This customized Salesforce instance is built specifically for technology data center operators and colocation providers. It simplifies tracking facility capacity, managing complex server deployments, and monitoring active network circuits. The streamlined layout ensures clear visibility into power density, cooling requirements, and service level agreements for enterprise clients.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Capture potential colocation clients and gauge their initial footprint needs. Accounts
Manage current enterprise tenants, their overall SLA, and contract terms. Contacts
Track facility access levels, technical contacts, and security clearances. Opportunities
Pipeline hardware migrations, rack expansions, and power commitment upgrades. Campaigns
Monitor marketing efforts targeting regional IT directors and channel partners. Data Centers
Monitor facility capacity, PUE metrics, and redundant cooling topology. Server Deployments
Manage custom hardware staging, rack density, and handover schedules. Network Circuits
Track cross-connects, IP allocations, bandwidth tiers, and latency guarantees.Lead
Marcus Vance - NexGen Storage
New
Contacted
Qualified
Technical Review
Proposal Sent
Converted
Details
Notes
Files
Primary Lead Information
First NameMarcus✎
Last NameVance✎
CompanyNexGen Storage✎
TitleVP of Infrastructure✎
Phone(555) 209-1834✎
Lead OwnerSarah Jenkins✎
StatusNew✎
SourceWebinar✎
IndustryTechnology✎
Expected Power Draw20 kW✎
Space Requirement4 Racks✎
Additional Details
Websitewww.nexgenstorage.demo✎
Street100 Tech Blvd✎
CityAustin✎
StateTX✎
Zip Code73301✎
Coolant Type PrefAir Cooled✎
Timeline1-3 Months✎
Current ProviderEquinix✎
Compliance NeedsSOC 2 Type II✎
Initial Budget$10k-$20k Monthly✎
Initial Scoping Call Notes
Client is looking to migrate out of on-prem facility. Needs 4 racks with standard air cooling, redundant A/B power.
Power Requirements Updated
Adjusted expected power draw up to 20kW total to accommodate new high-density storage arrays.
Competitor Pricing
Client mentioned they are cross-shopping with CoreSite. Need to emphasize our superior network peering options.
Account
Global Trade Bank
Details
Contacts
Opportunities
Data Centers
Server Deployments
Network Circuits
Notes
Files
Account Information
Account NameGlobal Trade Bank✎
Parent AccountGTB Holdings✎
Phone(800) 555-0199✎
Websitewww.globaltradebank.demo✎
Account OwnerDavid Ross✎
Account TypeEnterprise Colocation✎
IndustryFinance✎
SLA TierPlatinum (99.999%)✎
Facility Requirements
Total Footprint4,500 SqFt✎
Power Density12 kW/rack✎
Redundancy Req2N+1✎
Primary Data CenterAshburn DC-1✎
Network TopologyDual Homing✎
Billing CycleMonthly✎
| Name | Title | Phone | |
|---|---|---|---|
| Robert Vance | CIO | [email protected] | (555) 123-4455 |
| Linda Wu | Network Engineer | [email protected] | (555) 123-4456 |
| Thomas Miller | Facility Manager | [email protected] | (555) 123-4457 |
| Sarah Connor | Security Ops | [email protected] | (555) 123-4458 |
| James Dean | Procurement | [email protected] | (555) 123-4459 |
| Name | Amount | Stage | Close Date |
|---|---|---|---|
| GTB - Cage Expansion Ph2 | $450,000 | Proposal | Sep 15, 2026 |
| GTB - Cross Connect Upgrade | $25,000 | Closed Won | Jan 10, 2026 |
| GTB - Power Density Increase | $120,000 | Negotiation | Aug 30, 2026 |
| GTB - Dallas DR Site | $600,000 | Discovery | Nov 1, 2026 |
| GTB - Managed Smart Hands | $40,000 | Closed Won | Mar 5, 2026 |
| Facility Name | City | Max Capacity | Tier Rating |
|---|---|---|---|
| Ashburn DC-1 | Ashburn | 25 MW | Tier III |
| Ashburn DC-2 | Ashburn | 40 MW | Tier IV |
| Dallas DC-1 | Dallas | 15 MW | Tier III |
| Santa Clara DC-1 | Santa Clara | 20 MW | Tier III |
| Chicago DC-1 | Chicago | 30 MW | Tier IV |
| Deployment ID | Location | Status | Target Completion |
|---|---|---|---|
| DEP-2026-044 | Ashburn DC-1 | Staging | Aug 15, 2026 |
| DEP-2026-012 | Ashburn DC-1 | Completed | Jan 12, 2026 |
| DEP-2025-108 | Dallas DC-1 | Completed | Oct 10, 2025 |
| DEP-2026-089 | Chicago DC-1 | Planning | Sep 30, 2026 |
| DEP-2026-091 | Santa Clara DC-1 | Hardware Received | Sep 05, 2026 |
| Circuit ID | Provider | Status | Bandwidth |
|---|---|---|---|
| CIR-ATT-9921 | AT&T | Active | 10 Gbps |
| CIR-LVL3-441 | Lumen | Active | 10 Gbps |
| CIR-ZAY-002 | Zayo | Provisioning | 100 Gbps |
| CIR-EQX-998 | Equinix Fabric | Active | 1 Gbps |
| CIR-COG-112 | Cogent | Pending Testing | 10 Gbps |
Quarterly Business Review
Client is highly satisfied with SLA uptime in Ashburn. Discussed potential expansion to Chicago facility next year.
