Template Hub Template Hub

Sales Cloud Template for Electric Vehicle Manufacturers

Scaling electric vehicle production demands robust tracking of supply chains, charging network deployments, and high-voltage battery life cycles. This customized Salesforce configuration provides the clarity needed to manage fleet sales, orchestrate production output against supplier deliverables, and map out the required charging infrastructure for consumer and commercial adoption.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Lydia Torres - EcoLogistics Inc

New
Contacted
Qualified
Converted
Details
Notes
Files

Primary Information

First NameLydia✎
Last NameTorres✎
TitleProcurement Director✎
Phone(555) 234-9876✎
CompanyEcoLogistics Inc✎
Lead OwnerMiles Johnson✎
Lead StatusQualified ✎
Mobile(555) 987-1122✎
Lead SourceWeb Form ✎
RatingHot ✎
Websiteecologistics-fleet.com✎

EV Specifications & Interest

Interest TypeAero Sedan ✎
Target Range300-400 miles ✎
Drive TypeAWD (Dual Motor) ✎
Charging StandardNACS ✎
Purchase Timeline3-6 Months ✎
Intended UseCommercial Fleet ✎
Body StyleLight Commercial ✎
Battery ChemistryLFP ✎
Trade-In VehicleInternal Combustion ✎
Fleet Size10-50 Vehicles ✎
Initial Fleet Inquiry
Lydia submitted a form requesting details on the Hauler Pro for last mile delivery. They have a depot in Denver and are evaluating the NACS integration.
Created by Miles Johnson • Aug 10, 2026
Phone Qualification
Discussed the LFP battery limits in winter climates. She understands the slight range reduction. Needs to review charging hardware compatibility.
Created by Miles Johnson • Aug 12, 2026
Next Steps
Preparing a fleet pilot proposal for 5 vehicles to present next week.
Created by Miles Johnson • Aug 14, 2026
◄ Back to Accounts List
Account

Apex Delivery Services

Details
Contacts
Opportunities
Production Orders
Battery Packs
Charging Networks
Notes
Files

Primary Information

Account NameApex Delivery Services✎
Phone(555) 321-7654✎
Billing Address200 Logistics Pkwy✎
Account OwnerMiles Johnson✎
IndustryLogistics ✎
Account TypeFleet Operator ✎
Annual Revenue$150,000,000✎

EV Fleet Profile

Fleet Size200-500 Vehicles ✎
Dominant Use CaseLast Mile Delivery ✎
Charging DepotLevel 2 AC Fleet Mix ✎
Preferred OEMMixed Fleet ✎
Sustainability GoalNet Zero 2035 ✎
Budget TierHigh ($5M+) ✎
Quarterly Fleet Review
Met with Robert and Diana. The 10 pilot vehicles are exceeding efficiency targets. They are ready to move forward with the 50 unit expansion.
Created by Miles Johnson • Aug 01, 2026
Charging Infrastructure Limitations
John mentioned their Seattle depot requires electrical panel upgrades before they can install the 350kW DC fast chargers. Timeline pushed 2 months.
Created by Solutions Engineer • Jul 15, 2026
Battery Warranty Question
Clarified that fleet degradation guarantees cover pack replacement if SOH drops below 70% within 8 years or 150k miles.
Created by Miles Johnson • Jun 10, 2026
◄ Back to Contacts List
C
Contact

Robert Vance

Details
Notes
Files

Contact Information

First NameRobert✎
Last NameVance✎
Related AccountApex Delivery Services✎
Contact OwnerMiles Johnson✎
TitleVP of Fleet Operations✎
Phone(555) 321-1111✎
Mobile(555) 321-9988✎

Buyer Profile

EV ExperienceExperienced Fleet Deployer ✎
Primary DriverFleet Operators ✎
Charging SetupDepot Integration Req ✎
Commute DistanceRegional (150+ mi/day) ✎
Decision MakerFinal Sign-Off ✎
Communication PrefEmail Primary ✎
Fleet Expansion Requirements
Robert made it clear that any order above 50 units requires us to guarantee 98% uptime on the telematics API integration. Passed this to the software engineering lead.
Created by Miles Johnson • Aug 01, 2026
Out of Office
Robert is out touring their midwest facilities until August 15. CC Diana on any urgent contract updates.
Created by Miles Johnson • Aug 05, 2026
Cold Weather Concerns
He expressed concerns over battery thermal management during the Chicago winter routes. Emailed him the heat pump efficiency whitepaper.
Created by Miles Johnson • Jan 10, 2026
◄ Back to Opportunities List
O
Opportunity

