Chemical engineering consulting requires meticulous tracking of process designs, regulatory compliance, and equipment specifications. This CRM template is built specifically for process design, scale-up consulting, and safety analysis firms. Track project phases, P&ID developments, and hazard studies seamlessly. Streamline your firm operations and maintain rigorous project oversight.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track incoming process design bids and inquiries. Accounts
Manage plant operators and EPC contractors. Contacts
Organize key stakeholders and plant managers. Opportunities
Monitor engineering contracts and proposals. Campaigns
Coordinate technical seminars and trade events. Projects
Oversee active process and scale-up designs. HAZOP Studies
Track safety reviews and hazard analyses. Equipment Specs
Manage reactor, column, and pump submittals.Lead
Marcus Wright - Summit Petrochem
New
Contacted
Qualified
Pending RFP
Converted
Details
Notes
Files
Primary Information
First NameMarcus✎
Last NameWright✎
TitleProcess Engineering Manager✎
Lead Status
Contacted
✎
Project Category
Capacity Expansion
✎
Lead OwnerSarah Jenkins✎
Phone555-102-3948✎
Service Required
FEED Study
✎
Desired Schedule
Q3 Start
✎
Priority Rating
High
✎
Process Requirements
Lead Source
Referral
✎
Facility Type
Petrochemical Plant
✎
Primary Operation
Continuous Process
✎
Target Capacity
10k - 50k TPA
✎
Plant Address400 Industrial Way✎
Simulation Software
Aspen Plus
✎
Regulatory Standard
OSHA PSM Required
✎
Budget Status
Approved for FEED
✎
Hazard Level
High - Flammables
✎
City/State/ZipHouston, TX 77001✎
Initial Meeting Notes
Marcus indicated they need to increase capacity of the distillation unit by 25%. They want us to perform a FEED study and simulate the new column sizing in Aspen Plus.
Budget Clarification
Confirmed the FEED budget is fully funded. They are looking to issue the engineering RFP by the 15th.
Safety Requirements
Client stressed that a full HAZOP must be included in the scope due to the flammable nature of the solvent being processed.
Account
Apex Synthetics
Details
Contacts
Opportunities
Projects
HAZOP Studies
Equipment Specs
Notes
Files
Primary Information
Account NameApex Synthetics✎
Account TypePlant Operator✎
Industry SectorSpecialty Chemicals✎
Billing CityChicago✎
Account OwnerMichael Torres✎
Phone555-882-9911✎
Websitewww.apex-syn.com✎
Engineering Business Details
Primary MarketMidwest Industrial✎
Typical Project Size$10M - $50M CAPEX✎
Procurement MethodMaster Service Agreement✎
Active StatusActive Client✎
Preferred DeliveryEPCM✎
Engineering TierTier 1 - Strategic✎
Payment TermsNet 45✎
Quarterly Review Meeting
Met with Frank to review the ongoing Solvent Recovery project. They are happy with our turnaround times on equipment specs and want us to bid on the new Polymer line concept study.
MSA Renewal Update
Apex has sent over the updated Master Service Agreement for 2027. We need our legal team to review the updated IP clauses regarding simulation models.
Process Safety Stand-down
Apex held a mandatory safety stand-down across the plant today due to a minor release. All field walks for the WW tie-in project are paused until next week.
Contact
Sarah Connor
Details
Notes
Files
Contact Information
Engineering Role & Preferences
Contact RoleDesign Lead✎
Decision AuthorityTechnical Evaluator✎
Project Phase InvolvementFEED/Basic Design✎
Communication PrefEmail✎
Discipline PreferenceProcess Simulation✎
Approval FrequencyMilestone Only✎
P&ID Review Notes
Sarah wants the process design for the new line to include double block and bleed valves on all feed lines to the reactor. We need to update the P&IDs to reflect this preference.
Simulation Requirements
She stressed the importance of tracking vapor-liquid equilibrium (VLE) data accuracy in the Aspen model to ensure condenser sizing is correct.
