Template Hub Template Hub

Sales Cloud Template for Data Center Operators

This customized Salesforce instance is built specifically for technology data center operators and colocation providers. It simplifies tracking facility capacity, managing complex server deployments, and monitoring active network circuits. The streamlined layout ensures clear visibility into power density, cooling requirements, and service level agreements for enterprise clients.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Marcus Vance - NexGen Storage

New
Contacted
Qualified
Technical Review
Proposal Sent
Converted
Details
Notes
Files

Primary Lead Information

First NameMarcus✎
Last NameVance✎
CompanyNexGen Storage✎
TitleVP of Infrastructure✎
Phone(555) 209-1834✎
Lead OwnerSarah Jenkins✎
StatusNew✎
SourceWebinar✎
IndustryTechnology✎
Expected Power Draw20 kW✎
Space Requirement4 Racks✎

Additional Details

Websitewww.nexgenstorage.demo✎
Street100 Tech Blvd✎
CityAustin✎
StateTX✎
Zip Code73301✎
Coolant Type PrefAir Cooled✎
Timeline1-3 Months✎
Current ProviderEquinix✎
Compliance NeedsSOC 2 Type II✎
Initial Budget$10k-$20k Monthly✎
Initial Scoping Call Notes
Client is looking to migrate out of on-prem facility. Needs 4 racks with standard air cooling, redundant A/B power.
Created by Sarah Jenkins • Aug 2, 2026
Power Requirements Updated
Adjusted expected power draw up to 20kW total to accommodate new high-density storage arrays.
Created by Sarah Jenkins • Aug 1, 2026
Competitor Pricing
Client mentioned they are cross-shopping with CoreSite. Need to emphasize our superior network peering options.
Created by Sarah Jenkins • Jul 28, 2026
◄ Back to Accounts List
Account

Global Trade Bank

Details
Contacts
Opportunities
Data Centers
Server Deployments
Network Circuits
Notes
Files

Account Information

Account NameGlobal Trade Bank✎
Parent AccountGTB Holdings✎
Phone(800) 555-0199✎
Websitewww.globaltradebank.demo✎
Account OwnerDavid Ross✎
Account TypeEnterprise Colocation✎
IndustryFinance✎
SLA TierPlatinum (99.999%)✎

Facility Requirements

Total Footprint4,500 SqFt✎
Power Density12 kW/rack✎
Redundancy Req2N+1✎
Primary Data CenterAshburn DC-1✎
Network TopologyDual Homing✎
Billing CycleMonthly✎
Quarterly Business Review
Client is highly satisfied with SLA uptime in Ashburn. Discussed potential expansion to Chicago facility next year.
Created by David Ross • Jul 15, 2026
Cooling Audit Results
No issues found during the semi-annual cooling audit of cage C-44. Redundant loop functioning perfectly.
Created by System Admin • Jun 30, 2026
Access List Update
Linda Wu requested access for 3 new remote hands technicians. Approved and badges issued.
Created by Security Desk • May 12, 2026
◄ Back to Contacts List
C
Contact

Linda Wu

Details
Notes
Files

Contact Information

First NameLinda✎
Last NameWu✎
Account NameGlobal Trade Bank✎
TitleNetwork Engineer✎
Contact OwnerDavid Ross✎
DepartmentIT Ops✎
RoleTechnical Buyer✎
Pref. MethodEmail✎

Communication & Security

Phone(555) 123-4456✎
Mobile(555) 987-6543✎
Facility AccessUnescorted✎
Sec. ClearanceStandard Background✎
Notification PrefTechnical Outages Only✎
Primary Technical Contact
Linda is the main point of contact for all cross-connect provisioning and BGP routing changes.
Created by David Ross • Jan 10, 2026
Badge Renewal
Badge is set to expire next month. Sent reminder email with renewal instructions.
Created by Security Desk • Jul 12, 2026
Dietary Restriction
Client is allergic to shellfish. Remember for next QBR dinner.
Created by David Ross • Nov 5, 2025
◄ Back to Opportunities List
O
Opportunity

