Aerospace engineering services require precision, rigorous compliance, and secure data handling. Managing complex analysis scopes, securing ITAR-compliant resources, and tracking structural test articles are constant challenges for engineering firms. This template organizes technical scoping, AS9100 compliance documentation, and project deliverables directly within Salesforce to keep engineering operations tightly controlled. Navigate the tabs below to explore how an aerospace firm manages its specialized data.
✨ Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
L Leads
Track incoming inquiries for structural analysis and design.A Accounts
Manage OEMs, Tier 1 suppliers, and defense contractors.C Contacts
Organize chief engineers, program managers, and buyers.O Opportunities
Monitor bids for FEA, CFD, and certification consulting.C Campaigns
Drive outreach for defense trade shows and technical webinars.P Projects
Execute technical statements of work and resource allocation.C Certifications
Log STC, PMA, and AS9100 audit progress with authorities.T Test Articles
Track physical prototypes, composites, and NDT components.Interactive Template Below
L
Leads
| Name | Company | Engineering Discipline | Status | Target Platform | Lead Source |
|---|---|---|---|---|---|
| Sarah Jenkins | AeroSystems Inc | Structural Analysis | New | Commercial Rotorcraft | Referral |
| Mark Roberts | Titan Defense | Computational Fluid Dynamics | Contacted | UAV / Drone | Trade Show |
| Elena Rostova | Orbit Technologies | Systems Engineering | NDA Signed | Low Earth Orbit Satellite | Website Direct |
| James O'Connor | Global Airframes | Materials Science | Contacted | Regional Jet | Cold Call |
| Anita Patel | Nova Propulsion | Propulsion Systems | New | Hypersonic Test Vehicle | Webinar |
L
Lead
Sarah Jenkins - AeroSystems Inc
New
Contacted
NDA Signed
Technical Scoping
Converted
Details
Notes
Files
Primary Lead Information
Lead NameSarah Jenkins✎
CompanyAeroSystems Inc✎
Phone555-0192✎
Engineering DisciplineStructural Analysis✎
Current Vendor IssueInaccurate FEA Models✎
Lead OwnerAlex Rivera✎
Lead SourceReferral✎
Estimated Budget$120,000✎
Project Timeline1-3 Months✎
ITAR RequirementYes - Strict✎
Primary Service InterestFinite Element Analysis✎
Technical Requirements
Target Aircraft PlatformCommercial Rotorcraft✎
Material SpecificationsAdvanced Composites✎
Certification AuthorityFAA (Part 29)✎
CAD Software PrefCATIA V5✎
FEA/CFD RequiredAbaqus✎
Quality StandardAS9100 Rev D✎
Security ClearanceNone✎
Export Control StatusPending Classification✎
Procurement OfficerTBD✎
Priority LevelHigh✎
Initial Call Summary
Client is frustrated with their current engineering firm delivering inaccurate Abaqus models for their new rotorcraft composite tail section. They need a rapid turnaround.
Created by Alex Rivera • Aug 2, 2026
NDA Preparation
Make sure to send our mutual NDA template that includes the strict ITAR compliance clauses. Sarah mentioned they are under a tight deadline.
Created by Alex Rivera • Aug 1, 2026
Technical Scoping Notes
We will need to allocate at least 2 Senior Stress Engineers for this evaluation. I need to check our compute node availability for next month.
