Managing a biomass power generation business requires careful alignment of feedstock supply, operational efficiency, and strict emissions compliance. Track energy output, supplier contracts, daily operations, and compliance audits seamlessly with this industry specific operational CRM setup. Ensure maximum grid uptime and streamline your power distribution management.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track prospective feedstock suppliers, off-take agreements, and regional partners. Accounts
Manage municipal districts, utility operators, and aggregate material providers. Contacts
Organize key personnel at supplier mills, regulatory agencies, and utility boards. Opportunities
Drive power purchase agreements and capital upgrades through a structured sales path. Campaigns
Plan community outreach, supplier workshops, and regional energy initiatives. Feedstock Sources
Log contracted timber, agricultural waste, and municipal solid waste deliveries. Biomass Plants
Monitor individual boiler performance, turbine capacity, and active grid ties. Emissions Audits
Record regular particulate, SOx, and NOx compliance tests and reporting statuses.Lead
Robert Vance - Vance Logging Corp
New
Contacted
Qualified
Converted
Details
Notes
Files
Primary Lead Information
First NameRobert✎
Last NameVance✎
CompanyVance Logging Corp✎
TitleDirector of Operations✎
Phone(555) 201-9988✎
Lead OwnerSarah Jenkins✎
Lead StatusContacted✎
Feedstock TypeWood Chips✎
Daily Tonnage100 - 500 Tons✎
Moisture Content15% - 25%✎
Ash ContentLow (Under 3%)✎
Operational & Grid Details
RegionNorthwest✎
Delivery MethodHeavy Trucking✎
Supply ReliabilityHigh - Year Round✎
Contract Pref.Long Term (5+ Yrs)✎
Est. MW Potential15 MW✎
Grid ProximityWithin 10 Miles✎
Current Energy SourceDiesel Generators✎
Lead SourceTrade Show✎
RatingHot✎
IndustryForestry / Timber✎
Initial Logging Operations Review
Robert indicated they generate excess bark and sawdust that is currently being burned off-site. They are highly interested in a 5-year off-take agreement if we can arrange trucking.
Moisture Content Verification
Requested lab samples for moisture content. Robert says it stays below 20% year-round due to their covered storage facilities.
Logistics Discussion
Plant is about 8 miles from our proposed collection hub. Roads are heavy-load rated. No structural concerns for 18-wheelers.
Account
GreenPeak Utilities
Details
Contacts
Opportunities
Feedstock Sources
Biomass Plants
Emissions Audits
Notes
Files
Primary Account Info
Account NameGreenPeak Utilities✎
Phone(800) 555-1212✎
Account OwnerDavid Chen✎
Account TypeUtility Operator✎
Plant Capacity50 MW+✎
Grid ConnectionDirect Transmission✎
Operational Data
Primary FeedstockWood Pellets✎
Secondary FeedstockAgricultural Residue✎
Compliance StatusCompliant✎
RegionNortheast✎
Billing StateNew York✎
Ash DisposalCement Kiln Co-processing✎
Quarterly Review Meeting Notes
Met with Elena to discuss expanding pellet supply to their new Buffalo plant. They need a guaranteed 15,000 tons per quarter starting Q1 next year.
Boiler Efficiency Issues at Gamma
Plant Manager noted that Unit 3 at the Rochester facility is experiencing higher than normal ash buildup. We need to verify the moisture content of the latest feedstock delivery.
Contract Renewal Baseline
Current PPA expires in 18 months. Need to begin restructuring pricing model to account for recent fuel transportation cost increases.
Contact
Elena Rodriguez
Details
Notes
Files
Primary Contact Information
First NameElena✎
Last NameRodriguez✎
TitleChief Operations Officer✎
Role & Compliance
RoleExecutive Sponsor✎
Influence LevelHigh✎
DepartmentOperations✎
Lead SourcePartner Network✎
Pref. ContactEmail✎
Compliance Auth.Final Sign-off✎
Expansion Planning Call
Elena confirmed that the board approved the budget for the Buffalo plant expansion. We need to submit our feedstock supply proposal by the end of next month.
