Evan Wright

Details
Notes
Files

Contact Information

Contact NameEvan Wright✎
TitleChief Financial Officer✎
Phone(555) 789-0125✎
Contact OwnerC&I Sales✎
Role in Buying Center Economic Buyer ✎
Influence Level High ✎

Engagement & Preferences

Primary Interest Area ROI & Demand Charge Savings ✎
Communication Style Data/Metrics Driven ✎
Preferred Contact Method Email (Send Pre-reads) ✎
Software Portal Access Financial / Billing View ✎
Event Attendance Financial Webinars Only ✎
Tax Credit Experience Expert (Claimed ITC previously) ✎
Proposal Review Strategy
Evan is highly focused on payback period. For the Plant 3 proposal, ensure the cash-flow analysis clearly breaks out the MACRS depreciation and the Investment Tax Credit (ITC) impact in year 1.
Created by C&I Sales • August 2, 2026
Quarterly Business Review
Evan attended the QBR. He was pleased with the $14k in avoided demand charges but asked for a deeper dive into the tariff structures to see if we should switch rates.
Created by Account Manager • August 1, 2026
Service Agreement Renewal
He requested we run the numbers on an uptime guarantee structure for the next O&M contract. Wants to cap financial risk if the batteries go offline during a peak event.
Created by Services Sales • July 15, 2026
◄ Back to Opportunities List
O
Opportunity

Plant 3 Expansion - Solar Pairing

Discovery
System Sizing/Design
Proposal
Negotiation
Closed Won
Details
Line Items
Notes
Files

Opportunity Information

Opportunity NamePlant 3 Expansion - Solar Pairing✎
Amount$1,200,000✎
Close DateSep 30, 2026✎
Stage Proposal ✎
Type Existing Customer - Cross-sell ✎
Opportunity OwnerC&I Sales✎
Probability60%✎
Forecast Category Best Case ✎
Primary Application Solar Time Shifting ✎
Lead Source Internal Expansion (QBR) ✎
Financing Approach CapEx + ITC ✎

Technical Scope & Hardware

BESS Power (kW) 1.5 MW ✎
BESS Energy (kWh) 3.0 MWh (2-hour) ✎
Battery Chemistry LFP (Lithium Iron Phosphate) ✎
Coupling Topology AC Coupled ✎
Inverter Type String Inverters (Distributed) ✎
Enclosure Requirement Outdoor Pad-Mount (NEMA 3R) ✎
Software Subscription Pro (Demand Mgmt + Solar) ✎
Software License Term 5 Years ✎
Primary Competitor Tesla (Megapack) ✎
Interconnection Status Application Drafted ✎
Target Commissioning Q2 2027 ✎
Loss Reason N/A ✎
Proposal Walkthrough
Walked Evan (CFO) through the cash flow model. Emphasized that shifting their solar generation to the evening peak will yield an additional $8k/month in savings over their current pure-solar setup.
Created by C&I Sales • August 2, 2026
ITC Guidance
Provided the standard letter regarding the 30% ITC qualification since the batteries will be charging 100% from the co-located solar array. Advised them to consult their tax professional.
Created by Sales Engineer • July 28, 2026
Sizing Adjustment
Updated system size from 1MW to 1.5MW after analyzing the 15-minute interval data for Plant 3. The HVAC loads are spiking higher than initially estimated.
Created by Sales Engineer • July 20, 2026
◄ Back to Campaigns List
C
Campaign

Peak Shaving Masterclass Webinar

Details
Campaign Members
Notes
Files

Campaign Information

Campaign NamePeak Shaving Masterclass Webinar✎
Start DateJul 25, 2026✎
End DateJul 25, 2026✎
Type Webinar ✎
Campaign OwnerMarketing Team✎
Status Completed ✎
Budgeted Cost$2,500✎
Expected Revenue$850,000 Pipeline✎

Targeting & Strategy

Target Audience Facility & Energy Managers ✎
Theme/Topic Focus Demand Charge Reduction ✎
Expected Response Medium (100 - 300) ✎
Geographic Target High Demand Charge States ✎
Call to Action Request Free Bill Analysis ✎
Lead Routing C&I Sales Team ✎
Webinar Debrief
Excellent engagement. We had 120 live attendees. The live demonstration of the tariff analysis tool generated a lot of questions. 12 attendees clicked the 'Request Bill Analysis' CTA.
Created by Marketing Team • July 26, 2026
Follow-up Execution
The 12 'hot' leads have been assigned to the C&I SDRs. The recording link was emailed to all 250 registrants along with the slide deck.
Created by Marketing Ops • July 26, 2026
Content Repurposing
The product marketing team is chopping the Q&A segment into 3 short videos for the LinkedIn social campaign next month.
Created by Content Manager • August 1, 2026
◄ Back to Projects List
P
Deployment Project

City Hall Backup Microgrid

Pre-Sales Design
Permitting/Interconnection
Construction
Commissioning
Operating
Details
Notes
Files

Project Core Details

Project NameCity Hall Backup Microgrid✎
Account NameCity of Redstone✎
Opportunity ReferenceDowntown Microgrid Hub✎
Target PTO DateNov 01, 2026✎
Application Type Microgrid / Islanding ✎
Project Stage Construction ✎
Project ManagerDeployment Operations✎
Health Status On Track ✎
EPC Partner GridWorks EPC ✎
System Power (kW)500 kW✎
System Energy (kWh)1,000 kWh✎
Coupling AC Coupled ✎

