Building out an EV charging network involves coordinating site hosts, hardware deployment, utility grid capacity, and network software subscriptions. This pre-configured environment helps charge point operators manage the entire lifecycle from initial site assessment to ongoing charger maintenance and OCPP compliance.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Qualify site hosts and fleet depot prospects. Accounts
Manage host organizations and fleet operators. Contacts
Organize facilities managers and sustainability leads. Opportunities
Track hardware sales and SaaS network deals. Campaigns
Monitor NEVI funding outreach and marketing. Sites
Manage charging locations and grid capacity. Chargers
Track individual L2 and DCFC station telemetry. Work Orders
Dispatch technicians for maintenance and repairs.Lead
Marcus Wright
New
Contacted
Discovery
Qualified
Converted
Details
Notes
Files
Lead Information
Lead NameMarcus Wright✎
TitleVP of Facilities✎
Company NameOakwood Retail Plazas✎
Phone(555) 123-4567✎
Site Type
Retail Plaza
✎
Lead OwnerDirect Sales✎
Status
Contacted
✎
Rating
Hot
✎
Source
Webinar
✎
Anticipated Power Capacity
100 kW - 500 kW
✎
Site & Deployment Scope
Estimated Parking Spots
20 - 50 Spots
✎
Current EV Adoption
No Existing Chargers
✎
Funding Source
Applying for State Rebates
✎
Proposed Charger Mix
L2 & DCFC Hybrid
✎
Primary Pain Point
Attracting Retail Foot Traffic
✎
Preferred Ownership Model
Host Owned & Operated
✎
Network Protocol
OCPP 1.6J
✎
Timeline
3 - 6 Months
✎
Competitor Evaluated
ChargePoint
✎
Make-Ready Status
Requires Utility Upgrade
✎
Decision Maker
In Communication
✎
Initial Contact Setup
Marcus attended the "Retail Charging Revenue" webinar. Mentioned they have 4 plaza locations that need an amenity draw.
Rebate Discussion
Discussed the state utility make-ready program. He will check with their property management company about trenching costs.
Hardware Preferences
Interested in dual-port Level 2 chargers for employee parking and one DCFC for retail shoppers. Wants screen displays for ad revenue.
Account
Sunrise Properties LLC
Details
Contacts
Opportunities
Sites
Chargers
Work Orders
Notes
Files
Account Overview
Account NameSunrise Properties LLC✎
Phone(555) 987-6543✎
Billing CityDenver✎
Property Type
Multi-Family Residential
✎
Fleet Size
N/A
✎
Sustainability Goal
LEED Certification Points
✎
Number of Sites
5 - 10 Locations
✎
Account OwnerDirect Sales✎
Account Type
Site Host Partner
✎
Status
Active Host
✎
Ownership Model
Host Owned & Operated
✎
Grid Connectivity
Load Balancing Required
✎
Key Partner
Xcel Energy (Utility)
✎
Contract Term
3 Years SaaS
✎
Aurora Permitting Delay
The city of Aurora is requiring a secondary load study for the 8 L2 ports. Project timeline pushed back by 3 weeks.
Tenant Billing Rates
Elaine requested we update the driver billing tariff. Moving from $0.18/kWh to $0.22/kWh starting September 1st to cover rising utility costs.
Phase 2 Signoff
All Boulder units successfully commissioned. Handed over admin credentials to Thomas Vance.
Contact
Elaine Brooks
Details
Notes
Files
Contact Information
Contact NameElaine Brooks✎
TitleDirector of Properties✎
Phone(555) 987-6543✎
Role
Decision Maker
✎
EV Experience Level
Intermediate
✎
Contact OwnerDirect Sales✎
Preferred Contact
Email
✎
Site Access Level
Network Admin
✎
Primary Language
English
✎
Communication Style
Data/Metrics Driven
✎
Decision Influence
High
✎
Newsletter Opt-in
Yes
✎
Quarterly Check-in
Elaine is very pleased with uptime at HQ. She wants to ensure the Aurora project is completed before winter weather hits. Pushed us on the permitting delays.