Compliance Documentation Preference
Elena prefers all emissions compliance reports to be CC'd to her direct assistant and the central compliance inbox, not directly to her email to avoid clutter.
Introduction to Procurement Team
Elena introduced us to Linda Wu, who will be handling all day-to-day contract negotiations for feedstock deliveries moving forward.
Opportunity
Boiler Upgrade - Unit 3
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NameBoiler Upgrade - Unit 3✎
TypeExisting Business - Upgrade✎
Next StepFinalize SOW with Engineering✎
Lead SourcePartner Network✎
Opportunity OwnerDavid Chen✎
Amount$1,250,000✎
Close DateSept 15, 2026✎
StageNegotiation✎
Probability80%✎
Forecast CategoryCommit✎
Technical & Project Parameters
Target MW Capacity10 - 25 MW✎
Feedstock BlendHigh Moisture Chips✎
Boiler TechnologyCirculating Fluidized Bed✎
Turbine Mfr.Siemens Energy✎
Grid InterconnectExisting Infrastructure✎
PPA DurationN/A (Capital Upgrade)✎
Ash Handling SolutionWet Bottom Ash System✎
Moisture ToleranceUp to 45%✎
Delivery LogisticsCovered Conveyor✎
Emissions ControlBaghouse + SNCR✎
Tax Incentive Elig.PTC Eligible✎
Financing TypeCapex (Internal)✎
Final Price Negotiation
Linda Wu requested a 5% discount on the hardware if they sign by Sept 1st. I told her I need to clear it with engineering to ensure we don't cut into our implementation margins.
Engineering SOW Review
Engineering confirmed the wet bottom ash conveyor will integrate with their existing silo. Lead time is solid at 10 weeks. SOW is ready for signature.
Initial Site Walkthrough
Unit 3 is severely underperforming due to slagging from the new high-moisture chip blend they've been burning. The CFB retrofit should solve 90% of their downtime.
Campaign
Q3 Plant Efficiency Webinar
Details
Campaign Members
Notes
Files
Campaign Information
Campaign NameQ3 Plant Efficiency Webinar✎
Parent Campaign2026 Customer Retention✎
Start DateJuly 01, 2026✎
End DateSept 30, 2026✎
Campaign OwnerMarketing Team✎
StatusIn Progress✎
TypeWebinar✎
Expected Revenue$2,500,000✎
Targeting & Performance
Target AudiencePlant Managers✎
RegionNational (All)✎
Feedstock FocusGeneral Biomass✎
Budgeted Cost$15,000✎
Actual Cost$8,200✎
ResponsesExcellent (>10%)✎
Webinar Follow-up Strategy
All attendees who stayed for more than 30 minutes will receive a whitepaper on CFB Boiler Retrofits. Sales team is expected to call within 48 hours.
Content Approval
Engineering signed off on the slide deck detailing the moisture tolerance of the new conveyor systems. Deck is locked for presentation.
Initial Registration Numbers
We hit 150 registrants in the first week, heavily weighted towards plant managers in the Northeast experiencing slagging issues.
Feedstock Source
Northern Mill Contract
Evaluation
Negotiation
Active Contract
Expired / Renewing
Details
Notes
Files
Contract & Volume Info
Source NameNorthern Mill Contract✎
Contract StartJan 01, 2024✎
Contract EndDec 31, 2028✎
Price Per Ton$45.00✎
Total Volume50,000 Tons / Year✎
Source OwnerSarah Jenkins✎
Source TypeWood Chips✎
Moisture Content25% - 35%✎
Ash ContentLow (Under 3%)✎
Caloric ValueModerate (10-14 MJ/kg)✎
Delivery Freq.Daily✎
Logistics & Quality Control
RegionNortheast✎
Transport ModeWalking Floor Trailers✎
Supplier ReliabilityExcellent (>95% on time)✎
Storage Req.Covered Silo Recommended✎
Quality TierTier 1 - Primary Fuel✎
Certification StatusFSC Certified✎
SeasonalityYear-Round Steady✎
Pricing ModelFixed Rate (Index Pegged)✎
Payment TermsNet 45✎
StatusActive✎
Winter Supply Assurance Review
Met with the logistics team from Cascade Timber. They guaranteed that the new paved access roads will prevent the delivery slowdowns we experienced last winter during the thaw.
