Welcome to the Trade Services Building Material Suppliers environment. This setup simplifies how suppliers process blueprint takeoffs, track yard inventory, and coordinate flatbed deliveries. By centralizing purchasing and logistics, material providers can ensure general contractors and tradespeople receive their lumber, drywall, roofing, and concrete supplies exactly when and where they need them on the jobsite.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Qualify new builders, framers, and specialty trades. Accounts
Manage standard terms for recurring trade contractors. Contacts
Communicate with site foremen and purchasing managers. Opportunities
Track bulk material quotes and project bidding. Campaigns
Market seasonal promotions and vendor co-op programs. Takeoffs
Convert blueprints into exact material requirements. Deliveries
Dispatch trucks, track loads, and capture signatures. Inventory
Monitor yard stock, board feet, and reorder points.Lead
Marcus Vance - Vance Framing Co.
New
Contacted
Credit Check
Qualified
Converted
Details
Notes
Files
Primary Lead Information
First NameMarcus✎
Last NameVance✎
CompanyVance Framing Co.✎
TitleOwner / Chief Estimator✎
Phone(555) 234-9876✎
Lead OwnerSarah Jenkins✎
StatusContacted✎
RatingHot✎
Trade TypeFramer✎
Current Primary SupplierNational Builder Supply✎
Tax Exempt StatusPending Verification✎
Purchasing Details
Mobile(555) 234-9900✎
Lead SourceTrade Show Booth✎
Material Category FocusLumber & Framing✎
Est. Monthly Volume$25k - $50k✎
Jobsite RegionNorth Metro✎
Payment Terms RequestNet 30✎
Required CertificationFSC Certified Lumber✎
Trade AffiliationLocal Builders Union✎
Project TypeResidential Subdivision✎
Pref. Delivery MethodJobsite Flatbed Drop✎
Pricing Inquiry
Marcus called asking about our current board foot pricing for SPF dimensional lumber. Complained that his current supplier keeps missing delivery windows.
Credit Application Sent
Emailed the Net 30 credit application. He mentioned they have 3 new subdivisions starting in October.
Trade Show Meeting
Met Marcus at the Regional Builders Expo. He took a sample of our engineered I-joists.
Account
Apex General Contracting
Details
Contacts
Opportunities
Takeoffs
Deliveries
Inventory
Notes
Files
Primary Information
Account NameApex General Contracting✎
Account NumberAPX-45902✎
Phone(555) 200-1100✎
Billing Address1200 Industrial Pkwy, Suite 100✎
Primary Material FocusLumber & Framing✎
Customer TypeGeneral Contractor✎
Account OwnerSarah Jenkins✎
Credit StatusActive - Good Standing✎
Active Credit Line$150,000✎
Standard Discount TierTier 2 (Bronze)✎
Default Shipping MethodJobsite Delivery (Flatbed)✎
Year-to-Date Spend$340,500✎
Tax Exempt IDNot Exempt✎
Site Access Restrictions
Diane Wu warned that the Pine Ridge site entrance is muddy. Dispatch needs to send the all-wheel drive moffett truck for unloading next week.
Credit Increase Approval
Finance approved bumping their credit line from 100k to 150k to accommodate the Oak Street project load.
Substitution Agreement
Robert agreed we can substitute Spruce-Pine-Fir for Hem-Fir on framing packages if supply chain gets tight, as long as grade is #2 or better.
Contact
Diane Wu
Details
Notes
Files
Contact Information
Contact OwnerSarah Jenkins✎
Phone(555) 200-1102✎
Role on JobsiteSite Supervisor✎
Field Service Preferences
Preferred Contact MethodText Message✎
Purchasing AuthoritySite Requisitions Only✎
Cell Phone (For Dispatch)(555) 200-9999✎
Hard Hat SizeMedium✎
Primary LanguageEnglish✎
Certification LevelOSHA 30✎
Delivery Text Preferences
Diane requested that dispatch sends a text to her cell phone 30 minutes before the flatbed arrives at Pine Ridge so she can clear the drop zone.
Site Condition Warning
Reported heavy mud at the secondary entrance. Instructed our drivers to use the main paved gate only.
Requisition Process
Diane can request materials to prevent work stoppage, but Robert in the office must issue the official PO number within 24 hours.
Opportunity
Pine Ridge Phase 2 Lumber Pkg
Discovery
Takeoff/Estimating
Proposal
Negotiation
Closed Won
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NamePine Ridge Phase 2 Lumber Pkg✎
Amount$85,000✎
Close Date10/15/2026✎
StageProposal✎
Opportunity OwnerSarah Jenkins✎
Probability (%)60%✎
Lead SourceExisting Account Request✎
CompetitorNational Builder Supply✎
Next StepReview takeoff pricing with Robert✎
Project & Delivery Logistics
Project NamePine Ridge Development✎
Delivery AddressLot 42-60, Pine Ridge Pkwy✎
Project CategoryResidential New Construction✎
Required Delivery Date10/22/2026✎
Access RestrictionsMuddy Terrain (Needs 4WD)✎
Special Equipment NeededMoffett Forklift Attached✎
Material Grade Req.#2 or Better (Premium)✎
Will Call vs DeliverySupplier Delivered✎
Freight TermsPrepaid & Added to Invoice✎
Financing OptionStandard Net 30 Account✎
Warranty RequiredStandard Manufacturer✎
Order TypePhased Delivery (Multiple Drops)✎
Phased Drop Agreement
Robert requested we hold the roof trusses at our yard until framing inspection passes. We will drop floor joists and studs first.
Pricing Lock
Lumber commodity prices are volatile this week. Guaranteed this quote's board foot pricing for 14 days only.