Tariff Change Approval
Elaine approved the tariff hike to $0.22/kWh. We need to send a notice to registered drivers 30 days in advance.
Phase 2 Handover
Walked Elaine through the new Boulder dashboard. She requested a custom report showing daily utilization peaks.
Opportunity
Phase 3: Aurora Complex SaaS
Discovery
Proposal
Negotiation
Contract Sent
Closed Won
Details
Line Items
Notes
Files
Sales Overview
Opportunity NamePhase 3: Aurora Complex SaaS✎
Amount$15,000✎
Close DateOct 30, 2026✎
Stage
Proposal
✎
Probability50%✎
Primary Hardware Model
AC Pro Dual Port
✎
Number of L2 Chargers
8 Ports
✎
Number of DCFC Chargers
None
✎
Expected kW Output
Total ~75 kW
✎
Subsidies/Rebates Applied
Utility Make-Ready
✎
Financing Option
Capital Expense (Cash)
✎
Opportunity OwnerDirect Sales✎
Lead Source
Existing Customer Expansion
✎
Contract Type
Add-on / Expansion
✎
Utility Partner
Xcel Energy
✎
Estimated Make-Ready Cost
$25k - $50k
✎
Site Assessment Status
Completed
✎
Permitting Status
Pending City Approval
✎
Estimated Installation Date
December 2026
✎
Network Subscription Tier
Pro (Load Balancing)
✎
Payment Gateway
Stripe Integration
✎
Support SLA
Standard 48-Hour
✎
Loss Reason
N/A
✎
Proposal Delivered
Emailed the proposal to Elaine. Emphasized that the Pro tier includes the load balancing needed because their transformer only has 75kW of headroom.
Site Walkthrough Complete
Electrician confirmed the conduit run from the electrical room to the parking spots is clear. Make-ready costs will be minimal.
Initial Scoping Call
Sunrise wants to add amenities to the Aurora complex. They have 8 spots identified. Advised going with 4 dual-port units.
Campaign
Retail Charging Revenue Webinar
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameRetail Charging Revenue Webinar✎
Start DateJul 21, 2026✎
End DateJul 21, 2026✎
Type
Webinar
✎
Target Persona
Commercial Property Owners
✎
Key Theme
Passive Revenue Generation
✎
Call to Action
Book Site Evaluation
✎
Campaign OwnerMarketing Team✎
Status
Completed
✎
Budgeted Cost$1,500✎
Expected Revenue$150,000✎
Target Region
National / Digital
✎
Expected Response
Medium (100 - 300)
✎
Rebate Focus
General Make-Ready
✎
Webinar Debrief
Great turnout. 145 attendees. The ROI calculator tool we demoed got a lot of positive feedback in the Q&A.
Follow-up Automation
All attendees were added to the "Retail Site Evaluation" email drip. The 5 hot leads were routed directly to the sales team.
Next Steps
We should run a specific version of this for multi-family residential next quarter. The questions were distinctly different between retail and apartment managers.
Charging Site
Sunrise HQ Garage
Survey/Design
Permitting
Construction
Interconnection
Active Ops
Details
Notes
Files
Site Identity
Site NameSunrise HQ Garage✎
Address123 Sunrise Blvd, Denver CO✎
Latitude/Longitude39.7392, -104.9903✎
Access Type
Private (Tenants Only)
✎
Total Charger Count
10 Ports
✎
Host Payment Rev Share
80/20 Host Split
✎
Operating Hours
24/7 Access
✎
Property Manager
Internal Team
✎
Zoning District
Commercial Mixed-Use
✎
Make-Ready Completion Date
Completed
✎
Site OwnerDeployment Operations✎
Status
Active Ops
✎
Utility Provider
Xcel Energy
✎
Available Grid Capacity (kW)
100 kW
✎
Transformer Size (kVA)
150 kVA Dedicated
✎
On-Site Storage/Solar
None
✎
Canopy Coverage
Covered Parking Garage
✎
ADA Accessible Spots
1 Van Accessible
✎
Security Cameras
Existing Site Security
✎
Connectivity Type
Building Wi-Fi Extender
✎
Last Inspection Date
Completed January 2026
✎
Site Connectivity Update
The underground garage has weak cellular signal. We routed an ethernet drop from the main building switch to a Wi-Fi extender for the chargers. Working well.