Cooling Audit Results
No issues found during the semi-annual cooling audit of cage C-44. Redundant loop functioning perfectly.
Access List Update
Linda Wu requested access for 3 new remote hands technicians. Approved and badges issued.
Contact
Linda Wu
Details
Notes
Files
Contact Information
Contact OwnerDavid Ross✎
DepartmentIT Ops✎
RoleTechnical Buyer✎
Pref. MethodEmail✎
Communication & Security
Facility AccessUnescorted✎
Sec. ClearanceStandard Background✎
Notification PrefTechnical Outages Only✎
Primary Technical Contact
Linda is the main point of contact for all cross-connect provisioning and BGP routing changes.
Badge Renewal
Badge is set to expire next month. Sent reminder email with renewal instructions.
Dietary Restriction
Client is allergic to shellfish. Remember for next QBR dinner.
Opportunity
GTB - Cage Expansion Ph2
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Opportunity Details
Opportunity NameGTB - Cage Expansion Ph2✎
Amount$450,000✎
Close DateSep 15, 2026✎
Next StepReview draft design✎
Lead SourceAccount Expansion✎
Opp OwnerDavid Ross✎
StageProposal✎
TypeExisting Customer - Upgrade✎
Primary DCAshburn DC-1✎
Deployment TypePrivate Cage✎
Contract Term36 Months✎
Technical Specifications
Total Racks12✎
Power Commit144 kW✎
Cooling ConfigHot Aisle Containment✎
Uplink Speed100 Gbps✎
Cross Connects4 Fiber Pairs✎
Target Go-LiveNov 1, 2026✎
Power Redundancy2N (A/B Feeds)✎
Network RedundancyDiverse Entrances✎
Rack Type42U Standard✎
PDU StandardThree Phase 60A✎
Security Cage Req.Yes✎
Managed ServicesSmart Hands Block✎
Pricing Approval Required
Requested 10% discount on the cabinet recurring fees to match CoreSite's offer. Pending VP approval.
Cage Design Review
Facilities approved the custom cage design. Need to ensure under-floor mesh is included in the SOW.
Go-Live Date Slipped
Client hardware delivery delayed by vendor. Shifted target go-live from Oct 1 to Nov 1.
Campaign
Q3 High Density Power Push
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameQ3 High Density Power Push✎
Parent Campaign2026 Facility Expansions✎
Start DateJul 1, 2026✎
End DateSep 30, 2026✎
Campaign OwnerMarketing Team✎
StatusIn Progress✎
TypeEmail✎
Target AudienceIT Directors (Enterprise)✎
Budget & Metrics
Budgeted Cost$25,000✎
Actual Cost$18,400✎
Expected Revenue$1,500,000✎
Channel SegmentDirect Enterprise✎
Focus RegionNorth America✎
Expected Conv.4.5%✎
| Name | Company | Status | Type |
|---|---|---|---|
| Robert Vance | Global Trade Bank | Responded | Contact |
| Marcus Vance | NexGen Storage | Clicked Email | Lead |
| Elena Rostova | FinTech Global | Sent | Lead |
| Sam Petersen | CyberShield Sec | Responded | Contact |
| Sofia Lopez | Quantum AI | Bounced | Lead |
Email Batch 2 Performance
Second wave of emails emphasizing 20kW+ rack capacity resulted in a 3.2% CTR. Highest engagement in Texas region.
