Running an electrical contracting business means coordinating field technicians, tracking project bids from rough-in to trim-out, and ensuring municipal compliance. This workspace organizes commercial fit-outs and residential service calls, keeping your team focused on delivering high-quality electrical installations and tracking the flow of materials, permits, and maintenance schedules without losing momentum.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
L Leads
Track potential projects, bids, and service inquiries.A Accounts
Manage general contractors, municipalities, and properties.C Contacts
Site managers, property owners, and foremen.O Opportunities
Manage quotes for retrofits, rewiring, and fit-outs.C Campaigns
Promote LED upgrades and safety testing services.C Service Tickets
Dispatch emergency calls and track field troubleshooting.C Permits
Monitor municipal approvals, code checks, and rough-ins.C Maint. Contracts
Track preventive maintenance for switchgear and generators.Interactive Template Below
L
Leads
| Name | Company | Service Type | Status | Phone | Owner | |
|---|---|---|---|---|---|---|
| Skyline Office Fit-out | Skyline Property Mgmt | Tenant Fit-out | Quoting | 555-0988 | [email protected] | David Sparks |
| Retail Space Rewire | Prime GCs | Rewiring | New | 555-0102 | [email protected] | Sarah Watt |
| City Hall Lighting Retrofit | City Public Works | LED Retrofit | Site Walk | 555-0455 | [email protected] | David Sparks |
| Main St Data Center Prep | TechNode Facilities | Panel Upgrade | Contacted | 555-0811 | [email protected] | Sarah Watt |
| Distribution Center Subpanel | Valley Warehousing | New Construction | Converted | 555-0722 | [email protected] | David Sparks |
L
Lead
Skyline Office Fit-out
New
Contacted
Site Walk
Quoting
Converted
Details
Notes
Files
Primary Information
Lead NameSkyline Office Fit-out✎
CompanySkyline Property Mgmt✎
Service TypeTenant Fit-out✎
Lead SourceReferral✎
Project ScopeCommercial✎
Lead OwnerDavid Sparks✎
StatusQuoting✎
Phone555-0988✎
Estimated Budget$45,000✎
Priority LevelHigh✎
Site Details & Requirements
Property Address300 Horizon Drive, Suite 400✎
Phase of ConstructionRough-in Ready✎
Existing Service Size800A✎
Blueprint AvailabilityStamped Set Provided✎
Phase TypeThree Phase✎
Requested Start DateNov 01, 2026✎
Known HazardsNone✎
Site AccessibilityFreight Elevator Access✎
Union RequirementNon-Union Site✎
Dispatch ZoneNorth Metro✎
Site Walk Notes
Met with Marcus. The suite is completely gutted. The existing 800A switchgear in the core electrical room is sufficient, but we need to run all new conduit for the cubicle farm in the main open area.
Created by David Sparks • Oct 15, 2026
Fixture Selection
Client is requesting pricing on 2x4 troffers with daylight harvesting sensors near the windows to meet code. I need to get updated pricing from Rexel Supply.
Created by Sarah Watt • Oct 14, 2026
Initial Call
Skyline is preparing Suite 400 for a new tech tenant. Need a full electrical fit-out. Prints will be sent over by Friday.
