Managing large-scale teardowns, site grading, and hazardous material removal requires precise operational control. This system provides commercial demolition and excavation contractors with a unified view of bidding, site prep, equipment deployment, and municipal permit tracking. With streamlined estimating and safety compliance tools, your crews stay on schedule and under budget.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
L Leads
Track incoming demolition and site prep bids.A Accounts
Manage property developers and general contractors.C Contacts
Site managers, safety inspectors, and foremen.O Opportunities
Pipeline for grading, excavation, and structural teardowns.C Campaigns
Marketing initiatives for heavy machinery and site clearing.C Site Inspections
Record soil testing, hazmat surveys, and structural integrity.C Equipment Assets
Track excavators, loaders, and dump trucks per site.C Permits
Monitor local municipal clearances and zoning approvals.Interactive Template Below
L
Leads
| Name | Company | Project Type | Status | Estimated Volume (CY) | Phone | Owner |
|---|---|---|---|---|---|---|
| Midtown Commercial Teardown | Apex Property Developers | Structural Demolition | Site Visit Scheduled | 15,000 | 555-0192 | Sarah Jenkins |
| Riverfront Land Grading | Metro Construction | Mass Excavation | New | 45,000 | 555-0211 | Mike Wallace |
| Old Mill Hazmat Clearance | City Zoning Board | Asbestos Abatement | Estimating | 8,500 | 555-0394 | Sarah Jenkins |
| Highway 9 Extension Prep | State DOT | Trenching | Negotiation | 120,000 | 555-0442 | Mike Wallace |
| Suburban Retail Pad Eval | Greenfield Real Estate | Site Clearing | Proposal Sent | 22,000 | 555-0551 | Sarah Jenkins |
L
Lead
Midtown Commercial Teardown
New
Site Visit Scheduled
Estimating
Proposal Sent
Converted
Details
Notes
Files
Primary Lead Information
Lead NameMidtown Commercial Teardown✎
CompanyApex Property Developers✎
Project TypeStructural Demolition✎
Lead SourceTrade Show✎
Estimated Volume (CY)15,000✎
Lead OwnerSarah Jenkins✎
StatusSite Visit Scheduled✎
Phone555-0192✎
Estimated Budget$450,000✎
Site PriorityHigh✎
Site Details & Requirements
Address450 Industrial Parkway✎
Zoning ClassificationCommercial✎
Soil TypeClay & Rock✎
Structural MaterialReinforced Concrete✎
Hazmat PresentSuspected Asbestos✎
Required Clearance DateNov 15, 2026✎
Equipment NeededHigh Reach Excavator✎
Access RestrictionsNarrow Urban Alley✎
Disposal Distance12 Miles✎
Lead RatingHot✎
Site Walkthrough Impressions
The foundation is thicker than expected. We will need hydraulic breakers for the slab removal. Adjacent properties are very close.
Created by Sarah Jenkins • July 28, 2026
Zoning Discussion
Spoke with city planner. We need to submit a dust mitigation plan before they approve the final tear-down permit.
Created by Sarah Jenkins • July 25, 2026
Initial Call
Client needs the site completely graded and prepped by mid-November for winter construction. Budget seems flexible.
