Transportation airports and port authorities face complex challenges managing terminal infrastructure, berthing assignments, and multi-tenant leases. Relying on disconnected spreadsheets to monitor daily port calls or airside operations often results in delayed gate assignments, safety compliance gaps, and unbilled revenue. This pre-configured environment consolidates facility space allocations, operational movements, and infrastructure projects, giving commercial and operational directors total visibility over maritime and aviation assets.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Qualify potential tenant airlines, cargo shippers, and retail vendors. Accounts
Manage existing terminal operators, shipping lines, and FBOs. Contacts
Track station managers, compliance officers, and tenant leads. Opportunities
Negotiate long-term concessions, gate leases, and usage tariffs. Campaigns
Execute new route incentives and facility safety initiatives. Space Allocations
Monitor leased terminal zones, gates, and warehouse square footage. Port Calls
Track vessel berthing, turnaround times, and flight arrivals. Infra Projects
Manage runway dredging, apron repairs, and terminal expansions.Lead
Marcus Vance
New Inquiry
Contact Initiated
Site Visit Scheduled
Proposal Under Review
Converted
Details
Notes
Files
Primary Lead Information
Lead NameMarcus Vance✎
CompanyGlobal Air Express✎
TitleDirector of Network Planning✎
Primary RegionNorth America✎
Comm PreferenceEmail✎
Terminal InterestCargo Terminal North✎
Lead OwnerSarah Jenkins✎
Lead StatusSite Visit Scheduled✎
Lead SourceDirect Inquiry✎
Operation TypeAir Cargo✎
Desired FootprintMedium (10k-50k sqft)✎
Anticipated VolumeDaily Service✎
Operational Requirements
Contract RequestMulti-Year Lease✎
Preferred LocationAirside Proximity✎
Equipment NeedsHeavy Lift / Gantry✎
Utility RequirementsHigh Voltage Industrial✎
Customs Req.Bonded Warehouse Setup✎
Risk CategoryLow✎
Environmental ImpactStandard Operations✎
Investment ReadinessBudget Approved✎
Decision TimeframeThis Quarter✎
Lead PriorityHigh✎
Site Visit Coordination
Arranged a tour of Cargo Terminal North for next Tuesday. Ensure safety vests and airside badges are pre-cleared for the Global Air Express team.
Initial Capability Review
Discussed their requirement for wide-body freighter access. Confirmed our apron can accommodate 747-8F turnaround times within their 120-minute SLA.
Inquiry Received
Lead generated via direct portal inquiry. Looking for a secondary regional facility to relieve congestion from their primary coastal hub.
Account
Pacific Skyways
Details
Contacts
Opportunities
Space Allocations
Port Calls
Infra Projects
Notes
Files
Organization Information
Account NamePacific Skyways✎
Account NumberTEN-08492✎
Billing RegionNorth America✎
Account TypeCommercial Airline✎
Account OwnerMichael Torres✎
SLA LevelTier 1 (Anchor)✎
Carrier TierLegacy Flag Carrier✎
Operating ModalityPassenger Aviation✎
Authority & Compliance Status
Security ClearanceAviation Security Cleared✎
Facility AccessFull Airside/Terminal✎
Audit StatusPassed (Current Year)✎
Payment TermsNet 30 Days✎
Traffic VolumeHigh (>1M Pax/Yr)✎
Compliance StandingGood Standing✎
Lease Renewal Kickoff
Met with Capt. Reed regarding the Terminal B anchor lease renewal. They are requesting a cap on aeronautical fee increases over the next 10 years in exchange for funding the lounge upgrade.
Baggage System Disruption
Linda reported issues with the outbound belts during the morning bank of flights. Maintenance dispatched immediately. Resolved in 45 minutes. No flights delayed.
Annual Audit Completed
Safety audit completed for their ground equipment staging area. Passed with minor findings regarding high-vis gear compliance.
