Acoustical engineering requires precise tracking of sound isolation performance, environmental noise studies, and vibration analysis. This CRM template is built specifically for acoustic design and noise control consulting firms. Organize your field tests, track compliance metrics, and manage design recommendations all in one place.
Get this free template installed in Salesforce in one day.
Book a free one-hour onboarding session to get started.
Book a free one-hour onboarding session to get started.
Leads
Track inquiries for noise control and acoustic design. Accounts
Manage developers, contractors, and municipalities. Contacts
Organize project managers and facility planners. Opportunities
Monitor consulting contracts and testing proposals. Campaigns
Coordinate webinars on noise regulations and STC standards. Projects
Oversee active design engagements and field studies. Acoustic Surveys
Track field measurements and vibration tests. Design Recommendations
Manage proposed treatments and silencer specs.Lead
Marcus Wright - Summit Development
New
Contacted
Qualified
Pending RFP
Converted
Details
Notes
Files
Primary Information
First NameMarcus✎
Last NameWright✎
TitleProject Director✎
Lead Status
Contacted
✎
Project Category
Sound Isolation
✎
Lead OwnerDavid Miller✎
Phone555-102-3948✎
Construction Method
Design-Build
✎
Desired Schedule
Immediate Review
✎
Acoustic Requirements
Primary Noise Concern
Speech Privacy
✎
Primary Discipline
Architectural Acoustics
✎
Application Type
Corporate Office
✎
Desired STC Target
STC 50 (Very Private)
✎
Budget Status
Evaluating Cost
✎
Priority Rating
High
✎
Current NC Level
NC-45 (Too Loud)
✎
Regulation Standard
Client Private Spec
✎
Expected Sq Footage
50,000 - 100,000 sqft
✎
Lead Source
Referral
✎
City/State/ZipAustin, TX 78701✎
Initial Meeting - Privacy Concerns
Met with Marcus regarding the new corporate headquarters. They are highly concerned about speech privacy between executive suites. Requested we review partition assemblies to guarantee STC 50.
Budget Clarification
Confirmed they are currently evaluating the cost difference between sound masking systems and heavier physical construction. We will present a comparative analysis.
Design-Build Strategy
Client is opting for a Design-Build delivery method. We will interface directly with the lead interior designer.
Account
Apex General Contractors
Details
Contacts
Opportunities
Projects
Acoustic Surveys
Recommendations
Notes
Files
Primary Information
Account NameApex General Contractors✎
Account Type
Contractor
✎
Industry Sector
Private Developer
✎
Billing CityChicago✎
Account OwnerLisa Chen✎
Phone555-882-9911✎
Websitewww.apex-gc-builds.com✎
Consulting Business Details
Client Classification
Tier 1 - Strategic
✎
Payment Terms
Net 45
✎
Delivery Method
Design-Build
✎
Active Projects Vol
$10M - $50M
✎
Preferred Contract Type
Lump Sum (Fixed Price)
✎
Acoustic Standards
High - Exceeds Code
✎
Active Status
Active Customer
✎
Quarterly Review Meeting
Met with Frank to review the ongoing Riverfront project. They are happy with our turnaround times on acoustic modeling and want us to bid on the new Medical Center.
Insurance Requirement Update
Apex has updated their consultant requirements. We need to provide a new Certificate of Insurance (COI) with $2M professional liability coverage before the next contract signing.
Field Testing Access
Apex agreed to allow our technicians after-hours access for the ambient noise survey to avoid construction disruption.
Contact
Sarah Connor
Details
Notes
Files
Contact Information
First NameSarah✎
Last NameConnor✎
TitleDesign Director✎
Contact Role
Design Lead
✎
Decision Authority
Influencer
✎
Project Phase Involvement
Schematic Design (SD)
✎
Contact OwnerDavid Miller✎
Phone555-773-2288✎
Mobile555-773-9999✎
Communication Pref
Email
✎
Discipline Preference
Architectural Acoustics
✎
Approval Frequency
Weekly
✎
Acoustic Review Notes
Sarah wants the structure for the new tower to minimize footfall noise transmission. We need to evaluate IIC (Impact Insulation Class) ratings for the proposed floor/ceiling assemblies.