Created by Mike Wallace • July 20, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Midtown_Site_Blueprint.pdf | 4.2 MB | July 20, 2026 | |
| Hazmat_Initial_Survey.docx | DOCX | 1.1 MB | July 22, 2026 |
| Street_View_Photos.zip | ZIP | 18.5 MB | July 28, 2026 |
A
Accounts
| Account Name | Type | Industry | Active Sites | Phone | Owner |
|---|---|---|---|---|---|
| Apex Property Developers | General Contractor | Commercial Real Estate | 3 | 555-0991 | Sarah Jenkins |
| Metro Demolition Group | Partner | Demolition | 1 | 555-1123 | Mike Wallace |
| State Dept of Transportation | Government | Infrastructure | 5 | 555-8822 | Sarah Jenkins |
| Greenfield Real Estate | Developer | Residential | 2 | 555-3344 | Mike Wallace |
| Valley Landfill & Recycling | Vendor | Waste Management | 0 | 555-9012 | Sarah Jenkins |
A
Account
Apex Property Developers
Details
Contacts
Opportunities
Site Inspections
Equipment Assets
Permits
Notes
Files
Primary Information
Account NameApex Property Developers✎
Account TypeGeneral Contractor✎
Industry SpecialtyCommercial Real Estate✎
Active Sites3✎
Account OwnerSarah Jenkins✎
Phone555-0991✎
Websitewww.apexprop.com✎
StatusActive Client✎
Billing & Risk Profiling
Billing Address100 Corporate Way, Suite 500✎
Preferred PaymentNet 30✎
Safety Record TierTier 1 - Excellent✎
Annual Revenue$85,000,000✎
Preferred Disposal RouteRecycle Heavy✎
Insurance Requirement$5M Umbrella✎
C Contacts
| Name | Title | Phone | |
|---|---|---|---|
| John Miller | Site Manager | [email protected] | 555-0192 |
| Karen Davies | Procurement Director | [email protected] | 555-0193 |
| Tom Vance | Safety Officer | [email protected] | 555-0194 |
| Linda Wu | VP of Operations | [email protected] | 555-0195 |
| Marcus Wright | Estimator | [email protected] | 555-0196 |
O Opportunities
| Opportunity Name | Stage | Amount | Close Date |
|---|---|---|---|
| Phase 1 - Concrete Breakout | Negotiation | $185,000 | Aug 15, 2026 |
| North Lot Mass Grading | Closed Won | $420,000 | Jan 10, 2026 |
| Building 4 Implosion Prep | Proposal | $950,000 | Sep 01, 2026 |
| East Wing Asbestos Abatement | Discovery | $65,000 | Oct 12, 2026 |
| South Perimeter Trenching | Closed Lost | $110,000 | Mar 22, 2026 |
Quarterly Review
Apex is looking to consolidate their demo partners. If we perform well on the Midtown site, they will award us the suburban retail contract.
Created by Sarah Jenkins • July 01, 2026
Billing Update
Accounts payable requested we submit progress billing on the 15th of each month instead of the 1st. Updated system to reflect this.
Created by Finance Dept • June 15, 2026
Safety Alignment Meeting
Met with Tom Vance. They have instituted a new mandatory PPE standard requiring Class 3 high-vis on all urban sites.
Created by Sarah Jenkins • May 20, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Apex_MSA_Signed.pdf | 5.1 MB | Jan 10, 2026 | |
| Insurance_Cert_2026.pdf | 1.2 MB | Jan 12, 2026 | |
| Vendor_Setup_Form.docx | DOCX | 0.8 MB | Jan 05, 2026 |
C
Contacts
| Name | Account | Title | Role | Phone | Owner |
|---|---|---|---|---|---|
| John Miller | Apex Property Developers | Site Manager | Decision Maker | 555-0192 | Sarah Jenkins |
| Tom Vance | Apex Property Developers | Safety Officer | Influencer | 555-0194 | Sarah Jenkins |
| David O'Connor | Metro Demolition Group | Lead Estimator | Evaluator | 555-1123 | Mike Wallace |
| Rebecca Hayes | City Zoning Board | Permit Inspector | Regulator | 555-8822 | Sarah Jenkins |
| Frank Giordano | Valley Landfill | Facility Manager | Vendor Contact | 555-9012 | Mike Wallace |
C
Contact
John Miller
Details
Notes
Files
Contact Information
Contact OwnerSarah Jenkins✎
Mobile Phone555-0192✎
Project RoleDecision Maker✎
Operational Clearances
Safety CertificationOSHA 30✎
Site Access LevelAll Zones✎
Preferred CommunicationSMS Text✎
Union AffiliationNon-Union✎
Emergency ContactYes✎
Clearance ExpirationDec 31, 2027✎
Site Prep Preferences
John prefers daily text updates on yardage moved rather than weekly reports. Adjusting our update cadence.
Created by Sarah Jenkins • July 22, 2026
Safety Walk
Completed safety walk with John. He is very strict on perimeter fencing and dust control.
Created by Mike Wallace • June 05, 2026
Introduction
Met John at the heavy equipment expo. He manages all Tier 1 tear-downs for Apex.