Apex - 50x Hauler Pro Fleet

Discovery
Needs Analysis
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files

Opportunity Information

Opportunity NameApex - 50x Hauler Pro Fleet✎
Amount$2,250,000.00✎
Close DateSep 15, 2026✎
TypeFleet Expansion ✎
Lead SourceExisting Account ✎
Opportunity OwnerMiles Johnson✎
StageNegotiation ✎
Probability80%✎
Primary ContactRobert Vance✎
Forecast CategoryCommit ✎
Next StepFinalize bulk discount✎

Vehicle Configuration

Model LineHauler Pro ✎
Battery Option100 kWh Extended Range ✎
Motor ConfigDual Motor AWD ✎
Paint ColorFleet White ✎
Interior TrimCommercial Vinyl ✎
Autonomy LevelLevel 2 (Highway Assist) ✎
Wheel Setup18" Steel Utility ✎
Charging BundleLevel 2 Mobile Cable ✎
Expected DeliveryQ4 2026 ✎
Subsidy EligibilityCommercial Clean Vehicle ✎
Deposit StatusPaid ($50,000) ✎
Trade-In StatusN/A ✎
Bulk Discount Requested
Robert is asking for a 5% bulk discount on the vehicle base price. Waiting for VP approval on this margin cut.
Created by Miles Johnson • Aug 10, 2026
Delivery Schedule
They cannot take all 50 at once. Need to stagger delivery: 20 in Q4 2026, and 30 in Q1 2027. Factory confirmed this helps our output schedule.
Created by Miles Johnson • Jul 28, 2026
Telematics Promo
Agreed to throw in the first year of API telematics access for free to win the deal against Ford Pro.
Created by Miles Johnson • Jul 20, 2026
◄ Back to Campaigns List
C
Campaign

Aero Sedan West Coast Tour

Details
Campaign Members
Notes
Files

Campaign Overview

Campaign NameAero Sedan West Coast Tour✎
Start DateAug 01, 2026✎
End DateAug 30, 2026✎
TypeEvent ✎
OwnerLisa Ray✎
StatusIn Progress ✎
Is ActiveYes ✎
Parent CampaignAero Launch 2026✎

Performance Metrics

Budgeted Cost$50,000.00✎
Actual Cost$22,500.00✎
Expected Response10% ✎
Total Leads Gen450✎
Target AudienceDirect Consumers ✎
RegionWest Coast US ✎
Seattle Stop Success
The Seattle weekend drove 120 test drives and 15 pre-order deposits. Moving the trailer down to Portland next.
Created by Lisa Ray • Aug 09, 2026
Charging Logistics
Ensure we have the mobile Level 3 battery pack charged and ready before hitting the SF stop, as the event venue lacks high-power drops.
Created by Event Coordinator • Aug 05, 2026
Waiver Forms
Digital waiver forms are working well on the iPads, but keep paper backups just in case the cellular connection drops in the lots.
Created by Marketing Team • Aug 02, 2026
◄ Back to Production Orders
P
Production Order

PO-88392 - Hauler Pro

Scheduled
Assembly
Paint Shop
QA/Testing
Ready to Ship
Details
Notes
Files

Build Configuration

Order NumberPO-88392✎
Model LineHauler Pro ✎
Paint CodeFW-100 (Fleet White) ✎
InteriorVinyl Utility ✎
Motor TypeDual AWD Config ✎
Order OwnerPlant Manager✎
StatusAssembly ✎
Expected Roll-offAug 25, 2026 ✎
Factory LocationAustin Gigafactory ✎
PriorityHigh (Fleet Order) ✎
QA CheckPending Mating ✎