Created by Alex Rivera • July 28, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| AeroSystems_RFI_Doc.pdf | 3.2 MB | Aug 1, 2026 | |
| Draft_NDA_ITAR_Compliant.docx | Document | 0.1 MB | Aug 1, 2026 |
| Tail_Section_Envelope_Spec.pdf | 5.5 MB | July 30, 2026 |
A
Accounts
| Account Name | Aerospace Sector | Active Projects | Partnership Status | Phone | Owner |
|---|---|---|---|---|---|
| Horizon Aerospace | Commercial Aviation | 3 | Strategic Partner | 555-4011 | Maria Gomez |
| Titan Defense | Defense & Military | 1 | Active Client | 555-9088 | Alex Rivera |
| Delta Wing Corp | Tier 1 Supplier | 2 | In Negotiation | 555-3200 | Sam Patel |
| Orbit Technologies | Space / Satellite | 0 | Prospect | 555-1123 | Maria Gomez |
| Global Airframes | General Aviation | 4 | Strategic Partner | 555-8876 | Alex Rivera |
A
Account
Horizon Aerospace
Details
Contacts
Opportunities
Projects
Certifications
Test Articles
Notes
Files
Company Profile
Account NameHorizon Aerospace✎
Phone555-4011✎
Billing Address100 Aerospace Blvd, Suite 400✎
Aerospace SectorCommercial Aviation✎
Account OwnerMaria Gomez✎
Active Projects3✎
Partnership StatusStrategic Partner✎
Invoicing TermsNet 30✎
Compliance & Agreements
AS9100 CertifiedYes✎
NDA StatusActive - Mutual✎
Approved Supplier LevelTier 1 Approved✎
DUNS Number00-123-4567✎
Export Compliance TierITAR Registered✎
Master Services AgreementActive (Expires 2028)✎
| Name | Title | Engineering Specialty | Phone |
|---|---|---|---|
| Dr. Robert Chen | Chief Engineer | Structural Analysis | 555-4012 |
| Tom Higgins | Program Manager | Systems Engineering | 555-4015 |
| Jane Doe | Procurement Spec | None | 555-4022 |
| Mike Vance | Lead Stress Engineer | Finite Element Analysis | 555-4033 |
| Sue Allen | Billing Coordinator | None | 555-4088 |
| Opp Name | Stage | Amount | Close Date |
|---|---|---|---|
| Horizon - Winglet Redesign FEA | Closed Won | $120,000 | Jan 15, 2026 |
| Horizon - Landing Gear Stress Test | Negotiation | $85,500 | Aug 30, 2026 |
| Horizon - CFD Radome Eval | Proposal | $45,200 | Sep 15, 2026 |
| Horizon - Engine Mount Cert Support | Discovery | $62,000 | Oct 01, 2026 |
| Horizon - Cabin Interior Flammability | Closed Lost | $35,000 | Feb 10, 2026 |
| Project Name | Phase | Technical Lead | Target Completion |
|---|---|---|---|
| PRJ-9901 - Winglet Redesign | PDR | David Klein | Dec 1, 2026 |
| PRJ-9850 - Avionics Bay Thermal | Testing | Sarah Lin | Aug 15, 2026 |
| PRJ-9822 - Flap Actuator Fatigue | Closure | Mike Vance | July 30, 2026 |
| PRJ-9710 - Seat Track Structural | CDR | David Klein | Sep 10, 2026 |
| PRJ-9600 - Cargo Door Hinge Eval | Initiation | Sarah Lin | Nov 1, 2026 |
| Certification ID | Authority | Current Status | Expected Approval |
|---|---|---|---|
| CERT-2044 - FAA STC Mod | FAA (Part 25) | FAA Review | Oct 15, 2026 |
| CERT-2030 - EASA Validation | EASA | Submitted | Dec 1, 2026 |
| CERT-2015 - PMA Application | FAA (Part 21) | Approved | May 10, 2026 |
| CERT-2060 - AS9100 Surveillance | Third Party Registrar | Preparation | Sep 5, 2026 |
| CERT-1990 - Major Repair Alteration | DER Signoff | Approved | Jan 12, 2026 |
| Article Name | Part Number | Lifecycle Stage | Location |
|---|---|---|---|
| TA-8821 - Composite Wing Spar | HZ-WS-001 | Active Testing | Lab 3 - MTS Rig |
| TA-8822 - Landing Gear Trunnion | HZ-LG-404 | Pre-Test Insp | NDT Facility |
| TA-8805 - Radome Coupon A | HZ-RD-C1 | Post-Test Insp | Storage Bin B |
| TA-8790 - Flap Track Assembly | HZ-FT-99 | Disposition | Scrap Yard |
| TA-8840 - Wind Tunnel Scaled Model | HZ-WT-SM2 | Fabricated | Machining Shop |
MSA Renewal Note
Procurement wants to lock in 2026 rates for the MSA renewal. We need to present our software licensing cost increases.
Created by Maria Gomez • July 10, 2026
Export Control Audit
Horizon's compliance team requested an audit of our secure file transfer protocols for the military variant of the winglet project.
Created by Maria Gomez • July 17, 2026
Quarterly Review Summary
Dr. Chen is very happy with the FEA turnaround times. Wants a quote to add thermal analysis on the avionics bay.