Created by Sarah Jenkins • Jan 15, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Miller_Business_Card.jpg | JPG | 0.5 MB | Jan 16, 2026 |
| OSHA_30_Cert_Miller.pdf | 1.1 MB | Feb 10, 2026 | |
| Site_Access_Waiver.pdf | 0.9 MB | June 01, 2026 |
O
Opportunities
| Opportunity Name | Account Name | Amount | Stage | Close Date | Owner |
|---|---|---|---|---|---|
| Phase 1 - Concrete Breakout & Removal | Apex Property Developers | $185,000 | Proposal | Aug 15, 2026 | Sarah Jenkins |
| Highway 9 Trenching | State DOT | $420,000 | Negotiation | Sep 10, 2026 | Mike Wallace |
| Warehouse Structural Teardown | Metro Demolition Group | $85,000 | Discovery | Aug 30, 2026 | Sarah Jenkins |
| Suburban Pad Grading | Greenfield Real Estate | $210,000 | Closed Won | Jul 12, 2026 | Mike Wallace |
| Old Mill Asbestos Clearance | City Zoning Board | $145,000 | Proposal | Oct 01, 2026 | Sarah Jenkins |
O
Opportunity
Phase 1 - Concrete Breakout & Removal
Discovery
Site Evaluation
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Project Scope & Timeline
Opportunity NamePhase 1 - Concrete Breakout & Removal✎
TypeNew Project✎
Primary Demolition MethodExcavator Push / Breaker✎
Estimated CY12,000✎
Lead SourceDirect Inquiry✎
Opportunity OwnerSarah Jenkins✎
Close DateAug 15, 2026✎
StageProposal✎
Probability (%)60%✎
Project Start DateSep 01, 2026✎
Expected Duration3 Weeks✎
Financials & Logistics
Amount$185,000✎
Dump Fees Est.$22,000✎
Permit Costs Est.$4,500✎
Pricing ModelFixed Bid✎
Bonding RequiredPayment & Performance✎
Margin CategoryStandard (15-20%)✎
Equipment MobilizationHeavy - Multi Load✎
Water Source for DustCity Hydrant (Metered)✎
Debris Target FacilityValley Landfill✎
Night Work Req.No✎
CompetitorNational Demo Corp✎
Next StepSubmit finalized bid packet✎
P Line Items
| Service Name | Phase Code | Quantity (Days) | Day Rate | Total Price | Equipment Req. |
|---|---|---|---|---|---|
| Heavy Breaker Operation | PH-01-BRK | 5.00 | $6,500.00 | $32,500.00 | Excavator w/ Breaker |
| Concrete Loading & Haul | PH-02-HAUL | 8.00 | $8,200.00 | $65,600.00 | Loader & 4 Dump Trucks |
| Site Grading & Compaction | PH-03-GRD | 4.00 | $5,000.00 | $20,000.00 | Dozer & Compactor |
| Disposal Fees (Estimate) | FEE-DUMP | 1.00 | $66,900.00 | $66,900.00 | N/A |
Pricing Strategy Update
Adjusted the haul rates due to increased diesel costs this month. Client accepted the explanation.
Created by Sarah Jenkins • July 28, 2026
Equipment Scheduling Conflict
We may need to rent a breaker attachment for the first 3 days if the Highway 9 job runs long. Included rental contingency in the bid.
Created by Logistics Team • July 20, 2026
Initial Scope Definition
The existing slab is 12 inches reinforced. They want it broken down to minus 6 inch fill if possible, otherwise hauled away entirely. Bid is based on hauling.
Created by Sarah Jenkins • July 10, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Midtown_Bid_Packet_v2.pdf | 2.4 MB | July 29, 2026 | |
| Slab_Core_Sample_Results.pdf | 0.8 MB | July 15, 2026 | |
| Equipment_Cost_Breakdown.xlsx | XLSX | 1.2 MB | July 12, 2026 |
C
Campaigns
| Campaign Name | Type | Status | Start Date | End Date | Owner |
|---|---|---|---|---|---|
| Q3 Heavy Machinery Upgrades Promo | In Progress | Jul 01, 2026 | Sep 30, 2026 | Marketing Team | |
| Spring Commercial Tear-Down Mailer | Direct Mail | Completed | Mar 01, 2026 | May 31, 2026 | Marketing Team |
| Regional Construction Expo 2026 | Trade Show | Planned | Oct 15, 2026 | Oct 18, 2026 | Marketing Team |
| Hazmat Compliance Webinar | Webinar | In Progress | Jul 10, 2026 | Aug 10, 2026 | Sarah Jenkins |
| City Planner Outreach Series | Public Relations | Planned | Sep 01, 2026 | Dec 31, 2026 | Mike Wallace |
C
Campaign
Q3 Heavy Machinery Upgrades Promo
Details
Campaign Members
Notes
Files
Campaign Execution
Campaign NameQ3 Heavy Machinery Upgrades Promo✎
TypeEmail✎
StatusIn Progress✎
Target AudienceCommercial Developers✎
Campaign OwnerMarketing Team✎
Start DateJul 01, 2026✎
End DateSep 30, 2026✎
Metrics & Budget
Budgeted Cost$5,000✎
Actual Cost$2,100✎
Expected Revenue$150,000✎
Leads Generated14✎
Converted Leads3✎
Message ObjectiveFaster Clearance Times✎
C Campaign Members
| Name | Company | Status |
|---|---|---|
| John Miller | Apex Property Developers | Opened |
| David O'Connor | Metro Demolition Group | Clicked |
| Tom Vance | Apex Property Developers | Sent |
| Frank Giordano | Valley Landfill | Bounced |
| Linda Wu | Apex Property Developers | Responded |
Mid-Campaign Review
Open rate is hovering around 22%. The messaging about our new High Reach Excavator seems to be driving the most clicks.