Takeoff Completed
Estimating finished the takeoff from the Phase 2 prints. Total lumber counts are slightly lower than Phase 1 due to floor plan adjustments.
Campaign
Fall Roofing Blowout Promo
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameFall Roofing Blowout Promo✎
StatusIn Progress✎
Start Date09/01/2026✎
End Date10/31/2026✎
Campaign OwnerMarketing Team✎
TypeSeasonal Stock Promo✎
Is ActiveYes✎
Budgeted Cost$8,500✎
Targeting & Vendor Co-op
Target RegionStatewide Coverage✎
Material Segment FocusRoofing & Siding✎
Expected Response Rate8%✎
ChannelEmail + Pro Desk Signage✎
Vendor Co-Op PartnerOwens Corning✎
Trade TargetRoofers & Exteriors✎
Vendor Funding Approved
Owens Corning approved $4,250 in co-op marketing funds to cover the direct mailer printing costs.
Pro Desk Setup
All branches have received the point-of-sale displays. Instructed counter reps to push the pallet discount.
Initial Email Results
First email blast to roofing contractors resulted in a 24% open rate and 15 inquiries for truckload pricing.
Takeoff
TK-10992 - Pine Ridge Phase 2
Awaiting Prints
In Progress
Completed
Approved
Ordered
Details
Notes
Files
Takeoff Header Details
Takeoff NumberTK-10992✎
Project NamePine Ridge Phase 2✎
StatusCompleted✎
Requested By Date09/10/2026✎
Takeoff OwnerMike Ross✎
Revision NumberRev 2✎
Completion Date09/15/2026✎
Estimated Margin22.5%✎
Expedited RequestNo✎
Approval StatusPending Customer Review✎
Estimation Specifications
Plan VersionIFC (Issued for Construction)✎
Estimator NameMike Ross✎
Total Square Footage14,500 sq ft✎
Material Group FocusFraming & Sheathing✎
Project ComplexityModerate (Standard Trusses)✎
Blueprint FormatDigital PDF (Vector)✎
Substitution AllowedYes (Equal or Better)✎
Waste Factor Percentage10%✎
Supplier SourcedYard Stock & Direct Mill✎
Turnaround Time TierStandard (5-7 Days)✎
Roof Line Adjustments
The Rev 2 prints show a modified hip roof on the corner units. I adjusted the truss counts and added 15% more OSB sheathing for the waste factor on the cuts.
Engineered Wood Spec Check
Confirmed with the structural engineer that we can use our stocked 11-7/8" I-joists instead of the specified 12". Load calculations meet local code.
Prints Received
Vector PDFs received from Apex. Logged into the queue for standard 5-day turnaround.
Delivery
MAN-55401 - Apex (Pine Ridge)
Staged
Loading
On Route
Arrived at Site
Delivered / Signed
Details
Notes
Files
Delivery & Routing Information
Manifest IDMAN-55401✎
Delivery Date09/25/2026✎
StatusOn Route✎
Driver NameBill Sanderson✎
Truck TypeFlatbed w/ Moffett✎
Dispatch OwnerDispatch Desk✎
Loading ZoneYard A - Lumber✎
Jobsite ContactDiane Wu✎
Contact Phone(555) 200-9999✎
Gate Code4092#✎
Unload MethodForklift (Moffett) Drop✎
Load Details & Logistics
Total Weight (lbs)14,200 lbs✎
Number of Pallets8 Bunks✎
Hazardous MaterialsNo✎
Proof of DeliveryDigital Signature Req✎
Freight Cost$150.00 (Zone 2)✎
Signature RequiredYes✎
Delay ReasonNone (On Time)✎
Departure Time06:15 AM✎
Arrival Time--:--✎
Fleet Maintenance StatusCleared for Duty✎
Muddy Access Warning
Diane confirmed the site is muddy. Bill needs to park the flatbed on the paved road and use the Moffett to run the lumber bunks to the staging area.
Load Strapped & Tarped
Rain in the forecast. Yard crew tarped the OSB bunks prior to strapping.
ETA Text Sent
Automated SMS sent to Diane's cell phone: "Your delivery is en route. ETA 7:00 AM."
Inventory SKU
LUM-2X4-925 (2x4x92-5/8 Premium Stud)
Details
Notes
Files
Product Information
SKU NumberLUM-2X4-925✎
Product Name2x4x92-5/8 Premium Stud✎
CategoryLumber & Framing✎
Stock StatusIn Stock✎
Quantity on Hand4,500 Pcs✎
Unit of MeasurePiece (Each)✎
Inventory OwnerYard Manager✎
Standard Cost$2.85 / pc✎
Retail Price$4.15 / pc✎
Bulk Discount EligibleYes - Unit Break✎
Last Count Date08/30/2026✎
Shrinkage StatusNormal (Under 2%)✎
Sourcing & Yard Locations
Yard LocationYard A - Lumber Shed✎
Bin NumberA-12-Lower✎
Supplier NamePacific Northwest Mills✎
Lead Time (Days)14 Days✎
Min Order Qty1 Bunk (294 Pcs)✎
Restricted SaleNo Restrictions✎
Storage RequirementCovered Shed Recommended✎
Reorder Point2,500 Pcs✎
Restock Date10/05/2026✎
Quality Grade#2 or Better (Premium)✎
Mill Delivery Scheduled
Pacific Northwest Mills confirmed two rail cars of precut studs arriving next week. We should be well above the reorder point through November.
Damage Report
Found one bunk (294 pcs) with severe water damage on the bottom layers due to a tarp blowout in the storm. Written off to shrinkage.
Pricing Update Notice
Commodity index for SPF lumber dropped slightly. Adjusted retail price down from $4.35 to $4.15 effective immediately to stay competitive.


