Managing a centralized district heating and cooling network requires precise alignment of thermal generation, pipeline distribution, and building energy demands. Track connected properties, thermal substations, maintenance events, and energy efficiency upgrades seamlessly with this specialized operational CRM setup. Ensure maximum network uptime and streamline your thermal energy management operations.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track potential properties for district heating/cooling connections. Accounts
Manage connected commercial, residential, and municipal properties. Contacts
Organize facility managers and building owners across your network. Opportunities
Drive new thermal contracts and building capacity upgrades. Campaigns
Plan network expansion drives and energy efficiency webinars. Energy Substations
Log heat exchangers, flow meters, and property telemetry points. Pipeline Segments
Monitor underground chilled and hot water distribution pipes. Maintenance Events
Record scheduled flushing, valve checks, and emergency repairs.Lead
Eleanor Vance - Vance Commercial Real Estate
New
Contacted
Site Surveyed
Proposal Sent
Contract Signed
Details
Notes
Files
Primary Lead Information
First NameEleanor✎
Last NameVance✎
CompanyVance Commercial Real Estate✎
TitleProperty Developer✎
Phone(555) 433-2111✎
Lead OwnerSarah Jenkins✎
Lead StatusContacted✎
Connection TypeNew Construction✎
Network ProximityUnder 100 ft✎
MotivationCost Savings✎
Timeline6-12 Months✎
Technical Details
Current Energy SourceNatural Gas Boiler✎
Est. Peak Load (kW)450✎
Primary ApplicationHeating & Cooling✎
Building Size (sq ft)120,000✎
Lead SourceWeb Inquiry✎
Budget ApprovalPending Board Review✎
RatingHot✎
Industry SectorCommercial Office✎
RegionCentral Business District✎
Contract PreferenceFixed Rate Multi-Year✎
Initial Scoping Call Notes
Eleanor confirmed the new 120,000 sq ft development is in the planning phase. They want to avoid installing roof chillers to save space for a tenant terrace. Highly interested in our chilled water network.
Pipeline Proximity Check
Engineering verified the site is approximately 85 feet from the primary downtown chilled water loop. Minimal trenching required. Feasibility is very high.
Budget Cycle Clarification
Capital approval for the HVAC systems happens in October. We need to submit a firm proposal including connection fees by mid-September.
Account
Downtown Medical Center
Details
Contacts
Opportunities
Energy Substations
Pipeline Segments
Maintenance Events
Notes
Files
Primary Account Info
Account NameDowntown Medical Center✎
Phone(555) 888-0000✎
Account OwnerDavid Chen✎
Account TypeHospital/Medical✎
Network ZoneCentral Business District✎
Billing StateNY✎
Technical Specifications
Building TypeMedical / Lab✎
Total Connected Load (kW)2,400✎
SLA TierTier 1 (Mission Critical)✎
Thermal Energy PlanHeating + Cooling Base Load✎
Metering TypeSmart Ultrasonic BTU✎
Account StatusActive✎
SLA Compliance Review
Met with Alice Morgan. They are extremely happy with the 99.99% uptime on the chilled water loop this summer. Confirmed Tier 1 SLA metrics were met.
South Wing Expansion Plans
The hospital is expanding the South Wing. They will need an additional 400 kW of cooling capacity by next Spring. Engineering is evaluating the current bypass pipe limits.
Valve Leak Addressed
Emergency repair completed on the secondary isolation valve. Minimal pressure drop experienced. Substation back to normal operational parameters.
Contact
Alice Morgan
Details
Notes
Files
Primary Contact Info
Role Details
Contact OwnerDavid Chen✎
Contact RoleTechnical Buyer✎
DepartmentFacilities & Maintenance✎
Preferred Contact MethodMobile Phone✎
Technical ProficiencyAdvanced (Engineering)✎
Outage Notification PrefSMS + Email Alert✎
Influence LevelHigh✎
SLA Sign-off Protocol
Alice is the primary signatory for all technical modifications on the substations. She must be looped in before any maintenance crews are dispatched.