Webinar Attendee
Sarah attended our firm's Webinar on LOPA (Layer of Protection Analysis). She is highly interested in integrating this into their standard risk assessment workflow.
Opportunity
Reactor Line Capacity Upgrade
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Contract Information
Opportunity NameReactor Line Capacity Upgrade✎
TypeExisting Business - Expansion✎
StageNegotiation✎
Service TypeDetailed Engineering✎
Opportunity OwnerMichael Torres✎
Close Date10/15/2026✎
Amount$450,000✎
Probability (%)80%✎
Next StepFinalize deliverables list✎
Contract TypeLump Sum✎
Engineering Scope Specifications
Project ScopeProcess Unit Revamp✎
Design PhaseDetailed Engineering✎
Process TypeContinuous Reaction✎
Technical ComplexityHigh - Exothermic Reaction✎
Deliverables RequiredP&IDs, Specs, Hazop Report✎
Lead SourceAccount Penetration✎
Regulatory StandardOSHA PSM✎
Project ExecutionLump Sum Engineering✎
Target Capacity Increase25% (10k TPA add)✎
Safety Review MethodFull HAZOP Required✎
CompetitorFluor✎
Bid StatusShortlisted✎
Deliverables Contract Redline
Apex's PM returned our redlines on the deliverables clause. We agreed to provide the native Aspen Plus files upon project completion, provided they sign the liability waiver.
Scope Clarification
Updated the proposal to clarify that relief valve sizing calculations are included, but the actual procurement of the valves is by others.
Shortlist Notification
Frank called to let us know we made the final two. Our experience with this specific exothermic reaction gave us the edge over the competitor.
Campaign
LOPA Integration Webinar
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameLOPA Integration Webinar✎
TypeWebinar✎
StatusIn Progress✎
Is ActiveYes✎
Campaign OwnerMarketing Team✎
Start Date10/01/2026✎
End Date10/01/2026✎
Budget Allocated$2,500✎
Targeting & Performance
Target AudiencePlant Operators✎
Expected Response12%✎
Campaign ObjectiveLead Generation (Safety Bids)✎
Actual Cost$1,150✎
Outreach MethodDigital / Email Invites✎
Region FocusGulf Coast Hubs✎
Presentation Dry Run
The safety principles dry run went well. Need to add a slide comparing traditional HAZOP nodes to LOPA consequence severity mapping.
Target List Pulled
Pulled all contacts and leads in the Gulf Coast regions with active or past PSM compliance projects. Sent the first email blast today.
PDH Credit Approval
We received approval from the board to offer 1.0 Professional Development Hour (PDH) for attendees. This should drive up registration.
Project
PRJ-2026-001 (Solvent Recovery EPCM)
Concept
FEED
Detailed Eng
Procurement/Const
Commissioning
Details
Notes
Files
Project Overview
Project NamePRJ-2026-001 (Solvent Recovery EPCM)✎
PhaseDetailed Engineering✎
Delivery ModelEPCM✎
Primary Process SystemDistillation/Separation✎
Project ManagerMichael Torres✎
Start Date01/15/2026✎
Estimated Completion12/01/2027✎
Current StatusActive - Detailed Eng✎
P&ID StatusIssued for Design (IFD)✎
Contract TypeReimbursable (T&M)✎
Engineering Specifics & Progress
Regulatory ReqOSHA PSM Required✎
Simulation SoftwareAspen Plus✎
Client TypePlant Operator✎
PriorityHigh✎
Site Address400 Industrial Way✎
Project Scope TypeProcess Unit Revamp✎
Primary HazardFlammable Solvents✎
Review CycleWeekly Coordination✎
Equipment SizingIn Progress✎
Process RiskHigh - Exothermic✎
RegionMidwest✎
Hydraulic Calculation Check
Ran the line sizing calculations for the overhead condenser return line. The pressure drop is too high for the current pump head. We need to bump the line size from 4" to 6" to prevent cavitation.