GTB - Cage Expansion Ph2

Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files

Opportunity Details

Opportunity NameGTB - Cage Expansion Ph2✎
Account NameGlobal Trade Bank✎
Amount$450,000✎
Close DateSep 15, 2026✎
Next StepReview draft design✎
Lead SourceAccount Expansion✎
Opp OwnerDavid Ross✎
StageProposal✎
TypeExisting Customer - Upgrade✎
Primary DCAshburn DC-1✎
Deployment TypePrivate Cage✎
Contract Term36 Months✎

Technical Specifications

Total Racks12✎
Power Commit144 kW✎
Cooling ConfigHot Aisle Containment✎
Uplink Speed100 Gbps✎
Cross Connects4 Fiber Pairs✎
Target Go-LiveNov 1, 2026✎
Power Redundancy2N (A/B Feeds)✎
Network RedundancyDiverse Entrances✎
Rack Type42U Standard✎
PDU StandardThree Phase 60A✎
Security Cage Req.Yes✎
Managed ServicesSmart Hands Block✎
Pricing Approval Required
Requested 10% discount on the cabinet recurring fees to match CoreSite's offer. Pending VP approval.
Created by David Ross • Jul 25, 2026
Cage Design Review
Facilities approved the custom cage design. Need to ensure under-floor mesh is included in the SOW.
Created by Sales Engineer • Jul 22, 2026
Go-Live Date Slipped
Client hardware delivery delayed by vendor. Shifted target go-live from Oct 1 to Nov 1.
Created by David Ross • Jul 18, 2026
◄ Back to Campaigns List
C
Campaign

Q3 High Density Power Push

Details
Campaign Members
Notes
Files

Campaign Information

Campaign NameQ3 High Density Power Push✎
Parent Campaign2026 Facility Expansions✎
Start DateJul 1, 2026✎
End DateSep 30, 2026✎
Campaign OwnerMarketing Team✎
StatusIn Progress✎
TypeEmail✎
Target AudienceIT Directors (Enterprise)✎

Budget & Metrics

Budgeted Cost$25,000✎
Actual Cost$18,400✎
Expected Revenue$1,500,000✎
Channel SegmentDirect Enterprise✎
Focus RegionNorth America✎
Expected Conv.4.5%✎
Email Batch 2 Performance
Second wave of emails emphasizing 20kW+ rack capacity resulted in a 3.2% CTR. Highest engagement in Texas region.
Created by Marketing Team • Aug 1, 2026
Webinar Follow-up
Added 45 webinar attendees to this campaign to push the promotional pricing on direct liquid cooling options.
Created by Marketing Team • Jul 15, 2026
Budget Adjustment
Shifted $5k from display ads to targeted LinkedIn sponsored content targeting VP of IT titles.
Created by Marketing Team • Jul 05, 2026
◄ Back to Data Centers List
D
Data Center

Ashburn DC-1

Details
Notes
Files

Facility Overview

Facility NameAshburn DC-1✎
Location CityAshburn✎
Location StateVA✎
Total SqFt120,000✎
Built Year2018✎
Max Capacity25 MW✎
Facility OwnerFacilities Mgmt✎
Tier RatingTier III✎
Cooling TypeChilled Water (CRAH)✎
Power ProviderDominion Energy✎
Carrier NeutralYes✎
Security LevelLevel 5 (Mantraps/Bio)✎