Created by Maria Gomez • July 1, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Horizon_MSA_Countersigned.pdf | 4.5 MB | Dec 10, 2025 | |
| AS9100_Supplier_Cert.pdf | 1.2 MB | Jan 5, 2026 | |
| ITAR_TCP_Horizon.pdf | 0.8 MB | Aug 1, 2026 |
C
Contacts
| Name | Account | Title | Specialty | Phone | Owner |
|---|---|---|---|---|---|
| Dr. Robert Chen | Horizon Aerospace | Chief Engineer | Structural Analysis | 555-4012 | Maria Gomez |
| Tom Higgins | Horizon Aerospace | Program Manager | Systems Engineering | 555-4015 | Maria Gomez |
| Linda Brooks | Titan Defense | VP of Engineering | Propulsion | 555-9099 | Alex Rivera |
| Dave Martin | Delta Wing Corp | Lead Test Engineer | Flight Dynamics | 555-3205 | Sam Patel |
| Jane Doe | Horizon Aerospace | Procurement Spec | None | 555-4088 | Maria Gomez |
C
Contact
Dr. Robert Chen
Details
Notes
Files
Contact Information
Contact OwnerMaria Gomez✎
Phone555-4012✎
Mobile555-4019✎
Contact RoleTechnical Decision Maker✎
Technical & Security Profile
Engineering SpecialtyStructural Analysis✎
ITAR ClearedYes - US Citizen✎
Primary CAD ToolCATIA V5✎
Signature AuthorityTechnical SOWs Only✎
Secure File Transfer PrefDoD SAFE / GCC High✎
Marketing Opt-InTechnical Webinars Only✎
Model Preferences
Dr. Chen prefers all FEA results delivered in raw Abaqus .odb format along with the PDF report.
Created by Maria Gomez • Jan 10, 2026
Signature Authority
He can approve technical SOWs, but Jane Doe must sign the commercial POs.
Created by Maria Gomez • Jan 11, 2026
Vacation Alert
Dr. Chen is out of office the first week of September. Route CDR approvals to Mike Vance.
Created by Maria Gomez • Aug 1, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Chen_ITAR_Clearance.pdf | 0.5 MB | Dec 10, 2025 | |
| Technical_SOW_Template.pdf | 1.0 MB | Jan 12, 2026 | |
| PDR_Signoff_Signed.pdf | 1.4 MB | Feb 1, 2026 |
O
Opportunities
| Opportunity Name | Account Name | Amount | Stage | Engagement Type | Owner |
|---|---|---|---|---|---|
| Horizon - Landing Gear Stress Test | Horizon Aerospace | $85,500 | Negotiation | Fixed Price SOW | Maria Gomez |
| Titan - UAV Wing Optimization | Titan Defense | $145,000 | Proposal | Time & Materials | Alex Rivera |
| Delta - Nacelle Acoustic Mod | Delta Wing Corp | $60,000 | Discovery | Fixed Price SOW | Sam Patel |
| Evergreen - Custom Interior STC | Global Airframes | $210,000 | Closed Won | Retainer | Alex Rivera |
| Orbit - Thermal Shield CFD | Orbit Technologies | $340,000 | Proposal | Fixed Price SOW | Maria Gomez |
O
Opportunity
Horizon - Landing Gear Stress Test
Discovery
Technical Scoping
Proposal Sent
Negotiation
Closed Won
Details
Line Items
Notes
Files
Bid Information
Opportunity NameHorizon - Landing Gear Stress Test✎
Proposal Amount$85,500✎
Probability75%✎
StageNegotiation✎
Opportunity OwnerMaria Gomez✎
Close DateAug 30, 2026✎
Engagement TypeFixed Price SOW✎
Lead SourceExisting Account✎
Target Margin35%✎
Primary CompetitorIn-House Team✎
Technical Scope & Execution
Target Aircraft PlatformCommercial Rotorcraft✎
Core DisciplineStructural Analysis✎
Deliverables LevelFinal Report & Native DB✎
Required MilestonesPDR, CDR✎
Testing Phase RequiredVirtual Simulation Only✎
Facility ClearanceUnclassified✎
Est. Engineering Hours350 Hrs✎
Computing Resources ReqStandard Cluster✎
Material ProcurementNone✎
Subcontracting NeededNo✎
Export Control LevelEAR99✎
QA Review TierStandard Peer Review✎
P Line Items (Service Scope)
| Service Name | Role Type | Estimated Hrs | Bill Rate | Total Price | Discipline |
|---|---|---|---|---|---|
| Senior Stress Engineer | Lead Engineer | 200 | $180.00 | $36,000.00 | Structural |
| Finite Element Analyst | Analyst | 120 | $150.00 | $18,000.00 | Structural |
| Technical Writer (SOW Docs) | Support | 30 | $100.00 | $3,000.00 | Admin |
| Fixed Price FEA Setup Fee | Lump Sum | - | - | $28,500.00 | Infrastructure |
Discount Request
Dr. Chen asked if we can drop the price to $80,000 flat. I told him we could if they reduce the scope of the final report to just an executive summary and native files.