Contact
Captain Arthur Reed
Details
Notes
Files
Contact Information
Contact NameCaptain Arthur Reed✎
TitleVP Flight Operations✎
DepartmentAviation Operations✎
Contact OwnerMichael Torres✎
Contact StatusActive✎
Role in OperationsPrimary Decision Maker✎
Primary ContactYes✎
Access & Communication Preferences
Security Badge LevelSIDA / Red Badge✎
Ramp AccessAuthorized (Driving)✎
Incident AuthorityLevel 1 (Crisis Commander)✎
Communication PrefDirect Phone/Mobile✎
Shift ScheduleStandard Executive Hours✎
Escalation TierFinal Escalation Point✎
Lease Strategy Prep
Arthur is highly focused on keeping aeronautical fees flat. We need to present the lounge upgrade as a net positive revenue generator for them to justify the CapEx.
Executive Change Notice
Arthur assumes the VP role permanently after acting as interim for 6 months. Prioritized establishing a direct line with our Director of Aviation.
Security Badge Renewal
SIDA badge renewal completed. Fingerprint and background check cleared through 2028.
Opportunity
Terminal B Anchor Lease Renewal
Discovery
Proposal Under Review
Negotiation
Pending Board Approval
Closed
Details
Line Items
Notes
Files
Lease & Agreement Information
Opportunity NameTerminal B Anchor Lease Renewal✎
Amount$45,000,000.00✎
Close DateOct 15, 2026✎
Probability75%✎
Next StepAeronautical fee cap agreement✎
Revenue TypeAeronautical / Lease✎
Opportunity OwnerMichael Torres✎
StageNegotiation✎
Contract TypeLease Renewal✎
Forecast CategoryCommit✎
Pricing ModelFixed SQFT + Passenger Fee✎
Funding SourcePrivate Capital (Tenant)✎
Procurement VehicleDirect Negotiation✎
Asset & Compliance Requirements
Asset CategoryTerminal Gates✎
Term Length10 Years✎
Environmental ReviewCategorical Exclusion✎
Target Capacity12 Narrowbody Gates✎
Liability Coverage$500M Aviation Liability✎
Concession TierAnchor Tenant✎
Incentive ProgramNone Applied✎
Board Approval ReqYes - Full Board Vote✎
Competitor PresenceLow Threat✎
Loss Reason--None--✎
Fee Cap Negotiation
Pacific Skyways will accept the $125/SqFt rate for check-in space if we cap aeronautical landing fee increases to 2% annually for the next 5 years. Checking with Finance.
Lounge Upgrade CapEx
Tenant has agreed to self-fund the $2.5M lounge upgrade in exchange for rent abatement in Year 1. Sent terms to legal.
Initial Term Sheet Sent
Drafted the 10-year term sheet combining exclusive gate use and projected passenger throughput fees. Board review required in September.
Campaign
2026 Trans-Pacific Cargo Subsidy Program
Details
Campaign Members
Notes
Files
Campaign Information
Campaign Name2026 Trans-Pacific Cargo Subsidy✎
Is ActiveYes✎
Start DateJuly 01, 2026✎
End DateDec 31, 2026✎
Campaign OwnerSarah Jenkins✎
StatusIn Progress✎
TypeTargeted Incentive✎
Target AudienceCargo Airlines (APAC)✎
Financials & Logistics Focus
Revenue Bracket$5M - $10M✎
Budget StatusOn Budget✎
Expense Range$100k - $250k (Subsidy Pool)✎
Asset FocusCargo Terminal North✎
Promotional ChannelDirect Executive Outreach✎
Carrier IncentiveLanding Fee Waiver (Yr 1)✎
Initial Outreach Phase
Pitched the Year 1 landing fee waiver to 12 target APAC carriers looking for US West Coast capacity alternatives.
Board Authorization
Authority Board approved the $250k subsidy pool drawn from the strategic development fund. Maximum waiver is 12 months.
Target List Built
Compiled target list focusing specifically on B777F and B747 operators running current schedules to congested neighboring hubs.