Sustainability Requirements
She stressed the importance of achieving LEED V4 Acoustic Performance credits for the tenant spaces.
Lunch & Learn Attendee
Sarah attended our firm's Lunch & Learn on sound masking technologies. She is highly interested in using it for their open-plan office layouts.
Opportunity
Downtown Tower Acoustic Design
Discovery
Proposal
Negotiation
Closed
Details
Line Items
Notes
Files
Contract Information
Opportunity NameDowntown Tower Acoustic Design✎
Type
New Business
✎
Stage
Negotiation
✎
Service Type
Full Acoustic Design
✎
Opportunity OwnerLisa Chen✎
Close Date10/15/2026✎
Amount$45,000✎
Probability (%)80%✎
Next StepFinalize testing allowance✎
Contract Type
Lump Sum
✎
Consulting Scope Specifications
Project Scope
Core and Shell Base
✎
Design Phase
Concept/SD
✎
Building Classification
High-Rise Commercial
✎
Acoustic Complexity
High
✎
BIM Requirement
Revit Review Only
✎
Lead Source
Account Penetration
✎
Environmental Standard
LEED V4 Acoustic
✎
Delivery Method
Design-Build
✎
Expected Testing Hours
40-80 Hours
✎
Quality Assurance
Third Party Field Test
✎
Competitor
Cerami & Associates
✎
Bid Status
Shortlisted
✎
Legal Redline Status
Apex's legal counsel returned our redlines on the limitation of liability clause. We are pushing for a hard cap at our fee ($45k) rather than full project value, as we do not supply construction materials.
Scope Clarification
Updated the proposal to clarify that field testing covers up to 10 distinct demising walls. Any further STC testing will require a change order.
Shortlist Notification
Frank called to let us know we made the final two. Our experience with high-rise core vibration isolation gave us the edge over Cerami.
Campaign
LEED V4 Acoustics Webinar
Details
Campaign Members
Notes
Files
Campaign Details
Campaign NameLEED V4 Acoustics Webinar✎
Type
Webinar
✎
Status
In Progress
✎
Is Active
Yes
✎
Campaign OwnerMarketing Team✎
Start Date10/01/2026✎
End Date10/01/2026✎
Budget Allocated
$2,500
✎
Targeting & Performance
Target Audience
Commercial Real Estate
✎
Expected Response
12%
✎
Campaign Objective
Lead Generation (New Bids)
✎
Actual Cost$1,150✎
Outreach Method
Digital / Email Invites
✎
Region Focus
National / Global
✎
Presentation Dry Run
The acoustic principles dry run went well. Need to add a slide breaking down the difference between STC and NIC for the field testing segment.
Target List Pulled
Pulled all contacts and leads in the commercial sector with active or past LEED projects. Sent the first email blast today.
AIA CEU Credit Approval
We received approval from AIA to offer 1.0 Learning Unit (LU) for attendees of this webinar. This should drive up registration.
Project
PRJ-2026-001 (Riverfront Noise Control)
Design
Permitting
Construction Admin
Field Testing
Closeout
Details
Notes
Files
Project Overview
Project NamePRJ-2026-001 (Riverfront Noise Control)✎
Phase
Field Testing
✎
Delivery Model
Design-Build
✎
Primary Service
Compliance Testing (STC/IIC)
✎
Project OwnerLisa Chen✎
Start Date01/15/2026✎
Estimated Completion12/01/2027✎
Current Status
Active - Testing
✎
CAD Standard
Revit 3D Modeling
✎
Contract Type
Lump Sum
✎
Consulting Specifics & Progress
Process Type
Post-Construction Verification
✎
Simulation Used
INSUL Transmission Loss
✎
Client Type
Commercial Developer
✎
Priority
High
✎
Site Address45 Riverfront Ave✎
Target Improvement
Achieve STC 50
✎
Shift Schedule Base
After-Hours Testing Only
✎
Review Cycle
Milestone Only
✎
Implementation Status
Partitions Completed
✎
Operational Risk
Medium - Schedule Delay
✎
Partition Sealing Issue
Coordinated with Apex on the demising walls on Level 3. Drywall contractor failed to use acoustical caulk at the base track. If tested now, it will fail the STC 50 requirement. Notifying GC to remediate before testing.