Created by Maria Gomez • Aug 2, 2026
Resource Availability
Confirmed with Operations that we have a Senior Stress Engineer rolling off the Delta project next week to take this on.
Created by Maria Gomez • July 25, 2026
Scoping Findings
The existing landing gear CAD model is poorly surfaced. We will need to allocate 20 hours just to clean up the geometry before meshing.
Created by Maria Gomez • July 20, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Horizon_LG_Proposal_v2.pdf | 1.8 MB | Aug 1, 2026 | |
| CAD_STEP_File_Drop.zip | Archive | 14.5 MB | July 20, 2026 |
| Load_Cases_Matrix.xlsx | Spreadsheet | 0.4 MB | July 20, 2026 |
C
Campaigns
| Campaign Name | Type | Status | Start Date | Budget | Owner |
|---|---|---|---|---|---|
| Q3 Defense Sector Outreach | Email Blast | In Progress | Aug 1, 2026 | $1,500 | Marketing Dept |
| Aerospace Tech Expo 2026 | Trade Show | Planned | Oct 15, 2026 | $15,000 | Marketing Dept |
| Webinar: Intro to Nonlinear FEA | Webinar | Completed | Mar 1, 2026 | $3,200 | Marketing Dept |
| Whitepaper: Composite Failure Modes | Direct Mail | In Progress | July 15, 2026 | $500 | Alex Rivera |
| Client Referral Program 2026 | Referral Program | In Progress | Jan 1, 2026 | $5,000 | Marketing Dept |
C
Campaign
Q3 Defense Sector Outreach
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameQ3 Defense Sector Outreach✎
TypeEmail Blast✎
StatusIn Progress✎
Target Service LineITAR Compliant FEA✎
Campaign OwnerMarketing Dept✎
Start DateAug 1, 2026✎
End DateOct 31, 2026✎
Target AudienceDefense Contractors✎
Performance Metrics
Budgeted Cost$1,500✎
Actual Cost$450✎
Expected Response Rate5%✎
Invitations Sent450 Emails✎
Opportunities Generated2✎
Pipeline Value$145,000✎
| Name | Company | Status | Response Date |
|---|---|---|---|
| Linda Brooks | Titan Defense | Responded | Aug 2, 2026 |
| Dr. Robert Chen | Horizon Aerospace | Sent | Aug 1, 2026 |
| Sarah Jenkins | AeroSystems Inc | Opened | Aug 3, 2026 |
| Dave Martin | Delta Wing Corp | Opened | Aug 1, 2026 |
| Mark Roberts | Titan Defense | Sent | Aug 1, 2026 |
Messaging Strategy
Highlighting our new CMMC Level 2 compliance and 100% US-personnel guarantee for ITAR projects.
Created by Marketing Dept • July 20, 2026
A/B Testing
Subject line A (Secure FEA Offloading) outperformed Subject line B (ITAR Engineering Services) by 8% open rate.
Created by Marketing Dept • Aug 2, 2026
Sales Follow-up
Reps need to call all 'Responded' members within 24 hours to schedule capability briefs.
