Template Hub Template Hub

Sales Cloud Template for Chemical Engineering Consultants

Chemical engineering consulting requires meticulous tracking of process designs, regulatory compliance, and equipment specifications. This CRM template is built specifically for process design, scale-up consulting, and safety analysis firms. Track project phases, P&ID developments, and hazard studies seamlessly. Streamline your firm operations and maintain rigorous project oversight.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Marcus Wright - Summit Petrochem

New
Contacted
Qualified
Pending RFP
Converted
Details
Notes
Files

Primary Information

First NameMarcus✎
Last NameWright✎
TitleProcess Engineering Manager✎
Lead Status Contacted ✎
Project Category Capacity Expansion ✎
Lead OwnerSarah Jenkins✎
Phone555-102-3948✎
Service Required FEED Study ✎
Desired Schedule Q3 Start ✎
Priority Rating High ✎

Process Requirements

Lead Source Referral ✎
Facility Type Petrochemical Plant ✎
Primary Operation Continuous Process ✎
Target Capacity 10k - 50k TPA ✎
Plant Address400 Industrial Way✎
Simulation Software Aspen Plus ✎
Regulatory Standard OSHA PSM Required ✎
Budget Status Approved for FEED ✎
Hazard Level High - Flammables ✎
City/State/ZipHouston, TX 77001✎
Initial Meeting Notes
Marcus indicated they need to increase capacity of the distillation unit by 25%. They want us to perform a FEED study and simulate the new column sizing in Aspen Plus.
Created by Sarah Jenkins • August 1, 2026
Budget Clarification
Confirmed the FEED budget is fully funded. They are looking to issue the engineering RFP by the 15th.
Created by Sarah Jenkins • July 28, 2026
Safety Requirements
Client stressed that a full HAZOP must be included in the scope due to the flammable nature of the solvent being processed.
Created by Michael Torres • July 20, 2026
◄ Back to Accounts List
Account

Apex Synthetics

Details
Contacts
Opportunities
Projects
HAZOP Studies
Equipment Specs
Notes
Files

Primary Information

Account NameApex Synthetics✎
Account TypePlant Operator✎
Industry SectorSpecialty Chemicals✎
Billing CityChicago✎
Account OwnerMichael Torres✎
Phone555-882-9911✎
Websitewww.apex-syn.com✎

Engineering Business Details

Primary MarketMidwest Industrial✎
Typical Project Size$10M - $50M CAPEX✎
Procurement MethodMaster Service Agreement✎
Active StatusActive Client✎
Preferred DeliveryEPCM✎
Engineering TierTier 1 - Strategic✎
Payment TermsNet 45✎
Quarterly Review Meeting
Met with Frank to review the ongoing Solvent Recovery project. They are happy with our turnaround times on equipment specs and want us to bid on the new Polymer line concept study.
Created by Michael Torres • July 15, 2026
MSA Renewal Update
Apex has sent over the updated Master Service Agreement for 2027. We need our legal team to review the updated IP clauses regarding simulation models.
Created by System • June 10, 2026
Process Safety Stand-down
Apex held a mandatory safety stand-down across the plant today due to a minor release. All field walks for the WW tie-in project are paused until next week.
Created by Michael Torres • May 20, 2026
◄ Back to Contacts List
C
Contact

Sarah Connor

Details
Notes
Files

Contact Information

First NameSarah✎
Last NameConnor✎
Account NameSkyline EPC✎
TitleProcess Lead✎
Contact OwnerSarah Jenkins✎
Phone555-773-2288✎
Mobile555-773-9999✎

Engineering Role & Preferences

Contact RoleDesign Lead✎
Decision AuthorityTechnical Evaluator✎
Project Phase InvolvementFEED/Basic Design✎
Communication PrefEmail✎
Discipline PreferenceProcess Simulation✎
Approval FrequencyMilestone Only✎
P&ID Review Notes
Sarah wants the process design for the new line to include double block and bleed valves on all feed lines to the reactor. We need to update the P&IDs to reflect this preference.
Created by Sarah Jenkins • July 22, 2026
Simulation Requirements
She stressed the importance of tracking vapor-liquid equilibrium (VLE) data accuracy in the Aspen model to ensure condenser sizing is correct.
Created by Sarah Jenkins • June 15, 2026
Webinar Attendee
Sarah attended our firm's Webinar on LOPA (Layer of Protection Analysis). She is highly interested in integrating this into their standard risk assessment workflow.
Created by Marketing • May 10, 2026
◄ Back to Opportunities List
O
Opportunity

