Aerospace manufacturing requires a rigid control of processes, compliance standards, and raw material tracking. This customized CRM setup aligns sales cycles directly with production milestones. By managing complex work orders, maintaining strict AS9100 quality certifications, and tracking inspection data alongside core customer information, your team operates with complete visibility from procurement to final component delivery.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track RFQs and target production timelines. Accounts
Manage OEMs, prime contractors, and suppliers. Contacts
Connect with engineering and procurement leads. Opportunities
Drive complex prototype and production bids. Campaigns
Measure trade show and defense contract ROI. Certifications
Monitor AS9100, NADCAP, and FAA compliance. Work Orders
Track shop floor routing and component batches. Quality Inspections
Log tolerances, CMM results, and material defects.Lead
Marcus Vance - AeroTech Dynamics
New RFQ
Engineering Review
Quoted
Converted
Details
Notes
Files
Primary RFQ Information
Lead NameMarcus Vance✎
TitleProcurement Manager✎
CompanyAeroTech Dynamics✎
Phone(555) 123-4567✎
Lead OwnerSarah Operations✎
Lead StatusEngineering Review✎
Lead RatingHot✎
Industry SegmentDefense✎
Compliance StandardAS9100D✎
Manufacturing Requirements
Lead SourceTrade Show✎
Part RequirementTurbine Housing✎
Material SpecTitanium Alloy✎
Annual Volume5,000 units✎
Target ProductionQ4 2026✎
Budget$250,000✎
Competitor ProductUnknown✎
Delivery LocationWichita, KS✎
Preferred ShippingFreight LTL✎
Payment TermsNet 45✎
RFQ ReceivedAug 1, 2026✎
Material Supply Constraint Check
Engineering verified we have adequate Titanium Alloy stock for prototype phase. Full production run will require advance PO to mill.
Initial Qualification Call
Marcus confirmed ITAR compliance is mandatory for this assembly. Sent our registration certificate over.
Trade Show Interaction
Met Marcus at booth 402. Very interested in our 5-axis CNC capabilities. Handed off spec sheets.
Account
AeroTech Corporate
Details
Contacts
Opportunities
Certifications
Work Orders
Quality Inspections
Notes
Files
Primary Business Information
Account NameAeroTech Corporate✎
Account NumberACC-44910✎
Phone(316) 555-9000✎
Account OwnerMark Sales✎
Account RatingStrategic✎
Industry SegmentCommercial Aviation✎
AS9100 CertVerified Active✎
Operational Data
Billing Address100 Aviation Way, Wichita, KS✎
Customer TypeOEM✎
Primary FacilityWichita Assembly Plant✎
Annual Spend$4,500,000✎
SLA LevelGold (JIT Delivery)✎
Active NDAYes✎
Annual Supplier Review
Achieved 99.8% on-time delivery metric. Secured preferred supplier status for next fiscal year.
Facility Expansion Note
AeroTech is expanding their Wichita assembly line. Expect higher volume RFQs for structural components in Q4.
Quality Audit Follow-up
Emily Stone verified closure of minor non-conformance regarding raw material traceability tags.
Contact
John Miller
Details
Notes
Files
Primary Contact Data
Contact OwnerMark Sales✎
Purchasing AuthTechnical Approver✎
Preferred ContactEmail✎
Certification LevelPE, Six Sigma BB✎
Additional Information
Engineering DeptStructural Airframe✎
Mailing AddressBldg 4, 100 Aviation Way✎
Primary Product IntPrecision Machining✎
Comm StatusActive✎
Shift PreferenceFirst Shift✎
Tolerance Requirements Discussion
John is strict on geometric dimensioning. Wants all new quotes to specify CMM reporting limits upfront.
Material Substitution Approval
Approved use of Al 7075-T7351 in place of T6 for better stress corrosion resistance on bracket assembly.
Facility Tour Notes
Hosted John for plant tour. He was impressed by our new 5-axis Mazak machines.
Opportunity
Turbine Housing Prod Run
Discovery & RFQ
Proposal / Quoting
Engineering Review
Negotiation
Closed Won
Details
Line Items
Notes
Files
Opportunity Information
Opportunity NameTurbine Housing Prod Run✎
Amount$250,000✎
Lead SourceTrade Show✎
Part NumberPN-TH-001✎
Opportunity OwnerMark Sales✎
StageProposal✎
Probability50%✎
Close DateOct 15, 2026✎
Manufacturing PlantPlant A - Precision Machining✎
Quality StandardAS9100D✎
Manufacturing Details
Material ReqTitanium Alloy✎
Tooling Cost$15,000 NRE✎
Prototype ReqYes✎
Machine Tolerance+/- 0.0005"✎
Drawing AttachedYes✎
Expected Ship DateNov 30, 2026✎
Inspection Level100% CMM✎
Freight TermsFOB Origin✎
Export ControlITAR✎
Setup FeesIncluded in Piece Price✎
CompetitorPrecision Machining Corp✎
Next StepSend formal quote to Marcus✎
Pricing Strategy Discussion
Amortized the $15k tooling fixture cost slightly to bring unit price down. Marcus prefers lower piece price over lower NRE.