Created by Marketing Dept • Aug 1, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Defense_Outreach_Graphic.png | Image | 2.1 MB | July 15, 2026 |
| Email_Copy_Drafts.docx | Document | 0.1 MB | July 10, 2026 |
| Defense_Target_List_Q3.csv | Data | 0.5 MB | July 30, 2026 |
P
Projects
| Project Name | Account | Phase | Technical Lead | Target Completion | Health |
|---|---|---|---|---|---|
| PRJ-9901 - Winglet Redesign | Horizon Aerospace | PDR | David Klein | Dec 1, 2026 | On Track |
| PRJ-9850 - Avionics Bay Thermal | Horizon Aerospace | Testing | Sarah Lin | Aug 15, 2026 | At Risk |
| PRJ-9822 - Flap Actuator Fatigue | Delta Wing Corp | Closure | Mike Vance | July 30, 2026 | On Track |
| PRJ-9710 - Seat Track Structural | Global Airframes | CDR | David Klein | Sep 10, 2026 | On Track |
| PRJ-9600 - Cargo Door Hinge Eval | Horizon Aerospace | Initiation | Sarah Lin | Nov 1, 2026 | On Track |
P
Project
PRJ-9901 - Winglet Redesign
Initiation
PDR (Prelim Design)
CDR (Critical Design)
Testing/Analysis
Closure
Details
Notes
Files
Project Overview
Project NamePRJ-9901 - Winglet Redesign✎
Technical LeadDavid Klein✎
PhasePDR✎
PriorityHigh✎
Project Owner (PM)Maria Gomez✎
Start DateFeb 1, 2026✎
Target CompletionDec 1, 2026✎
Project TypeStructural Modification✎
ITAR StatusNot Restricted (EAR99)✎
Overall HealthOn Track✎
Engineering Parameters
Primary Software ToolAbaqus Standard✎
Compute Node AllocationHigh-Perf Cluster (32 Core)✎
Material ClassCarbon Fiber Composite✎
Regulatory FrameworkFAA Part 25 (Transport)✎
Configuration BaselineRev B Locked✎
Earned Value (CPI)0.98✎
Est. Hours Remaining145 Hrs✎
FEA/CFD StatusMesh Generation✎
Prototype RequiredYes - Scaled Coupon✎
Subcontractor StatusNone Active✎
Meshing Issue
The trailing edge geometry supplied by Horizon has self-intersecting surfaces. David is manually repairing the CAD before we can generate the tet mesh.
Created by David Klein • Aug 2, 2026
PDR Prep
Preliminary Design Review is scheduled for next Thursday. Need to ensure the load cases match the FAA Part 25 gust load requirements precisely.
Created by Maria Gomez • July 28, 2026
Compute Cluster Queuing
Requested priority queue on the HPC cluster for this weekend to run the explicit impact simulations.
Created by David Klein • July 25, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| PRJ9901_Requirements_Trace.xlsx | Spreadsheet | 0.6 MB | Feb 15, 2026 |
| Trailing_Edge_Geo_Fix.stp | CAD | 22.1 MB | Aug 2, 2026 |
| PDR_Slide_Deck_Draft.pptx | Presentation | 8.5 MB | Aug 1, 2026 |
C
Certifications
| Certification ID | Authority | Account | Current Status | Expected Approval | Owner |
|---|---|---|---|---|---|
| CERT-2044 - FAA STC Mod | FAA (Part 25) | Horizon Aerospace | FAA Review | Oct 15, 2026 | Compliance Team |
| CERT-2030 - EASA Validation | EASA | Horizon Aerospace | Submitted | Dec 1, 2026 | Compliance Team |
| CERT-2060 - AS9100 Surveillance | Third Party Registrar | Internal | Preparation | Sep 5, 2026 | Quality Dept |
| CERT-2075 - PMA Application | FAA (Part 21) | Titan Defense | DER Signoff | Aug 30, 2026 | Compliance Team |
| CERT-2088 - DoD Cyber CMMC | DoD Auditor | Internal | Preparation | Nov 15, 2026 | IT Security |
C
Certification
CERT-2044 - FAA STC Mod
Preparation
Submitted
FAA Review
DER Signoff
Approved
Details
Notes
Files
Certification Details
Certification NameCERT-2044 - FAA STC Mod✎
AuthorityFAA (Part 25)✎
Application PhaseStage 3 - Compliance✎
CriticalityFlight Critical✎
Certification OwnerCompliance Team✎
Submission DateJune 1, 2026✎
Expected ApprovalOct 15, 2026✎
Compliance Standard14 CFR 25.571✎
Audit FrequencyOne-Time (STC)✎
Current StatusFAA Review✎
Technical Justification & Auditing
DER DesigneeJohn Miller (Structures)✎
Test Report IDTR-9901-A✎
Design Data Prov.Master Drawing List✎
Structural ValidationAnalysis + Test (A+T)✎
Safety AssessmentFHA Completed✎
Export JurisdictionCommerce (EAR)✎
Non-Conformance Rep.0 Active✎
Action Items Open2✎
Auditor/ACO NameSeattle ACO Branch✎
Next Audit DateN/A✎
FAA Question on Material
The ACO rep asked for clarification on the thermal degradation curve of the composite matrix. We need to upload the material spec sheet from the supplier.