Operational Metrics

Current Util (%)82%✎
Avail Power (MW)4.5 MW✎
Avail Space (SqFt)21,600 SqFt✎
PUE Metric1.35✎
WUE Metric1.1 L/kWh✎
Seismic ZoneZone 1✎
Backup GeneratorN+1 Diesel✎
UPS TopologyBlock Redundant✎
Fire SuppressionPre-action Dry Pipe✎
Certification StatusSOC 2, ISO 27001✎
Generator Testing
Monthly load bank testing completed successfully. Gen 3 required a minor filter replacement.
Created by Operations Desk • Aug 1, 2026
Capacity Warning
Data Hall 4 is reaching 90% power utilization. We need to throttle new deployments in that hall until the panel upgrade next month.
Created by Facilities Mgmt • Jul 20, 2026
Compliance Audit
Annual SOC 2 audit completed with zero non-conformities. Final report uploaded.
Created by Compliance Team • Jun 15, 2026
◄ Back to Server Deployments List
S
Server Deployment

DEP-2026-044

Planning
Hardware Received
Staging
Racking/Cabling
Power Validation
Client Handover
Details
Notes
Files

Deployment Info

Deployment IDDEP-2026-044✎
Account NameGlobal Trade Bank✎
LocationAshburn DC-1✎
Project StartJul 10, 2026✎
Target EndAug 15, 2026✎
OpportunityGTB - Cage Expansion✎
Deploy OwnerDeployment Team✎
StatusStaging✎
Hardware VendorDell EMC✎
Rack DensityHigh Density (>15kW)✎
Network SetupTop of Rack (ToR)✎
OS RequirementVMware ESXi✎

Hardware Details

Server Count120✎
Switch Count12✎
Storage Arrays6✎
Total Rack Units240 U✎
Cabling TypeCat6a + OS2 Fiber✎
Power PhaseThree Phase✎
Receptacle TypeL15-30P✎
Environment TierProduction✎
SLA AgreementPlatinum Managed✎
Handover StatusPending Checks✎
Rails Installation Complete
All server rails installed in racks C44 through C49. Waiting on final pallet of Dell servers from loading dock.
Created by Smart Hands • Aug 2, 2026
PDU Delivery Issue
Two L15-30P PDUs were DOA. RMA requested, replacements should arrive by Thursday. We can still rack/stack in the meantime.
Created by Smart Hands • Jul 30, 2026
Kickoff Call Notes
Client stressed strict adherence to port-map documentation for the ToR switches.
Created by Deployment Manager • Jul 10, 2026
◄ Back to Network Circuits List
N
Network Circuit

CIR-ZAY-002

Ordered
Provisioning
Pending Testing
Active
Renewed
Decommissioned
Details
Notes
Files

Circuit Information

Circuit IDCIR-ZAY-002✎
Account NameGlobal Trade Bank✎
Provider NameZayo✎
Demarcation PtMeet-Me-Room B, Rack 4✎
Contract StartAug 15, 2026✎
Contract EndAug 14, 2029✎
Circuit OwnerNOC Team✎
Circuit StatusProvisioning✎
Connection TypeCross Connect✎
Bandwidth Tier100 Gbps✎
Media TypeSingle Mode Fiber✎
Handoff Interface100GBASE-LR4✎

Technical Specifications

IP Blocks Assigned/28 IPv4✎
Latency Guar.(ms)< 5ms Local✎
VLAN Tagging802.1Q (VLAN 404)✎
AS NumberAS65001✎
Monthly Cost$2,800.00✎
Redundancy PathPath B (Diverse)✎
Routing ProtocolBGP✎
IPv6 SupportDual Stack✎
Monitoring LevelSNMP + NetFlow✎
Troubleshoot SLA4 Hour MTTR✎
LOA/CFA Received
Received the Letter of Authorization and Connecting Facility Assignment from Zayo. Cross-connect team scheduled to run fiber on Tuesday.
Created by NOC Provisioning • Aug 1, 2026
Optic Compatibility Check
Verified client router uses matching 100GBASE-LR4 transceivers. We will not need signal conditioning.
Created by NOC Engineering • Jul 28, 2026
Order Placed
Order submitted to carrier portal. Standard 30 day SLA on the physical handoff.
Created by Order Admin • Jul 15, 2026