Electrical engineering firms require precise tracking for complex system designs, power studies, and equipment submittals. This CRM template is built specifically for electrical system design, power distribution, and coordination services. Track project phases, arc flash studies, and switchgear submittals seamlessly. Streamline your firm operations and maintain rigorous project oversight.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track incoming electrical design bids and inquiries. Accounts
Manage contractors, developers, and municipalities. Contacts
Organize key stakeholders and facility managers. Opportunities
Monitor engineering contracts and proposals. Campaigns
Coordinate technical seminars and trade events. Projects
Oversee active power distribution and lighting designs. Power Studies
Track arc flash, short circuit, and coordination reports. Design Submittals
Manage switchgear and lighting shop drawing reviews.Lead
Marcus Wright - Summit Construction
New
Contacted
Qualified
Pending RFP
Converted
Details
Notes
Files
Primary Information
First NameMarcus✎
Last NameWright✎
TitlePreconstruction Manager✎
Lead Status
Contacted
✎
Project Category
Commercial Office
✎
Lead OwnerSarah Jenkins✎
Phone555-102-3948✎
Construction Method
Design-Build
✎
Desired Schedule
Q3 Start
✎
Priority Rating
High
✎
Electrical System Requirements
Lead Source
Referral
✎
Building Type
Mid-Rise (4-9 Stories)
✎
Primary Service
Power Distribution Design
✎
Est. Facility Size
100,000 - 250,000 sqft
✎
Address400 Commerce Way✎
Service Voltage
Medium Voltage (5kV - 15kV)
✎
Sustainability Goal
LEED Silver
✎
Budget Status
Approved
✎
Industry Sector
Private Developer
✎
City/State/ZipDenver, CO 60204✎
Initial Meeting Notes
Marcus indicated they need a new 15kV primary service coordination with the local utility. They want to avoid a massive indoor substation and explore pad-mount options.
Budget Clarification
Confirmed the core/shell electrical budget is fully funded. They are looking to issue the EE design RFP by the 15th.
Design-Build Strategy
Client prefers Design-Build. We should partner with Apex Electrical for the bidding phase.
Account
Apex General Contractors
Details
Contacts
Opportunities
Projects
Power Studies
Design Submittals
Notes
Files
Primary Information
Account NameApex General Contractors✎
Account TypeContractor✎
Industry SectorPrivate Developer✎
Billing CityChicago✎
Account OwnerMichael Torres✎
Phone555-882-9911✎
Websitewww.apex-gc.com✎
Engineering Business Details
Primary MarketMidwest Commercial✎
Typical Project Size$10M - $50M✎
Procurement MethodNegotiated Contract✎
Active StatusActive Client✎
Delivery MethodDesign-Build✎
Engineering TierTier 1 - Strategic✎
Payment TermsNet 45✎
Quarterly Review Meeting
Met with Frank to review the ongoing Riverfront project. They are happy with our turnaround times on switchgear submittals and want us to bid on the new Medical Center.
Insurance Requirement Update
Apex has updated their subcontractor requirements. We need to provide a new Certificate of Insurance (COI) with $5M umbrella coverage before the next contract signing.
BIM Coordination Stand-down
Apex held a mandatory Navisworks coordination stand-down across all sites today due to persistent clashing with the conduit tray. We need to upload our latest LOD 400 models tonight.
Contact
Sarah Connor
Details
Notes
Files
Contact Information
Engineering Role & Preferences
Contact RoleDesign Lead✎
Decision AuthorityInfluencer✎
Project PhaseSchematic Design (SD)✎
Communication PrefEmail✎
Discipline PreferencePower Distribution✎
Approval FrequencyWeekly✎
Design Charette Notes
Sarah wants the electrical systems for the new tower to support a full microgrid integration. We need to evaluate generator vs battery storage for the critical load backup.
Sustainability Requirements
She stressed the importance of tracking the lighting power density (LPD) to help them achieve LEED Platinum.
Lunch & Learn Attendee
Sarah attended our firm's Lunch & Learn on NFPA 70E updates. She is highly interested in using SKM for their campus arc flash study.
Opportunity
Downtown Tower Power Design
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Contract Information
Opportunity NameDowntown Tower Power Design✎
TypeNew Business✎
StageNegotiation✎
Service TypeFull Electrical Design✎
Opportunity OwnerMichael Torres✎
Close Date10/15/2026✎
Amount$450,000✎
Probability (%)80%✎
Next StepFinalize BIM contract✎
Contract TypeLump Sum✎
Engineering Scope Specifications
Project ScopeCore and Shell Only✎
Design PhaseConcept/SD✎
Building ClassificationHigh-Rise Commercial✎
Electrical ComplexityHigh - Substation Design✎
BIM RequirementLOD 350 Coordination✎
Lead SourceAccount Penetration✎
Environmental StdLEED Gold✎
Construction DeliveryDesign-Build✎
Est. Load (kVA)1500 - 3000 kVA✎
Quality AssuranceThird Party Commissioning✎
CompetitorMazzetti✎
Bid StatusShortlisted✎
BIM Contract Redline
Apex's BIM manager returned our redlines on the LOD 350 clause. We agreed to model all conduit 2" and larger.
Scope Clarification
Updated the proposal to clarify that low voltage data drops are design-build by the telecom contractor, we are only providing pathway specs.
Shortlist Notification
Frank called to let us know we made the final two. Our SKM PowerTools modeling capabilities gave us the edge over the competitor.