South Wing Blueprint Discussion
Alice shared the early CAD drawings for the South Wing expansion. The new chiller requirement is confirmed at 400 kW. She wants a proposal ASAP.
Emergency Contact Update
Alice requested we add Miguel Santos (Maintenance Supervisor) as the first point of contact for night-shift flow anomalies.
Opportunity
South Wing Chilled Water Expansion
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NameSouth Wing Chilled Water Expansion✎
TypeCapacity Upgrade✎
Next StepFinalize Equipment Pricing✎
Lead SourceAccount Management✎
Opportunity OwnerDavid Chen✎
Amount$125,000✎
Close DateOct 15, 2026✎
StageNegotiation✎
Probability80%✎
Forecast CategoryCommit✎
Technical & Project Parameters
Building Sq Footage45,000 (Expansion)✎
Req. Chilled Water (Tons)400✎
Req. Hot Water (MMBtu)N/A✎
Installation ComplexityModerate (Brownfield)✎
Financing TypeCapex (Upfront)✎
Contract Term10 Years✎
Pipeline RegionCentral Business District✎
CompetitorStandalone Air Chillers✎
Primary ObstacleCapEx Budget Constraints✎
Thermal Service TierTier 1 (Mission Critical)✎
Substation Req.Upgrade Existing✎
Delivery MethodTurnkey Installation✎
Pricing Negotiation Update
Alice pushed back slightly on the Chilled Water Connection Fee. I explained it covers the specific trenching bypass required to link the South Wing to the main line without shutting down the primary hospital feed.
Equipment Sourcing
Confirmed with procurement that the 400T Alfa Laval Heat Exchanger is in stock at the regional warehouse. Lead time is well within their required construction schedule.
Initial Proposal Walkthrough
Presented the initial proposal to Alice and the COO. They are pleased with the projected energy efficiency compared to installing dedicated rooftop chillers.
Campaign
Q3 Medical Campus Efficiency Drive
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameQ3 Medical Campus Efficiency Drive✎
Parent Campaign2026 Healthcare Decarbonization✎
Start DateJul 01, 2026✎
End DateSep 30, 2026✎
Budgeted Cost$12,000✎
Actual Cost$5,400✎
Target Building TypeHospital/Medical✎
Campaign OwnerMarketing Team✎
StatusIn Progress✎
TypeWebinar✎
Expected Revenue$850,000✎
RegionNational (All)✎
Target Decision MakerFacilities Director✎
Campaign RatingExcellent (>10% Resp)✎
Webinar Follow-up Protocol
All hospital facilities directors who attended the webinar should receive the "Mission Critical Cooling Reliability" whitepaper by Friday. Sales teams must call within 48 hours.
Content Approval
Engineering signed off on the slide deck detailing the redundancy features of the Tier 1 SLA. Deck is locked for presentation.
Initial Registration Numbers
We hit 85 registrants in the first week, heavily weighted towards medical campuses in the downtown corridor looking to replace aging chiller plants.
Energy Substation
DMC Main Chiller Exchange
Procurement
Installation
Commissioning
Online (Active)
Maintenance Mode
Details
Notes
Files
Hardware Specifications
Substation NameDMC Main Chiller Exchange✎
Commission DateApr 15, 2018✎
ManufacturerAlfa Laval✎
Serial NumberAL-CH-88293✎
Physical LocationBasement Mech Room B✎
Substation OwnerField Operations✎
StatusOnline✎
Service ZoneCentral Business District✎
Thermal ApplicationPrimary Cooling Circuit✎
Valve Type2-Way Modulating✎
Pumping ConfigurationVariable Primary Flow✎
Operating Parameters
Heat Exchanger Cap1,500 kW✎
Design Flow Rate (GPM)850✎
Primary FluidChilled Water (District)✎
Secondary FluidChilled Water (Building)✎
Telemetry IP10.150.22.4✎
Maintenance TierTier 1 (Mission Critical)✎
Network Isolation LevelFully Indirect (Plate HEX)✎
Remote MonitoringActive - 1 Min Polling✎
Connection MethodFlanged Steel 10"✎
Last Inspection StatusPassed - Optimal✎
Annual Flushing Completed
Completed the annual reverse flushing of the primary side plate pack. Flow differential pressure returned to baseline (1.2 psi drop). Unit is operating at peak efficiency.