Created by Admin • Oct 10, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Suite400_Electrical_Drawings_E1.pdf | 4.5 MB | Oct 13, 2026 | |
| Lighting_Fixture_Schedule.xlsx | XLSX | 0.8 MB | Oct 13, 2026 |
| Site_Photos_Rough_In.zip | ZIP | 14.2 MB | Oct 15, 2026 |
A
Accounts
| Account Name | Type | Industry | Active Job Sites | Phone | Owner |
|---|---|---|---|---|---|
| Skyline Property Mgmt | Property Manager | Commercial Real Estate | 3 | 555-0988 | David Sparks |
| Prime GCs | General Contractor | Construction | 5 | 555-0102 | Sarah Watt |
| City Public Works | Municipality | Government | 1 | 555-0455 | David Sparks |
| Rexel Electrical Supply | Supplier | Wholesale | 0 | 555-0811 | Procurement |
| Valley Warehousing | Commercial Client | Logistics | 2 | 555-0722 | Sarah Watt |
A
Account
Skyline Property Mgmt
Details
Contacts
Opportunities
Service Tickets
Permits
Maint. Contracts
Notes
Files
Primary Information
Account NameSkyline Property Mgmt✎
Account TypeProperty Manager✎
IndustryCommercial Real Estate✎
Active Job Sites3✎
Account OwnerDavid Sparks✎
Phone555-0988✎
Websitewww.skylinepm.com✎
Account StatusActive✎
Billing & Compliance
Billing Address100 Skyline Tower, Floor 12✎
Payment TermsNet 45✎
Safety Certification RequiredOSHA 10 Required✎
Annual Revenue$150,000+✎
Liability Insurance Req$5M Umbrella✎
C Contacts
| Name | Title | Phone | |
|---|---|---|---|
| Marcus Brown | Facilities Manager | [email protected] | 555-0988 |
| Jessica Lin | Property Manager | [email protected] | 555-0989 |
| Tom Vance | Building Engineer | [email protected] | 555-0990 |
| Linda Wu | Accounts Payable | [email protected] | 555-0991 |
| Derek Cole | Chief of Operations | [email protected] | 555-0992 |
O Opportunities
| Opportunity Name | Stage | Amount | Close Date |
|---|---|---|---|
| Skyline Office Fit-out | Proposal | $45,000 | Oct 30, 2026 |
| Parking Garage LED Upgrade | Closed Won | $18,500 | Feb 10, 2026 |
| Backup Generator Install | Closed Won | $32,000 | Mar 22, 2026 |
| Elevator Lobby Rewire | Closed Lost | $5,100 | May 10, 2026 |
| Annual Maintenance Renewal | Negotiation | $12,500 | Dec 01, 2026 |
C Service Tickets
| Ticket # | Issue | Status | Date Logged |
|---|---|---|---|
| TK-5021 | Tripped Main Breaker Suite 200 | Resolved | Sep 10, 2026 |
| TK-5088 | Flickering Lights in Lobby | Resolved | Sep 25, 2026 |
| TK-5102 | HVAC Disconnect Replacement | Resolved | Oct 05, 2026 |
| TK-5140 | Exterior Signage Timer Repair | Dispatched | Oct 18, 2026 |
| TK-5145 | Generator Fault Alarm | Logged | Oct 20, 2026 |
C Permits
| Permit # | Type | Status | Expiration |
|---|---|---|---|
| ELEC-26-044 | Generator Interlock | Closed | Dec 31, 2026 |
| ELEC-26-089 | LED Retrofit | Closed | Feb 15, 2027 |
| ELEC-26-112 | Electrical General | Approved | Nov 30, 2026 |
| ELEC-26-200 | Fire Alarm Mod | Under Review | -- |
| ELEC-26-210 | Low Voltage/Data | Application Prep | -- |
Master Service Agreement
Skyline signed the new MSA for 2026-2028. This guarantees us right-of-first-refusal on all electrical service work for their downtown properties.
Created by David Sparks • Jan 15, 2026
Billing Notice
Accounts payable requires all invoices over $10,000 to be accompanied by a partial lien waiver. Added to accounting notes.
Created by Finance Dept • Mar 10, 2026
Site Access Procedures
All technicians must check in at the loading dock with security before accessing electrical rooms. Keycards must be returned daily.