Logistics & Tracking

VINPending Generation✎
Shipping MethodRail Transport ✎
Destination PortDenver Rail Hub ✎
CarrierBNSF Railway ✎
Customs StatusDomestic (N/A) ✎
Battery SerialBP-LFP-9901✎
HomologationUS/DOT Compliant ✎
PDI StatusNot Started ✎
ETA to CustomerQ4 2026 ✎
Handover StatusPending ✎
Chassis and Battery Mating
Scheduled for station 4 at 14:00 today. Battery pack BP-LFP-9901 has been staged line-side.
Created by Line Supervisor • Aug 24, 2026
Paint Defect Cleared
Minor orange peel on rear passenger door was sanded and buffed out. Passed paint QA this morning.
Created by QA Lead • Aug 23, 2026
Fleet Allocation Tag
This unit is tagged for Apex Delivery Services. Ensure the custom fleet telematics module is flashed before end-of-line dyno testing.
Created by Plant Manager • Aug 20, 2026
◄ Back to Battery Packs
B
Battery Pack Traceability

BP-LFP-9901

Manufactured
In Inventory
Installed
Active Field Use
End of Life
Details
Notes
Files

Pack Information

Pack SerialBP-LFP-9901✎
SupplierCATL North America ✎
ChemistryLFP ✎
Capacity100 kWh ✎
Cell FormatPrismatic ✎
Thermal MgmtLiquid Cooled (Glycol) ✎
Pack OwnerSupply Chain Mgr✎
Lifecycle StageIn Inventory ✎
Production BatchBCH-202607-LFP1✎
Warranty StatusActive ✎
SOH Rating100% ✎
Voltage Rating800V Architecture ✎

Integration & Compliance

Assigned VINPending (PO-88392)✎
Peak Charge Rate250 kW DC ✎
Discharge Limit1200A Burst ✎
Firmware Versionv4.2.1-BMS✎
Hardware RevRev B.2 ✎
Module Count16 Modules ✎
Assembly LineLine 3 (Heavy Packs) ✎
QC PassPassed Hi-Pot Test ✎
Shipping StatusReceived ✎
Compliance StandardUN38.3 Certified ✎
Hi-Pot Test Result
Pack successfully held 3000V DC for 60 seconds with leakage current below 1mA. Passed final isolation check.
Created by QA Technician • Aug 23, 2026
Firmware Flash
Flashed BMS to v4.2.1 to patch the cold weather charging limitation bug reported in the previous batch.
Created by Systems Engineer • Aug 22, 2026
Received at Plant
Unloaded from CATL shipment. No physical damage to the aluminum enclosure. Moved to line-side staging for PO-88392.
Created by Logistics Coordinator • Aug 20, 2026
◄ Back to Charging Networks
C
Charging Station

CN-SEA-02 (Apex Seattle Depot)

Planning
Permitting
Construction
Commissioning
Online
Details
Notes
Files

Station Details

Station IDCN-SEA-02✎
Location TypeFleet Depot ✎
InstallerVoltCharge Networks ✎
Plugs Count4 Plugs ✎
Access TypePrivate (RFID/Telematics) ✎
Network OwnerProject Manager✎
Operational StatusConstruction ✎
Power TierDC Fast (350kW) ✎
Connector StandardNACS & CCS1 Dual ✎
Payment GatewayFleet Billing Integration ✎
ConnectivityLTE/5G Modem ✎

Grid & Analytics

Grid CapacityRequires Transformer Upgrade ✎
Solar IntegrationCanopy Planned ✎
Storage Buffer1 MWh Megapack ✎
Daily UtilizationN/A (Offline) ✎
Maintenance TierPlatinum (4hr Response) ✎
Uptime Guarantee99% Contractual ✎
SubsidizedNEVI Grant ✎
Permitting StatusApproved ✎
Hardware VendorABB E-mobility ✎
Last ServicedN/A✎
Transformer Delay Mitigation
Seattle City Light stated the 2MW transformer is on backorder until September. We are installing the 1 MWh Megapack early to buffer the current grid connection so we can commission 2 of the 4 plugs on time.
Created by Project Manager • Jul 28, 2026
Permit Approved
City of Seattle finally approved the trenching permit for the DC lines running from the switchgear to the dispensers. Trenching begins Monday.
Created by Project Manager • Jul 15, 2026
NEVI Grant Funding
Confirmed this depot installation qualifies for partial NEVI funding because it will have a public-facing gate for other medium-duty fleets during off-peak hours.
Created by Grants Admin • Jun 10, 2026