Telemetry Drop-out Resolved
The smart meter dropped off the SCADA network for 15 minutes due to a localized switch reset in the hospital's IT room. Connectivity restored automatically.
Initial Commissioning Log
Unit commissioned successfully. Passed all pressure tests at 150 PSI. The 2-way modulating valve strokes fully within 45 seconds.
Pipeline Segment
SEG-CBD-881 (DMC Trunk)
Planning & Routing
Under Construction
Pressure Testing
Active Line
Decommissioned
Details
Notes
Files
Physical Characteristics
Segment IDSEG-CBD-881✎
Installation DateSep 01, 2017✎
Length (Meters)850✎
Diameter (Inches)12✎
Operating Pressure120 PSI✎
Segment OwnerNetwork Engineering✎
StatusActive✎
Fluid TypeChilled Water✎
Pipe MaterialCarbon Steel✎
Insulation MaterialPolyurethane Foam (PUR)✎
Pressure RatingPN 16 (232 PSI)✎
Operating Conditions & Routing
Operating Temp (F)42 F✎
Leak Detection SysCopper Wire Resistance✎
Depth (Meters)1.5 - 2.0✎
Street LocationUnder 4th Ave Corridor✎
Trench TypeDirect Buried✎
Flow DirectionSupply Line (Outbound)✎
Maintenance ZoneCBD - Grid Sector 4✎
Surrounding SoilUrban Fill / Sand✎
Traffic Impact LevelHigh (Arterial Road)✎
Corrosion ProtectionCathodic + HDPE Jacket✎
Leak Detection Sensor Test
Routine copper wire resistance test showed nominal ohms across the entire 850m segment. No moisture ingress detected in the polyurethane insulation layer.
South Wing Tie-in Planning
Reviewed the CAD files for the upcoming South Wing bypass (SEG-CBD-885). We will need to schedule a partial flow reduction on this trunk for 6 hours during the hot tap operation.
Street Resurfacing Coordination
The city is resurfacing 4th Ave next month. Coordinated with the municipal works department to ensure our manhole covers are raised to the new grade level.
Maintenance Event
Chilled Water Flow Anomaly
Reported / Logged
Dispatched
In Progress
Resolved
QA / Closed
Details
Notes
Files
Event Details
Event NameChilled Water Flow Anomaly✎
Related PipelineN/A✎
Start DateAug 01, 2026 02:15 AM✎
End DateAug 01, 2026 04:30 AM✎
Estimated Cost$1,250✎
Event OwnerField Operations✎
StatusResolved✎
Event TypeEmergency Repair✎
PriorityCritical✎
Service RegionCentral Business District✎
Equipment CategoryValve / Actuator✎
Logistics & Outcomes
Labor Hours4.5✎
Vendor NameInternal Team✎
Work Order IDWO-99412✎
Safety Permit NumLOTO-2026-881✎
Root CauseActuator seal failure✎
Resolution CodePart Replaced✎
Parts RequiredO-Ring Seal Kit 10"✎
Customer ImpactSlight Temp Drift (<1F)✎
Approval StatusAuto-Approved (Emerg)✎
Post-Event QAPending Supervisor Review✎
Initial SCADA Alert
SCADA reported a sudden 15% pressure drop on the secondary isolation valve for DMC Substation. Automated alert paged the on-call tech at 2:15 AM.
Field Diagnosis
Arrived on site at 2:45 AM. Found the primary actuator seal had blown out, causing minor fluid bypass. Locked out and tagged out (LOTO) the line.
Repair Summary
Replaced the 10-inch O-ring seal kit. Repressurized the line slowly. Zero leaks observed. Total downtime was under 2 hours, resulting in no noticeable impact to the hospital's cooling loop.