Created by Service Dispatch • Jan 20, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Skyline_MSA_Signed.pdf | 5.1 MB | Jan 15, 2026 | |
| Lien_Waiver_Template.pdf | 0.2 MB | Mar 11, 2026 | |
| Insurance_Cert_Skyline.pdf | 1.1 MB | Jan 12, 2026 |
C
Contacts
| Name | Account | Title | Role | Phone | Owner |
|---|---|---|---|---|---|
| Marcus Brown | Skyline Property Mgmt | Facilities Manager | Decision Maker | 555-0988 | David Sparks |
| Tom Vance | Skyline Property Mgmt | Building Engineer | Site Access Point | 555-0990 | David Sparks |
| David O'Connor | Prime GCs | Lead Estimator | Evaluator | 555-0102 | Sarah Watt |
| Rebecca Hayes | City Public Works | Electrical Inspector | Municipal Authority | 555-0455 | David Sparks |
| Frank Giordano | Rexel Electrical Supply | Branch Manager | Vendor Contact | 555-0811 | Procurement |
C
Contact
Marcus Brown
Details
Notes
Files
Contact Information
Contact OwnerDavid Sparks✎
Mobile Phone555-0988✎
Project RoleDecision Maker✎
Operational Clearances
Communication PrefMobile Call✎
Trade AffiliationNon-Union✎
Site Access LevelMaster Keys✎
Decision AuthorityFull Sign-off (Up to $50k)✎
Preferred ShiftStandard Office Hrs✎
Emergency ContactPrimary 24/7✎
Communication Style
Marcus prefers phone calls over email for anything urgent. If it's a quote, email it first, then call him to review it together.
Created by David Sparks • Oct 01, 2026
Site Rules Update
He requested all our technicians park in the designated contractor lot on the north side, as tenant complaints have increased.
Created by Service Dispatch • Aug 15, 2026
Introduction
Met Marcus during the parking garage LED upgrade. Very practical, no-nonsense manager. He handles all mechanical and electrical vendor relationships for Skyline.
Created by David Sparks • Jan 10, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Brown_Business_Card.jpg | JPG | 0.5 MB | Jan 12, 2026 |
| Site_Access_Waiver.pdf | 0.9 MB | Jan 20, 2026 | |
| Approved_Vendor_Letter.pdf | 1.1 MB | Feb 15, 2026 |
O
Opportunities
| Opportunity Name | Account Name | Amount | Stage | Close Date | Owner |
|---|---|---|---|---|---|
| Skyline Office Fit-out | Skyline Property Mgmt | $45,000 | Proposal | Oct 30, 2026 | David Sparks |
| Retail Space Rewire | Prime GCs | $32,000 | Discovery | Nov 15, 2026 | Sarah Watt |
| City Hall Lighting Retrofit | City Public Works | $85,000 | Estimating | Dec 10, 2026 | David Sparks |
| Main St Data Center Prep | TechNode Facilities | $125,000 | Negotiation | Oct 25, 2026 | Sarah Watt |
| Annual Maintenance Renewal | Skyline Property Mgmt | $12,500 | Negotiation | Dec 01, 2026 | David Sparks |
O
Opportunity
Skyline Office Fit-out
Discovery
Estimating
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Project Details
Opportunity NameSkyline Office Fit-out✎
Opportunity TypeNew Business✎
Primary Work TypeRough-in✎
Building ClassificationClass A Office✎
Lead SourceReferral✎
Opportunity OwnerDavid Sparks✎
Close DateOct 30, 2026✎
StageProposal✎
Probability (%)75%✎
Expected Start DateNov 10, 2026✎
Estimated Duration2-3 Weeks✎
Financials & Subcontractors
Amount$45,000✎
Estimated Material Cost$18,500✎
Labor Hours Est220 hrs✎
Pricing ModelFixed Bid✎
Discount LevelNone✎
Rebate EligibilityUtility LED Rebate✎
CompetitorValley Electric Co.✎
Subcontractor NeededLow Voltage Data✎
Lift Equipment ReqScissor Lift✎
Warranty TierStandard 1-Year Labor✎
Inspection PhasingRough-in & Final✎
Next StepReview proposal with Marcus✎
P Line Items
| Service / Part Name | Phase Code | Quantity | Unit Price | Total Price | Material Spec |
|---|---|---|---|---|---|
| 2x4 LED Volumetric Troffers | LGT-LED-01 | 42.00 | $185.00 | $7,770.00 | Daylight Harvesting |
| 3/4" EMT Conduit & Fittings | MAT-CND-02 | 800.00 ft | $2.50 | $2,000.00 | Galvanized Steel |
| Commercial Rough-in Labor | LAB-ROUGH | 120.00 hrs | $125.00 | $15,000.00 | Journey/Apprentice Pair |
| Commercial Trim-out Labor | LAB-TRIM | 100.00 hrs | $125.00 | $12,500.00 | Journey/Apprentice Pair |
Proposal Delivered
Sent the finalized proposal to Marcus. I emphasized that we have our own scissor lifts, saving them rental fees compared to Valley Electric.
