Template Hub Template Hub

Sales Cloud Template for Building Material Suppliers

Welcome to the Trade Services Building Material Suppliers environment. This setup simplifies how suppliers process blueprint takeoffs, track yard inventory, and coordinate flatbed deliveries. By centralizing purchasing and logistics, material providers can ensure general contractors and tradespeople receive their lumber, drywall, roofing, and concrete supplies exactly when and where they need them on the jobsite.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
◄ Back to Leads List
L
Lead

Marcus Vance - Vance Framing Co.

New
Contacted
Credit Check
Qualified
Converted
Details
Notes
Files

Primary Lead Information

First NameMarcus✎
Last NameVance✎
CompanyVance Framing Co.✎
TitleOwner / Chief Estimator✎
Phone(555) 234-9876✎
Lead OwnerSarah Jenkins✎
StatusContacted✎
RatingHot✎
Trade TypeFramer✎
Current Primary SupplierNational Builder Supply✎
Tax Exempt StatusPending Verification✎

Purchasing Details

Mobile(555) 234-9900✎
Lead SourceTrade Show Booth✎
Material Category FocusLumber & Framing✎
Est. Monthly Volume$25k - $50k✎
Jobsite RegionNorth Metro✎
Payment Terms RequestNet 30✎
Required CertificationFSC Certified Lumber✎
Trade AffiliationLocal Builders Union✎
Project TypeResidential Subdivision✎
Pref. Delivery MethodJobsite Flatbed Drop✎
Pricing Inquiry
Marcus called asking about our current board foot pricing for SPF dimensional lumber. Complained that his current supplier keeps missing delivery windows.
Created by Sarah Jenkins • Sept 12, 2026
Credit Application Sent
Emailed the Net 30 credit application. He mentioned they have 3 new subdivisions starting in October.
Created by Sarah Jenkins • Sept 14, 2026
Trade Show Meeting
Met Marcus at the Regional Builders Expo. He took a sample of our engineered I-joists.
Created by Sales Team • Sept 05, 2026
◄ Back to Accounts List
Account

Apex General Contracting

Details
Contacts
Opportunities
Takeoffs
Deliveries
Inventory
Notes
Files

Primary Information

Account NameApex General Contracting✎
Account NumberAPX-45902✎
Phone(555) 200-1100✎
Billing Address1200 Industrial Pkwy, Suite 100✎
Primary Material FocusLumber & Framing✎
Customer TypeGeneral Contractor✎
Account OwnerSarah Jenkins✎
Credit StatusActive - Good Standing✎
Active Credit Line$150,000✎
Standard Discount TierTier 2 (Bronze)✎
Default Shipping MethodJobsite Delivery (Flatbed)✎
Year-to-Date Spend$340,500✎
Tax Exempt IDNot Exempt✎
Site Access Restrictions
Diane Wu warned that the Pine Ridge site entrance is muddy. Dispatch needs to send the all-wheel drive moffett truck for unloading next week.
Created by Sarah Jenkins • Sept 20, 2026
Credit Increase Approval
Finance approved bumping their credit line from 100k to 150k to accommodate the Oak Street project load.
Created by Account Manager • Sept 05, 2026
Substitution Agreement
Robert agreed we can substitute Spruce-Pine-Fir for Hem-Fir on framing packages if supply chain gets tight, as long as grade is #2 or better.
Created by Sarah Jenkins • August 12, 2026
◄ Back to Contacts List
C
Contact

Diane Wu

Details
Notes
Files

Contact Information

First NameDiane✎
Last NameWu✎
TitleSite Superintendent✎
Contact OwnerSarah Jenkins✎
Phone(555) 200-1102✎
Role on JobsiteSite Supervisor✎

Field Service Preferences

Preferred Contact MethodText Message✎
Purchasing AuthoritySite Requisitions Only✎
Cell Phone (For Dispatch)(555) 200-9999✎
Hard Hat SizeMedium✎
Primary LanguageEnglish✎
Certification LevelOSHA 30✎
Delivery Text Preferences
Diane requested that dispatch sends a text to her cell phone 30 minutes before the flatbed arrives at Pine Ridge so she can clear the drop zone.
Created by Dispatch Team • Sept 18, 2026
Site Condition Warning
Reported heavy mud at the secondary entrance. Instructed our drivers to use the main paved gate only.
Created by Sarah Jenkins • Sept 10, 2026
Requisition Process
Diane can request materials to prevent work stoppage, but Robert in the office must issue the official PO number within 24 hours.
Created by Account Manager • August 05, 2026
◄ Back to Opportunities List
O
Opportunity