Submittal Review Complete
Finished reviewing the batch 4 HVAC silencer shop drawings. Marked "Approved as Noted". Required heavier gauge casing to prevent breakout noise in the ceiling plenum.
Equipment Pad Pour
Concrete contractor has completed the floating inertia pad on the roof. Spring isolators are set. We are ready to receive the main chiller units next week.
Acoustic Survey
SRV-1045 (Vibration Analysis)
Scheduled
Data Collection
Pending Remediation
Passed/Complete
Report Filed
Details
Notes
Files
Primary Survey Details
Survey IDSRV-1045✎
Survey Category
Vibration Analysis
✎
Equipment Used
B&K Type 2250 Analyzer
✎
Status
Pending Remediation
✎
Target Area
Level 3 Slab (Under Chiller)
✎
Survey OwnerDavid Miller✎
Request Date05/10/2026✎
Field Data Collection
Complete
✎
Approval Status
Pending Corrective Action
✎
Due Date09/01/2026✎
Software Platform
B&K Pulse
✎
Testing Metrics & Findings
Measured RT60N/A✎
Ambient Noise (NC)NC-35 (Background)✎
Exterior Traffic (dBA)N/A✎
Source Sound Power92 dBA (Chiller Unit)✎
Primary Measurement
Velocity (in/sec)
✎
Vibration Criterion (VC)
Failing VC-B Limit
✎
Identified Path
Structure-borne Flanking
✎
Transmission Loss (TL)N/A✎
Remediation Req
Adjust Spring Isolators
✎
Code Compliance
Failing Design Spec
✎
Isolator Short-Circuit
Field analysis indicates the chiller's vibration is transmitting into the Level 3 slab. Discovered that the mechanical contractor installed rigid electrical conduit directly to the frame, short-circuiting the spring isolators.
Client Notification Complete
The GC reviewed the field report. They agreed to have the electrical contractor replace the rigid conduit with flexible conduit loops to decouple the vibration path.
Accelerometer Data Collection Complete
Finished the vibration logging session while the chiller was running at 100% capacity. Capturing peak velocities. Uploading to Pulse for 1/3 octave band analysis.
Design Recommendation
REC-0092 - Partition Isolation Clip Detail
Drafted
Under Review
Pending Integrator
Approved by Client
Closed/Implemented
Details
Notes
Files
Recommendation Information
Recommendation IDREC-0092✎
Submittal Type
Design Clarification (ASK)
✎
Discipline
Architectural Acoustics
✎
Target AssemblyDemising Wall (Type A4)✎
Lead ReviewerDavid Miller✎
Date Submitted08/01/2026✎
Due Date08/05/2026✎
Approval DatePending✎
Action Taken
Pending Client Approval
✎
Current Status
Under Review
✎
Impact & Detail
Proposed MaterialResilient Sound Isolation Clips (RSIC-1)✎
ManufacturerPAC International✎
STC Rating Added+12 STC Points✎
NRC Rating AddedN/A✎
Impact Level
Material Addition Required
✎
Cost Impact
Additive Change Order
✎
Schedule Impact
None (If resolved by 8/5)
✎
Aesthetic Impact
Invisible (In-wall)
✎
Constructability Issue
Furring Channel Spacing
✎
Delivery Method
Procore Integration
✎
Initial Assessment
The GC submitted a request regarding the demising walls on Level 3. The current assembly only achieves STC 42 on paper. To hit the required STC 50 for executive privacy, we are recommending the addition of RSIC-1 isolation clips and hat channel before the drywall is hung.
Coordination Call
Called the architect. They confirmed the wall thickness can accommodate the extra 1-5/8" required for the clips and channel without impacting ADA hallway clearances. I will draft an acoustic sketch (ASK-012) to formalize this change.
Drafting Sketch
Sketch ASK-012 is with the CAD team. It will update the typical wall section details. Should be ready for sign-off by tomorrow afternoon.