Created by David Sparks • Oct 16, 2026
Data Cabling Exclusion
We are pulling the EMT and running pull strings for the low voltage guys, but we are excluding the actual Cat6 terminations. Clarified in the exclusions section.
Created by Estimating Team • Oct 15, 2026
Material Pricing Lock
Confirmed with Rexel Supply that the pricing on the LED troffers is locked in for 30 days. Lead time is currently 2 weeks.
Created by Procurement • Oct 14, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Skyline_Suite400_Proposal.pdf | 1.2 MB | Oct 16, 2026 | |
| Material_Cost_Breakdown.xlsx | XLSX | 0.5 MB | Oct 15, 2026 |
| Lighting_Rebate_Estimate.pdf | 0.8 MB | Oct 14, 2026 |
C
Campaigns
| Campaign Name | Type | Status | Start Date | End Date | Owner |
|---|---|---|---|---|---|
| Q4 Commercial LED Retrofit Promo | Email Newsletter | In Progress | Oct 01, 2026 | Dec 31, 2026 | Marketing Dept |
| Regional Facilities Expo Booth | Trade Show | Planned | Nov 15, 2026 | Nov 18, 2026 | David Sparks |
| Fall Generator Load Test Mailer | Direct Mail | Completed | Aug 01, 2026 | Sep 30, 2026 | Marketing Dept |
| NEC Code Update Seminar | Webinar / Seminar | In Progress | Oct 10, 2026 | Nov 10, 2026 | Sarah Watt |
| Service Van Fleet Branding | Public Relations | Completed | Jan 05, 2026 | Mar 01, 2026 | Marketing Dept |
C
Campaign
Q4 Commercial LED Retrofit Promo
Details
Campaign Members
Notes
Files
Campaign Execution
Campaign NameQ4 Commercial LED Retrofit Promo✎
TypeEmail Newsletter✎
Target AudienceProperty Managers✎
StatusIn Progress✎
Campaign OwnerMarketing Dept✎
Start DateOct 01, 2026✎
End DateDec 31, 2026✎
Promotion OfferFree Energy Audit✎
Metrics & Goals
Budgeted Cost$3,000✎
Actual Cost$1,200✎
Expected Revenue$150,000✎
Leads Generated32✎
Converted Leads4✎
Strategic GoalUtilize End-of-Year Budgets✎
C Campaign Members
| Name | Company | Status |
|---|---|---|
| Marcus Brown | Skyline Property Mgmt | Responded |
| Jessica Lin | Skyline Property Mgmt | Opened |
| Tom Vance | City Public Works | Clicked |
| Sarah Higgins | TechNode Facilities | Sent |
| Ken Masters | Valley Warehousing | Bounced |
Mid-Campaign Review
The messaging detailing the local utility rebate program is driving the most clicks. Property managers are trying to burn through their 2026 budgets.
Created by Marketing Dept • Oct 15, 2026
List Segmentation
Excluded residential contacts and general contractors. Focused strictly on facility managers and commercial property owners.
Created by Marketing Dept • Sep 28, 2026
Content Approval
David Sparks approved the final copy. He noted that we should explicitly mention our ability to handle the rebate paperwork for them.