Pine Ridge Phase 2 Lumber Pkg

Discovery
Takeoff/Estimating
Proposal
Negotiation
Closed Won
Details
Line Items
Notes
Files

Opportunity Information

Opportunity NamePine Ridge Phase 2 Lumber Pkg✎
Primary ContactRobert Vance✎
Amount$85,000✎
Close Date10/15/2026✎
StageProposal✎
Opportunity OwnerSarah Jenkins✎
Probability (%)60%✎
Lead SourceExisting Account Request✎
CompetitorNational Builder Supply✎
Next StepReview takeoff pricing with Robert✎
Estimate/Takeoff IDTK-10992✎

Project & Delivery Logistics

Project NamePine Ridge Development✎
Delivery AddressLot 42-60, Pine Ridge Pkwy✎
Project CategoryResidential New Construction✎
Required Delivery Date10/22/2026✎
Access RestrictionsMuddy Terrain (Needs 4WD)✎
Special Equipment NeededMoffett Forklift Attached✎
Material Grade Req.#2 or Better (Premium)✎
Will Call vs DeliverySupplier Delivered✎
Freight TermsPrepaid & Added to Invoice✎
Financing OptionStandard Net 30 Account✎
Warranty RequiredStandard Manufacturer✎
Order TypePhased Delivery (Multiple Drops)✎
Phased Drop Agreement
Robert requested we hold the roof trusses at our yard until framing inspection passes. We will drop floor joists and studs first.
Created by Sarah Jenkins • Sept 22, 2026
Pricing Lock
Lumber commodity prices are volatile this week. Guaranteed this quote's board foot pricing for 14 days only.
Created by Sarah Jenkins • Sept 18, 2026
Takeoff Completed
Estimating finished the takeoff from the Phase 2 prints. Total lumber counts are slightly lower than Phase 1 due to floor plan adjustments.
Created by Mike Ross (Estimator) • Sept 15, 2026
◄ Back to Campaigns List
C
Campaign

Fall Roofing Blowout Promo

Details
Campaign Members
Notes
Files

Campaign Details

Campaign NameFall Roofing Blowout Promo✎
StatusIn Progress✎
Start Date09/01/2026✎
End Date10/31/2026✎
Campaign OwnerMarketing Team✎
TypeSeasonal Stock Promo✎
Is ActiveYes✎
Budgeted Cost$8,500✎

Targeting & Vendor Co-op

Target RegionStatewide Coverage✎
Material Segment FocusRoofing & Siding✎
Expected Response Rate8%✎
ChannelEmail + Pro Desk Signage✎
Vendor Co-Op PartnerOwens Corning✎
Trade TargetRoofers & Exteriors✎
Vendor Funding Approved
Owens Corning approved $4,250 in co-op marketing funds to cover the direct mailer printing costs.
Created by Marketing Team • August 20, 2026
Pro Desk Setup
All branches have received the point-of-sale displays. Instructed counter reps to push the pallet discount.
Created by Branch Manager • Sept 01, 2026
Initial Email Results
First email blast to roofing contractors resulted in a 24% open rate and 15 inquiries for truckload pricing.
Created by Marketing Team • Sept 10, 2026
◄ Back to Takeoffs List
T
Takeoff

TK-10992 - Pine Ridge Phase 2

Awaiting Prints
In Progress
Completed
Approved
Ordered
Details
Notes
Files

Takeoff Header Details

Takeoff NumberTK-10992✎
Project NamePine Ridge Phase 2✎
Related OpportunityPine Ridge Phase 2 Lumber Pkg✎
StatusCompleted✎
Requested By Date09/10/2026✎
Takeoff OwnerMike Ross✎
Revision NumberRev 2✎
Completion Date09/15/2026✎
Estimated Margin22.5%✎
Expedited RequestNo✎
Approval StatusPending Customer Review✎