Created by Compliance Team • Aug 2, 2026
DER Availability
John Miller confirmed he can sign off on the 8110-3 form next Tuesday once the FEA report is finalized.
Created by Compliance Team • July 25, 2026
Submission Confirmation
Project Specific Certification Plan (PSCP) was successfully submitted to the portal.
Created by Compliance Team • June 1, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| FAA_Form_8110-3_Draft.pdf | 0.3 MB | Aug 1, 2026 | |
| Compliance_Checklist.xlsx | Spreadsheet | 0.1 MB | July 15, 2026 |
| PSCP_Submitted_Copy.pdf | 4.2 MB | June 1, 2026 |
T
Test Articles
| Article Name | Part Number | Account | Lifecycle Stage | Location | Owner |
|---|---|---|---|---|---|
| TA-8821 - Composite Wing Spar | HZ-WS-001 | Horizon Aerospace | Active Testing | Lab 3 - MTS Rig | Test Dept |
| TA-8822 - Landing Gear Trunnion | HZ-LG-404 | Horizon Aerospace | Pre-Test Insp | NDT Facility | Test Dept |
| TA-8850 - Radome Coupon Pack | DW-RD-C1 | Delta Wing Corp | Post-Test Insp | Storage Bin B | Test Dept |
| TA-8790 - Flap Track Assembly | HZ-FT-99 | Horizon Aerospace | Disposition | Scrap Yard | Test Dept |
| TA-8901 - Hypersonic Nose Cone | NV-NC-001 | Nova Propulsion | Fabricated | Secure Vault 1 | Test Dept |
T
Test Article
TA-8821 - Composite Wing Spar
Fabricated
Pre-Test Insp
Active Testing
Post-Test Insp
Disposition
Details
Notes
Files
Article Identity
Article NameTA-8821 - Composite Wing Spar✎
Part NumberHZ-WS-001✎
Revision LevelRev B✎
Current LocationLab 3 - MTS Rig✎
Article OwnerTest Dept✎
Manufacturing DateJuly 10, 2026✎
Article TypeFull-Scale Component✎
Lifecycle StageActive Testing✎
Asset Value$15,000✎
Storage RequirementClimate Controlled✎
Testing Parameters & Status
Material Comp.Carbon/Epoxy Prepreg✎
Primary Test MethodStatic Ultimate Load✎
Sensors Installed45 Strain Gauges✎
Maximum Load Limit12,500 lbf✎
Calibration StatusValid (Expires Nov)✎
Destructive Testing?Yes - Test to Failure✎
NDT MethodUltrasonic C-Scan✎
Inspection StandardASTM D3039✎
Discrepancy Log0 Open Findings✎
DispositionPending Test Completion✎
Strain Gauge Bonding
Gauges 12 and 14 showed anomalous readings during the 10% limit load check. Tech re-bonded them and verified calibration.
Created by Test Dept • Aug 2, 2026
Pre-Test Ultrasonic
C-Scan showed zero delamination or voids originating from the manufacturing process. Article cleared for limit load testing.
Created by Test Dept • July 25, 2026
Receiving Inspection
Crate arrived with minor exterior damage, but the spar was secured well. No visible damage to the composite matrix.
Created by Test Dept • July 15, 2026
📄 Files
| File Name | Type | Size | Uploaded |
|---|---|---|---|
| Strain_Gauge_Map.pdf | 1.2 MB | Aug 1, 2026 | |
| C-Scan_Results.png | Image | 4.1 MB | July 25, 2026 |
| CoC_Material_Cert.pdf | 0.5 MB | July 15, 2026 |