Moisture Content Spike Warning
May deliveries showed a moisture content creeping close to 38%. Supplier was warned about potential pricing penalties if it exceeds the 35% threshold per the contract.
FSC Certification Renewed
Supplier provided the updated FSC certification documents. We are cleared for claiming renewable tax credits on this volume for the next 3 years.
Biomass Plant
GreenPeak Plant Alpha
Details
Notes
Files
Facility Information
Plant NameGreenPeak Plant Alpha✎
Commission DateMay 15, 2018✎
Total Investment$45,000,000✎
Address100 Energy Way✎
CityAlbany✎
Plant OwnerPlant Operations✎
Operational StatusOperational✎
Boiler TypeStoker Grate✎
Turbine TypeCondensing Steam✎
Nameplate Capacity25 MW✎
Grid OperatorNYISO✎
Technical Operations
Primary FeedstockWood Chips✎
Secondary FeedstockWood Pellets✎
Daily Consumption750 Tons✎
Water SourceMunicipal Supply✎
Ash DisposalCement Co-processing✎
RegionNortheast✎
Control SystemEmerson Ovation DCS✎
Backup FuelNatural Gas Pipeline✎
Outage FrequencyBiannual (Scheduled)✎
Efficiency RatingHigh (28% - 32%)✎
Turbine Vibration Alert Resolved
The minor vibration alert from the primary Siemens turbine was traced to a faulty sensor mounting. Maintenance secured the sensor and readings have normalized. No downtime required.
Feedstock Blend Adjustment
Increased the wood pellet ratio in the boiler by 10% to offset the high moisture content coming from the chips supplied by the Northern Mill contract.
Annual Grid Interconnect Test Passed
NYISO completed their annual interconnect load test. We demonstrated the ability to shed 10 MW within 5 minutes. Full compliance achieved.
Emissions Audit
Q3 2026 Alpha Audit
Scheduled
Data Collection
Under Review
Finalized (Passed)
Details
Notes
Files
Audit Information
Audit NameQ3 2026 Alpha Audit✎
Audit DateJuly 10, 2026✎
Auditor NameJames Kincaid✎
Next Audit DateOct 10, 2026✎
Violation Fine Amt$0.00✎
Audit OwnerCompliance Team✎
Audit StatusPassed✎
NOx EmissionsBelow Threshold✎
SOx EmissionsBelow Threshold✎
Particulate MatterBelow Threshold✎
CO2 OutputNormal (Biogenic)✎
Regulatory & Technical Specs
Regulatory BodyState DEC✎
Compliance TierTitle V Major Source✎
Scrubber EfficiencyOptimal (>98%)✎
Cont. MonitoringActive CEMS✎
Audit TypeQuarterly Routine✎
RegionNortheast✎
Reporting Freq.Quarterly✎
Correction PlanNot Required✎
Remediation StatusN/A✎
Final RatingCompliant✎
CEMS Calibration Success
The Continuous Emissions Monitoring System was successfully calibrated prior to the audit. All readings aligned perfectly with the manual stack test samples.
NOx Levels Dropping
Noted a 5% drop in NOx levels compared to Q2. This directly correlates with the new SNCR injection timing software update we installed last month.
Auditor Feedback
James Kincaid praised the cleanliness of the baghouse area. No fugitive dust issues were noted during the site walkthrough.