Reactor Line Capacity Upgrade

Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files

Contract Information

Opportunity NameReactor Line Capacity Upgrade✎
Account NameApex Synthetics✎
TypeExisting Business - Expansion✎
StageNegotiation✎
Primary ContactFrank Costello✎
Service TypeDetailed Engineering✎
Opportunity OwnerMichael Torres✎
Close Date10/15/2026✎
Amount$450,000✎
Probability (%)80%✎
Next StepFinalize deliverables list✎
Contract TypeLump Sum✎

Engineering Scope Specifications

Project ScopeProcess Unit Revamp✎
Design PhaseDetailed Engineering✎
Process TypeContinuous Reaction✎
Technical ComplexityHigh - Exothermic Reaction✎
Deliverables RequiredP&IDs, Specs, Hazop Report✎
Lead SourceAccount Penetration✎
Regulatory StandardOSHA PSM✎
Project ExecutionLump Sum Engineering✎
Target Capacity Increase25% (10k TPA add)✎
Safety Review MethodFull HAZOP Required✎
CompetitorFluor✎
Bid StatusShortlisted✎
Deliverables Contract Redline
Apex's PM returned our redlines on the deliverables clause. We agreed to provide the native Aspen Plus files upon project completion, provided they sign the liability waiver.
Created by Michael Torres • August 2, 2026
Scope Clarification
Updated the proposal to clarify that relief valve sizing calculations are included, but the actual procurement of the valves is by others.
Created by Michael Torres • July 25, 2026
Shortlist Notification
Frank called to let us know we made the final two. Our experience with this specific exothermic reaction gave us the edge over the competitor.
Created by Michael Torres • July 20, 2026
◄ Back to Campaigns List
C
Campaign

LOPA Integration Webinar

Details
Campaign Members
Notes
Files

Campaign Details

Campaign NameLOPA Integration Webinar✎
TypeWebinar✎
StatusIn Progress✎
Is ActiveYes✎
Campaign OwnerMarketing Team✎
Start Date10/01/2026✎
End Date10/01/2026✎
Budget Allocated$2,500✎

Targeting & Performance

Target AudiencePlant Operators✎
Expected Response12%✎
Campaign ObjectiveLead Generation (Safety Bids)✎
Actual Cost$1,150✎
Outreach MethodDigital / Email Invites✎
Region FocusGulf Coast Hubs✎
Presentation Dry Run
The safety principles dry run went well. Need to add a slide comparing traditional HAZOP nodes to LOPA consequence severity mapping.
Created by Marketing • August 1, 2026
Target List Pulled
Pulled all contacts and leads in the Gulf Coast regions with active or past PSM compliance projects. Sent the first email blast today.
Created by Marketing • July 25, 2026
PDH Credit Approval
We received approval from the board to offer 1.0 Professional Development Hour (PDH) for attendees. This should drive up registration.
Created by Marketing • July 15, 2026
◄ Back to Projects List
P
Project

PRJ-2026-001 (Solvent Recovery EPCM)

Concept
FEED
Detailed Eng
Procurement/Const
Commissioning
Details
Notes
Files

Project Overview

Project NamePRJ-2026-001 (Solvent Recovery EPCM)✎
AccountApex Synthetics✎
PhaseDetailed Engineering✎
Delivery ModelEPCM✎
Primary Process SystemDistillation/Separation✎
Project ManagerMichael Torres✎
Start Date01/15/2026✎
Estimated Completion12/01/2027✎
Current StatusActive - Detailed Eng✎
P&ID StatusIssued for Design (IFD)✎
Contract TypeReimbursable (T&M)✎

Engineering Specifics & Progress

Regulatory ReqOSHA PSM Required✎
Simulation SoftwareAspen Plus✎
Client TypePlant Operator✎
PriorityHigh✎
Site Address400 Industrial Way✎
Project Scope TypeProcess Unit Revamp✎
Primary HazardFlammable Solvents✎
Review CycleWeekly Coordination✎
Equipment SizingIn Progress✎
Process RiskHigh - Exothermic✎
RegionMidwest✎
Hydraulic Calculation Check
Ran the line sizing calculations for the overhead condenser return line. The pressure drop is too high for the current pump head. We need to bump the line size from 4" to 6" to prevent cavitation.
Created by Michael Torres • August 1, 2026
P&ID IFD Issue
The "Issued for Design" (IFD) P&ID set has been published to Document Control. This locks the major equipment list so procurement can start issuing RFQs for the long-lead items.
Created by Michael Torres • July 20, 2026
FEED Stage Gate Sign-off
Client approved the final FEED report and mass balance. We are officially moving into Detailed Engineering phase.
Created by Sarah Jenkins • June 15, 2026
◄ Back to HAZOP Studies List
H
HAZOP Study