Estimation Specifications

Plan VersionIFC (Issued for Construction)✎
Estimator NameMike Ross✎
Total Square Footage14,500 sq ft✎
Material Group FocusFraming & Sheathing✎
Project ComplexityModerate (Standard Trusses)✎
Blueprint FormatDigital PDF (Vector)✎
Substitution AllowedYes (Equal or Better)✎
Waste Factor Percentage10%✎
Supplier SourcedYard Stock & Direct Mill✎
Turnaround Time TierStandard (5-7 Days)✎
Roof Line Adjustments
The Rev 2 prints show a modified hip roof on the corner units. I adjusted the truss counts and added 15% more OSB sheathing for the waste factor on the cuts.
Created by Mike Ross • Sept 14, 2026
Engineered Wood Spec Check
Confirmed with the structural engineer that we can use our stocked 11-7/8" I-joists instead of the specified 12". Load calculations meet local code.
Created by Mike Ross • Sept 13, 2026
Prints Received
Vector PDFs received from Apex. Logged into the queue for standard 5-day turnaround.
Created by Estimating Coordinator • Sept 10, 2026
◄ Back to Deliveries List
D
Delivery

MAN-55401 - Apex (Pine Ridge)

Staged
Loading
On Route
Arrived at Site
Delivered / Signed
Details
Notes
Files

Delivery & Routing Information

Manifest IDMAN-55401✎
Related AccountApex General Contracting✎
Delivery Date09/25/2026✎
StatusOn Route✎
Driver NameBill Sanderson✎
Truck TypeFlatbed w/ Moffett✎
Dispatch OwnerDispatch Desk✎
Loading ZoneYard A - Lumber✎
Jobsite ContactDiane Wu✎
Contact Phone(555) 200-9999✎
Gate Code4092#✎
Unload MethodForklift (Moffett) Drop✎

Load Details & Logistics

Total Weight (lbs)14,200 lbs✎
Number of Pallets8 Bunks✎
Hazardous MaterialsNo✎
Proof of DeliveryDigital Signature Req✎
Freight Cost$150.00 (Zone 2)✎
Signature RequiredYes✎
Delay ReasonNone (On Time)✎
Departure Time06:15 AM✎
Arrival Time--:--✎
Fleet Maintenance StatusCleared for Duty✎
Muddy Access Warning
Diane confirmed the site is muddy. Bill needs to park the flatbed on the paved road and use the Moffett to run the lumber bunks to the staging area.
Created by Dispatch Desk • Sept 24, 2026
Load Strapped & Tarped
Rain in the forecast. Yard crew tarped the OSB bunks prior to strapping.
Created by Yard Supervisor • Sept 24, 2026
ETA Text Sent
Automated SMS sent to Diane's cell phone: "Your delivery is en route. ETA 7:00 AM."
Created by System • Sept 25, 2026
◄ Back to Inventory List
I
Inventory SKU

LUM-2X4-925 (2x4x92-5/8 Premium Stud)

Details
Notes
Files

Product Information

SKU NumberLUM-2X4-925✎
Product Name2x4x92-5/8 Premium Stud✎
CategoryLumber & Framing✎
Stock StatusIn Stock✎
Quantity on Hand4,500 Pcs✎
Unit of MeasurePiece (Each)✎
Inventory OwnerYard Manager✎
Standard Cost$2.85 / pc✎
Retail Price$4.15 / pc✎
Bulk Discount EligibleYes - Unit Break✎
Last Count Date08/30/2026✎
Shrinkage StatusNormal (Under 2%)✎

Sourcing & Yard Locations

Yard LocationYard A - Lumber Shed✎
Bin NumberA-12-Lower✎
Supplier NamePacific Northwest Mills✎
Lead Time (Days)14 Days✎
Min Order Qty1 Bunk (294 Pcs)✎
Restricted SaleNo Restrictions✎
Storage RequirementCovered Shed Recommended✎
Reorder Point2,500 Pcs✎
Restock Date10/05/2026✎
Quality Grade#2 or Better (Premium)✎
Mill Delivery Scheduled
Pacific Northwest Mills confirmed two rail cars of precut studs arriving next week. We should be well above the reorder point through November.
Created by Purchasing Dept • Sept 20, 2026
Damage Report
Found one bunk (294 pcs) with severe water damage on the bottom layers due to a tarp blowout in the storm. Written off to shrinkage.
Created by Yard Manager • Sept 05, 2026
Pricing Update Notice
Commodity index for SPF lumber dropped slightly. Adjusted retail price down from $4.35 to $4.15 effective immediately to stay competitive.
Created by Branch Manager • Sept 01, 2026