Created by Marketing Dept • Sep 15, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Email_Draft_v3.html | HTML | 0.1 MB | Sep 28, 2026 |
| LED_ROI_Calculator.pdf | 2.5 MB | Sep 20, 2026 | |
| Commercial_PM_List.csv | CSV | 0.8 MB | Sep 28, 2026 |
C
Service Tickets
| Ticket # | Account Name | Issue | Status | Urgency | Electrician |
|---|---|---|---|---|---|
| TK-5140 | Skyline Property Mgmt | Exterior Signage Timer Repair | Dispatched | Routine | Mike Ross |
| TK-5145 | Skyline Property Mgmt | Generator Fault Alarm | Logged | High | Unassigned |
| TK-5152 | Prime GCs | Temp Power Pole Tripping | Awaiting Parts | High | Mike Ross |
| TK-5160 | Valley Warehousing | Bay 4 High Bay Lights Out | Diagnosing | Medium | Sarah Jenkins |
| TK-5165 | The Smith Residence | Panel Making Buzzing Noise | Dispatched | Emergency | Tom Alvarez |
C
Service Ticket
TK-5140 - Exterior Signage Timer Repair
Logged
Dispatched
Diagnosing
Awaiting Parts
Resolved
Details
Notes
Files
Issue Details
Ticket NumberTK-5140✎
Issue CategoryLighting & Controls✎
Reported ProblemTimer not switching on✎
Voltage Level120V Standard✎
System AffectedExterior Signage✎
Ticket OwnerDispatch Team✎
StatusDispatched✎
Date LoggedOct 18, 2026✎
UrgencyRoutine✎
Travel Time Mins35✎
Resolution & Compliance
Diagnosed FaultDefective Device✎
Required PartsIntermatic Astronomic Timer✎
Resolution CodePending Repair✎
LOTO Procedure UsedLockout/Tagout Verified✎
Arc Flash PPE LevelLevel 0✎
Time On Site--✎
Invoice StatusUnbilled✎
Follow-up NeededNo✎
Customer SignatureNot Collected✎
Satisfaction RatingPending✎
Technician Notes (Mike R.)
I'm en route now. Picked up the Intermatic timer from the shop stock just in case. Will verify voltage at the contractor first.
Created by Mike Ross • Oct 18, 2026
Dispatch Update
Assigned to Mike Ross since he was finishing up the EV charger job nearby. Customer notified of 1PM ETA.
Created by Dispatch Team • Oct 18, 2026
Initial Call
Property manager says the main monument sign did not turn on last night. Breaker isn't tripped. Suspects the mechanical timer in the electrical room is dead.
Created by Admin • Oct 18, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Signage_Electrical_AsBuilt.pdf | 1.4 MB | Oct 18, 2026 | |
| Intermatic_Manual.pdf | 0.8 MB | Oct 18, 2026 | |
| Photo_Timer_Box.jpg | JPG | 1.1 MB | Oct 18, 2026 |
C
Permits
| Permit # | Account Name | Permit Type | Authority | Status | Owner |
|---|---|---|---|---|---|
| ELEC-26-112 | Skyline Property Mgmt | Electrical General | City Code Dept | Approved | Sarah Watt |
| ELEC-26-200 | Skyline Property Mgmt | Fire Alarm | Fire Marshal | Under Review | David Sparks |
| ELEC-26-210 | Prime GCs | Low Voltage/Data | City Code Dept | Application Prep | Sarah Watt |
| ELEC-26-215 | Valley Warehousing | Trenching/Underground | County Public Works | Approved | David Sparks |
| ELEC-26-240 | The Smith Residence | Generator Interlock | Township Inspector | Closed | Lisa Ray |
C
Permit
ELEC-26-112 - Electrical General
Application Prep
Submitted
Under Review
Approved
Closed
Details
Notes
Files
Permit Basics
Permit NumberELEC-26-112✎
Permit TypeElectrical General✎
Authority Having JurisdictionCity Code Dept✎
Filing Fee$450.00✎
Permit OwnerSarah Watt✎
StatusApproved✎
Submission DateOct 10, 2026✎
Approval DateOct 16, 2026✎
Valid FromOct 16, 2026✎
Expiration DateNov 30, 2026✎
Inspections & Conditions
Rough-In InspectionScheduled✎
Final InspectionPending✎
Master Electrician LicenseE-1002 (Tom Harris)✎
Stamped Drawings ReqYes - Full Set✎
NEC Cycle Year2023✎
Inspector NameJim Davis✎
Inspector Phone555-0810✎
Notice to ProceedReceived✎
Utility Disconnect ReqN/A✎
Utility ProviderMetro Power✎
Inspection Scheduling
Rough-in inspection is scheduled for next Tuesday between 9AM and 12PM. Ensure all MC cable in the drop ceiling is strapped properly per code.