Space Allocation
SPC-88210 (Pacific Skyways - Term B Gates)
Available
Pending Agreement
Active Lease
Under Renovation
Expired
Details
Notes
Files
Allocation Identification
Allocation IDSPC-88210✎
Terminal ZoneTerminal B Concourse✎
Square FootageSize Bracket 4 (25k-50k)✎
Start DateJan 01, 2017✎
End DateDec 31, 2026✎
Property OwnerCommercial Dept✎
StatusActive Lease✎
Asset TypeGate Assignment (Exclusive)✎
Security ZoneSIDA / Sterile Area✎
Access LevelTenant Staff & Pax Only✎
Maintenance TierAuthority Maintained (Full)✎
Operational & Leasing Details
Footprint TypeContiguous Space✎
Utility ProvisionFully Metered (Tenant Pays)✎
Wi-Fi CoverageTenant Dedicated Network✎
Janitorial ServiceAuthority Provided✎
HVAC ZoneCentral Loop Managed✎
Leasing ModelFixed SQFT Rate✎
Revenue ShareNo Split✎
Inspection StatusPassed Current Year✎
Insurance VerificationValid on File✎
Renewal PriorityCritical (Anchor)✎
Gate Maintenance Issue
Tenant reported the passenger boarding bridge at Gate 4 is occasionally failing to retract fully. Work order submitted to facilities.
Upcoming Expiration
Lease expires at end of year. Active opportunity created to track the 10-year renewal negotiation.
Fire Marshall Inspection
Annual fire safety inspection passed. No blocked exits or overloaded power circuits identified.
Port Call / Flight Op
OPS-77350 (PS-902 / Pacific Skyways)
Scheduled
En Route
Arrived at Gate
Ops in Progress
Departed
Details
Notes
Files
Arrival & Schedule Identification
Call ReferenceOPS-77350✎
Vessel/Flight NamePS-902 (A350)✎
Call DateJuly 30, 2026✎
Estimated Time ArrJuly 30, 11:15 AM✎
Estimated Time DepJuly 30, 1:45 PM✎
Record OwnerOperations Control✎
StatusArrived at Gate✎
ModalityAviation (Passenger)✎
Berth/Gate AssignTerminal B, Gate 8✎
Turnaround PriorityHigh (Tight Schedule)✎
Delay ReasonNone (On Time)✎
Operational Requirements
Disembarkation TypeJet Bridge✎
Cargo OperationsBelly Cargo Load/Unload✎
Ground HandlerApex Ground Handling✎
Refueling RequiredYes (Hydrant System)✎
Catering ServiceFull Service Swap✎
Pax Load FactorHigh (85-100%)✎
Cargo Volume BracketLow (<5 Tons)✎
Customs ClearingDomestic Flight (N/A)✎
Security DetailStandard Perimeter✎
Border Agency HoldClear✎
Arrival Notification
Aircraft touched down at 11:08 AM. Blocked in at Gate 8 at 11:15 AM exact. Turnaround clock started.
Ground Handling Check
Apex teams confirmed present at Gate 8 prior to block-in. Baggage offload commenced at 11:18 AM.
Pre-Arrival Briefing
Flight is a domestic turn. High passenger load (92%). Catering trucks are staged on the apron.
Infrastructure Project
PRJ-1015 (Runway 24R Repaving)
Planning
Procurement
Execution (Active)
Final Inspection
Completed
Details
Notes
Files
Project Overview
Project IDPRJ-1015✎
Contractor AccountGranite Construction✎
Project NameRunway 24R Repaving✎
Kickoff DateMay 01, 2026✎
Target CompletionSep 15, 2026✎
Budget Allocation$14,500,000.00✎
Record OwnerCivil Engineering✎
StatusExecution (Active)✎
Project CategoryPaving & Surfaces✎
Impact ZoneAirside Runways✎
CriticalityCritical (Ops Impact)✎
Funding SourceFederal AIP Grant✎
Operational Execution Details
Disruptions ExpectedRunway Closure (Nightly)✎
Environmental PermitApproved & Active✎
Labor Union SectorHeavy Equipment Ops✎
Materials StagingOn-Airport (Zone 4)✎
Shift TimingNight Shift (22:00-05:00)✎
Phase MilestoneMilling Completed✎
Safety AuditPassed Last Week✎
Procurement MethodPublic Tender (Lowest Bid)✎
Grant EligibilityAIP Reimbursable (75%)✎
Delay RiskLow (On Schedule)✎
Milling Phase Complete
Night crews successfully completed the asphalt milling phase ahead of schedule. Base coat pouring will commence tonight at 22:30.
NOTAM Issued
Notice to Air Missions (NOTAM) extended for the nightly closures of 24R through August. All carriers notified via portal.
Safety Inspection
Unannounced site visit by OSHA and airport safety officers. Contractor was fully compliant with FOD (Foreign Object Debris) mitigation protocols.