Campaign
Microgrid Integration Webinar
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameMicrogrid Integration Webinar✎
TypeWebinar✎
StatusIn Progress✎
Is ActiveYes✎
Campaign OwnerMarketing Team✎
Start Date10/01/2026✎
End Date10/01/2026✎
Budget Allocated$2,500✎
Targeting & Performance
Target AudienceCommercial Real Estate✎
Expected Response12%✎
Campaign ObjectiveLead Generation (New Bids)✎
Actual Cost$1,150✎
Outreach MethodDigital / Email Invites✎
Region FocusMidwest Hubs✎
Presentation Dry Run
The engineering principles dry run went well. Need to add a slide comparing lithium-ion vs flow battery storage for the microgrid section.
Target List Pulled
Pulled all contacts and leads in the Midwest regions with active or past central plant projects. Sent the first email blast today.
PDH Credit Approval
We received approval from the board to offer 1.0 Professional Development Hour (PDH) for attendees. This should drive up registration.
Project
PRJ-2026-001 (Riverfront Substation)
Design
Permitting
Bidding/Fabrication
Construction
Closeout
Details
Notes
Files
Project Overview
Project NamePRJ-2026-001 (Riverfront Substation)✎
PhaseConstruction Administration✎
Delivery ModelDesign-Build✎
Primary Electrical SystemPrimary Substation✎
Project ManagerMichael Torres✎
Start Date01/15/2026✎
Estimated Completion12/01/2027✎
Current StatusActive - Construction✎
BIM LODLOD 400 (Fabrication)✎
Contract TypeLump Sum✎
Engineering Specifics & Progress
Backup Power ReqN+1 Generator Redundancy✎
Sustainability StdLEED Gold✎
Client TypeCommercial Developer✎
PriorityHigh✎
Site Address45 Riverfront Ave✎
Construction TypeNew Build✎
Utility ProviderComEd✎
Review CycleMonthly EOR Review✎
Submittal StatusUnder Review✎
Electrical RiskHigh - Arc Flash Hazard✎
Conduit Coordination Clash
Coordinated with Apex on the Level 3 main feeder routing. The 4" rigid conduit clashes with the main HVAC duct near column line F4. Generating RFI to clarify routing.
Submittal Review Complete
Finished reviewing the batch 4 switchgear shop drawings. Marked "Approved as Noted". Required updated breaker settings based on the latest short circuit study.
Transformer Pad Pour
Concrete contractor has completed the transformer pad pour on the exterior site. We are ready to receive the medium voltage transformers next week.
Power Study
STD-AF-001 (Arc Flash Analysis)
Data Collection
Modeling
Pending Review
Approved
Labels Issued
Details
Notes
Files
Primary Study Details
Study IDSTD-AF-001✎
Study CategoryArc Flash Analysis✎
Manufacturer BaseEaton / Square D✎
StatusApproved✎
Study EngineerMichael Torres✎
Study OwnerMichael Torres✎
Request Date05/10/2026✎
Field Data CollectionComplete✎
Approval StatusApproved by EOR✎
Due Date09/01/2026✎
Software PlatformSKM Power*Tools✎
Technical Model Data
Study TypeUpdate Existing Model✎
Voltage Level480V Main / 208V Dist✎
Hazard Risk CategoryHRC 2 (Max)✎
Standard UsedIEEE 1584-2018✎
Equipment Count145 Buses✎
Primary SubstationSubstation A (1500kVA)✎
Utility Fault Contrib45,000 Amps S.C.✎
Highest Incident Energy14.2 cal/cm² @ Main✎
Remediation ReqAdjust Trip Settings✎
Warranty/UpdateIncludes 1-Year Model Maint.✎
Incident Energy Reduction
By adjusting the short-time delay on the main breaker from 0.3s to 0.1s, we reduced the incident energy at the main switchgear from a dangerous 45 cal/cm² down to 14.2 cal/cm² (HRC 3). Coordination with downstream breakers remains acceptable.
Utility Data Received
ComEd finally provided the available fault current letter. X/R ratio is slightly higher than we estimated. Model has been updated.
Field Data Collection Complete
Field technicians finished tracing all panels and verifying feeder lengths. Data has been imported into SKM.
Design Submittal
SUB-ELEC-092 - Generator Sizing Clarification
Received
Under Review
Pending Consultant
Returned to GC
Closed
Details
Notes
Files
Submittal Information
Submittal IDSUB-ELEC-092✎
Submittal TypeField RFI✎
DisciplineGenerator Systems✎
Related EquipmentEQ-GEN-001✎
Lead ReviewerSarah Jenkins✎
Received Date08/01/2026✎
Due Date08/05/2026✎
Returned DatePending✎
Action TakenPending✎
PriorityHigh✎
Impact & Resolution
Current StatusUnder Review✎
Impact LevelDesign Clarification✎
Code StandardNEC Article 700✎
Review IterationRev 0 (Initial)✎
Deviation from SpecEquipment Substitution✎
Cost ImpactNone Anticipated✎
Schedule Impact1-3 Days (Pending Sizing)✎
Clash DetectedNo Clash✎
Submittal FormatCalculation Package✎
Delivery MethodProcore Integration✎
Initial Assessment
The GC submitted a request to substitute the Cummins 1000kW generator with a Caterpillar equivalent due to lead times. We need to verify that the Cat model's subtransient reactance (X"d) does not negatively impact the short circuit ratings of the downstream emergency panels.
Coordination Call
Called the Cat rep. They provided the detailed alternator data sheet. Entering this into SKM to verify the fault current.
Model Update
SKM model updated. The fault current is slightly higher but still within the 65kAIC rating of the emergency distribution board. The substitution is technically acceptable.