Created by Marketing Team • July 25, 2026
List Segmentation
Excluded residential developers from this blast to keep the focus strictly on heavy commercial teardowns.
Created by Marketing Team • June 30, 2026
Content Approval
Management approved the promo copy emphasizing speed of deployment for high-density urban sites.
Created by Sarah Jenkins • June 15, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Email_Draft_v3.html | HTML | 0.2 MB | June 28, 2026 |
| Excavator_Promo_Header.png | PNG | 1.5 MB | June 20, 2026 |
| Target_List_Q3.csv | CSV | 0.9 MB | June 29, 2026 |
C
Site Inspections
| Inspection ID | Site/Account | Type | Result | Date | Owner |
|---|---|---|---|---|---|
| INSP-0091 | Apex Property Developers | Pre-Demolition | Passed | Jul 28, 2026 | Tom Vance |
| INSP-0082 | State DOT | Soil Compaction | Passed w/ Conditions | Jul 20, 2026 | Sarah Jenkins |
| INSP-0074 | City Zoning Board | Hazmat / Asbestos | Pending Lab Results | Jul 18, 2026 | Tom Vance |
| INSP-0065 | Metro Demolition Group | Air Quality | Failed - Lead Dust | Jul 10, 2026 | Third Party |
| INSP-0050 | Greenfield Real Estate | Utility Mark-out Check | Passed | Jun 25, 2026 | Mike Wallace |
C
Site Inspection
INSP-0091 - Pre-Demolition Check
Scheduled
On-Site Walk
Lab Processing
Report Generated
Closed
Details
Notes
Files
Inspection Details
Inspection IDINSP-0091✎
Inspection TypePre-Demolition Check✎
Result StatusPassed✎
Inspector NameTom Vance✎
Testing AgencyInternal Safety Dept✎
OwnerSarah Jenkins✎
Inspection DateJul 28, 2026✎
Site PhasePre-Mobilization✎
Hazard Level IdentifiedLow✎
Remediation RequiredNo✎
Follow-up RequiredNo✎
Field Notes & Observations
Structural WeaknessRoof partially collapsed✎
Soil ConditionsStable - Mixed Fill✎
Utility Cutoff ConfirmedYes - All Disconnected✎
Perimeter Fencing CheckSecure✎
Dust Mitigation PlanApproved✎
Weather ConditionsClear, Dry✎
Site Access RouteClear for Heavy Trucks✎
Traffic Control Req.Flaggers Needed✎
Photo Evidence LinkedYes✎
Next Inspection DueN/A✎
Site Verification
All underground utilities have been properly capped at the street level. We are clear to begin foundation breakout.
Created by Tom Vance • July 28, 2026
Traffic Note
Because of the narrow alleyway access, we will need two flaggers stationed during all dump truck load-outs.
Created by Tom Vance • July 28, 2026
Preparation Checklist
Verified signage is posted on all 4 corners of the perimeter fence in accordance with municipal code.