Engineering Feasibility Confirm
Confirmed Plant A can hold the +/- 0.0005" tolerance on the internal bore using the new Mazak. No capacity issues.
RFQ Received
Converted lead and received formal drawing pack. Need to return quote by Aug 10.
Campaign
AeroDef Manufacturing Show 2026
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameAeroDef Manufacturing Show 2026✎
Parent Campaign2026 Global Trade Shows✎
Start DateJul 25, 2026✎
End DateJul 28, 2026✎
Campaign OwnerMarketing Team✎
StatusIn Progress✎
TypeTrade Show✎
ActiveYes✎
Financials & Metrics
Expected Revenue$1,000,000✎
Budgeted Cost$45,000✎
Target SegmentDefense & Aerospace OEMs✎
Actual Cost$42,500✎
Expected Response15%✎
Sent Count2,500 Invites✎
Booth Setup Confirmation
All CNC display parts arrived at the venue safely. Booth 402 is fully operational.
Show Follow-up Strategy
Sales must follow up with all "Hot" leads within 48 hours of show close. Using the AS9100 sell sheet as primary collateral.
Sponsorship Opportunity
Secured logo placement on the main networking lounge signage.
Certification
AS9100D Supplier Audit
Preparation
Audit Scheduled
Audit Conducted
Active / Certified
Renewal Pending
Details
Notes
Files
Certification Information
Certification NameAS9100D Supplier Audit✎
Audit DateDec 15, 2024✎
Expiration DateDec 31, 2027✎
Auditor NameBSI Group✎
Scope of ApprovalPrecision Machining of Aerospace Components✎
Cert OwnerQuality Dept✎
StatusActive✎
TypeQuality Management System✎
Facility LocationPlant A✎
StandardAS9100D✎
Approving BodyBSI✎
Audit Findings & Follow-up
Non-Conformances1 Minor✎
Finding 1Gage Calibration Tag faded✎
Finding 2N/A✎
Action PlanImplement digital calibration tags✎
Target Close DateJan 30, 2025✎
Renewal Cycle3 Years✎
Issue DateJan 01, 2025✎
Compliance TierTier 1✎
Follow-up ReqNo✎
Next Audit TypeSurveillance✎
Minor NC Closed
Auditor accepted our corrective action for the calibration tags. Transitioned to digital barcode scanning for all shop floor gages.
Surveillance Audit Prep
Next surveillance audit scheduled for Q4 2026. Internal mock audit will be held in September.
Scope Addition Request
AeroTech requested we add assembly services to our scope of approval during the next recert cycle.
Work Order
WO-99201
Released
Material Pulled
In Machining
In Inspection
Finished Goods
Details
Notes
Files
Manufacturing Routing
Work Order NumWO-99201✎
Part NumberPN-TH-001✎
Batch Size5,000✎
Material LotLOT-TI-2249✎
WO OwnerProduction Manager✎
StatusIn Progress✎
PriorityHigh✎
Facility PlantPlant A✎
ShiftFirst Shift✎
QA Inspection Req100% CMM✎
Performance Metrics
Start DateAug 15, 2026✎
Completion DateSep 15, 2026✎
Machine RoutingOp 10: Mazak 5-Axis✎
Primary OperatorDave Machinist✎
Tooling IDFIXT-884✎
Setup Time4.5 Hours✎
Run Time12.2 Mins/Part✎
Reject Rate0.2%✎
Rework StatusNone✎
Final Sign-offPending✎
Tooling Setup Complete
FIXT-884 verified on Mazak machine. First piece run completed and sent to CMM lab.
Material Lot Traceability Logged
All Titanium billets tagged to LOT-TI-2249 in the MES. Certs filed.
Expedite Request
Sales requested to move 500 units to AOG priority. Scheduled overtime for the weekend.
Quality Inspection
QI-8840 - First Piece Insp
Logged
Measuring
Pending Review (MRB)
Dispositioned
Details
Notes
Files
Inspection Log
Inspection IDQI-8840✎
Inspector NameSam Tooling✎
Inspection DateAug 16, 2026✎
Part NumberPN-TH-001✎
Insp OwnerQuality Dept✎
StatusPending Review✎
TypeFirst Article (AS9102)✎
ResultPending Review✎
Discrepancy LvlMinor Dimensional✎
Measuring InstZeiss CMM 02✎
Dimensional & Disposition Data
Dimension ANominal: 4.500" Act: 4.5006"✎
Dimension BNominal: 2.125" Act: 2.1248"✎
Surface FinishRa 32 (Pass)✎
Tensile StrengthPer Mill Cert (Pass)✎
Defect DescDim A is 0.0001" out of tol✎
Calibration StatusCurrent (Exp Jan 2027)✎
Supervisor ApprvPending✎
Rework RequiredYes✎
Corrective Act IDPending MRB✎
Re-inspect DateAug 18, 2026✎
MRB Board Escalation
Dimension A is 0.0001" over the upper limit. Sent to MRB. Engineering states we can likely take a spring pass to bring it in.
CMM Program Update
Updated Zeiss routine to add more touch points on the internal bore to verify roundness.
Customer Concession Note
If rework fails, we will submit a deviation request to AeroTech. It does not affect form, fit, or function.