Webinar Follow-up
Added 45 webinar attendees to this campaign to push the promotional pricing on direct liquid cooling options.
Budget Adjustment
Shifted $5k from display ads to targeted LinkedIn sponsored content targeting VP of IT titles.
Data Center
Ashburn DC-1
Details
Notes
Files
Facility Overview
Facility NameAshburn DC-1✎
Location CityAshburn✎
Location StateVA✎
Total SqFt120,000✎
Built Year2018✎
Max Capacity25 MW✎
Facility OwnerFacilities Mgmt✎
Tier RatingTier III✎
Cooling TypeChilled Water (CRAH)✎
Power ProviderDominion Energy✎
Carrier NeutralYes✎
Security LevelLevel 5 (Mantraps/Bio)✎
Operational Metrics
Current Util (%)82%✎
Avail Power (MW)4.5 MW✎
Avail Space (SqFt)21,600 SqFt✎
PUE Metric1.35✎
WUE Metric1.1 L/kWh✎
Seismic ZoneZone 1✎
Backup GeneratorN+1 Diesel✎
UPS TopologyBlock Redundant✎
Fire SuppressionPre-action Dry Pipe✎
Certification StatusSOC 2, ISO 27001✎
Generator Testing
Monthly load bank testing completed successfully. Gen 3 required a minor filter replacement.
Capacity Warning
Data Hall 4 is reaching 90% power utilization. We need to throttle new deployments in that hall until the panel upgrade next month.
Compliance Audit
Annual SOC 2 audit completed with zero non-conformities. Final report uploaded.
Server Deployment
DEP-2026-044
Planning
Hardware Received
Staging
Racking/Cabling
Power Validation
Client Handover
Details
Notes
Files
Deployment Info
Deployment IDDEP-2026-044✎
Project StartJul 10, 2026✎
Target EndAug 15, 2026✎
Deploy OwnerDeployment Team✎
StatusStaging✎
Hardware VendorDell EMC✎
Rack DensityHigh Density (>15kW)✎
Network SetupTop of Rack (ToR)✎
OS RequirementVMware ESXi✎
Hardware Details
Server Count120✎
Switch Count12✎
Storage Arrays6✎
Total Rack Units240 U✎
Cabling TypeCat6a + OS2 Fiber✎
Power PhaseThree Phase✎
Receptacle TypeL15-30P✎
Environment TierProduction✎
SLA AgreementPlatinum Managed✎
Handover StatusPending Checks✎
Rails Installation Complete
All server rails installed in racks C44 through C49. Waiting on final pallet of Dell servers from loading dock.
PDU Delivery Issue
Two L15-30P PDUs were DOA. RMA requested, replacements should arrive by Thursday. We can still rack/stack in the meantime.
Kickoff Call Notes
Client stressed strict adherence to port-map documentation for the ToR switches.
Network Circuit
CIR-ZAY-002
Ordered
Provisioning
Pending Testing
Active
Renewed
Decommissioned
Details
Notes
Files
Circuit Information
Circuit IDCIR-ZAY-002✎
Provider NameZayo✎
Demarcation PtMeet-Me-Room B, Rack 4✎
Contract StartAug 15, 2026✎
Contract EndAug 14, 2029✎
Circuit OwnerNOC Team✎
Circuit StatusProvisioning✎
Connection TypeCross Connect✎
Bandwidth Tier100 Gbps✎
Media TypeSingle Mode Fiber✎
Handoff Interface100GBASE-LR4✎
Technical Specifications
IP Blocks Assigned/28 IPv4✎
Latency Guar.(ms)< 5ms Local✎
VLAN Tagging802.1Q (VLAN 404)✎
AS NumberAS65001✎
Monthly Cost$2,800.00✎
Redundancy PathPath B (Diverse)✎
Routing ProtocolBGP✎
IPv6 SupportDual Stack✎
Monitoring LevelSNMP + NetFlow✎
Troubleshoot SLA4 Hour MTTR✎
LOA/CFA Received
Received the Letter of Authorization and Connecting Facility Assignment from Zayo. Cross-connect team scheduled to run fiber on Tuesday.
Optic Compatibility Check
Verified client router uses matching 100GBASE-LR4 transceivers. We will not need signal conditioning.
Order Placed
Order submitted to carrier portal. Standard 30 day SLA on the physical handoff.