Created by Sarah Jenkins • July 25, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Utility_Disconnect_Proof.pdf | 1.4 MB | July 28, 2026 | |
| Inspection_Photos_July28.zip | ZIP | 24.0 MB | July 28, 2026 |
| Safety_Checklist_Signed.pdf | 0.5 MB | July 28, 2026 |
C
Equipment Assets
| Asset Tag | Type | Status | Current Site | Hours Logged | Owner |
|---|---|---|---|---|---|
| EX-405 | Crawler Excavator | Deployed | Midtown Teardown | 4,250 | Fleet Manager |
| DT-112 | Articulated Dump Truck | Maintenance Required | Shop | 8,100 | Mechanic Team |
| SS-099 | Skid Steer Loader | Available | Main Yard | 1,200 | Fleet Manager |
| CR-300 | Mobile Crusher | Deployed | Midtown Teardown | 2,800 | Fleet Manager |
| DZ-220 | Bulldozer | Deployed | North Lot Grading | 6,500 | Fleet Manager |
C
Equipment Asset
EX-405 - High Reach Crawler Excavator
Details
Notes
Files
Asset Specifications
Asset TagEX-405✎
Equipment ClassCrawler Excavator✎
Make / ModelCat 352 UHD✎
Year of Manufacture2021✎
Ownership StatusOwned✎
Primary AttachmentHydraulic Breaker✎
Asset OwnerFleet Manager✎
Current StatusDeployed✎
Engine Hours4,250✎
Last Service DateMay 10, 2026✎
Next PM Due (Hours)4,500✎
Operational Log & Logistics
Daily Burn Rate (Fuel)85 Gals/Day✎
Operating Weight115,000 lbs✎
Transport RequirementsLowboy / Oversize Permit✎
Telematics LinkedYes - Active✎
Insurance Value$650,000✎
Assigned OperatorDave 'Bear' Higgins✎
Operator Union/CertOperating Eng. Local 4✎
Deployment StartAug 01, 2026✎
Est Release DateAug 21, 2026✎
Condition RatingGood✎
Hydraulic Line Check
Replaced the secondary hydraulic lines to the breaker attachment before deploying to Midtown. Pressure holding steady.
Created by Mechanic Team • July 25, 2026
Operator Feedback
Bear noted the AC in the cab is struggling on hot days. Ordered a replacement condenser unit.
Created by Fleet Manager • July 10, 2026
Telematic Update
Firmware updated on the GPS tracker. Idling metrics should now be perfectly synced with the main dashboard.
Created by IT Support • June 02, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Cat_352_Manual.pdf | 15.2 MB | Jan 05, 2026 | |
| Maintenance_Log_2026.xlsx | XLSX | 0.4 MB | July 25, 2026 |
| Oversize_Load_Permit_Midtown.pdf | 0.9 MB | July 30, 2026 |
C
Permits & Clearances
| Permit # | Site/Account | Authority | Type | Status | Owner |
|---|---|---|---|---|---|
| PRM-8831 | Apex Property Developers | City Zoning Dept | Structural Demo | Approved | Sarah Jenkins |
| PRM-8842 | City Zoning Board | EPA Regional | Hazmat Disposal | Under Review | Sarah Jenkins |
| PRM-8890 | State DOT | County Water | Runoff Discharge | Approved | Mike Wallace |
| PRM-8901 | Apex Property Developers | DOT | Oversize Load Routing | Approved | Dispatch Team |
| PRM-8915 | Metro Demolition Group | City Fire Dept | Implosion Safety | Pending Hearing | Sarah Jenkins |
C
Permits & Clearances
PRM-8831 - Structural Demolition Clearance
Application Prepped
Submitted
Under Review
Approved
Expired / Closed
Details
Notes
Files
Permit Details
Permit NumberPRM-8831✎
Permit TypeStructural Demo✎
Authority / AgencyCity Zoning Dept✎
StatusApproved✎
Filing Fee ($)$1,250✎
Permit OwnerSarah Jenkins✎
Submission DateJun 15, 2026✎
Approval DateJul 20, 2026✎
Valid FromAug 01, 2026✎
Expiration DateNov 01, 2026✎
Renewal RequiredNo✎
Compliance & Conditions
Operating Hours Allowed7:00 AM - 5:00 PM✎
Noise Limit (dB)85 dB at Perimeter✎
Dust Control ReqContinuous Watering✎
Vibration MonitoringRequired (Seismograph)✎
Signage MandatePublic Notice Posted✎
Inspector ContactOfficer D. Ruiz✎
Inspector Phone555-8810✎
Notice to ProceedReceived✎
Pre-Construction MtgCompleted✎
Bond Posted?Yes✎
Approval Conditions
The city granted approval but stipulated that we cannot begin hammering until 8:00 AM due to the nearby residential zone.
Created by Sarah Jenkins • July 20, 2026
Vibration Monitoring Setup
Hired Geotech Corp to set up seismographs on the adjacent eastern wall to ensure compliance with the permit limits.
Created by Mike Wallace • July 05, 2026
Application Submitted
Dropped off the hard copies of the site plan and structural engineering sign-off at City Hall.
Created by Sarah Jenkins • June 15, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Official_Permit_PRM8831.pdf | 2.1 MB | July 20, 2026 | |
| Stamped_Engineering_Plans.pdf | 18.5 MB | June 15, 2026 | |
| Payment_Receipt_Fee.png | PNG | 0.3 MB | June 15, 2026 |