Interconnection Sign-off
Xcel Energy completed the final meter set. Site is fully energized. Ready to start load balancing tests.
ADA Paint Note
The van-accessible spot needs to be repainted. The contractor used the wrong blue shade. Sunrise properties is handling it internally.
Charging Station (Hardware)
EVSE-SUN-HQ-03
Details
Notes
Files
Hardware Identification
Charger IDEVSE-SUN-HQ-03✎
Model Number
AC Pro Dual Port
✎
Max kW Output
19.2 kW
✎
Charger Type
Level 2 (AC)
✎
Connector Types
2x J1772
✎
Charger OwnerNetwork Operations✎
Operational Status
Fault Detected
✎
Cable Length
18 Feet
✎
Screen Display
7" LCD Color
✎
Card Reader Status
Active / Functional
✎
Firmware Version
v2.1.4
✎
Telemetry & Configuration
Serial NumberSN-88402919✎
Last Online Time
2 Hours Ago
✎
OCPP Connection Status
Rejected (Auth Error)
✎
Load Balancing Group
LBG-Sunrise-Grp1
✎
Current Error Code
ERR_GFCI_TRIP
✎
Daily Avg Energy (kWh)
14 kWh/day
✎
Commissioning Date
Feb 01, 2026
✎
Warranty Expiration
Valid (2029)
✎
Preventative Maint. Cycle
Annual
✎
Manufacturer
Tritium (Direct)
✎
GFCI Trip Logged
Charger logged a ground fault trip on port 1 during a heavy rainstorm. Unit went offline to protect the circuit. Needs a physical reset and inspection.
Work Order Dispatched
Created WO-44021. Local tech is scheduled to inspect the charging cable for weather damage tomorrow.
Commissioning Success
Unit booted up, downloaded OCPP config, and successfully pushed a test transaction of 1.5 kWh.
Maintenance Work Order
WO-44021
New
Dispatched
In Progress
Pending Parts
Resolved
Details
Notes
Files
Ticket Information
Work Order NumberWO-44021✎
Reported IssueGFCI Trip / Unit Offline✎
Issue Category
Hardware / Electrical
✎
RequestorAutomated System (NOC)✎
Work Order OwnerDispatch Team✎
Status
Open - Assigned
✎
Priority
High
✎
Escalation Required
No
✎
Diagnostic Code
ERR_GFCI_TRIP
✎
Diagnostics & Resolution
SLA Level
Standard 48-Hour
✎
Technician AssignedMike Rivera (Local Tech)✎
Dispatch DateAug 04, 2026✎
Resolution Type
Pending
✎
Customer Approval
Pre-Approved (Under Contract)
✎
Replacement Part Needed
Assessing
✎
Current Downtime (Hours)
14 Hours
✎
Root Cause Analysis
Pending Inspection
✎
Fix Date
TBD
✎
Invoice Status
N/A (Covered by SLA)
✎
Service Contractor
Internal Technician
✎
Dispatch Update
Assigned Mike Rivera. He will be on site at Sunrise HQ by 10am tomorrow. He has a spare J1772 cable in the truck just in case the port is damaged.
Customer Contacted
Emailed Thomas Vance to let him know unit #3 is down and a tech is scheduled. He appreciated the proactive reach-out.
Initial Diagnostic
Remote reset attempted at 8:00am. The unit accepted the reset command but immediately tripped the GFCI again. Hardware issue confirmed.