Created by Sarah Watt • Oct 17, 2026
Permit Approval Received
City approved the stamped plans. Make sure to print a hard copy of the yellow permit placard and post it on the main panel door in Suite 400.
Created by Admin • Oct 16, 2026
Application Review
City required an updated load calculation before they would approve the panel addition. Sent the revised calc sheet to the reviewer.
Created by Tom Harris • Oct 12, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Approved_Permit_Placard.pdf | 0.5 MB | Oct 16, 2026 | |
| Revised_Load_Calc.pdf | 1.1 MB | Oct 12, 2026 | |
| Initial_Application_Receipt.png | PNG | 0.3 MB | Oct 10, 2026 |
C
Maintenance Contracts
| Contract ID | Account Name | Coverage Tier | Visits/Yr | Status | Owner |
|---|---|---|---|---|---|
| MC-8001 | Skyline Property Mgmt | Gold Plan | 4 Quarterly | Active | David Sparks |
| MC-8055 | Skyline Property Mgmt | Generator Only | 2 Bi-Annual | Active | David Sparks |
| MC-7022 | Valley Warehousing | Silver Plan | 1 Annual | In Renewal | Sarah Watt |
| MC-9100 | Prime GCs | Platinum All-Inclusive | 12 Monthly | Drafting | Sarah Watt |
| MC-6001 | City Public Works | Standard Plan | 1 Annual | Expired | David Sparks |
C
Maintenance Contract
MC-8001 - Skyline Property Mgmt
Drafting
Sent for Signature
Active
In Renewal
Cancelled
Details
Notes
Files
Contract Terms
Contract IDMC-8001✎
Coverage TierGold Plan✎
Billing FrequencyQuarterly Invoice✎
Included Visits4 Quarterly✎
Equipment Type CoveredSwitchgear & Panels✎
Contract OwnerDavid Sparks✎
StatusActive✎
Start DateJan 01, 2026✎
End DateDec 31, 2026✎
Renewal TypeAuto-Renew✎
Coverage Details
Infrared Thermography ScanIncluded Annual✎
Load Bank TestingExcluded✎
Breaker ExercisingIncluded (Annually)✎
Discount on Parts15% Off List✎
Emergency Response Time4-Hour Guaranteed✎
Annual Value$12,500✎
Next Scheduled VisitNov 15, 2026✎
Last Visit DateAug 15, 2026✎
Contract PhaseQ4 Delivery✎
Cancellation ReasonN/A✎
IR Scan Scheduling
The annual IR scan of the main switchgear is due in the Q4 visit. Make sure Mike takes the FLIR camera and submits the PDF report to the property manager for insurance purposes.
Created by Service Dispatch • Oct 10, 2026
Auto-Renew Reminder
This contract is set to auto-renew on Jan 1st with a 4% inflation increase built in. I am negotiating the renewal now so there are no surprises.
Created by David Sparks • Oct 01, 2026
Access Requirements
Remember that breaker exercising must be done on Sunday mornings between 2AM and 5AM to avoid tenant disruption.
Created by Mike Ross • Aug 16, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Signed_PM_Agreement_2026.pdf | 2.1 MB | Dec 15, 2025 | |
| Q3_Maintenance_Report.pdf | 1.5 MB | Aug 16, 2026 | |
| Equipment_Inventory_List.xlsx | XLSX | 0.3 MB | Jan 05, 2026 |