Execution Milestones & Logistics

Interconnection Application Approved (ISA Signed) ✎
Utility Upgrades Required None ✎
Local AHJ Permitting Permits Issued ✎
Hardware Lead Time Delivered to Site ✎
Civil/Pad Construction Completed ✎
Electrical Integration In Progress ✎
Network / Comms Setup Pending Cellular Gateway ✎
Site Acceptance Testing (SAT) Scheduled for Mid-October ✎
Permission to Operate (PTO) Pending Final Utility Inspect ✎
Customer Handover Pending SAT/PTO ✎
Hardware Delivery
The battery enclosures and the bi-directional inverter arrived on site yesterday. The crane successfully placed them on the concrete pad. Electrical trenching is actively connecting to the main switchgear.
Created by Project Manager • August 2, 2026
Utility Inspection Scheduled
Coordinated with Redstone Municipal. Their inspector will be on site October 20th to perform the anti-islanding witness test required for PTO.
Created by Interconnection Coordinator • July 28, 2026
Cellular Connectivity Issue
The IT team noted poor Verizon signal at the pad location. We are ordering a high-gain external antenna for the EMS gateway to ensure stable telemetry before commissioning.
Created by Field Engineer • July 25, 2026
◄ Back to Assets List
A
Hardware Asset

BESS-SL2-01 (SN: LFP-2025-998)

Details
Notes
Files

Hardware Identification

Asset IDBESS-SL2-01✎
Serial NumberLFP-2025-998✎
Project / SiteStarlight Plant 2 Install✎
Asset Category Battery Enclosure ✎
Manufacturer Sungrow ✎
Hardware Model LFP Modular 500kW ✎
Asset OwnerNOC Operations✎
Operational Status Fault Detected ✎
State of Charge (SOC) 82% ✎
State of Health (SOH) 99.2% (Year 1) ✎
Current Fault Code ERR_THERMAL_HVAC_04 ✎

Firmware & Maintenance

BMS Firmware Version v3.2.1 ✎
Connection Protocol Modbus TCP ✎
Thermal Management Liquid Cooled (Glycol) ✎
Commissioning DateAug 15, 2025✎
Last PM Check Jan 10, 2026 ✎
Warranty Expiration Aug 15, 2035 (10-Yr) ✎
Active Work Order SRV-90112 ✎
Maintenance Priority High - Derated Output ✎
Thermal Fault Triggered
The BESS logged an ERR_THERMAL_HVAC_04 code during the extreme heatwave in Chicago yesterday. Ambient temps exceeded 105F. The internal chiller pump seems to have failed. EMS automatically derated charge/discharge limits to 20% to protect the cells.
Created by Automated NOC Alert • August 3, 2026
Remote Diagnostic Check
Pushed a remote reset command to the thermal management controller. The pump attempted to restart but drew excessive current and tripped the internal breaker. Definitely a hardware failure in the cooling loop. Dispatched field tech.
Created by Tier 2 Support • August 3, 2026
Annual PM Completed
Completed the 6-month visual inspection and torque checks on the DC busbars. Replaced the intake air filters. System health verified at 99.2%.
Created by Field Technician • January 10, 2026
◄ Back to Service List
S
Maintenance Work Order

SRV-90112

New Alert
Remote Triage
Dispatched
In Progress On-Site
Resolved / Closed
Details
Notes
Files

Ticket Details

Ticket NumberSRV-90112✎
Asset IDBESS-SL2-01✎
Customer ContactMaria Cortez✎
Issue Category Hardware Fault (Thermal) ✎
Date CreatedAug 03, 2026✎
Ticket OwnerDispatch Team✎
Status Open - Dispatched ✎
Priority Level High (Derated Output) ✎
SLA Commitment 48-Hour Response ✎
Reported By Automated System Alert ✎
SLA Breach Risk Safe (Time Remaining) ✎

Resolution & Field Logistics

Remote Fix Attempted Yes - Failed ✎
Field Tech Assigned John Davis (Chicago Region) ✎
Scheduled Arrival Aug 03, 2:00 PM ✎
Safety / LOTO Required Yes (Medium Voltage) ✎
Root Cause Category Environmental (Extreme Heat) ✎
RMA Part Number Needed PMP-COOL-05 (Glycol Pump) ✎
Part Availability In Tech Van Inventory ✎
Estimated Downtime Hours 12 Hours (Derated) ✎
Warranty Coverage Fully Covered (Parts & Labor) ✎
Customer Notified Yes - Alerted via Portal ✎
Initial Alert Received
BESS-SL2-01 reported ERR_THERMAL_HVAC_04 at 8:15 AM. System internal temperature crossed 45C limit. EMS automatically derated charge and discharge capabilities to 20% to prevent cell thermal runaway.
Created by Automated System • August 3, 2026
Tier 2 Triage
Attempted soft reset of the thermal management controller via Modbus command. Pump attempted to restart, drew 15A (normal is 5A), and tripped the internal DC breaker. Pump motor is likely seized or burned out due to the heatwave. Needs physical replacement.
Created by Tier 2 Support • August 3, 2026
Dispatch Update
Contacted John Davis. He has a spare PMP-COOL-05 pump assembly in his van. Redirecting him from a routine PM check to Starlight Plant 2. ETA 2:00 PM today.
Created by Dispatch Team • August 3, 2026