P&ID IFD Issue
The "Issued for Design" (IFD) P&ID set has been published to Document Control. This locks the major equipment list so procurement can start issuing RFQs for the long-lead items.
FEED Stage Gate Sign-off
Client approved the final FEED report and mass balance. We are officially moving into Detailed Engineering phase.
HAZOP Study
HZP-SRU-001 (HAZOP + LOPA)
Node Definition
Sessions Ongoing
Pending Review
Approved
Action Items Closed
Details
Notes
Files
Primary Study Details
Study IDHZP-SRU-001✎
Study CategoryHAZOP + LOPA✎
P&ID Revision BaseIFD - Rev 0✎
StatusApproved✎
Lead FacilitatorMichael Torres✎
Study OwnerMichael Torres✎
Start Date05/10/2026✎
Session Duration4 Days✎
Approval StatusApproved by Client✎
Report Issue Date09/01/2026✎
Software PlatformPHA-Pro✎
Technical Node Data & Findings
Process AreaUnit 300 - Solvent Recovery✎
Number of Nodes12✎
Highest ConsequenceSeverity 5 (Catastrophic)✎
Risk Matrix UsedClient Standard 5x5✎
Total Action Items24✎
LOPA Required?Yes - SIL Target Req✎
SIL Target (Max)SIL 2✎
High Risk Scenarios4 Scenarios Unmitigated✎
Remediation ReqAdd SIS Interlocks✎
Open Action Items4✎
LOPA Node 4 Finding
In Node 4 (Overhead Condenser), loss of cooling water leads to column overpressure (Severity 5). Current safeguards (PSV and BPCS alarm) only provide 2 credits. A gap of 1 credit remains. Recommended adding a SIL 2 Safety Instrumented System (SIS) interlock to shut off steam to the reboiler.
Client Review Complete
The plant safety director reviewed the draft report. They agreed with the SIL 2 recommendation for the reboiler interlock. Report is now finalized and approved.
HAZOP Sessions Complete
Finished the 4-day session with the operations and control team. All 12 nodes reviewed. Exporting data from PHA-Pro to draft the report.
Equipment Spec
EQ-PMP-092 - Reflux Pump Sizing
Data Sheet Draft
Vendor Review
Pending Consultant
Returned to EPC
Closed/Procured
Details
Notes
Files
Specification Information
Spec IDEQ-PMP-092✎
Equipment CategoryCentrifugal Pump✎
DisciplineRotating Equipment✎
Tag NumberP-301A/B✎
Lead EngineerSarah Jenkins✎
Issued Date08/01/2026✎
Vendor Due Date08/05/2026✎
VendorGoulds/Flowserve✎
Action TakenPending Vendor✎
PriorityHigh - Long Lead✎
Technical Operating Parameters
Fluid HandledToluene Mix✎
Current StatusVendor Review✎
Design Temperature150 °C✎
Design Pressure10 barg✎
Material of Const.316L Stainless Steel✎
Design StandardAPI 610✎
Required Flow (Rated)120 m3/hr✎
Required Head (Rated)45 m✎
NPSH Available2.5 m✎
Seal Type Req.Dual Mechanical (API Plan 53)✎
Motor Specs30 kW / 460V / EXP✎
Hydraulic Assessment
Because we increased the reflux line size to 6" to fix the pressure drop, the NPSH available at the pump suction increased slightly to 2.5m. We need the vendor to confirm their pump's NPSH required is at least 0.5m below this (max 2.0m NPSHr) for safety margin.
Coordination Call
Called the Flowserve rep. They are reviewing the updated data sheet. They noted that achieving the required NPSH with a standard impeller might be tight and suggested an inducer option. Waiting on their formal pump curve submission.
Seal Plan Update
Process safety requested we upgrade to a Dual Mechanical seal with API Plan 53 barrier fluid system due to the toxicity of the toluene mix. Data sheet updated before sending to vendor.