HZP-SRU-001 (HAZOP + LOPA)

Node Definition
Sessions Ongoing
Pending Review
Approved
Action Items Closed
Details
Notes
Files

Primary Study Details

Study IDHZP-SRU-001✎
ProjectPRJ-2026-001✎
Study CategoryHAZOP + LOPA✎
P&ID Revision BaseIFD - Rev 0✎
StatusApproved✎
Lead FacilitatorMichael Torres✎
Study OwnerMichael Torres✎
Start Date05/10/2026✎
Session Duration4 Days✎
Approval StatusApproved by Client✎
Report Issue Date09/01/2026✎
Software PlatformPHA-Pro✎

Technical Node Data & Findings

Process AreaUnit 300 - Solvent Recovery✎
Number of Nodes12✎
Highest ConsequenceSeverity 5 (Catastrophic)✎
Risk Matrix UsedClient Standard 5x5✎
Total Action Items24✎
LOPA Required?Yes - SIL Target Req✎
SIL Target (Max)SIL 2✎
High Risk Scenarios4 Scenarios Unmitigated✎
Remediation ReqAdd SIS Interlocks✎
Open Action Items4✎
LOPA Node 4 Finding
In Node 4 (Overhead Condenser), loss of cooling water leads to column overpressure (Severity 5). Current safeguards (PSV and BPCS alarm) only provide 2 credits. A gap of 1 credit remains. Recommended adding a SIL 2 Safety Instrumented System (SIS) interlock to shut off steam to the reboiler.
Created by Michael Torres • August 1, 2026
Client Review Complete
The plant safety director reviewed the draft report. They agreed with the SIL 2 recommendation for the reboiler interlock. Report is now finalized and approved.
Created by Michael Torres • July 20, 2026
HAZOP Sessions Complete
Finished the 4-day session with the operations and control team. All 12 nodes reviewed. Exporting data from PHA-Pro to draft the report.
Created by System • June 15, 2026
◄ Back to Equipment Specs List
E
Equipment Spec

EQ-PMP-092 - Reflux Pump Sizing

Data Sheet Draft
Vendor Review
Pending Consultant
Returned to EPC
Closed/Procured
Details
Notes
Files

Specification Information

Spec IDEQ-PMP-092✎
ProjectPRJ-2026-001✎
EPC/ContractorApex Synthetics✎
Equipment CategoryCentrifugal Pump✎
DisciplineRotating Equipment✎
Tag NumberP-301A/B✎
Lead EngineerSarah Jenkins✎
Issued Date08/01/2026✎
Vendor Due Date08/05/2026✎
VendorGoulds/Flowserve✎
Action TakenPending Vendor✎
PriorityHigh - Long Lead✎

Technical Operating Parameters

Fluid HandledToluene Mix✎
Current StatusVendor Review✎
Design Temperature150 °C✎
Design Pressure10 barg✎
Material of Const.316L Stainless Steel✎
Design StandardAPI 610✎
Required Flow (Rated)120 m3/hr✎
Required Head (Rated)45 m✎
NPSH Available2.5 m✎
Seal Type Req.Dual Mechanical (API Plan 53)✎
Motor Specs30 kW / 460V / EXP✎
Hydraulic Assessment
Because we increased the reflux line size to 6" to fix the pressure drop, the NPSH available at the pump suction increased slightly to 2.5m. We need the vendor to confirm their pump's NPSH required is at least 0.5m below this (max 2.0m NPSHr) for safety margin.
Created by Sarah Jenkins • August 2, 2026
Coordination Call
Called the Flowserve rep. They are reviewing the updated data sheet. They noted that achieving the required NPSH with a standard impeller might be tight and suggested an inducer option. Waiting on their formal pump curve submission.
Created by Sarah Jenkins • August 3, 2026
Seal Plan Update
Process safety requested we upgrade to a Dual Mechanical seal with API Plan 53 barrier fluid system due to the toxicity of the toluene mix. Data sheet updated before sending to vendor.
Created by Sarah Jenkins • August 1, 2026